CN109630144A CN201811479487.0A CN201811479487A CN109630144A CN 109630144 A CN109630144 A CN 109630144A CN 201811479487 A CN201811479487 A CN 201811479487A CN 109630144 A CN109630144 A CN 109630144A
Authority
CN
China
Prior art keywords
shield
tail brush
shield tail
twice
brush ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811479487.0A
Other languages
Chinese (zh)
Other versions
CN109630144B (en
Inventor
马超
陈春雷
唐天龙
王新龙
张晨晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co
Original Assignee
No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co filed Critical No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co
Priority to CN201811479487.0A priority Critical patent/CN109630144B/en
Publication of CN109630144A publication Critical patent/CN109630144A/en
Application granted granted Critical
Publication of CN109630144B publication Critical patent/CN109630144B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0635Tail sealing means, e.g. used as end shuttering
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of methods of the shield machine of water rich strata constructing tunnel replacement twice shield tail brush ring, the following steps are included: 1) carry out patching to the section of jurisdiction for being used to support tunnel, 2) level of ground water within the scope of ventilating shaft is reduced, 3) shield tail brush ring shield machine, which tunnels forward, exposes the twice shield tail brush ring that needs replacing of shield drive end unit, 4) removing old shield tail brush ring and more renewing.The present invention has filled up in rich water soft stratum the construction technology blank for replacing twice shield tail brush, with good economic efficiency and social benefit.The limitation of one of shield tail brush of shield drive end unit can only be replaced by breaching the prior art, can be replaced twice shield tail brush simultaneously, be improved the construction efficiency of tunnel piercing, and provide safety guarantee, solve the technical problem of the Shield Construction Method Used shield tail safety of relatively long distance.It also solves tunnel and goes out the waterproof problem of downcast mouth, and ensure that the safety of replacement shield tail brush operating environment, the faster and better construction operation for completing replacement shield tail brush.

