CN109653787A - A kind of high artesian high gas layer group coordination pumping and mining pressure relief method - Google Patents

A kind of high artesian high gas layer group coordination pumping and mining pressure relief method Download PDF

Info

Publication number
CN109653787A
CN109653787A CN201910072920.7A CN201910072920A CN109653787A CN 109653787 A CN109653787 A CN 109653787A CN 201910072920 A CN201910072920 A CN 201910072920A CN 109653787 A CN109653787 A CN 109653787A
Authority
CN
China
Prior art keywords
coal seam
drilling
gas
water
extraction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910072920.7A
Other languages
Chinese (zh)
Other versions
CN109653787B (en
Inventor
王磊
袁秋鹏
焦振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201910072920.7A priority Critical patent/CN109653787B/en
Publication of CN109653787A publication Critical patent/CN109653787A/en
Priority to PCT/CN2019/096402 priority patent/WO2020151207A1/en
Priority to ZA2020/00363A priority patent/ZA202000363B/en
Application granted granted Critical
Publication of CN109653787B publication Critical patent/CN109653787B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Pipeline Systems (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention discloses a kind of high artesian high gas layer groups to coordinate pumping and mining pressure relief method, it is by opening up a vertical drilling, and the coal bed drilling for being connected to each coal seam is opened up in vertical drilling, the pressure break that high pressure water realizes coal seam is injected into vertical drilling and coal bed drilling, after coal bed fracturing, extraction high pressure water, hydrophobic drilling connection vertical drilling and water-bearing layer are set again, extraction general pipeline is arranged in vertical drilling, gas drainage branch pipe is arranged in coal bed drilling, hydrophobic branch pipe is arranged in hydrophobic drilling, and install corresponding valve, the storage water in gas and water-bearing layer is detached in order, to realize " one hole and one pipe is multi-purpose " draining coal seam gas and high artesian, it is simple with operational procedure, it is at low cost, and extraction, unrestrained high-efficient advantage.

