CN109677452A - 基于多重锁闭的车车通信轨旁设备资源管理方法 - Google Patents

基于多重锁闭的车车通信轨旁设备资源管理方法 Download PDF

Info

Publication number
CN109677452A
CN109677452A CN201811353168.5A CN201811353168A CN109677452A CN 109677452 A CN109677452 A CN 109677452A CN 201811353168 A CN201811353168 A CN 201811353168A CN 109677452 A CN109677452 A CN 109677452A
Authority
CN
China
Prior art keywords
locking
switch
train
track switch
order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811353168.5A
Other languages
English (en)
Inventor
胡顺定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhonghe Technology Co Ltd
Unittec Co Ltd
Original Assignee
Zhejiang Zhonghe Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhonghe Technology Co Ltd filed Critical Zhejiang Zhonghe Technology Co Ltd
Priority to CN201811353168.5A priority Critical patent/CN109677452A/zh
Publication of CN109677452A publication Critical patent/CN109677452A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L19/00Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/08Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only
    • B61L23/14Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only automatically operated
    • B61L23/16Track circuits specially adapted for section blocking

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

本发明公开了一种基于多重锁闭的车车通信轨旁设备资源管理方法,包括如下步骤:首先,当车载设备检测移动授权延伸到道岔时,若检测到道岔锁闭位置与本列车的运行计划相匹配,则向OC发送道岔锁闭命令;然后,OC在接收到道岔锁闭命令时,若当前已有列车锁闭道岔,则在已有锁闭上再叠加一道锁闭命令,并向车载设备反馈道岔锁闭完成;最后,车载设备在接收到道岔锁闭完成应答后,允许移动授权延伸过道岔。本发明采用多重锁闭机制,多车共享资源,以实现车与车的紧追踪,并通过操作命令和锁闭命令的顺序互斥执行策略,确保列车可行驶过轨旁设备时,轨旁设备保持安全状态,可操作时,则不再将资源授权给另一车载设备,保证安全。

Description

基于多重锁闭的车车通信轨旁设备资源管理方法
技术领域
本发明涉及轨道交通技术领域,具体涉及车车通信技术。
背景技术
车车通信的CBTC系统,车载设备需要获取道岔资源并锁闭道岔之后,才能将自身的移动授权延伸过道岔。
目前的实现方案中,一般由OC(Object Controller,中文翻译为目标控制器或对象控制器)对道岔资源进行登记,由车载设备对道岔资源进行征用。现有方案一个道岔仅允许一辆列车进行资源锁闭。
由于一个道岔仅允许一辆列车进行资源锁闭,则在两车紧追踪时,仅在前车释放了道岔之后,后车可以将移动授权延伸过道岔。在传统基于前车为零速的CBTC移动授权计算方法下,该锁闭方式对系统性能无影响。而车车通信一般采用前车不为零速的情况,则后车的移动授权将越过前车的车尾,进入前车车身甚至车前的领域。因此一车一锁的方式,显然无法满足车车通信的追踪间隔的要求。
如图1所示,受限于道岔,列车移动授权无法延伸,导致车速降低,追踪间隔增加。
发明内容
本发明所要解决的技术问题就是提供一种基于多重锁闭的车车通信轨旁设备资源管理方法,实现车与车的紧追踪,满足车车通信的追踪间隔要求。
为解决上述技术问题,本发明采用如下技术方案:基于多重锁闭的车车通信轨旁设备资源管理方法,包括如下步骤:
首先,当车载设备检测移动授权延伸到道岔时,若检测到道岔锁闭位置与本列车的运行计划相匹配,则向OC发送道岔锁闭命令;
然后,OC在接收到道岔锁闭命令时,若当前已有列车锁闭道岔,则在已有锁闭上再叠加一道锁闭命令,并向车载设备反馈道岔锁闭完成;
最后,车载设备在接收到道岔锁闭完成应答后,允许移动授权延伸过道岔。
进一步的,仅当被一列车锁闭道岔时,才允许该列车解锁并操作道岔。
进一步的,为避免操作中道岔被锁闭,OC应顺序执行道岔锁闭和操作命令,若道岔已被多于一列车锁闭,则禁止道岔操作;若道岔已被操作,则反馈锁闭失败。
本发明采用多重锁闭机制,多车共享资源,以实现车与车的紧追踪。具有如下有益效果:
1、即使当前已有列车锁闭道岔,也同样接收锁闭命令,通过增加道岔多重锁闭机制,确保前后紧追踪的两车可不受干扰的运行。
2、通过操作命令和锁闭命令的顺序互斥执行策略,确保列车可行驶过轨旁设备时,轨旁设备保持安全状态。可操作时,则不再将资源授权给另一车载设备,保证安全。
本发明的具体技术方案及其有益效果将会在下面的具体实施方式中结合附图进行详细的说明。
附图说明
下面结合附图和具体实施方式对本发明作进一步描述:
图1是现有技术中一车一锁的方式示意图;
图2是本发明多重锁闭机制示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。以下对至少一个示例性实施例的描述实际上仅仅是说明性的,决不作为对本发明及其应用或使用的任何限制。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
参考图2所示,基于多重锁闭的车车通信轨旁设备资源管理方法,如下步骤:
首先,当车载设备检测移动授权延伸到道岔时,若检测到道岔锁闭位置与本列车的运行计划相匹配,即则向OC发送道岔锁闭命令,尝试锁闭道岔,OC反馈完成锁闭后,允许移动授权向前延伸;
然后,OC在接收到道岔锁闭命令时,即使当前已有列车锁闭道岔,也同样接收锁闭命令,在已有锁闭上再叠加一道锁闭命令,并向车载设备反馈道岔锁闭完成;
最后,车载设备在接收到道岔锁闭完成应答后,允许移动授权延伸过道岔。
为保证安全,仅当被单一列车锁闭道岔时,才允许该列车解锁并操作道岔。
如图2所示,当道岔被两列车同时锁闭时,后车即可紧追踪前车。
因此,本发明通过增加道岔双重锁闭机制,实现车与车的紧追踪,满足车车通信的追踪间隔要求,确保前后紧追踪的两车可不受干扰的运行。
为保证安全,避免操作中道岔被锁闭,OC应顺序执行道岔二次锁闭和操作命令。即当命令序列里同时存在道岔锁闭和操作命令时,依顺序执行命令。即当先接受到二次锁闭命令,先执行二次锁闭,并拒绝道岔操作命令。若先接受操作命令,则拒绝道岔二次锁闭命令。车载设备则应该正确接收道岔已被自己锁闭时,才可延伸移动授权。通过操作命令和锁闭命令的顺序互斥执行策略,确保列车可行驶过轨旁设备时,轨旁设备保持安全状态。道岔操作时,则不再将资源授权给另一车载设备,保证安全。
类似的,本发明还可以用于库门、防淹门等设备的操作允许防护。当列车需要将移动授权延伸过库门、防淹门等设备前,需要先行锁闭这些设备,同样至少需要为两列车提供锁闭服务。而执行关闭操作之前,也应确定无列车锁闭这些资源。同样需要对操作命令和锁闭提供顺序互斥的执行策略。
除上述优选实施例外,本发明还有其他的实施方式,本领域技术人员可以根据本发明作出各种改变和变形,只要不脱离本发明的精神,均应属于本发明权利要求书中所定义的范围。