Description

The method of the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel
Technical field
The present invention relates to a kind of replacing options of shield machine tail sealing device for underground water rich strata constructing tunnel, In particular to a kind of method for replacing shield drive end unit shield tail brush ring, belongs to hypogee technical field of construction.
Background technique
With the continuous development of shield machine and its construction technology and perfect, shield-tunneling construction engineering method also has become current city tunnel Indispensable a kind of construction method in road and subway engineering.But when tunnel is built in big city, it is faced with the complexity in city Difficulty caused by unstability of property, the diversity of underground structure and pipeline and stratum etc., when the shield machine in tunnel passes through When intricately condition above-mentioned, the route of longer and small radius of curvature is needed, the shield tail brush sealing effect to shield drive end unit is pole Big test.As shown in Figures 2 and 3, interval secures three annular shield tail brush rings 20 in shield drive end unit shield shell 101, often One of shield tail brush ring 20 is spliced by muti-piece shield tail brush block 201.When shield machine 10 tunnels, three shield tail brush rings 20 are for sealing It puts in 30 periphery of ring body being made of in shield drive end unit shield shell 101 and multi-disc section of jurisdiction 301 and shield drive end unit shield shell 101 Gap between wall, to prevent water and silt in stratum from entering in shield machine 10.Shield machine 10 mixes in underground driving silt Under severe working condition, after a distance is tunneled in underground, 20 well damage of shield tail brush ring needs replacement in time.Conventional The method of replacement shield tail brush is one of shield tail brush ring 20 of replacement, or replaces in shallow embedding routine stratum shield tail brush and twice after retaining Shield tail brush ring 20, for keeping the leakproofness of the entirety of three shield tail brush ring 20.
Due to the good formation condition that shallow embedding routine stratum has underground water deeper, reduce the generation of Sand, from And substantially reduce the risk of replacement shield tail brush.Tunnel first is tunneled with shield machine at " well after first tunnel ", then excavates vertical wind In the construction technology of well, shield machine water-rich sand layer tunnel during need replacing shield tail brush ring when, need first by tunnel into Outlet air well head reinforces sealing and replaces shield tail brush ring again, and work progress is cumbersome, at high cost, it is also possible to influence the heading driver of shield machine Phase;And there was only the protective effect of one of shield tail brush ring at this time, there are larger leakage and sprays during replacing shield tail brush ring The risk gushed.
Summary of the invention
The object of the present invention is to provide a kind of present invention provide one kind in ventilating shaft in water-rich sand layer shield machine replace twice The construction method of shield tail brush ring can replace twice shield tail brush ring simultaneously, improve construction efficiency.
The present invention is achieved by the following technical programs:
A kind of method of the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel, comprising the following steps:
1) patching is carried out to the section of jurisdiction for being used to support the soil body before replacing twice shield tail brush ring
After shield machine reaches predetermined position, to 10 endless tube pieces finish and engaging one another of having constructed after shield drive end unit Sealing mortar depositing construction is carried out between outer peripheral surface and inside formation wall;
2) level of ground water within the scope of ventilating shaft is reduced
Several mouthfuls of dewatering wells of constructing within the scope of the ventilating shaft that will be constructed carry out precipitation;
3) shield machine, which tunnels forward, exposes the twice shield tail brush ring that shield drive end unit needs replacing
Section of jurisdiction is adjacent to piecewise in the lower half circle for being fixed on shield drive end unit shield shell inner wall, under composition is semicircular Semicircle section of jurisdiction assembly;Then it is enclosed in multiple horizontally-supported oil cylinders in shield drive end unit one, selects the level at the several intervals in top Support cylinder, and so that the tailpiece of the piston rod head assembly of the horizontally-supported oil cylinder is passed through corresponding auxiliary support bar respectively and support On the section of jurisdiction end face of corresponding position, bottom lower half circle section of jurisdiction and upper support oil cylinder provide shield machine and tunnel counter-force;Shield machine Continue driving and exposes the twice shield tail brush ring needed replacing;
4) the shield tail brush ring removing old shield tail brush ring and more renewing
4.1) inner peripheral surface, grease storehouse and the old shield tail of twice to be removed for first removing shield drive end unit shield shell upper semi-circle paint Grease and mortar, then alternately replacement shield drive end unit shield shell upper semi-circle in several horizontally-supported oil cylinders and corresponding auxiliary The muti-piece shield tail brush block that corresponding position is removed in corresponding region is vacated in the Support Position of support rod;Then respectively by the new shield of muti-piece Ventral brush block adjacent side is weldingly fixed on the original position for the old shield tail brush of twice that shield drive end unit shield shell has been removed with mutually spelling, and constitutes two The semicircle combination block of the new shield tail brush in road;By the friendship of horizontally-supported oil cylinders several for several times and corresponding auxiliary support bar Support Position For being welded and fixed for the semicircle combination block of transformation and corresponding position, complete in shield drive end unit shield shell upper semi-circle inner peripheral surface region The dismounting of the old shield tail brush of twice and being welded and fixed for the new shield tail brush semicircle combination block of twice;