Description

A kind of high artesian high gas layer group coordination pumping and mining pressure relief method
Technical field
Coordinate extraction the present invention relates to coal mining technology field more particularly to a kind of high artesian high gas layer group to unload Pressure method.
Background technique
East China mining area coal measure strata is mostly coal seam group condition, and coal-bed gas pressure is high and is often accompanied by water-bearing layer, is exploited Difficulty is very big, and to prevent the accidents such as gas, water damage, safe working needs first coal seam to implement drilling in seam mining previous aspect, Firedamp drainage;On the other hand also to implement drilling to water-bearing layer to discharge water, current pumping and mining pressure relief and the unrestrained measure construction journey of draining Sequence is complicated, higher cost, and extraction, unrestrained inefficiency.
Summary of the invention
The present invention provides a kind of high artesian high gas layer groups to coordinate pumping and mining pressure relief method, and operational procedure can be made simple It is single, cost is reduced, and improve extraction and unrestrained efficiency.
The present invention provides a kind of high artesian high gas layer groups to coordinate pumping and mining pressure relief method comprising:
The distribution situation of detection of coal seam and the preservation situation in each coal seam and water-bearing layer;
Implement vertical drilling through each coal seam until in bottom coal seam from ground, and runs through each coal seam position Towards opening up corresponding coal bed drilling in each coal seam on the hole wall of the vertical drilling;
Extraction general pipeline is arranged in the vertical drilling, arrangement and the extraction general pipeline phase in each coal bed drilling Gas drainage branch pipe even, injects high pressure into the coal bed drilling by the extraction general pipeline and the gas drainage branch pipe Water carries out frac treatment to each coal seam, detaches the high pressure water after each coal seam is by pressure break;
After the high pressure water is pulled out, the drainage hole for being connected to the water-bearing layer is opened up from the vertical drilling; Arrange that the hydrophobic branch pipe being connected with the extraction general pipeline, the extraction general pipeline are equipped with total valve, institute in the drainage hole Gas drainage branch pipe is stated equipped with gas drainage valve, the hydrophobic branch pipe is equipped with hydrophobic valve;
The extraction equipment that is connected with the extraction general pipeline is set outside the vertical drilling, and start the extraction equipment, The total valve and the gas drainage valve are opened, gas is carried out to each coal seam and is detached;
When gas density in coal seam is down to safe range, the gas drainage valve is closed, the drain valve is opened Storage water in door extraction water-bearing layer.
Further, the coal bed drilling is at being radially distributed in each coal seam.
Further, execute it is described to each coal seam carry out frac treatment step while the method also includes: Suitable proppant and gaza's amount are selected according to the characteristic attribute in each coal seam.
Further, the drainage hole is to open up from the vertical drilling towards inclination angled in the water-bearing layer Hole body.
Further, the total valve, the gas drainage valve and the hydrophobic valve are single by outside control The electronic valve that member is uniformly controlled.
The embodiment of the present invention opens up the coal for being connected to each coal seam by opening up a vertical drilling in vertical drilling The pressure break that high pressure water realizes coal seam is injected in layer drilling into vertical drilling and coal bed drilling, after coal bed fracturing, extraction high pressure Water, then hydrophobic drilling connection vertical drilling and water-bearing layer is arranged is arranged extraction general pipeline in vertical drilling, is arranged in coal bed drilling Gas drainage branch pipe arranges hydrophobic branch pipe in hydrophobic drilling, and installs corresponding valve, detaches gas and water-bearing layer in order Storage water, " one hole and one pipe is multi-purpose " draining coal seam gas and high artesian, have operational procedure simple, cost to realize It is low, and extraction, unrestrained high-efficient advantage.
Detailed description of the invention
Technical solution in order to illustrate the embodiments of the present invention more clearly, below will be to needed in embodiment description Attached drawing is briefly described, it should be apparent that, drawings in the following description are some embodiments of the invention, general for this field For logical technical staff, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is that a kind of high artesian high gas layer group that the embodiment of the present invention one provides coordinates showing for pumping and mining pressure relief method Meaning flow chart;
Fig. 2 is the reality that a kind of high artesian high gas layer group that the embodiment of the present invention one provides coordinates pumping and mining pressure relief method Existing structural schematic diagram;
Fig. 3 is that a kind of high artesian high gas layer group that the embodiment of the present invention one provides coordinates the every of pumping and mining pressure relief method Gas drainage branch pipe fit structure schematic diagram in a coal seam.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
It should be appreciated that ought use in this specification and in the appended claims, term " includes " and "comprising" instruction Described feature, entirety, step, operation, the presence of element and/or component, but one or more of the other feature, whole is not precluded Body, step, operation, the presence or addition of element, component and/or its set.
