CN109630844A - 10KV overhead transmission line high-tension apparatus double rod support construction and its installation method - Google Patents

10KV overhead transmission line high-tension apparatus double rod support construction and its installation method Download PDF

Info

Publication number
CN109630844A
CN109630844A CN201811585383.8A CN201811585383A CN109630844A CN 109630844 A CN109630844 A CN 109630844A CN 201811585383 A CN201811585383 A CN 201811585383A CN 109630844 A CN109630844 A CN 109630844A
Authority
CN
China
Prior art keywords
fixed
tension apparatus
anchor ear
ear
level frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811585383.8A
Other languages
Chinese (zh)
Inventor
赵小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Ruinong Electric Power Design Consulting Co Ltd
Original Assignee
Nanjing Ruinong Electric Power Design Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Ruinong Electric Power Design Consulting Co Ltd filed Critical Nanjing Ruinong Electric Power Design Consulting Co Ltd
Priority to CN201811585383.8A priority Critical patent/CN109630844A/en
Publication of CN109630844A publication Critical patent/CN109630844A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M13/00Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles
    • F16M13/02Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles for supporting on, or attaching to, an object, e.g. tree, gate, window-frame, cycle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon Stands for scientific apparatus such as gravitational force meters

Abstract

The present invention relates to a kind of 10KV overhead transmission line high-tension apparatus double rod support construction and its installation methods, belong to the technical field of high pressure power transmission and distribution, 10KV overhead transmission line high-tension apparatus double rod support construction includes level frame, support frame and fixation kit, wherein, fixation kit has the first fixed anchor ear, anchor ear has the first anchor ear ontology and the second anchor ear ontology, first anchor ear ontology and the second anchor ear ontology have the second bending slot of the first bending slot and semicircular in shape, first anchor ear ontology and the second anchor ear ontology are embraced on roofbolt by the first bending slot, second fixed ear is by being fixedly connected on the end of level frame;The first sliding sleeve of hollow cylinder is formed with after the docking of second bending slot.The advantages of double rod support construction of the invention is to enable to high-tension apparatus installation more stable.