4.2) the horizontally-supported oil cylinder of several symmetric arrays in shield drive end unit shield shell upper semi-circle is passed through respectively respectively Corresponding auxiliary support bar is supported on the section of jurisdiction end face of corresponding position, according to the symmetric position of tunnel inner wall two sides, uses spelling Several pieces sections of jurisdiction of the lower half circle of shield drive end unit outer tunnel inner wall are removed in installation in several times;Then respectively by the new shield tail brush block of muti-piece Adjacent side is weldingly fixed on the original position of the old shield tail brush of twice of shield drive end unit shield shell lower half circle inner peripheral surface dismounting with mutually spelling;Twice New shield tail brush block is respectively welded on the upper and lower semicircle for being fixed on shield drive end unit shield shell inner peripheral surface, constitutes spaced twice New shield tail brush ring, the hand grease on the new shield tail brush ring of twice.
The purpose of the present invention can also be further realized by following technical measures.
Further, in the sealing mortar depositing construction of 10 endless tube pieces engaging one another described in step 1), shield drive end unit Sealing is starched using polyurethane between outer endless tube piece outer circle and stratum, remaining 9 ring is all made of dual slurry sealing;The dual slurry is The mixture of cement slurry and waterglass slurry.
Further, the depth of dewatering well is more than distance of the shield machine downside away from ground elevation in step 2).
Further, the structure of the auxiliary support bar in step 4.1) is the vertical end panel and intermediate horizontal circle at both ends Steel construction piece made of steel-pipe welding.
The present invention has filled up in rich water soft stratum the construction technology blank for replacing twice shield tail brush, has good economy Benefit and social benefit overcome diversity, the unstability on stratum because of metropolitan complexity, underground structure and pipeline Give constructing tunnel bring difficult, shield drive end unit shield shell spillage leak provides safety guarantee when for soft stratum constructing tunnel And construction technical method.The present invention, which breaches the prior art, can only replace the limitation of one of shield tail brush of shield drive end unit, can be simultaneously Twice shield tail brush is replaced, the construction efficiency of tunnel piercing is improved, and provide safety guarantee, especially solves relatively long distance Shield Construction Method Used shield tail safety technical problem.The present invention is using a variety of slip casting measures and reasonable grouting sequence to shield Sealing mortar depositing construction is carried out between the 10 endless tube piece outer peripheral surfaces for having constructed finishing and engaging one another after drive end unit and stratum, and The measure that dewatering well carries out precipitation is added in the ventilating shaft not excavated, solves the waterproof problem that tunnel goes out downcast mouth, and protect The safety for having demonstrate,proved replacement shield tail brush operating environment makes to replace the faster and better completion of shield tail brush construction operation.
The advantages and features of the present invention will be illustrated and explained by the non-limitative illustration of preferred embodiment below, These embodiments only provide as an example referring to attached drawing.
Detailed description of the invention
Fig. 1 is flow chart of the invention;
Fig. 2 is the schematic diagram that shield drive end unit of the invention exposes twice shield tail brush;
Fig. 3 is the top view of ventilating shaft and dewatering well position that not yet excavates on the ground in the tunnel of shield machine driving;
Fig. 4 is the process chart of step 4) of the present invention;
Fig. 5 is the structural schematic diagram of auxiliary support bar of the present invention.
Specific embodiment
The case history pair constructed with reference to the accompanying drawing with Foshan Line 2 Metro Nan Zhuanzhan~lake section Yong Zhan double track tunnel The present invention is described further.
As shown in figure 3, Foshan Line 2 Metro Nan Zhuanzhan~lake section Yong Zhan, the long 2.29km of interval circuit (left line), completely River, high-pressure gas, high voltage transmission line tower, groups of building are passed through, wide bright high speed etc. has a ventilating shaft 40 to also serve as 3# contact logical among tunnel Road.For construction technology using the pattern for ventilating shaft 40 of constructing after first construction tunnel 100, the position of ventilating shaft 40 is South Lake section all fronts condition Best position, it is existing that shield machine 10 occurs 10 tail portion spillage of shield machine when the label of driving to ring body 30 is ring or so As tentatively judging that shield tail brush ring 20 damages, blocking polyurethane by 10 tail portion of shield machine, increase the injection of 10 tail portion grease of shield machine The measures such as amount carry out leak stopping, and shield machine 10 tunnels label in a nearest shield tail brush 20 replacement point i.e. ring body 30 in spite of illness and is Ring (hereinafter referred to as 528 rings).