It is also understood that mesh of the term used in this description of the invention merely for the sake of description specific embodiment And be not intended to limit the present invention.As description of the invention and it is used in the attached claims, unless on Other situations are hereafter clearly indicated, otherwise " one " of singular, "one" and "the" are intended to include plural form.
It is that a kind of high artesian high gas layer group that the embodiment of the present invention one provides coordinates pumping and mining pressure relief side referring to Fig. 1 The schematic flow diagram of method comprising following steps S101~S106:
Step S101: the distribution situation of detection of coal seam and the preservation situation in each coal seam and water-bearing layer.
Step S102: implement vertical drilling through each coal seam until in bottom coal seam from ground, and through each Towards opening up corresponding coal bed drilling in each coal seam on the hole wall of the vertical drilling of coal seam position.
Step S103: extraction general pipeline is arranged in vertical drilling, arranges in each coal bed drilling and is connected with extraction general pipeline Gas drainage branch pipe, high pressure water is injected into coal bed drilling by extraction general pipeline and gas drainage branch pipe, to each coal seam into Row frac treatment detaches high pressure water after each coal seam is by pressure break.
Step S104: after high pressure water is pulled out, the drainage hole for being connected to water-bearing layer is opened up from vertical drilling, is being arranged Arrange that the hydrophobic branch pipe being connected with extraction general pipeline, extraction general pipeline are equipped with total valve in water drilling hole, gas drainage branch pipe is equipped with Gas drainage valve, hydrophobic branch pipe are equipped with hydrophobic valve.
Step S105: being arranged the extraction equipment being connected with extraction general pipeline outside vertical drilling, and starts extraction equipment, opens Total valve and gas drainage valve carry out gas to each coal seam and detach.
Step S106: when gas density in coal seam is down to safe range, closed gas extraction valve opens described dredge Storage water in penstock extraction water-bearing layer.
Specifically, referring to fig. 2, by taking three layers of coal seam as an example (coal seam 1, coal seam 2 and coal seam 3 in such as figure), detection of coal seam 1, The preservation situation in coal seam 2, coal seam 3 and water-bearing layer 4;Implement vertical drilling 6 from ground 5, passes through coal seam 1, coal seam 2 and reach coal seam 3; Implement coal bed drilling 7 in 3 coal seam of coal seam 1, coal seam 2 and coal seam;High pressure water is injected to vertical drilling 6 and coal bed drilling 7, is utilized High pressure water pressure break coal seam 1, coal seam 2 reach coal seam 3, generate coal seam fracture 16, improve the gas permeability in coal seam;Extraction vertical drilling 6 And the high pressure water in coal bed drilling 7;Drainage hole 8 is played from vertical drilling 6, reaches water-bearing layer 4;It arranges and takes out in vertical drilling 6 Put main pipe rail 9;Gas drainage bye-pass 10 is arranged in coal bed drilling 7;Hydrophobic branch pipe(tube) 11 is arranged in drainage hole 8;Peace Fill total valve 12, gas drainage valve 13, hydrophobic valve 14;Extraction equipment 15 is disposed about in vertical drilling 6;Starting extraction is set Standby 15, open total valve 12, gas drainage valve 13,3 coal-bed gas of extraction coal seam 1, coal seam 2 and coal seam;Closed gas extraction Valve 13 opens hydrophobic valve 14, the high pressure water in extraction water-bearing layer 4.It in the concrete realization, can such as opening vertical drilling 6 If diameter is set as making it meet the extraction demand of one hole and one pipe not less than 150mm, extraction efficiency is improved.
Specifically, by opening up a vertical drilling, and the coal seam drilling for being connected to each coal seam is opened up in vertical drilling The pressure break that high pressure water realizes coal seam is injected in hole into vertical drilling and coal bed drilling, after coal bed fracturing, extraction high pressure water, then Hydrophobic drilling connection vertical drilling and water-bearing layer are set, extraction general pipeline is arranged in vertical drilling, arranges gas in coal bed drilling Extraction branch pipe arranges hydrophobic branch pipe in hydrophobic drilling, and installs corresponding valve, detaches depositing for gas and water-bearing layer in order Water storage has operational procedure simple to realize " one hole and one pipe is multi-purpose " draining coal seam gas and high artesian, at low cost, and Extraction, unrestrained high-efficient advantage.
Referring to Fig. 3, further, coal bed drilling 7 is at being radially distributed in each coal seam.
Specifically, coal bed drilling 7 is opened up at radial in each coal seam, it is ensured that the pressure break in each coal seam is uniformly and coal Layer gas drainage under suction is thorough.
Referring to fig. 2, further, drainage hole 8 is to open up from vertical drilling 6 towards inclination angled in water-bearing layer 4 Hole body.
It specifically, can be to water-bearing layer 4 by using inclined drill because the storage water in water-bearing layer 4 has certain pressure Interior storage water generates certain buffer function, it is ensured that the safety of drilling construction.
Further, total valve 12, gas drainage valve 13 and hydrophobic valve 14 are unified by external control unit outside The electronic valve of control.
Specifically, total valve 12, gas drainage valve 13 and hydrophobic valve 14 are electronic valve, single by outside control Member is uniformly controlled opening and closing, so that coherent in time controls each pipeline, improves extraction working efficiency.
In embodiment provided herein, it should be understood that disclosed content only schematically can be with It realizes by another way.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or replace It changes, these modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with right It is required that protection scope subject to.

Claims (4)

1. a kind of high artesian high gas layer group coordinates pumping and mining pressure relief method characterized by comprising
The distribution situation of detection of coal seam and the preservation situation in each coal seam and water-bearing layer;
Implement vertical drilling through each coal seam until in bottom coal seam from ground, and is running through described in each coal seam position Towards opening up corresponding coal bed drilling in each coal seam on the hole wall of vertical drilling;
Extraction general pipeline is arranged in the vertical drilling, arrangement is connected with the extraction general pipeline in each coal bed drilling Gas drainage branch pipe injects high pressure water into the coal bed drilling by the extraction general pipeline and the gas drainage branch pipe, right Each coal seam carries out frac treatment, detaches the high pressure water after each coal seam is by pressure break;
After the high pressure water is pulled out, the drainage hole for being connected to the water-bearing layer is opened up from the vertical drilling, in institute Stating the hydrophobic branch pipe that arrangement is connected with the extraction general pipeline in drainage hole, the extraction general pipeline is equipped with total valve, and described watt This extraction branch pipe is equipped with gas drainage valve, and the hydrophobic branch pipe is equipped with hydrophobic valve;
The extraction equipment being connected with the extraction general pipeline is set outside the vertical drilling, and starts the extraction equipment, opening The total valve and the gas drainage valve carry out gas to each coal seam and detach;
When gas density in coal seam is down to safe range, the gas drainage valve is closed, the hydrophobic valve is opened and takes out Put the storage water in water-bearing layer.
2. high artesian high gas layer group according to claim 1 coordinates pumping and mining pressure relief method, which is characterized in that described Coal bed drilling is at being radially distributed in each coal seam.
3. high artesian high gas layer group according to claim 1 coordinates pumping and mining pressure relief method, which is characterized in that described Drainage hole is to tilt the hole body opened up from the vertical drilling towards angled in the water-bearing layer.
4. high artesian high gas layer group according to claim 1 coordinates pumping and mining pressure relief method, which is characterized in that described Total valve, the gas drainage valve and the hydrophobic valve are the electronic valve being uniformly controlled by external control unit outside.
CN201910072920.7A 2019-01-25 2019-01-25 Coordinated extraction pressure relief method for high-pressure-bearing water and high-gas coal seam group Active CN109653787B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201910072920.7A CN109653787B (en) 2019-01-25 2019-01-25 Coordinated extraction pressure relief method for high-pressure-bearing water and high-gas coal seam group
PCT/CN2019/096402 WO2020151207A1 (en) 2019-01-25 2019-07-17 Coordinative extraction and pressure relief method for high confined water high gas coal seam group
ZA2020/00363A ZA202000363B (en) 2019-01-25 2020-01-20 Method for coordinate extraction and pressure relief of high-pressure water and high-gas coal seam groups

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910072920.7A CN109653787B (en) 2019-01-25 2019-01-25 Coordinated extraction pressure relief method for high-pressure-bearing water and high-gas coal seam group

Publications (2)

Publication Number Publication Date
CN109653787A true CN109653787A (en) 2019-04-19
CN109653787B CN109653787B (en) 2024-05-03

Family

ID=66121219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910072920.7A Active CN109653787B (en) 2019-01-25 2019-01-25 Coordinated extraction pressure relief method for high-pressure-bearing water and high-gas coal seam group

Country Status (3)

Country Link
CN (1) CN109653787B (en)
WO (1) WO2020151207A1 (en)
ZA (1) ZA202000363B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020151207A1 (en) * 2019-01-25 2020-07-30 安徽理工大学 Coordinative extraction and pressure relief method for high confined water high gas coal seam group
CN113107583A (en) * 2021-05-21 2021-07-13 中国矿业大学 Thick and hard roof high-gas coal seam gas extraction system and extraction method
CN113123720A (en) * 2021-03-22 2021-07-16 中国煤炭地质总局水文地质局 Construction process for treating grouting holes and simultaneously using grouting holes as gas extraction holes in water damage area of coal seam floor

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837646B (en) * 2022-05-05 2023-11-24 中联煤层气国家工程研究中心有限责任公司 Multilayer co-mining device for coal bed gas mining

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2047742C1 (en) * 1992-03-06 1995-11-10 Акционерное общество закрытого типа "Биотехинвест" Method for extraction of gas from water-bearing bed
GB0606133D0 (en) * 2006-03-28 2006-05-03 Schlumberger Holdings Method of facturing a coalbed gas reservoir
CN101251028A (en) * 2008-04-03 2008-08-27 淮南矿业(集团)有限责任公司 Method for taking out and picking high gassy seam group dislodging gob-side entry retaining Y type ventilated decompression firedamp
CN101775974A (en) * 2010-01-28 2010-07-14 郑州大学 Method for exploiting coal bed methane (CBM) by water transportation and pressure relief in butted well
CN102155187A (en) * 2011-03-22 2011-08-17 上海宏睿油气田径向井技术服务有限公司 Method for treating coal bed bottom plate karst water through hydraulic jetting and radial drilling
CN102493794A (en) * 2011-12-13 2012-06-13 王建生 Coal bed methane exploring method of spraying gas-water mixed liquid to drill well and forming quincunx radial horizontal well
CN103362540A (en) * 2013-08-07 2013-10-23 中国矿业大学 High gas coal seam pressure relief gas extraction method
WO2014044192A1 (en) * 2012-09-21 2014-03-27 新奥气化采煤有限公司 Method for joint-mining of coalbed gas and coal
CN105089493A (en) * 2014-05-13 2015-11-25 郑州大学 Ground vertical well and underground cross drilling combined pressure-released coal-bed gas extraction method
CN105332676A (en) * 2015-12-02 2016-02-17 中国矿业大学 Discharge and mining control method and device of exposing combination development coal-bed gas well upper production layer
WO2017075935A1 (en) * 2015-11-06 2017-05-11 中国矿业大学 Method of increasing permeability of coal seam using high-power electric blasting assisted by hydraulic fracturing from bottom drainage roadway
CN107905834A (en) * 2017-12-20 2018-04-13 中原工学院 A kind of hypotonic high prominent coal seam architecture gas production method
CN108086901A (en) * 2017-12-12 2018-05-29 中煤科工集团重庆研究院有限公司 A kind of netted slot anti-reflection method of layer-through drilling
CN109209472A (en) * 2018-07-27 2019-01-15 中国矿业大学 The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101915086B (en) * 2010-08-13 2011-06-22 山西晋城无烟煤矿业集团有限责任公司 Coal mine underground gas borehole fracturing method
CN102080519A (en) * 2011-01-21 2011-06-01 中矿瑞杰(北京)科技有限公司 Method for extracting coal bed gas by negative pressure on ground through gas-coal simultaneous extraction
CN102852546B (en) * 2011-06-30 2015-04-29 河南煤业化工集团研究院有限责任公司 Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area
CN103174453A (en) * 2013-03-28 2013-06-26 重庆大学 Layered hydraulic fracturing method of underground coal mine multiple coal seams
RU2534881C1 (en) * 2013-07-02 2014-12-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тульский государственный университет" (ТулГУ) Method of preliminary degassing of coal bed
CA2963459A1 (en) * 2017-04-06 2018-10-06 Vladimir Sukhanov The method of thermal reservoir stimulation
CN109162676B (en) * 2018-09-27 2020-11-17 太原理工大学 Method for simultaneously extracting and utilizing coal bed gas and accumulated water in goaf
CN109653787B (en) * 2019-01-25 2024-05-03 安徽理工大学 Coordinated extraction pressure relief method for high-pressure-bearing water and high-gas coal seam group

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2047742C1 (en) * 1992-03-06 1995-11-10 Акционерное общество закрытого типа "Биотехинвест" Method for extraction of gas from water-bearing bed
GB0606133D0 (en) * 2006-03-28 2006-05-03 Schlumberger Holdings Method of facturing a coalbed gas reservoir
CN101251028A (en) * 2008-04-03 2008-08-27 淮南矿业(集团)有限责任公司 Method for taking out and picking high gassy seam group dislodging gob-side entry retaining Y type ventilated decompression firedamp
CN101775974A (en) * 2010-01-28 2010-07-14 郑州大学 Method for exploiting coal bed methane (CBM) by water transportation and pressure relief in butted well
CN102155187A (en) * 2011-03-22 2011-08-17 上海宏睿油气田径向井技术服务有限公司 Method for treating coal bed bottom plate karst water through hydraulic jetting and radial drilling
CN102493794A (en) * 2011-12-13 2012-06-13 王建生 Coal bed methane exploring method of spraying gas-water mixed liquid to drill well and forming quincunx radial horizontal well
WO2014044192A1 (en) * 2012-09-21 2014-03-27 新奥气化采煤有限公司 Method for joint-mining of coalbed gas and coal
CN103362540A (en) * 2013-08-07 2013-10-23 中国矿业大学 High gas coal seam pressure relief gas extraction method
CN105089493A (en) * 2014-05-13 2015-11-25 郑州大学 Ground vertical well and underground cross drilling combined pressure-released coal-bed gas extraction method
WO2017075935A1 (en) * 2015-11-06 2017-05-11 中国矿业大学 Method of increasing permeability of coal seam using high-power electric blasting assisted by hydraulic fracturing from bottom drainage roadway
CN105332676A (en) * 2015-12-02 2016-02-17 中国矿业大学 Discharge and mining control method and device of exposing combination development coal-bed gas well upper production layer
CN108086901A (en) * 2017-12-12 2018-05-29 中煤科工集团重庆研究院有限公司 A kind of netted slot anti-reflection method of layer-through drilling
CN107905834A (en) * 2017-12-20 2018-04-13 中原工学院 A kind of hypotonic high prominent coal seam architecture gas production method
CN109209472A (en) * 2018-07-27 2019-01-15 中国矿业大学 The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
廉法宪;: "新集一矿地面抽采瓦斯钻井成井技术", 煤田地质与勘探, no. 06, 25 December 2012 (2012-12-25) *
李钢;: "深部高瓦斯煤层群煤与瓦斯协调开采技术", 煤炭技术, no. 03, pages 158 - 160 *
袁亮;: "低透高瓦斯煤层群安全开采关键技术研究", 岩石力学与工程学报, no. 07, 15 July 2008 (2008-07-15) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020151207A1 (en) * 2019-01-25 2020-07-30 安徽理工大学 Coordinative extraction and pressure relief method for high confined water high gas coal seam group
CN113123720A (en) * 2021-03-22 2021-07-16 中国煤炭地质总局水文地质局 Construction process for treating grouting holes and simultaneously using grouting holes as gas extraction holes in water damage area of coal seam floor
CN113107583A (en) * 2021-05-21 2021-07-13 中国矿业大学 Thick and hard roof high-gas coal seam gas extraction system and extraction method

Also Published As

Publication number Publication date
WO2020151207A1 (en) 2020-07-30
ZA202000363B (en) 2020-12-23
CN109653787B (en) 2024-05-03

Similar Documents

Publication Publication Date Title
CN109653787A (en) A kind of high artesian high gas layer group coordination pumping and mining pressure relief method
CN101403314B (en) Coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique
CN106703871B (en) A kind of method of high pressure water injection prevention and treatment gas and coal dust
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN102926770B (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN207554023U (en) Hydrate recovery well cased hole gravel packing analogue system
CN106930728B (en) A kind of gas injection row's halogen method and device of salt hole air reserved storeroom
CN207073410U (en) The anti-reflection system of injection hot water and liquid nitrogen is circulated to coal seam
CN107795303A (en) Hydrate recovery well cased hole gravel packing analogue system and method
CN108868706A (en) Directional drilling supercritical carbon dioxide fracturing replacement exploitation of gas hydrate method
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN106988719A (en) The anti-reflection system and anti-reflection method of injection hot water and liquid nitrogen are circulated to coal seam
CN105952378A (en) Tree-shape structure well drilling and completion and yield increasing method
CN107780888A (en) Gas hydrates pilot production analogue means and method
CN104879167B (en) Method for rebuilding gas storage reservoir and layered injection and recovery system
CN109322644A (en) A kind of coal bed gas well pressure control water pumping gas production method and system
CN108979280B (en) Close hole Mine Roadway storage tank farm, oil storage method and construction method
CN104929565A (en) Double-layered grouting guide pipe
CN103470233B (en) A kind of heavy crude reservoir natural gas huff and puff oil recovery process system and oil production method
CN106801427A (en) Foundation ditch horizontal precipitation device and its application method
CN110344874A (en) A method of prevention and treatment Period of Coal Seam Spontaneous Combustion
CN209444365U (en) A kind of high artesian high gas layer group coordination pumping and mining pressure relief system
CN115492557A (en) Deep non-recoverable coal seam CO 2 Sealing and coal bed gas negative pressure extraction device and method
CN104863185A (en) Blocking and seepage-proofing technology of leaky well
CN114635748A (en) Shaft sinking water damage prevention method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant