CN109658053A - A kind of power supply company's item data management system - Google Patents

A kind of power supply company's item data management system Download PDF

Info

Publication number
CN109658053A
CN109658053A CN201811472304.2A CN201811472304A CN109658053A CN 109658053 A CN109658053 A CN 109658053A CN 201811472304 A CN201811472304 A CN 201811472304A CN 109658053 A CN109658053 A CN 109658053A
Authority
CN
China
Prior art keywords
data
project
construction
layer
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811472304.2A
Other languages
Chinese (zh)
Inventor
齐金定
孙涛
单岩
司祎梅
薛松
郑少华
于振洪
孙静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811472304.2A priority Critical patent/CN109658053A/en
Publication of CN109658053A publication Critical patent/CN109658053A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/44Program or device authentication
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Abstract

The invention discloses a kind of power supply company's item data management systems, comprising: data Layer, supporting layer, application layer, access layer and service layer;It can be realized the unified supervision to sporadic development system, the system of data effective use is provided, multidimensional analysis to data integration is realized to reach and deep-cut the advanced practical of pick to data and monitor to the flattening of data under abnormality, and it is able to carry out timely early warning, build into the unified big data integration system of electric power enterprise, this has very long-range meaning for improving electric power enterprise to the synthesized competitiveness of the utilization efficiency of data and promotion enterprise.

Description

A kind of power supply company's item data management system
Technical field
The present invention relates to a kind of data management system, in particular to a kind of power supply company's item data management system.
Background technique
Current social demand for development power supply enterprise has higher power supply ability, power quality and the power grid in China Improvement project deepens continuously, these situations all fully expose the deficiency for having management mode, urgently needs to improve work Thread management mode improves engineering construction effect.For from the angle of electric power enterprise itself, the project characteristic usually participated in is Quantity is more, small, and the process of construction is comparatively laborious, and a power engineering generally requires the ability that cooperates with one another of multiple departments It smoothly completes.If none unified project management process of electric power enterprise, then its working efficiency will certainly be very low.
In addition, due to the expansion of Utilities Electric Co.'s business or the quickening of IT application process, original database volume or software Function cannot meet the needs, and then carry out the upgrading of software upgrading and Database Systems, because of the injustice of software and hardware development Weighing apparatus, complete upgrading is costly, so only part upgrades, and the performance of whole system is affected.
With the arrival of big data era, the data that power supply enterprise generates are with magnanimity, multi-source, isomery and growth rate It is fastly main feature.However information island is still formed between many operation systems, interdepartmental data sharing in enterprise Degree is not high, and production cannot utilize well with a large amount of real time data generated in management process.
Summary of the invention
In view of the above problems, the present invention provides a kind of power supply company's item data management system, can be realized to scattering The unified supervision of hair system provides the system of data effective use, realizes the multidimensional analysis to data integration to reach to data It deep-cuts the advanced practical of pick and the flattening of data under abnormality is monitored.
The embodiment of the present invention provides a kind of power supply company's item data management system, comprising:
Data Layer, for storing power supply company's basic data, business datum, file data and historical data;And receive support Data in data Layer are sent to application layer by supporting layer by the order for the called data that layer is sent;
Supporting layer is the interface that data Layer is connect with application layer data, receives the request of data of all pairs of data Layers of application layer, And read the data in data Layer in each database;The supporting layer also provides report management, MESSAGE EXCHANGE, system public pipe Reason, XML exchange, workflow management and the exchange of FTP report;
Application layer, for being interacted by access layer with system user, Xiang Suoshu application layer sends request command and obtains the data number of plies According to, and public information service management, core business system management, project scheduling management are carried out, and provide auxiliary system service;
Access layer logs in gate system for system user, receives the data command for the calling application layer that system user issues, leads to Cross verifying user name and password, the function and the corresponding function privilege of distribution and data permission of Lai Shixian application layer;
Service layer, the data for sending command calls application layer are supplied to system user;The system user includes: to undertake the construction of Institute, company leader and system maintenance personnel, management side, are ground at construction party in side.
Further, the data Layer, comprising:
Project database, for storing construction project data;Project data include it is multiple respectively with file data, component data and The associated foreign key field of historical data, establishes file data, component data and historical data and the logic of project data is closed System;
Document data bank, for storing picture file, archive file;At least one unique major key of each of them data and item Mesh number evidence is associated;
Component database, for storing tower line data, environment survey data;At least one is unique for each of them data Major key is associated with project data;
Knowledge data base, for storing steel tower and track data;At least one unique major key of each of them data and project Data are associated.
Further, the application layer, comprising:
Public information service subsystem sends maintenance request by the access layer for system user, realizes Content Management, matches It sets and issuing function;
Core business subsystem sends management request by the access layer for system user, according to the corresponding permission of user, The project data being related to is managed;
Project scheduling management subsystem, for system user by the access layer send monitoring request, realize access control and Data supervision;
Assistant subsystem sends inquiry request by the access layer for system user, realizes to component data, knowledge data Inquiry.
Further, the core business subsystem, comprising:
Data input and acquisition module, in construction project construction, the side of undertaking the construction of staff to be to construction site relevant information Typing;
Project management module, for making a report on item related information, audit relevant information and making an inspection tour project;
Project Exhibition module, for system user according to corresponding permission, the relevant plan of real time inspection project, progress, The displaying information of audit, risk assessment.
Further, the data input and acquisition module, comprising:
Project establishes submodule, examined on the spot using mobile terminal to scene for the side of undertaking the construction of personnel, substation, steel tower Scene carries out a selection operation, typing project initial information;
Project prepares submodule, for the typing project plan, risk assessment, safe early warning, auditing standards, acceptance criteria correlation letter Breath;
Project construction submodule, for, by mobile terminal, being based on GPS positioning function combination photo system in project construction, Carry out live shooting upload;
Hidden danger acquires submodule, for acquiring break rules and regulations in project construction safety zone trees, barrier, is made a report on by filling in data Function is made a report on, and adds the photo site of party's GPS positioning information and shooting, is uploaded to server.
Further, the hidden danger acquires submodule, is also used to finish when the side of undertaking the construction of carries out rectification, floor picture, Rectification information is filled in, server saves data is uploaded to.
Further, the project management module, comprising:
Project makes a report on submodule, makes a report on for the progress situation to current project;
Project audits submodule, and for comparing stage auditing standards according to construction speed: each project participant is to construction link It is audited after the completion;
Project makes an inspection tour submodule, is used for according to project visit program, and related personnel makes an inspection tour project, sends out during making an inspection tour Existing problem input system.
The beneficial effect of above-mentioned technical proposal provided in an embodiment of the present invention includes at least:
Above-mentioned a kind of power supply company's item data management system provided in an embodiment of the present invention, can be realized to sporadic development system Unified supervision, the system of data effective use is provided, realizes that multidimensional analysis to data integration deep-cuts pick to data to reach It is advanced practical and the flattening of data under abnormality is monitored, and be able to carry out timely early warning, construction is looked forward at electric power The unified big data integration system of industry, this competes the utilization efficiency of data and the comprehensive of promotion enterprise for improving electric power enterprise Power has very long-range meaning.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification It obtains it is clear that understand through the implementation of the invention.The objectives and other advantages of the invention can be by written explanation Specifically noted structure is achieved and obtained in book, claims and attached drawing.
Below by drawings and examples, technical scheme of the present invention will be described in further detail.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of structure chart of power supply company's item data management system provided in an embodiment of the present invention;
Fig. 2 is the structural block diagram of application layer provided in an embodiment of the present invention;
Fig. 3 is the structural block diagram of core business subsystem 22 provided in an embodiment of the present invention;
Fig. 4 is the structural block diagram of data input provided in an embodiment of the present invention and acquisition module 221;
Fig. 5 is the structural block diagram of project management module 222 provided in an embodiment of the present invention.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.
A kind of power supply company's item data management system provided in an embodiment of the present invention, one kind provided in an embodiment of the present invention Power supply company's item data management system, using service-oriented Technical Architecture (SOA Service Oriented Architecture), using the design pattern of widely accepted standard (such as XML and SOAP and JMS) and loose coupling, together When, Technical Architecture and module open standard based on SOA are beneficial to the extension of docking project data, and building one is easy to extend It is shown referring to Fig.1 with telescopic system comprising:
Data Layer, for storing power supply company's basic data, business datum, file data and historical data;And receive support Data in data Layer are sent to application layer by supporting layer by the order for the called data that layer is sent;
Supporting layer is the interface that data Layer is connect with application layer data, receives the request of data of all pairs of data Layers of application layer, And read the data in data Layer in each database;The supporting layer also provides report management, MESSAGE EXCHANGE, system public pipe Reason, XML exchange, workflow management and the exchange of FTP report;
Application layer, for being interacted by access layer with system user, Xiang Suoshu application layer sends request command and obtains the data number of plies According to, and public information service management, core business system management, project scheduling management are carried out, and provide auxiliary system service;
Access layer logs in gate system for system user, receives the data command for the calling application layer that system user issues, leads to Cross verifying user name and password, the function and the corresponding function privilege of distribution and data permission of Lai Shixian application layer;
Service layer, the data for sending command calls application layer are supplied to system user;The system user includes: to undertake the construction of Institute, company leader and system maintenance personnel, management side, are ground at construction party in side.
The system can carry out system tray from infrastructure layer, information resources layer, using supporting layer, application layer and service layer Building is set, and progressive, mutual support forms the overall framework of system;Construct core business system, public information service system The operation systems such as system, project scheduling management and auxiliary system are each ring of construction project in conjunction with personalized portals service window Section provides comprehensive process management.It can be realized the unified supervision to sporadic development system, provide data effective use is System realizes the multidimensional analysis to data integration to reach and deep-cut the advanced practical of pick to data and to data under abnormality Flattening monitoring, and it is able to carry out timely early warning, the big data integration system unified at electric power enterprise is built, this is for improving Electric power enterprise has very long-range meaning to the utilization efficiency of data and the synthesized competitiveness of promotion enterprise.
SOA framework in the present embodiment is Services Oriented Achitecture, is a component model, it is by application program Different function units (referred to as service) by these service between define good interface and contract connects.Interface is to adopt It is defined with neutral mode, it should be independently of hardware system, operating system and the programming language for realizing service.This makes The service in various such systems must be constructed can be interacted with a kind of unification and general mode.
SOA framework business structure is unified, scalability enhancing.In system application, the exploitation and deployment of infrastructure will Become more consistent.Existing component, component newly developed can merge in defining good SOA frame, different by addition Functional module element expansion system application.Such assembly set will be as the service arrangement in existing infrastructure.In addition, by In service-oriented agile design, there is stronger tolerance in terms of processing business variation.
SOA has characteristics that
(1) easy to maintain: the loose couplings relationship of business service supplier and business service user and the use to open standard Ensure the realization of the characteristic.Information system on the basis of with SOA is established not need to repair when demand changes Change and the interface of business service is provided, it is only necessary to adjust business service process or modification operation, entire application system is also more It is easy to be maintained.
(2) availability is high: the feature is sent out in the loose couplings relationship for be ISP and service user It waves and embodies.
(3) retractility is strong: realizing retractility by framework model used by business service design, exploitation and deployment etc.. ISP is adjusted mutually independently of one another, to meet new demand for services.
In addition, the system is also equipped with LBS positioning service, LBS positioning service, which is called, is mobile location-based service (Location Based Service, LBS), it is the location information that mobile terminal user is obtained by communication network (such as GSM net, CDMA net) (latitude and longitude coordinates) provide a kind of business of respective service under the support of electronic map system for user.It is to pass through communication Network (such as GSM net, CDMA net) or external positioning method (such as GPS) obtain position message (the geographical seat of mobile terminal user Mark).
The multiple technologies such as system bonding apparatus mark, LBS positioning service, user right identification are in one.By mobile whole The data of acquisition are uploaded to Utilities Electric Co.'s server by end, are then carried out data summarization, calculating and analysis, system and are automatically derived item Mesh construction information etc..
Further, above-mentioned data Layer, comprising:
Project database, for storing construction project data;Project data include it is multiple respectively with file data, component data and The associated foreign key field of historical data, establishes file data, component data and historical data and the logic of project data is closed System;
Document data bank, for storing picture file, archive file;At least one unique major key of each of them data and item Mesh number evidence is associated;
Component database, for storing tower line data, environment survey data;At least one is unique for each of them data Major key is associated with project data;
Knowledge data base, for storing steel tower and track data;At least one unique major key of each of them data and project Data are associated.
Further, above-mentioned application layer, referring to shown in Fig. 2, comprising:
Public information service subsystem 21, for system user by the access layer send maintenance request, realization Content Management, Configuration and issuing function;
Core business subsystem 22 sends management request by the access layer for system user, according to the corresponding power of user Limit, is managed the project data being related to;
Project scheduling management subsystem 23 sends monitoring request by the access layer for system user, realizes access control It is supervised with data;
Assistant subsystem 24 sends inquiry request by the access layer for system user, realizes to component data, knowledge number According to inquiry.
Further, referring to shown in Fig. 3, core business subsystem 22, comprising:
Data input and acquisition module 221, in construction project construction, the side of undertaking the construction of staff to believe construction site correlation The typing of breath;
Project management module 222, for making a report on item related information, audit relevant information and making an inspection tour project;
Project Exhibition module 223, for system user according to corresponding permission, the relevant plan of real time inspection project, into Degree is audited, the displaying information of risk assessment.
Further, referring to shown in Fig. 4, above- mentioned information typing and acquisition module 221, comprising:
Project establishes submodule 2211, is examined on the spot using mobile terminal to scene for the side of undertaking the construction of personnel, substation, iron The scene of tower carries out a selection operation, typing project initial information;
Project prepares submodule 2212, is used for the typing project plan, risk assessment, safe early warning, auditing standards, acceptance criteria phase Close information;
Project construction submodule 2213, for, by mobile terminal, being based on GPS positioning function combination photo system in project construction System, carries out live shooting upload;
Hidden danger acquires submodule 2214, for acquiring break rules and regulations in project construction safety zone trees, barrier, by filling in data It makes a report on function to make a report on, and adds the photo site of party's GPS positioning information and shooting, be uploaded to server.
Further, hidden danger acquires submodule 2214, is also used to finish when the side of undertaking the construction of carries out rectification, floor picture, Rectification information is filled in, server saves data is uploaded to.
In the present embodiment: data input and acquisition function include:
2.1.1 project is established
Situations such as construction project first stage of construction needs staff to construction site, route, planning and designing is reconnoitred, and is remembered Location information is recorded, ambient condition information is acquired, the basic basis as the construction of project later period.
Staff examines on the spot scene using mobile terminal, can carry out to Different fields such as substation, steel towers Point selection operation, system click content according to staff and generate corresponding initialization rule, and staff according to system suggestion records Enter project initial information (predominantly location information).
The entire path of project need to be reconnoitred by examining on the spot, and every steel tower point need to click primary confirmation point (current iron tower location position) and current steel tower information (can customize filling information), ambient enviroment exploration are inserted (around steel tower Shoot on location uploads, and web terminal can carry out real time inspection and be studied and judged according to environment), when the completion of route Initialize installation, backstage Route and steel tower point information (showing on map) can be automatically generated.
The essential information that collected location information is project is initialized, data are saved after acquisition, save letter Breath can not be changed (jurisdictions mandate), and subsequent construction is built on this basis.
2.1.2 project prepares
In conjunction with Guo Wang company project construction plan scheme, system entry item purpose essential information (including the project plan, risk are commented Estimate, safe early warning, auditing standards, acceptance criteria etc.) (it is still necessary to decide through consultation for this content), the judge mark as the project process complete period It is quasi-.
2.1.3 project construction
Information collection is mainly completed in mobile terminal in project construction.Based on GPS positioning function combination photo system, all photos It is only uploaded, can not be chosen in photograph album by being taken on site, generating photo all may choose whether to generate watermark, it is ensured that information Accuracy, the authenticity of typing issue current project construction situation in time.
Corresponding photograph taking is set according to project progress and uploads rule.Each engineering is divided into different phase, each stage The photo rule that need to be uploaded is set
Such as:
Civil engineering stage, smooth location need to shoot smooth preceding place, picture, smooth rear place in work;
It builds the tower stage, shooting construction photo, number of pictures several can only be taken on site.
2.1.4 hidden danger acquires
Break rules and regulations in project construction safety zone trees, barrier etc. are acquired, function is made a report on by filling in data and makes a report on, and add and work as Thing people GPS positioning information and the photo site of shooting are uploaded to server, and are prompted (this function to responsible person concerned It in conjunction with initialization and project construction function, finds the problem upload at any time at any time).Responsible person concerned, which implements, to be solved the problems, such as, is proposed whole Change scheme.Party rectifies and improves, and rectification finishes, and floor picture fills in rectification information, is uploaded to server and saves number According to.
Further, referring to Figure 5, project management module 222, comprising:
Project makes a report on submodule 2221, makes a report on for the progress situation to current project;
Project audits submodule 2222, and for comparing stage auditing standards according to construction speed: each project participant is to construction It is audited after the completion of link;
Project makes an inspection tour submodule 2223, for according to project visit program, related personnel to make an inspection tour project, by the process of making an inspection tour In find the problem input system.
In the present embodiment, project, which is made a report on, audits and maked an inspection tour, includes:
2.2.1 project is made a report on
Current project make a report on (a certain project proceed to a certain stage carry out essential information fill in, confirmation of completing), pass through report Timely amended subject setup state is filled in, (this function need to negotiate the report mould that need to be filled in the details of tracking understanding project Plate).The information based on standard form is supported to import, export function.
2.2.2 project is audited
Compare stage auditing standards according to construction speed: after the completion of each construction link, construction party clicks completion-owner's confirmation- Supervision & assessment, after tripartite approve after be allowed for access next construction link (inside add permission classification, when construction party responsible person not Fail to complete confirmation etc. in special circumstances at the scene or for some reason can to confirm that replacing its to click completes by owner, after last supervision & assessment It is allowed for access next construction link).
2.2.3 project is maked an inspection tour
According to project visit program, related personnel makes an inspection tour project, input system of finding the problem during making an inspection tour, to existing Field is taken pictures (addition of watermark), is continued tracking problem and is rectified and improved situation.Ensure high quality finished item construction task.
Further, for the function of sophisticated systems, further includes: Project Exhibition function;
For convenience of the more intuitive understanding project construction situation of staff, this function is integrated by the way of picture combination text It shows.The information such as plan relevant to project, progress, audit, risk assessment are grasped in real time, according to the post of participative management personnel And post sets corresponding module permission, accomplishes concurrent management, uniformly summarizes.
2.3.1 project overview
User jumps to main interface after inputting account number cipher login system, according to user right difference, corresponding interface exhibition Show that information is different.Main interface be included in build and history item record etc. relevant informations, take a column to do wherein can appoint Comprehensive data statistics.Separately other function option button (the new function mould being added according to later demand is equipped in this page Block).
2.3.2 single Project Exhibition
The project for wanting to check is clicked, into the project currently clicked, most timely, comprehensive information is carried out to current project and is slapped Control and other department information (such as security risk other information specifically needs to negotiate) are with the progress of picture and text combination It shows.
1. project picture presentation information:
For the start-stop point of project route, different legends is distributed substation, steel tower and route, and every kind of legend has different State, corresponding different figure (preproduction phase, civil engineering stage build the tower stage, the stringing stage, put into production).
2. project text shows that information mainly includes:
Project construction information: project name, planned time, on-stream time, time of completion, practical production time;
Project participates in unit information: the side of undertaking the construction of, owner, management;
Project personnel's information: project leader, main constructor etc.;
Project construction state: the stage of current project construction, security information, msu message;
Line information: starting point, terminal, an iron rake with three to six teeth quantity etc..
Project progress table (horizontal shape figure) can be generated in summary
2.3.3 details is shown
The substation for wanting to check, steel tower or route are clicked, its corresponding details is shown.
Show information are as follows:
1. picture presentation: clicking the legend of construction project, (include project construction front ring in conjunction with the historical data based on this coordinate points The photo site that per stage uploads in border figure, construction) it is shown according to timing node;
2. text is shown: (line name, undertakes the construction of unit, building time, material at steel tower property to the essential information of steel tower and route Supplying unit etc.).
To ensure that project can intuitively be shown, by the way of the upper figure of point, by clicking corresponding steel tower or substation, bullet Corresponding details out (outdoor scene of setup state, construction progress and different times builds photo).
Further, above-mentioned mobile client 1, comprising:
Audit management module, for mobile client 1 and the system docking, current generation construction is completed, and is summarized this stage and is built If information, project construction is promoted;Closed loop management is realized in procedure transmission, the examination & approval of realization project, realizes responsibility materialization and work Make process standard;
Locating module, for going to scene as staff, comparison initialization positioning, passes through photo acquisition function after fixation and recognition Field position, association steel tower, time of arrival, condition of construction, surrounding enviroment can be recorded;
Synchronized upload module is used for initialization data, project construction data, hidden danger situation and audit situation automatic synchronization to institute State server;
Data display module, the data for carrying out data displaying and progress chart in mobile client are shown;
Account management module logs in management other users permission for system maintenance personnel, carries out maintenance of information and buffer setting.
In the present embodiment, mobile terminal function is specific as follows:
3.1 application and development
Mobile terminal application is developed according to Andriod kernel.
3.2 mobile office
Capital construction work personnel can carry out the management work of project by mobile terminal, realize the acquisition of project initialization information, item Information collection and Project Exhibition function in mesh construction.
3.3 photo acquisition functions
Mobile terminal data docks with WEB terminal data and interacts data processing, and construction party is taken pictures on the spot and is uploaded to clothes Business end.
3.4 safety management
Risk, discovery and rectification closed loop management can be assessed, improve capital construction work by checking the photo of collection in worksite by having permission user Make efficiency.The client wherein having permission is the user that system manager or administrator are assigned with the power of examination and approval, note: specified examination & approval It is owner or management that permission, which has administrator to determine, and tentative construction party only fills in data and function is submitted to have no other permissions.
Permission is divided at present: owner, management and construction party.Wherein owner can check the photo of collection in worksite, assess risk, It was found that and rectification closed loop management.
3.5 audit management
Mobile terminal data is docked with system data, and current generation construction is completed, and summarizes this stage construction information, according to " construction Square completion-owner's confirmation-supervision & assessment " sequence promotes project construction.Closed loop pipe is realized in procedure transmission, the examination & approval of realization project Reason realizes responsibility materialization and workflow criteria.
3.6 plans are checked
All users can check the project construction plan currently belonged within the scope of oneself, convenient to carry out work adjustment in time, with Just accomplish self-test, supervision etc..
3.7 positioning function
Staff goes to scene, and system compares initialization positioning after fixation and recognition, records scene by photo acquisition function Position, association steel tower, time of arrival, condition of construction, surrounding enviroment etc.;
Foundation can be provided for work arrival rate examination by GPS positioning function.
3.8 data uplink synchronizations
By initialization data, project construction data, hidden danger situation and audit situation automatic synchronization to system server.
3.9 data are shown
The data that data displaying and progress chart are carried out on the page show (specific display data is undetermined)
3.10 account management
Functional overview
In order to it is more acurrate, more timely count unit arrival rates at different levels, it is proposed that staff safeguards the account information of oneself, account Family management is the basis of mobile terminal stable operation, can upload data after login in real time, account management function includes: Yong Hudeng Record, maintenance of information, buffer setting.
Function is detailed
One key log in: system according to setting, through allowing in the case where realize a key log in;(leaving a question open)
It forgets Password: according to the information of registration, giving password for change, or sought help online by phone;
3.10.1 equipment authenticates
The mobile terminal used must and need identification by system authentication, it is ensured that the safety of electric power data.Equipment Information need to be unified to register, and not be registered for not allowing to access the system.
Account is distributed by administrator, which prevents non-grid personnel to be strayed into without registering functional.Mobile phone is carried out after logging in set Standby certification:
Process:
1. first time, which logs in, carries out binding mobile phone string code
2. binding SIM card information
Logging in the two every time selects one progress safety certification all to replace as unexpected mobile phone and sim occurs, and needs to owner in other words Obviously condition to this person's account carry out initialization start bind process again.
3.10.2 user right
Tripartite's user authority setting: construction, owner, management, to the open different rights of different user.
Owner: project increases, project information typing, makes an announcement, checking project process, audit.
Construction party: photo site shooting sends examination & approval.
Management: project process, audit are checked.
WEB client side Functional Design is specifically described below:
4.1 rights management
The permission of login system is allocated, the corresponding work permission of different operating posts is different, facilitate personal management, It shares out the work.
It is management that system manager's (possessing highest permission), which can distribute all personnel permission such as distribution a, then a possesses prison The all permissions (approval process, management project and management function personnel's authority distribution below) of reason.
It is owner that system manager, which specifies b, then b possesses the permission of owner: project increase, project information typing, publication are logical Know, check project process, audit.
4.2 data identifications
Data identification management is this system according to network, equipment MAC, the information that link distributes and other essential informations are comprehensive Identification technology, not only a kind of technology of information identification management or set of system construction criteria and information identify management system. The user for not having this system identity can not log in this system, and administrative staff is needed to distribute identity authority.
Equipment starts the authentication operation to the user after the MAC Address for detecting user for the first time.Using exchanging Username and password is pre-configured on machine to be authenticated.At this time, it is desirable that all users all with the user name that is configured on interchanger and Password is corresponded by then recording its computer mac and ip after certification, is logged in ip, mac every time later and is all met the requirements It can login system.
4.3 basic data typings
For convenience of end item management, project data typing interface need to be separately provided, provide production data record according to set demand Enter template, realize the specification of data, accurate typing (typing information includes item planning chart, method of assessment etc.).
There is the carry out typing key message of management and the above permission, it can be with typing other details information below owner and owner And the information of management and the above permission of management can not be edited.
4.4 data are imported, are exported
Data required for each engineering project are necessarily a large amount of, and the typing of data is Xiang Chongfu, cumbersome but essential Work step, this system support authority data batch import.
For example data include: approve and initiate a project content, construction plan table, project participant etc..
Because need of work project needs leave-on document, this system supports the export of data, the statistics of data is facilitated to summarize.
4.5 data summarization
The collected data of mobile terminal are packaged (then Json carries out pbkdf2 encryption) and upload onto the server in system, and backstage is managed Reason system receives data and does storage processing.
Data before data summarization are by encryption.Because data demand is true, not alterability, all data It must be format special in system, and be the professional format (then Json carries out pbkdf2 encryption) after encryption, be System needs to carry out identification when reading the data.
Data must be remembered when uploading: upper successor, uplink time, uploading position.
4.6 positions mark (positioning)
System is compared according to the data for uploading and summarizing with steel tower data, is identified under current project by spatial database All steel tower positions simultaneously display it in map, including: steel tower information, construction progress, current project overview etc. Necessary information.
4.7 bulleted list
All construction projects of our unit are shown in homepage, and the user for possessing specified permission can modify to project, add The operation such as add, delete.
4.8 project early warning
According to the original plan, project early warning is carried out in conjunction with real work progress.
According to the target advance of project construction initial stage design, in conjunction with Practical Project progress, reduced time node, with picture and The mode of text carries out early warning to project.
4.9 risk assessment
Risk assessment is carried out to project link according to the standard that Guo Wang company proposes, and gives system in specified link, position and mentions Show and carries out warning prompting.
Such as: project construction to certain degree, node combination actual progress prompts industry in key node according to schedule Main, management intervention carries out examination examination.
Monthly or quarterly owner carries out a project tour as requested.
For example risk identification-risk point is concluded that using the standard that Guo Wang company proposes as reference frame following below scheme Analysis-risk assessment:
Wherein risk identification:
(1) information related with project risk is collected;
(2) risk factors are determined;
(3) establishment project risk identification report.
Risk analysis:
(1) probability that the analysis method and risk factors proposed using existing data information and state net relevant speciality personage is occurred It is analyzed
(2) grade and influence that analysis risk obtains
Risk assessment:
(1) risk management target, range
(2) feasible risk management method and data source
(3) it is lost caused by risk
Risk-warning is generated according to the conclusion that obtains above, is mentioned no matter user gives preferential pop-up in which operation pages Show.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part It is bright.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (7)

1. a kind of power supply company's item data management system characterized by comprising
Data Layer, for storing power supply company's basic data, business datum, file data and historical data;And receive support Data in data Layer are sent to application layer by supporting layer by the order for the called data that layer is sent;
Supporting layer is the interface that data Layer is connect with application layer data, receives the request of data of all pairs of data Layers of application layer, And read the data in data Layer in each database;The supporting layer also provides report management, MESSAGE EXCHANGE, system public pipe Reason, XML exchange, workflow management and the exchange of FTP report;
Application layer, for being interacted by access layer with system user, Xiang Suoshu application layer sends request command and obtains the data number of plies According to, and public information service management, core business system management, project scheduling management are carried out, and provide auxiliary system service;
Access layer logs in gate system for system user, receives the data command for the calling application layer that system user issues, leads to Cross verifying user name and password, the function and the corresponding function privilege of distribution and data permission of Lai Shixian application layer;
Service layer, the data for sending command calls application layer are supplied to system user;The system user includes: to undertake the construction of Institute, company leader and system maintenance personnel, management side, are ground at construction party in side.
2. the system as claimed in claim 1, which is characterized in that the data Layer, comprising:
Project database, for storing construction project data;Project data include it is multiple respectively with file data, component data and The associated foreign key field of historical data, establishes file data, component data and historical data and the logic of project data is closed System;
Document data bank, for storing picture file, archive file;At least one unique major key of each of them data and item Mesh number evidence is associated;
Component database, for storing tower line data, environment survey data;At least one is unique for each of them data Major key is associated with project data;
Knowledge data base, for storing steel tower and track data;At least one unique major key of each of them data and project Data are associated.
3. the system as claimed in claim 1, which is characterized in that the application layer, comprising:
Public information service subsystem sends maintenance request by the access layer for system user, realizes Content Management, matches It sets and issuing function;
Core business subsystem sends management request by the access layer for system user, according to the corresponding permission of user, The project data being related to is managed;
Project scheduling management subsystem, for system user by the access layer send monitoring request, realize access control and Data supervision;
Assistant subsystem sends inquiry request by the access layer for system user, realizes to component data, knowledge data Inquiry.
4. system as claimed in claim 3, which is characterized in that the core business subsystem, comprising:
Data input and acquisition module, in construction project construction, the side of undertaking the construction of staff to be to construction site relevant information Typing;
Project management module, for making a report on item related information, audit relevant information and making an inspection tour project;
Project Exhibition module, for system user according to corresponding permission, the relevant plan of real time inspection project, progress, The displaying information of audit, risk assessment.
5. system as claimed in claim 4, which is characterized in that the data input and acquisition module, comprising:
Project establishes submodule, examined on the spot using mobile terminal to scene for the side of undertaking the construction of personnel, substation, steel tower Scene carries out a selection operation, typing project initial information;
Project prepares submodule, for the typing project plan, risk assessment, safe early warning, auditing standards, acceptance criteria correlation letter Breath;
Project construction submodule, for, by mobile terminal, being based on GPS positioning function combination photo system in project construction, Carry out live shooting upload;
Hidden danger acquires submodule, for acquiring break rules and regulations in project construction safety zone trees, barrier, is made a report on by filling in data Function is made a report on, and adds the photo site of party's GPS positioning information and shooting, is uploaded to server.
6. system as claimed in claim 5, which is characterized in that the hidden danger acquires submodule, is also used to when the side's of undertaking the construction of progress Rectification finishes, and floor picture fills in rectification information, is uploaded to server saves data.
7. system as claimed in claim 4, which is characterized in that the project management module, comprising:
Project makes a report on submodule, makes a report on for the progress situation to current project;
Project audits submodule, and for comparing stage auditing standards according to construction speed: each project participant is to construction link It is audited after the completion;
Project makes an inspection tour submodule, is used for according to project visit program, and related personnel makes an inspection tour project, sends out during making an inspection tour Existing problem input system.
CN201811472304.2A 2018-12-04 2018-12-04 A kind of power supply company's item data management system Pending CN109658053A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811472304.2A CN109658053A (en) 2018-12-04 2018-12-04 A kind of power supply company's item data management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811472304.2A CN109658053A (en) 2018-12-04 2018-12-04 A kind of power supply company's item data management system

Publications (1)

Publication Number Publication Date
CN109658053A true CN109658053A (en) 2019-04-19

Family

ID=66112751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811472304.2A Pending CN109658053A (en) 2018-12-04 2018-12-04 A kind of power supply company's item data management system

Country Status (1)

Country Link
CN (1) CN109658053A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110245862A (en) * 2019-06-14 2019-09-17 国网陕西省电力公司电力科学研究院 Electric system project management system
CN110276530A (en) * 2019-05-31 2019-09-24 江苏普信达智能交通有限公司 A kind of intelligent engineering operation and maintenance supervising method
CN110298693A (en) * 2019-06-17 2019-10-01 中电科大数据研究院有限公司 A kind of big data system recommended based on vegetable price prediction
CN110502592A (en) * 2019-08-27 2019-11-26 深圳供电局有限公司 Item domains subject analysis system based on big data analysis technology
CN110737728A (en) * 2019-10-15 2020-01-31 深圳供电局有限公司 Project domain topic analysis system based on big data analysis technology
CN112632026A (en) * 2020-10-29 2021-04-09 江苏海岸线互联网科技有限公司 Industrial discrete data structured database system
CN114598492A (en) * 2021-12-22 2022-06-07 航天信息股份有限公司 System and method for co-acquiring and sharing data
CN115514099A (en) * 2022-11-23 2022-12-23 国网山东省电力公司荣成市供电公司 Electric power utilization safety inspection system and method
CN116482714A (en) * 2023-03-29 2023-07-25 国家电投集团郑州燃气发电有限公司 Power plant satellite positioning system based on safety double prevention system
CN116502855A (en) * 2023-05-08 2023-07-28 国网江苏省电力有限公司南通供电分公司 Digital management system for power grid infrastructure profession

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030144970A1 (en) * 2001-12-10 2003-07-31 Coyne Patrick J. Project management database and method of managing project related information
US20080091448A1 (en) * 2006-10-16 2008-04-17 Niheu Eric K System and method of integrating enterprise applications
CN105427091A (en) * 2015-12-03 2016-03-23 国网浙江杭州市萧山区供电公司 High-voltage business expansion overall process management and control system of power marketing
CN106503927A (en) * 2016-11-14 2017-03-15 南京三方化工设备监理有限公司 A kind of petrochemical industry project equipment Monitoring information management system
CN107330593A (en) * 2017-06-20 2017-11-07 北京市运输管理技术支持中心 A kind of traffic monitoring inspection and credit worthiness management system
CN107657546A (en) * 2017-09-29 2018-02-02 杭州惠嘉信息科技有限公司 A kind of electricity power engineering site safety management-control method and system based on Internet of Things
CN108200173A (en) * 2018-01-03 2018-06-22 广州供电局有限公司 A kind of electric power construction field informationization monitoring system
CN108565747A (en) * 2018-04-08 2018-09-21 国网河北省电力有限公司 A kind of substation inspection system based on intelligent wearable device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030144970A1 (en) * 2001-12-10 2003-07-31 Coyne Patrick J. Project management database and method of managing project related information
US20080091448A1 (en) * 2006-10-16 2008-04-17 Niheu Eric K System and method of integrating enterprise applications
CN105427091A (en) * 2015-12-03 2016-03-23 国网浙江杭州市萧山区供电公司 High-voltage business expansion overall process management and control system of power marketing
CN106503927A (en) * 2016-11-14 2017-03-15 南京三方化工设备监理有限公司 A kind of petrochemical industry project equipment Monitoring information management system
CN107330593A (en) * 2017-06-20 2017-11-07 北京市运输管理技术支持中心 A kind of traffic monitoring inspection and credit worthiness management system
CN107657546A (en) * 2017-09-29 2018-02-02 杭州惠嘉信息科技有限公司 A kind of electricity power engineering site safety management-control method and system based on Internet of Things
CN108200173A (en) * 2018-01-03 2018-06-22 广州供电局有限公司 A kind of electric power construction field informationization monitoring system
CN108565747A (en) * 2018-04-08 2018-09-21 国网河北省电力有限公司 A kind of substation inspection system based on intelligent wearable device

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110276530A (en) * 2019-05-31 2019-09-24 江苏普信达智能交通有限公司 A kind of intelligent engineering operation and maintenance supervising method
CN110245862A (en) * 2019-06-14 2019-09-17 国网陕西省电力公司电力科学研究院 Electric system project management system
CN110298693A (en) * 2019-06-17 2019-10-01 中电科大数据研究院有限公司 A kind of big data system recommended based on vegetable price prediction
CN110502592A (en) * 2019-08-27 2019-11-26 深圳供电局有限公司 Item domains subject analysis system based on big data analysis technology
CN110502592B (en) * 2019-08-27 2023-08-11 深圳供电局有限公司 Project domain topic analysis system based on big data analysis technology
CN110737728B (en) * 2019-10-15 2023-05-30 深圳供电局有限公司 Project domain topic analysis system based on big data analysis technology
CN110737728A (en) * 2019-10-15 2020-01-31 深圳供电局有限公司 Project domain topic analysis system based on big data analysis technology
CN112632026A (en) * 2020-10-29 2021-04-09 江苏海岸线互联网科技有限公司 Industrial discrete data structured database system
CN114598492A (en) * 2021-12-22 2022-06-07 航天信息股份有限公司 System and method for co-acquiring and sharing data
CN115514099A (en) * 2022-11-23 2022-12-23 国网山东省电力公司荣成市供电公司 Electric power utilization safety inspection system and method
CN115514099B (en) * 2022-11-23 2023-11-21 国网山东省电力公司荣成市供电公司 Electric power safety inspection system and method
CN116482714A (en) * 2023-03-29 2023-07-25 国家电投集团郑州燃气发电有限公司 Power plant satellite positioning system based on safety double prevention system
CN116502855A (en) * 2023-05-08 2023-07-28 国网江苏省电力有限公司南通供电分公司 Digital management system for power grid infrastructure profession

Similar Documents

Publication Publication Date Title
CN109685452A (en) A kind of power supply company's item data management platform
CN109658053A (en) A kind of power supply company's item data management system
CN109729168B (en) Data sharing exchange system and method based on block chain
US10607190B2 (en) Mobile check-in with push notification services
CN107516282A (en) Three look into the Land Change Survey information management system of unification
US7908208B2 (en) Private entity profile network
CN100391189C (en) System and method based on internet access and shared remote apparatus
CN109658067A (en) A kind of power engineering project control platform and system
US20070288275A1 (en) It services architecture planning and management
CN105989443A (en) Intelligent-mobile-terminal-based communication line inspection system
US11063947B2 (en) Integrated activity management system and method of using same
CN107146143B (en) Advanced manufacturing e-commerce platform
CN109214784A (en) A kind of method, client, server and the system of fire-fighting inspection management
CN109710696A (en) The System and method for the mobile operation of unusual fluctuation is verified for power equipment
CN106296529A (en) Hidden fire-fighting danger and key unit's management information system
CN110795422B (en) Data service management method and system
CN111897866A (en) Remote sensing monitoring pattern spot docking system and using method thereof
CN109034406A (en) A kind of enterprise's electric power repair reporting system based on cell phone application
CN109102084A (en) A kind of electric power repair reporting system based on cell phone application
CN114897596A (en) Letter service platform and electronic equipment
CN105871998A (en) Data displaying method and device
US11196810B2 (en) System and method for dynamically generating a site survey
CN110866855A (en) License issuing and safety management system based on block chain
CN105718602A (en) Cloud system for work safety standardization of rural hydropower station
CN109614430A (en) Configurable data acquisition and data verification system and method based on WLAN

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419