As depicted in figs. 1 and 2, method of the invention, comprising the following steps:
1) patching is carried out to the section of jurisdiction 301 for being used to support tunnel 100 before replacing twice shield tail brush ring 20
It is finishing and each other to having constructed behind 10 tail portion of shield machine as shown in Fig. 2, after shield machine 10 reaches predetermined position 10 endless tube pieces 301 (518-527 ring) of linking carry out sealing mortar depositing construction between outer peripheral surface and stratum.Outside 10 tail portion of shield machine Polyurethane sealing is used between 527 endless tube piece, 301 outer circle and stratum, remaining 9 ring is all made of dual slurry sealing;The dual slurry The mixture starched for cement slurry and waterglass.
2) level of ground water in 40 range of ventilating shaft is reduced
As shown in figure 3,4 mouthfuls of dewatering wells 401 of constructing in 40 range of ventilating shaft that will be constructed carry out precipitation, dewatering well 401 Depth be more than distance of 10 downside of shield machine away from ground elevation be 28.8 meters, 100 construction surface of tunnel can be effectively reduced Level of ground water, improve execution conditions.
3) shield machine 10, which tunnels forward, exposes the twice shield tail brush ring 20 that 10 tail portion of shield machine needs replacing
Section of jurisdiction 301 is adjacent in the lower half circle for being fixed on 10 tail portion shield shell inner wall of shield machine piecewise, forms semicircle The lower half circle section of jurisdiction assembly 301A of shape.Then Monday encloses 16 water outside 10 tail portion of shield machine shown in the A such as Fig. 2 and Fig. 4 In flat support cylinder 102, the horizontally-supported oil cylinder 102 at 3 intervals in top is selected, label is respectively 1,3 and 15, and is made described The tailpiece of the piston rod head assembly 103 of horizontally-supported oil cylinder 102 passes through corresponding vertical end by both ends as shown in Figure 5 respectively The auxiliary support bar 50 that panel 501 and intermediate horizontal round steel pipe 502 are welded is supported on the three pieces section of jurisdiction 301 of corresponding position On end face;Shield machine 10 continues driving and exposes the twice shield tail brush ring 20 needed replacing.
4) it removes old shield tail brush and more renews shield tail brush
4.1) inner peripheral surface, grease storehouse and the old shield tail of twice to be removed of 101 upper semi-circle of shield drive end unit shield shell are first removed The grease and mortar painted, then shown in the H according to B~Fig. 4 of Fig. 4, successively alternately replacement label is respectively in the following order 1, the horizontally-supported oil cylinder 102 (B of Fig. 4) at 32 intervals, label are respectively 3,15 (C of Fig. 4), label respectively 1,15 (D of Fig. 4) and label are respectively the arrangement of 1,3 and 15 (E of Fig. 4) different intervals, 2 or 3 horizontally-supported oil cylinders being spaced 102, vacate the muti-piece shield tail brush block that corresponding position was cleared up and removed to 101 upper semi-circle regional area of shield drive end unit shield shell 201, the new shield tail brush block adjacent side of muti-piece is then weldingly fixed on the twice that shield drive end unit shield shell 101 has been removed with mutually spelling respectively On the original position of old shield tail brush, the semicircle combination block of the new shield tail brush of twice is constituted.By 2~3 for several times horizontally-supported oil cylinders 102 And the welding of the new shield tail brush semicircle combination block of the checker and corresponding position of corresponding 50 Support Position of auxiliary support bar is solid It is fixed, complete dismounting and the new shield of twice of the old shield tail brush ring of twice in 101 upper semi-circle inner peripheral surface region of shield drive end unit shield shell The semicircle combination block of ventral brush is welded and fixed.
4.2) shown in the H by F~Fig. 4 of Fig. 4, by 3 in 101 upper semi-circle of shield drive end unit shield shell labels be respectively 1, 3 and 15 horizontally-supported oil cylinder 102 is supported on the section of jurisdiction 301 of corresponding position by corresponding auxiliary support bar 50 respectively On end face.According to the symmetric position of 100 inner wall two sides of tunnel, the section of jurisdiction 301 of the left side position A1 is first removed with assembling machine, such as Fig. 4 F shown in;The section of jurisdiction 301 for removing the right side position A3 again, as shown in the G of Fig. 4;Finally remove the pipe of the position A2 of lower side position Piece 301, as shown in the H of Fig. 4.In this way, 3 sections of jurisdiction 301 of the lower half circle in point 3 dismounting 10 tail portions of shield machine.Then distinguish The twice that the new shield tail brush block adjacent side of muti-piece is weldingly fixed on the dismounting of 101 lower half circle inner peripheral surface of shield drive end unit shield shell with mutually spelling are old On the original position of shield tail brush;The upper and lower semicircle for being fixed on 101 inner peripheral surface of shield drive end unit shield shell is respectively welded in the new shield tail brush block of twice On, constitute the new shield tail brush ring 20 of spaced twice.The hand grease on the new shield tail brush ring 20 of twice completes twice shield tail The replacement of brush ring 20.
In addition to the implementation, the present invention can also have other embodiments, all to use equivalent substitution or equivalent transformation shape At technical solution, be all fallen within the protection domain of application claims.