Description

10KV overhead transmission line high-tension apparatus double rod support construction and its installation method
Technical field
The present invention relates to the technical fields of high pressure power transmission and distribution, more particularly, to a kind of 10KV overhead transmission line high-tension apparatus double rod Support construction and its installation method.
Background technique
In high-tension overhead line erection, need that transformer is installed on overhead distribution line road, high pressure acrobatic skills compensates automatically The high pressures equipment for power transmission and distribution such as device, wherein the superiority and inferiority of the mounting structure of high pressure equipment for power transmission and distribution will have a direct impact on the reliable of power transmission and distribution Property.
The mounting structure of existing overhead distribution is complex, and amount of parts is numerous, and installation is inconvenient, Wu Faman The efficient requirement of the work such as sufficient in-site installation, later period maintenance.
Summary of the invention
It is an object of the present invention to provide a kind of 10KV overhead transmission line high-tension apparatus double rod support constructions, its advantage is that energy Enough so that high-tension apparatus installation is more stable.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of 10KV overhead transmission line high-tension apparatus double rod support construction, comprising: level frame, for installing the high-tension apparatus;Branch Support is set to the lower section of level frame, to support the level frame;Fixation kit, there are two settings, and is oppositely disposed in two On a roofbolt, wherein each fixation kit includes the first fixed anchor ear, and the anchor ear has the first anchor ear ontology and second armful Ontology is bound round, the first anchor ear ontology and the second anchor ear ontology have the first arc-shaped bending slot positioned at middle part, bending slot One end be formed with the first fixed ear, the other end of the first bending slot is formed with the second bending slot of semicircular in shape, the second bending The outside one end of slot is formed with the second fixed ear, offers mounting hole in the first fixed ear and the second fixed ear;Described first armful It binds round ontology and the second anchor ear ontology to embrace on roofbolt by the first bending slot, and the first fixed ear is fixed by the first bolt, the The end that two fixed ears are bolted to the level frame by second;Hollow cylinder is formed with after the second bending slot docking First sliding sleeve of shape.
The present invention is further arranged to: there are two the level frame settings, passes through curved reinforcing rod between two level frames Support, the fixation kit are provided with two groups, and every group of fixation kit accordingly fixes a level frame.
The present invention is further arranged to: it is connected between the first bending slot and the second bending slot by third fixed ear, Mounting hole is offered in the third fixed ear, third fixed ear is fixed by third bolt.
The present invention is further arranged to: support frame as described above includes completely identical in structure two second support bars, and two Two support rods are relatively obliquely installed;Wherein, higher one end of second support bar is fixedly connected on underlying water The bottom of flatrack, lower one end is by being fixed on roofbolt with the first fixed anchor ear of fixed hooping structure identical second On.
The present invention is further arranged to: being formed with after the second bending slot docking of the described second fixed anchor ear and the first sliding Cover the second concentric sliding sleeve.
The present invention is further arranged to: there are two parallel first support bar, two first support bars for the level frame tool Between spaced set have several connecting rods, the both ends of two first support bars and connected between two first support bars There is connecting elements, the connecting elements is bolted with second fixed ear commonly through second.
The present invention is further arranged to: the connecting elements includes two straight connecting rods, and be located at two straight connecting rods it Between, and the bent rod connecting three times with another straight connecting rod is continuously vertically bent by one end of a straight connecting rod;The bent rod The first bending part, the second bending part and third bending part are successively included, is opened on first bending part and third bending part Equipped with the lock hole concentric with mounting hole, second fixed ear is inserted into what first bending part was formed with third bending part It bends in space, and level frame is fixed across the mounting hole and locking hole by the second bolt.
It is a further object to provide a kind of installation methods of high-tension apparatus, its advantage is that can be without using large size Hanging device rapidly installs high-tension apparatus.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of installation side of high-tension apparatus Method has follow steps: the first, the mounting height of high-tension apparatus is determined according to design requirement, so that it is determined that the installation of level frame Highly;The second, according to the height measured, two first fixed anchor ears are fixed on two roofbolts, two first fixations are embraced The spacing of hoop is the spacing of two level frames;Third, the level on the roofbolt positioned at the two first upward 1.5m of fixed anchor ear Two fixed pulleys are fixed, two tractors are set on the ground, two tractors are respectively connected with a hawser, and two hawsers are right to son A roofbolt is answered, hawser sequentially passes through the first sliding sleeve from bottom to up and the second sliding sleeve then passes around fixed pulley, end and height The included lifting lug in pressure equipment upper end is fixed;The synchronous driving of four, the two draggers, gradually by high-tension apparatus pull-up, is pulled up to height Stop after the height of level frame;5th, successively two level frames are locked with the corresponding first fixed anchor ear by bolt;The Six, two support rods are relatively arranged, the upper end of support rod is bolted on underlying level frame, support rod Lower end be connected on the second fixed anchor ear;7th, high-tension apparatus is slowly placed on the level on upper layer by tractor drives hawser On frame, and it is fixed;8th, by Cable taking up, fixed pulley can not be removed, and be used later for subsequent maintenance, dismounting high-tension apparatus; 9th, the external cable line of high-tension apparatus can pass through the first sliding sleeve and the second sliding sleeve is regular on roofbolt.
In conclusion advantageous effects of the invention are as follows:
1, level frame can steadily be connected by the first fixed anchor ear of setting and the second fixed anchor ear, and it is advantageous on site Fast Installation;
2, by the second bending slot being arranged on the first fixed anchor ear and the second fixed anchor ear, it not only can be used as subsequent installation The limit sleeve of hawser when high-tension apparatus, can also high-tension apparatus after the installation is completed, as the gathering set of high-tension apparatus cable, knot Structure is simple, functional stronger;
3, by using the installation method of high-tension apparatus of the invention, rapidly high pressure can be set without using Large-scale Hoisting equipment It is standby to carry out in-site installation, and facilitate subsequent maintenance and replacement to high-tension apparatus, substantially increase work efficiency.
Detailed description of the invention
Fig. 1 is the main view of the embodiment of the present invention one;
Fig. 2 is the top view of the embodiment of the present invention one;
Fig. 3 is the structural schematic diagram of the connecting elements of the embodiment of the present invention one;
Fig. 4 is the structural schematic diagram of the first clip ontology of the embodiment of the present invention one;
Fig. 5 is the installation process schematic diagram of the embodiment of the present invention two.
In figure, 1, level frame;11, fixed frame;12, first support bar;13, connecting rod;2, support frame;21, the second support Bar;3, fixation kit;31, the first fixed anchor ear;311, the first anchor ear ontology;312, the second anchor ear ontology;3111, the first bending Slot;3112, the second bending slot;3113, the first fixed ear;3114, the second fixed ear;3115, third fixed ear;32, second is solid Determine anchor ear;4, reinforcing rod;5, connecting elements;51, straight connecting rod;52, bent rod;521, the first bending part;522, the second bending part; 523, third bending part;6, the first sliding sleeve;7, the second sliding sleeve;8, roofbolt;9, high-tension apparatus;10, pulley;11, hawser; 12, dragger;13, lifting lug.
Specific embodiment
Embodiment one
With reference to Fig. 1 and Fig. 2, the embodiment of the present invention one discloses a kind of 10KV overhead transmission line high-tension apparatus double rod support construction, With for installing high-tension apparatus 9 level frame 1, fixed frame 11, positioned at the lower section of level frame 1 for propping up level frame 1 The support frame 2 of support, and the fixation kit 3 for being fixed on level frame 1 on two sides roofbolt 8.
Preferably, level frame 1 can be set to two, and two level frames 1 are setting up and down and pass through between the two
Curved reinforcing rod 4 connects, and forms the reinforcement structure of " arch (bridge) type ".
More specifically, the tool of level frame 1 is there are two the first support bar 12 that is parallel to each other, between two first support bars 12 etc. Spacing is fixedly connected with several connecting rods 13 for connecting, reinforcing two first support bars 12.The both ends of level frame 1 pass through Connecting elements 5 is fixedly connected with fixation kit 3.
Referring to figs. 2 and 3, connecting elements 5 has one there are two straight connecting rod 51 and between two straight connecting rods 51 Bent rod 52, straight connecting rod 51 and bent rod 52 are made of one piece.The both ends of two straight connecting rods 51 are solid with support rod respectively Fixed connection, bent rod 52 have the first bending part 521, the second bending part 522 and third bending part 523, the first bending part 521, the second bending part 522 and third bending part 523 are continuously vertically bent to form three times by the end of a straight connecting rod 51 , a bending space is formed between three bending parts, in order to be connected with fixation kit 3, first to be parallel to each other is bent Portion 521 and the middle part of third bending part 523 offer concentric lock hole.
Fixation kit 3 is provided with two groups, the corresponding level frame 1 of every group of fixation kit 3.Every group of fixation kit 3 is provided with Two, and be oppositely disposed on two roofbolts 8.Each fixation kit 3 has the first fixed anchor ear 31, the first fixed anchor ear 31 Holding is connected on roofbolt 8, and with the connecting elements 5 on level frame 1.
With reference to Fig. 2, Fig. 3 and Fig. 4, more specifically, the first fixed anchor ear 31 has the first anchor ear ontology 311 and second armful Bind round ontology 312.First anchor ear ontology 311 is identical with the structure of the second anchor ear ontology 312.It should be strongly noted that the One anchor ear ontology 311 and ontology and the second anchor ear ontology 312 all have certain width dimensions, it is therefore preferable to plate body.First Anchor ear ontology 311 and the second anchor ear ontology 312 have the first bending slot 3111 and the second bending slot 3112, the first bending slot 3111 one end is formed with the first fixed ear 3113, and one end of the second bending slot 3112 is formed with the second fixed ear 3114, and first Third fixed ear 3115, the first fixed ear 3113, the second fixed ear are formed between bending slot 3111 and the second bending slot 3112 3114 and third fixed ear 3115 be respectively positioned on same straight line;First fixed ear 3113, the second fixed ear 3114, third are fixed The middle part of ear 3115 offers mounting hole, and the first fixed ear 3113 is fixed by the first bolt, and the second fixed ear 3114 passes through Second bolt is fixed, and third fixed ear 3115 is fixed by third bolt.
First bending slot 3111 is in half arc, and the second bending slot 3112 is in semicircular arc, when the first fixed anchor ear 31 is installed When, for the first bending slot 3111 for holding tightly in roofbolt 8, both ends are solid by the first fixed ear 3113 and third fixed ear 3115 It is fixed;After second fixed ear 3114 is fixed, the first sliding sleeve in hollow cylinder is formd between two the second bending slots 3112 6, third fixed ear 3115 is integrally inserted into the bending space on connecting elements 5 after docking, and makes the second fixed ear 3114 Mounting hole and the first bending part 521 and third bending part 523 lock hole it is concentric, then by third bolt from first bending Lock hole is passed through outside portion 521 and connecting elements 5 is fixedly connected by mounting hole with the second fixed ear 3114.
For the tool of support frame 2 there are two completely identical in structure second support bar 21, two second support bars 21 are relatively outside It is obliquely installed, higher one end can be bolted to connection in the bottom of underlying level frame 1, and lower one end is logical It is fixed to cross the fixed anchor ear 32 of second be fixedly connected on roofbolt 8, the fixed anchor ear 32 of second here and the second fixed anchor ear 32 Structure it is identical, details are not described herein.The second equally docking of bending slot 3112 of the second fixed anchor ear 32 is formed with second Sliding sleeve 7, the second sliding sleeve 7 and the first sliding sleeve 6 are concentric setting.
Here the first sliding sleeve 6 and the second sliding sleeve 7 not only can be when installing high-tension apparatus 9 as the limit of hawser 11 Position set, meanwhile, after being installed high-tension apparatus 9, first sliding sleeve 6 and the second sliding sleeve 7 can be used as high-tension apparatus 9 The gathering set of cable, can be by the regular gathering of cable into the first sliding sleeve 6 and the second sliding sleeve 7.
Embodiment two
With reference to Fig. 5, the embodiment of the present invention two discloses a kind of installation method of high-tension apparatus, has follow steps:
Step 1: the mounting height of high-tension apparatus 9 is determined according to design requirement, so that it is determined that the mounting height of level frame 1.
Step 2: according to the height measured, two first fixed anchor ears 31 are fixed on two roofbolts 8, two The spacing of one fixed anchor ear 31 is the spacing of two level frames 1.
Step 3: level fixes two fixed pulleys 10 on the roofbolt 8 positioned at the two first upward 1.5m of fixed anchor ear 31, Two tractors are set on the ground, and two tractors are respectively connected with a hawser 11, and two hawsers 11 give son a corresponding roofbolt 8, hawser 11 sequentially passes through the first sliding sleeve 6 from bottom to up and the second sliding sleeve 7 then passes around fixed pulley 10, and end is set with high pressure The lifting lug 13 that standby 9 upper ends carry is fixed.
Step 4: the synchronous driving of two draggers 12, gradually by 9 pull-up of high-tension apparatus, is pulled up to the height higher than level frame 1 Stop after degree.
Step 5: successively two level frames 1 are locked with the corresponding first fixed anchor ear 31 by bolt.
Step 6: two second support bars 21 are relatively arranged, the upper end of second support bar 21 is bolted on On underlying level frame 1, the lower end of second support bar 21 is connected on the second fixed anchor ear 32.
Step 7: dragger 12 drives hawser 11 that slowly high-tension apparatus 9 is placed on the level frame 1 on upper layer, and fixed.
Step 8: hawser 11 is packed up, fixed pulley 10 can not be removed, and subsequent maintenance later, dismounting high-tension apparatus 9 make With.
Step 9: the external cable line of high-tension apparatus 9 can pass through the first sliding sleeve 6 and the second sliding sleeve 7 is regular in bar On column 8.
Installation method through the embodiment of the present invention, construction personnel can not use Large-scale Hoisting equipment in the case where, In-site installation rapidly can be carried out to high-tension apparatus 9;Meanwhile also facilitating later maintenance, service personnel to the dimension of high-tension apparatus 9 Shield or disassembling, assembling and replacing.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (8)

1. a kind of 10KV overhead transmission line high-tension apparatus double rod support construction, characterized in that include
Level frame (1), for installing the high-tension apparatus (9);
Support frame (2), is set to the lower section of level frame (1), to support the level frame (1);
Fixation kit (3), there are two settings, and is oppositely disposed on two roofbolts (8), wherein each fixation kit (3) tool Have:
First fixed anchor ear (31), the anchor ear have the first anchor ear ontology (311) and a second anchor ear ontology (312), and described the One anchor ear ontology (311) and the second anchor ear ontology (312) have the first arc-shaped bending slot (3111) positioned at middle part, bending One end of slot is formed with the first fixed ear (3113), and the other end of the first bending slot (3111) is formed with the second folding of semicircular in shape Curved groove (3112), the outside one end of the second bending slot (3112) are formed with the second fixed ear (3114), the first fixed ear (3113) Mounting hole is offered on the second fixed ear (3114);
The first anchor ear ontology (311) and the second anchor ear ontology (312) are embraced by the first bending slot (3111) in roofbolt (8) On, and the first fixed ear (3113) is fixed by the first bolt, the second fixed ear (3114) is bolted to described by second The end of level frame (1);
The first sliding sleeve (6) of hollow cylinder is formed with after second bending slot (3112) docking.
2. 10KV overhead transmission line high-tension apparatus double rod support construction according to claim 1, characterized in that
There are two level frame (1) settings, is supported between two level frames (1) by curved reinforcing rod (4), described fixed group Part (3) is provided with two groups, and every group of fixation kit (3) accordingly fixes a level frame (1).
3. 10KV overhead transmission line high-tension apparatus double rod support construction according to claim 1 or 2, characterized in that
It is connect between the first bending slot (3111) and the second bending slot (3112) by third fixed ear (3115), described the Mounting hole is offered in three fixed ears (3115), third fixed ear (3115) is fixed by third bolt.
4. 10KV overhead transmission line high-tension apparatus double rod support construction according to claim 1, feature are being,
Support frame as described above (2) includes
Completely identical in structure two second support bars (21), two second support bars (21) are relatively obliquely installed;
Wherein, higher one end of second support bar (21) is fixedly connected on the bottom of underlying level frame (1), compared with Low one end with first fixed anchor ear (31) completely identical in structure second fixed anchor ear (32) by being fixed on roofbolt (8).
5. 10KV overhead transmission line high-tension apparatus double rod support construction according to claim 4, characterized in that
It is formed with after the second bending slot (3112) docking of described second fixed anchor ear (32) concentric with the first sliding sleeve (6) Second sliding sleeve (7).
6. 10KV overhead transmission line high-tension apparatus double rod support construction according to claim 1, characterized in that
The level frame (1) tool is equidistantly set between two first support bars (12) there are two parallel first support bar (12) It is equipped with several connecting rods (13), the both ends of two first support bars (12) and is connected between two first support bars (12) Have connecting elements (5), the connecting elements (5) is bolted with second fixed ear (3114) commonly through second.
7. 10KV overhead transmission line high-tension apparatus double rod support construction according to claim 6, it is characterized in that:
The connecting elements (5) includes
Two straight connecting rods (51), and
Between two straight connecting rods (51), and continuously vertically bent by one end of a straight connecting rod (51) straight with another three times The bent rod (52) of connecting rod (51) connection;
The bent rod (52) successively includes
First bending part (521), the second bending part (522) and third bending part (523), first bending part (521) with The lock hole concentric with mounting hole is offered on third bending part (523), second fixed ear (3114) is inserted into described In the bending space that one bending part (521) and third bending part (523) are formed, and by the second bolt pass through the mounting hole and Level frame (1) is fixed in locking hole.
8. a kind of installation method of high-tension apparatus, characterized in that
It has follow steps:
The first, the mounting height of high-tension apparatus (9) is determined according to design requirement, so that it is determined that the mounting height of level frame (1);
The second, two first fixed anchor ears (31) are fixed according to the height that measures, on two roofbolts (8), two first The spacing of fixed anchor ear (31) is the spacing of two level frames (1);
Third, level fixes two fixed pulleys (10) on the roofbolt (8) for being located at the upward 1.5m of two first fixed anchor ears (31), Two tractors are set on the ground, and two tractors are respectively connected with a hawser (11), and two hawsers (11) are one corresponding to son Roofbolt (8), hawser (11) sequentially pass through the first sliding sleeve (6) and the second sliding sleeve (7) from bottom to up and then pass around fixed pulley (10), the lifting lug (13) that end and high-tension apparatus (9) upper end carry is fixed;
The synchronous driving of four, the two draggers (12), gradually by high-tension apparatus (9) pull-up, is pulled up to the height higher than level frame (1) Stop after degree;
5th, successively two level frames (1) are locked with corresponding first fixed anchor ear (31) by bolt;
6th, two second support bars (21) are relatively arranged, the upper end of second support bar (21) is bolted on position In on the level frame (1) of lower section, the lower end of second support bar (21) is connected on second fixed anchor ear (32);
7th, high-tension apparatus (9) is slowly placed on the level frame (1) on upper layer by dragger (12) driving hawser (11), and solid It is fixed;
8th, hawser (11) is packed up, fixed pulley (10) can not be removed, and subsequent maintenance, dismounting high-tension apparatus (9) make later With;
9th, by the external cable line of high-tension apparatus (9) can pass through the first sliding sleeve (6) and the second sliding sleeve (7) it is regular On roofbolt (8).
CN201811585383.8A 2018-12-24 2018-12-24 10KV overhead transmission line high-tension apparatus double rod support construction and its installation method Pending CN109630844A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811585383.8A CN109630844A (en) 2018-12-24 2018-12-24 10KV overhead transmission line high-tension apparatus double rod support construction and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811585383.8A CN109630844A (en) 2018-12-24 2018-12-24 10KV overhead transmission line high-tension apparatus double rod support construction and its installation method

Publications (1)

Publication Number Publication Date
CN109630844A true CN109630844A (en) 2019-04-16

Family

ID=66077116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811585383.8A Pending CN109630844A (en) 2018-12-24 2018-12-24 10KV overhead transmission line high-tension apparatus double rod support construction and its installation method

Country Status (1)

Country Link
CN (1) CN109630844A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257966A (en) * 2015-11-12 2016-01-20 江苏省电力公司苏州供电公司 Rack of power transmission and distribution equipment
CN206417798U (en) * 2017-01-24 2017-08-18 龙口矿业集团有限公司 A kind of on-load tap changer overhauls the device that rises and falls
CN108002269A (en) * 2017-11-30 2018-05-08 国网山东省电力公司济南市历城区供电公司 A kind of simple pole type transformer lifting gear
CN108682341A (en) * 2018-06-07 2018-10-19 广东电网有限责任公司 The tamper-proof alarming device of middle pressure overhead transmission line and distribution assembly
CN208044135U (en) * 2017-10-26 2018-11-02 福建源发电力勘察设计有限公司 A kind of distribution cross-connecting box mounting bracket

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257966A (en) * 2015-11-12 2016-01-20 江苏省电力公司苏州供电公司 Rack of power transmission and distribution equipment
CN206417798U (en) * 2017-01-24 2017-08-18 龙口矿业集团有限公司 A kind of on-load tap changer overhauls the device that rises and falls
CN208044135U (en) * 2017-10-26 2018-11-02 福建源发电力勘察设计有限公司 A kind of distribution cross-connecting box mounting bracket
CN108002269A (en) * 2017-11-30 2018-05-08 国网山东省电力公司济南市历城区供电公司 A kind of simple pole type transformer lifting gear
CN108682341A (en) * 2018-06-07 2018-10-19 广东电网有限责任公司 The tamper-proof alarming device of middle pressure overhead transmission line and distribution assembly

Similar Documents

Publication Publication Date Title
CN102856838B (en) Tubular bus support insulator changing tool and method
CN204651769U (en) A kind of erection portable transmission overhead line crossing construction device easily
CN105780658B (en) A kind of Spatial Cable face structural cables system is laterally to pulling method
CN105914646A (en) Live-line working method for replacing 35kV strain insulator strings
CN102661057B (en) Power angle tower pull leg main material changing method and special main material clamp
CN109630844A (en) 10KV overhead transmission line high-tension apparatus double rod support construction and its installation method
CN104577871A (en) Portable power transmission overhead line crossing construction device
CN201149972Y (en) Equipotential operation curved ladder
CN202917892U (en) Replacing tool for supporting insulator of tubular busbar
CN102097189A (en) Four-link tension string for +/-800KV heavy ice area
CN109083395A (en) A kind of Excitations for Long Span Suspension operating platform and its erection method
CN103174323A (en) Multifunctional hoisting support frame
CN209669866U (en) A kind of prestress anchorage cable tensioning fixation component
CN209144662U (en) A kind of front fulcrum hangs the tensioning equipment of blue construction
CN208267411U (en) Civil building wall reinforcement device
CN203435482U (en) Tree reinforcing device
CN103477941B (en) Strengthening device of tree
CN205447177U (en) Equipment for power transmission and distribution rack
CN205724648U (en) A kind of charged for replacement 35kV strain insulator string specific purpose tool
CN205829059U (en) A kind of locking device and cable termination tower operating platform
CN109941900A (en) A kind of sound barrier plate simply installs equipment
CN205657377U (en) General card of 500kV circuit strain insulator tower wire end band corner block
CN204213262U (en) A kind of linkage structure of suspending wirerope and balance weight body in midair
CN204060013U (en) To encorbelment outward protective frame
CN220664621U (en) Large pump station overhauling lifting hook device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416