Claims (3)

1.基于多重锁闭的车车通信轨旁设备资源管理方法,其特征在于包括如下步骤:
首先,当车载设备检测移动授权延伸到道岔时,若检测到道岔锁闭位置与本列车的运行计划相匹配,则向OC发送道岔锁闭命令;
然后,OC在接收到道岔锁闭命令时,若当前已有列车锁闭道岔,则在已有锁闭上再叠加一道锁闭命令,并向车载设备反馈道岔锁闭完成;
最后,车载设备在接收到道岔锁闭完成应答后,允许移动授权延伸过道岔。
2.根据权利要求1所述的基于多重锁闭的车车通信轨旁设备资源管理方法,其特征在于:仅当被一列车锁闭道岔时,才允许该列车解锁并操作道岔。
3.根据权利要求1所述的基于多重锁闭的车车通信轨旁设备资源管理方法,其特征在于:为避免操作中道岔被锁闭,OC应顺序执行道岔锁闭和操作命令,若道岔已被多于一列车锁闭,则禁止道岔操作;若道岔已被操作,则反馈锁闭失败。
CN201811353168.5A 2018-11-14 2018-11-14 基于多重锁闭的车车通信轨旁设备资源管理方法 Pending CN109677452A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811353168.5A CN109677452A (zh) 2018-11-14 2018-11-14 基于多重锁闭的车车通信轨旁设备资源管理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811353168.5A CN109677452A (zh) 2018-11-14 2018-11-14 基于多重锁闭的车车通信轨旁设备资源管理方法

Publications (1)

Publication Number Publication Date
CN109677452A true CN109677452A (zh) 2019-04-26

Family

ID=66185425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811353168.5A Pending CN109677452A (zh) 2018-11-14 2018-11-14 基于多重锁闭的车车通信轨旁设备资源管理方法

Country Status (1)

Country Link
CN (1) CN109677452A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112319559A (zh) * 2020-10-12 2021-02-05 北京市轨道交通建设管理有限公司 列车停车方法及装置
CN113247056A (zh) * 2021-06-09 2021-08-13 交控科技股份有限公司 移动授权计算方法、装置、电子设备和存储介质
WO2021197320A1 (zh) * 2020-03-31 2021-10-07 比亚迪股份有限公司 道岔控制方法、装置和存储介质
CN113954908A (zh) * 2021-10-22 2022-01-21 湖南中车时代通信信号有限公司 一种磁浮道岔的控制方法、系统、电子设备及存储介质
CN114291135A (zh) * 2021-12-31 2022-04-08 卡斯柯信号有限公司 一种多确认机制的道岔安全控制方法、设备及介质

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101934807A (zh) * 2010-08-24 2011-01-05 北京交通大学 基于列车控制系统的移动授权计算方法
CN105101094A (zh) * 2015-09-17 2015-11-25 北京交通大学 列车运行控制系统
CN106394611A (zh) * 2016-08-31 2017-02-15 交控科技股份有限公司 一种道岔控制方法、装置及控制器
JP2017112832A (ja) * 2017-02-16 2017-06-22 株式会社東芝 列車制御システム
CN107284471A (zh) * 2017-05-18 2017-10-24 交控科技股份有限公司 一种基于车车通信的cbtc系统
CN107878505A (zh) * 2016-12-23 2018-04-06 比亚迪股份有限公司 路径控制方法及装置
CN107985351A (zh) * 2017-11-16 2018-05-04 交控科技股份有限公司 一种基于互联互通cbtc的移动授权处理方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101934807A (zh) * 2010-08-24 2011-01-05 北京交通大学 基于列车控制系统的移动授权计算方法
CN105101094A (zh) * 2015-09-17 2015-11-25 北京交通大学 列车运行控制系统
CN106394611A (zh) * 2016-08-31 2017-02-15 交控科技股份有限公司 一种道岔控制方法、装置及控制器
CN107878505A (zh) * 2016-12-23 2018-04-06 比亚迪股份有限公司 路径控制方法及装置
JP2017112832A (ja) * 2017-02-16 2017-06-22 株式会社東芝 列車制御システム
CN107284471A (zh) * 2017-05-18 2017-10-24 交控科技股份有限公司 一种基于车车通信的cbtc系统
CN107985351A (zh) * 2017-11-16 2018-05-04 交控科技股份有限公司 一种基于互联互通cbtc的移动授权处理方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021197320A1 (zh) * 2020-03-31 2021-10-07 比亚迪股份有限公司 道岔控制方法、装置和存储介质
CN112319559A (zh) * 2020-10-12 2021-02-05 北京市轨道交通建设管理有限公司 列车停车方法及装置
CN113247056A (zh) * 2021-06-09 2021-08-13 交控科技股份有限公司 移动授权计算方法、装置、电子设备和存储介质
CN113247056B (zh) * 2021-06-09 2021-11-12 交控科技股份有限公司 移动授权计算方法、装置、电子设备和存储介质
CN113954908A (zh) * 2021-10-22 2022-01-21 湖南中车时代通信信号有限公司 一种磁浮道岔的控制方法、系统、电子设备及存储介质
CN114291135A (zh) * 2021-12-31 2022-04-08 卡斯柯信号有限公司 一种多确认机制的道岔安全控制方法、设备及介质
CN114291135B (zh) * 2021-12-31 2023-08-25 卡斯柯信号有限公司 一种多确认机制的道岔安全控制方法、设备及介质

Similar Documents

Publication Publication Date Title
CN109677452A (zh) 基于多重锁闭的车车通信轨旁设备资源管理方法
CN109878556B (zh) 一种轨道交通资源的管理方法及装置
CN114275015B (zh) 一种基于资源管理的列车控制系统及控制方法
CN107685749A (zh) 一种基于车车通信的虚拟连挂小编组列车控制系统及方法
CN110104031A (zh) 一种基于车车通信的列控系统降级管理系统
CN106394610A (zh) 一种降级信号系统下的点式ato防护方法
CN105059329A (zh) 一种基于通信的列车控制系统下进路控制方法及相关设备
CN109625031A (zh) 简化轨道占用检测设备的非通信车运行方法和控制系统
CN111497896B (zh) 一种轨道交通道岔资源的管理方法
KR101745505B1 (ko) Ats의 차량간 통신기반 열차제어시스템을 위한 열차간 연결 토폴로지 무결성 관리 방법
EP4159583A1 (en) Movement authorization verification-based method for controlling train
CN105035126B (zh) 一种车载设备及列车通信系统
CN105128895A (zh) 一种计算机联锁方法及系统
CN110104023B (zh) 轨道交通道岔动作区域和侧冲区域管理方法与装置
CN109625032A (zh) 一种无轨道占用检测设备的非通信车运行方法和控制系统
CN105035120B (zh) 一种区域切换方法
CN114261433B (zh) 一种多功能的资源目标控制器
WO2022193679A1 (zh) 一种基于轨旁平台独立的多模列控系统的实现方法
CN113799854B (zh) 一种车地协同的列车走行路径资源管理与授权方法
CN113479241B (zh) 一种用于列车侧冲防护的方法及列车控制系统
KR20200057860A (ko) 배타적 선로자원 공유시스템
CN113954928B (zh) 一种适用于资源进路到联锁进路的列车交接方法
CN103786751A (zh) 一种城市轨道交通轨旁运控系统正线与车辆段一体化方法
CN113954929B (zh) 一种车车通信的降级列车进路管理方法及系统
CN106809253A (zh) 一种基于通信的分布式列车运行控制系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190426

RJ01 Rejection of invention patent application after publication