Claims (5)

1. a kind of method of the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel, which is characterized in that including following Step:
Patching is carried out to the section of jurisdiction for being used to support tunnel before replacement twice shield tail brush ring
After shield machine reaches predetermined position, to 10 endless tube piece peripheries finish and engaging one another of having constructed after shield drive end unit Sealing mortar depositing construction is carried out between face and stratum;
Reduce the level of ground water within the scope of ventilating shaft
Several mouthfuls of dewatering wells of constructing within the scope of the ventilating shaft that will be constructed carry out precipitation;
Shield machine, which tunnels forward, exposes the twice shield tail brush ring that shield drive end unit needs replacing
Section of jurisdiction is adjacent in the lower half circle for being fixed on shield drive end unit shield shell inner wall piecewise, forms semicircular lower half circle Section of jurisdiction assembly;Then it is enclosed in multiple horizontally-supported oil cylinders in shield drive end unit one, selects the horizontally-supported of the several intervals in top Oil cylinder, and so that the tailpiece of the piston rod head assembly of the horizontally-supported oil cylinder is passed through corresponding auxiliary support bar respectively and be supported on pair It answers on the section of jurisdiction end face of position, bottom lower half circle section of jurisdiction and upper support oil cylinder provide shield machine and tunnel counter-force;Shield machine continues Driving exposes the twice shield tail brush ring needed replacing;
4) the shield tail brush ring removing old shield tail brush ring and more renewing
4.1) on inner peripheral surface, grease storehouse and the old shield tail brush ring of twice to be removed for first removing shield drive end unit shell upper semi-circle Then grease and mortar alternately replace several horizontally-supported oil cylinders and corresponding auxiliary branch in shield drive end unit shell upper semi-circle The muti-piece shield tail brush ring block that corresponding position is removed in corresponding region is vacated in the Support Position of strut;Then that muti-piece is new respectively Shield tail brush ring block adjacent side is weldingly fixed on the original position for the old shield tail brush ring of twice that shield drive end unit shell has been removed with mutually spelling, group At the semicircle combination block of the new shield tail brush ring of twice;By horizontally-supported oil cylinders several for several times and corresponding auxiliary support bar branch Being welded and fixed for the new shield tail brush semicircle combination block of the checker and corresponding position of support position, completes shield drive end unit shell The dismounting of the old shield tail brush ring of twice and being welded and fixed for the new shield tail brush semicircle combination block of twice in upper semi-circle inner peripheral surface region;
4.2) the horizontally-supported oil cylinder of several symmetric arrays in shield drive end unit shell upper semi-circle is passed through respectively and is respectively corresponded to Auxiliary support bar be supported on the section of jurisdiction end face of corresponding position, according to the symmetric position of tunnel inner wall two sides, use assembling machine Several pieces sections of jurisdiction of the lower half circle of shield drive end unit outer tunnel inner wall are removed in several times;Then respectively that the new shield tail brush ring block of muti-piece is adjacent Side is weldingly fixed on the original position of the old shield tail brush ring of twice of shield drive end unit shell lower half circle inner peripheral surface dismounting with mutually spelling;Twice New shield tail brush ring block is respectively welded on the upper and lower semicircle for being fixed on shield drive end unit shell inner peripheral surface, constitutes spaced The new shield tail brush ring ring of twice, the hand grease on the new shield tail brush ring of twice.
2. the method for the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel in ventilating shaft as described in claim 1, It is characterized by: in the sealing mortar depositing construction of 10 endless tube pieces engaging one another described in step 1), the outer ring of shield drive end unit Sealing is starched using polyurethane between section of jurisdiction outer circle and stratum, remaining 9 ring is all made of dual slurry sealing.
3. the method for the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel in ventilating shaft as claimed in claim 2, It is characterized by: the dual slurry is the mixture that cement slurry and waterglass are starched.
4. the method for the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel in ventilating shaft as described in claim 1, It is characterized by: the depth of dewatering well is more than distance of the shield machine downside away from ground elevation in step 2.
5. the method for the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel in ventilating shaft as described in claim 1, It is characterized by: the structure of the auxiliary support bar in step 4.1) is the vertical end panel and intermediate horizontal circle steel pipe welding at both ends Steel construction piece made of connecing.
CN201811479487.0A 2018-12-05 2018-12-05 Method for replacing two shield tail brush rings of shield tunneling machine for water-rich stratum tunnel construction Active CN109630144B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811479487.0A CN109630144B (en) 2018-12-05 2018-12-05 Method for replacing two shield tail brush rings of shield tunneling machine for water-rich stratum tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811479487.0A CN109630144B (en) 2018-12-05 2018-12-05 Method for replacing two shield tail brush rings of shield tunneling machine for water-rich stratum tunnel construction

Publications (2)

Publication Number Publication Date
CN109630144A true CN109630144A (en) 2019-04-16
CN109630144B CN109630144B (en) 2020-07-07

Family

ID=66071390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811479487.0A Active CN109630144B (en) 2018-12-05 2018-12-05 Method for replacing two shield tail brush rings of shield tunneling machine for water-rich stratum tunnel construction

Country Status (1)

Country Link
CN (1) CN109630144B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067565A (en) * 2019-05-16 2019-07-30 中铁十二局集团有限公司 A method of acting on exchanging shield ventral brush in rich water sandy silt soil stratum shield-tunneling construction
CN110541722A (en) * 2019-09-30 2019-12-06 中铁第四勘察设计院集团有限公司 Partial shield tunnel segment dismantling method and water stop structure in middle air shaft
CN110757397A (en) * 2019-11-15 2020-02-07 沪东中华造船(集团)有限公司 Method for replacing box body top plate of large pin wheel supporting ring of gantry crane
CN111648779A (en) * 2020-05-09 2020-09-11 徐州工程学院 Shield head system capable of effectively reducing surrounding rock disturbance
CN114033400A (en) * 2021-11-25 2022-02-11 中铁隧道局集团有限公司 Shield tail mechanism capable of replacing all shield tail brushes in hole and method for replacing shield tail brushes

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08218783A (en) * 1995-02-17 1996-08-27 Kajima Corp Exchange method of tail seal in shield machine
JPH10131683A (en) * 1996-11-05 1998-05-19 Kajima Corp Emergency water impervious device for tail seal of shield machine
JP2000220386A (en) * 1999-02-03 2000-08-08 Shimizu Corp Shield excavator
JP2002021486A (en) * 2000-07-05 2002-01-23 Taisei Corp Tail bush replacing device and replacing method for shield machine
JP2007303134A (en) * 2006-05-10 2007-11-22 Tohoku Oshima Kogyo Kk Sealing device of buckling shield machine
CN101251015A (en) * 2008-04-02 2008-08-27 上海隧道工程股份有限公司 Construction method for exchanging shield ventral brush
CN102242633A (en) * 2011-07-23 2011-11-16 中铁十二局集团有限公司 Method for replacing tail brush in extra large diameter shield driving under high water pressure condition
CN107035378A (en) * 2017-05-25 2017-08-11 上海隧道工程有限公司 The method of super-large-diameter shield machine exchanging shield ventral brush under high hydraulic condition
CN107387101A (en) * 2017-09-19 2017-11-24 五邑大学 The exchanging shield ventral brush method of shield machine
CN108374664A (en) * 2018-02-07 2018-08-07 中铁十二局集团有限公司 The closed station-crossing construction method of ventilating shaft steel bushing among rich water soft soil layer
CN108571322A (en) * 2018-05-16 2018-09-25 华东交通大学 A kind of shield machine ventral brush device and its replacing options

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08218783A (en) * 1995-02-17 1996-08-27 Kajima Corp Exchange method of tail seal in shield machine
JPH10131683A (en) * 1996-11-05 1998-05-19 Kajima Corp Emergency water impervious device for tail seal of shield machine
JP2000220386A (en) * 1999-02-03 2000-08-08 Shimizu Corp Shield excavator
JP2002021486A (en) * 2000-07-05 2002-01-23 Taisei Corp Tail bush replacing device and replacing method for shield machine
JP2007303134A (en) * 2006-05-10 2007-11-22 Tohoku Oshima Kogyo Kk Sealing device of buckling shield machine
CN101251015A (en) * 2008-04-02 2008-08-27 上海隧道工程股份有限公司 Construction method for exchanging shield ventral brush
CN102242633A (en) * 2011-07-23 2011-11-16 中铁十二局集团有限公司 Method for replacing tail brush in extra large diameter shield driving under high water pressure condition
CN107035378A (en) * 2017-05-25 2017-08-11 上海隧道工程有限公司 The method of super-large-diameter shield machine exchanging shield ventral brush under high hydraulic condition
CN107387101A (en) * 2017-09-19 2017-11-24 五邑大学 The exchanging shield ventral brush method of shield machine
CN108374664A (en) * 2018-02-07 2018-08-07 中铁十二局集团有限公司 The closed station-crossing construction method of ventilating shaft steel bushing among rich water soft soil layer
CN108571322A (en) * 2018-05-16 2018-09-25 华东交通大学 A kind of shield machine ventral brush device and its replacing options

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李有兵: "泥水盾构高水压条件下盾尾刷的更换技术", 《建筑机械化》 *
邵高波: "富水砂卵石地层盾尾刷更换技术", 《铁道建筑技术》 *
陶云超: "海瑞克盾构机盾尾刷更换技术研究", 《铁道建筑技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067565A (en) * 2019-05-16 2019-07-30 中铁十二局集团有限公司 A method of acting on exchanging shield ventral brush in rich water sandy silt soil stratum shield-tunneling construction
CN110541722A (en) * 2019-09-30 2019-12-06 中铁第四勘察设计院集团有限公司 Partial shield tunnel segment dismantling method and water stop structure in middle air shaft
CN110757397A (en) * 2019-11-15 2020-02-07 沪东中华造船(集团)有限公司 Method for replacing box body top plate of large pin wheel supporting ring of gantry crane
CN111648779A (en) * 2020-05-09 2020-09-11 徐州工程学院 Shield head system capable of effectively reducing surrounding rock disturbance
CN111648779B (en) * 2020-05-09 2021-07-27 徐州工程学院 Shield head system capable of effectively reducing surrounding rock disturbance
CN114033400A (en) * 2021-11-25 2022-02-11 中铁隧道局集团有限公司 Shield tail mechanism capable of replacing all shield tail brushes in hole and method for replacing shield tail brushes
CN114033400B (en) * 2021-11-25 2023-06-30 中铁隧道局集团有限公司 Shield tail mechanism capable of replacing all shield tail brushes in hole and method for replacing shield tail brushes

Also Published As

Publication number Publication date
CN109630144B (en) 2020-07-07

Similar Documents

Publication Publication Date Title
CN109630144A (en) The method of the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
CN104089089B (en) Pressure backfill type elasticity pipe laying method of construction
CN102352757B (en) Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel
CN106934159A (en) A kind of assembled point bit digitizing type selecting assembling method of duct pieces of shield tunnel
CN109630133B (en) A kind of push-bench exempts to dismount pipeline system and its construction method
CN110332409A (en) The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure
CN103334761B (en) Method of constructing shallow tunnel underground passage variable-cross section cross mid-partition wall
CN212690047U (en) Tunnel fault broken zone excavation outline line edge curtain slip casting body structure
CN105484773A (en) System plugging and draining structure for tunnel leakage treatment
US20230003123A1 (en) Comprehensive utilization method and test equipment for surface water, goaf and geothermal energy in coal mining subsidence area
CN107687344A (en) A kind of shield machine exchanging shield ventral brush stretches steel loop, sealing structure and replacing options
CN108591614A (en) Multi-pipe crossing construction method in combustion gas old pipeline
CN203700978U (en) Box culvert pilot tubal curtain device
CN208073510U (en) A kind of shield tunnel liner construction of the assembled prefabricated secondary lining section of jurisdiction in arch
CN109594574A (en) Large-scale push pipe open caisson reversed construction method based on the confined space
CN204783063U (en) Doubly -linked encircles tunnel mid -board prevents drainage structures
CN202690073U (en) Water stopping structure of steel wire brush of shield tunnel portal
CN104018858A (en) Novel water stopping structure for tunneling seam in permafrost region
CN208396715U (en) A kind of leading pilot tunnel of running tunnel freezes water sealing structure
CN103628899B (en) Retain CRD median septum and be welded with water flange construction technology
CN216008513U (en) Railway shield tunnel segment ring block structure
CN205189889U (en) Shield constructs section of jurisdiction waterproof construction
CN101705717A (en) Internal liner of drainage pipe or dirt discharge pipe for operation with water and construction method thereof for operation with water
CN106761781A (en) Shield armored concrete open cut tunnel receives construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant