CN107387101A - The exchanging shield ventral brush method of shield machine - Google Patents

The exchanging shield ventral brush method of shield machine Download PDF

Info

Publication number
CN107387101A
CN107387101A CN201710851920.8A CN201710851920A CN107387101A CN 107387101 A CN107387101 A CN 107387101A CN 201710851920 A CN201710851920 A CN 201710851920A CN 107387101 A CN107387101 A CN 107387101A
Authority
CN
China
Prior art keywords
shield
jurisdiction
shield tail
section
brush
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710851920.8A
Other languages
Chinese (zh)
Inventor
曾晖
胡俊
陈青生
姚柳
邓璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuyi University
Original Assignee
Wuyi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuyi University filed Critical Wuyi University
Priority to CN201710851920.8A priority Critical patent/CN107387101A/en
Publication of CN107387101A publication Critical patent/CN107387101A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement

Abstract

The invention discloses a kind of exchanging shield ventral brush method of shield machine, its method is:Step 1: annular bamboo reinforcement injected hole arrangement and mortar depositing construction;Step 2: the replacing of shield tail brush;Step 3: installation section of jurisdiction;Step 4: the safeguard measure after exchanging shield ventral brush.Beneficial effects of the present invention:Localization slip casting can be oriented according to on-site actual situations.Have the advantages that low cost, practical, ruggedized equipment of constructing are not take up tunnel space, short time limit.Influence less, to have no adverse effect to shield tunnel construction stability to caused by the structure durability of section of jurisdiction.With larger application value.

Description

The exchanging shield ventral brush method of shield machine
Technical field
The present invention relates to a kind of replacing options of construction machinery part, more particularly to a kind of exchanging shield ventral brush side of shield machine Method.
Background technology
At present, either balancing earth-pressure shielding machine or slurry balance shield machine, are all the operations in the environment of closing, shield Should be dry in structure machine.But different degrees of infiltration occurs for various reasons, inside shield machine, oozes mud etc. Phenomenon, and shield machine internal leak phenomenon is concentrated mainly on shield tail.How to prevent and treat with control shield tail leakage problems is shield tunnel Another key subject in construction.Shield tail seepage assembles the improper, back of the body mainly due to section of jurisdiction and fills in the unfavorable, oil quantity of slurry and pressure not Caused by foot, the damage of shield tail brush etc..
Due to reasons such as pipe sheet assembling is improper, shield long distance drivings, shield tail brush can be damaged inevitably, according to Experience, the life-span of shield tail brush is typically in 2.5km or so under shield normal operating conditions.The damage of shield tail brush can cause shield tail close Envelope property declines, and serious meeting influences shield and normally tunneled, and in this case, the shield tail brush of damage need to be changed.In the past Engineering practice in exchanging shield ventral brush mostly use increase shield tail synchronous grouting amount and change slip casting proportioning coagulated with accelerating slurries Admittedly the measure of grade.However, the stratum inadaptability of slip casting method, the poor continuity of grouting curtain, lack of homogeneity, the slip casting soil body and shield And the flexible unfavorable factor with toughness of cementing shortage of section of jurisdiction is objective reality, can cause the risk hidden danger of water shutoff difference.It is right In the stratum of full water weak soil, slip casting lack of homogeneity, the excessive risk work under the conditions of subaqueous tunnel and exchanging shield ventral brush grade long in time limit Journey, grouting seal water is still without absolutely holding.Compared to ejection for water plugging layer, the Frozen Soil Cylinder that freezing process is formed has continuity Well, the advantages that uniformity is good, water shutoff is good, pliability is good, intensity is high.Therefore, engineering with artificial freezing method starts extensive utilization to shield tail Brush changes construction.Annular consolidation by freezing water sealing structure when patent CN 205260042U disclose a kind of exchanging shield ventral brush, it is Annular freezing pipe is embedded with the soil body of shield tail brush position, freezes to make the soil body at shield tail brush to be formed by annular freezing pipe There is annular Frozen Soil Cylinder to reinforce water sealing structure.But the patent has the disadvantage that:
1st, the duration reinforces long in time limit with respect to slip casting method, and freezing process needs to carry out the standard of low temperature refrigerant medium with refrigeration plant It is standby, actively freeze to generally require 30 days, therefore add the duration.
2nd, freezing consolidation needs to place freezing equipment in shield tunnel, and the freezing equipment space-consuming is big, influences shield The subsequent construction that ventral brush is changed.
3rd, freezing equipment process of refrigerastion power consumption is big, and freezing consolidation cost is high.
The content of the invention
The invention aims to a kind of exchanging shield ventral brush method for the shield machine for solving above-mentioned technical problem and providing.
The exchanging shield ventral brush method of shield machine provided by the invention, its method are as described below:
Step 1: annular bamboo reinforcement injected hole arrangement and mortar depositing construction:
1-2 root rings are buried on the precalculated position of the soil body outside the section of jurisdiction for changing shield tail brush by annular injected hole construction equipment Shape bamboo reinforcement grouted anchor bar, annular bamboo reinforcement grouted anchor bar soil body outside replacing shield tail brush section of jurisdiction are generally 1 arrangement and put, water shutoff requirement 2 rows can be arranged in the case of height, injecting paste material is ordinary cement single slurry combination ordinary cement-waterglass dual slurry, and slurries are matched somebody with somebody Than for ordinary cement single slurry W:C=0.6-0.8:1;Ordinary cement-waterglass dual slurry W:C=1:1, C:S=1:1;Slip casting Pressure 2-3MPa;Perforate is controlled in ± 10cm according to design attitude, deviation;When the more difficult pore-forming of stratum weakness, using sleeve pipe with Enter, pass through sleeve pipe tripping in annular bamboo reinforcement grouted anchor bar, it is ensured that projected depth is arrived under anchor pole;Annular bamboo reinforcement grouted anchor bar installs completion After moving back brill, orifice sealing is carried out, and carry out slip casting immediately to prevent because sediment outflow, draining cause surrounding soil displacement to aggravate, it is ensured that ring The anchor force of shape bamboo reinforcement anchor pole;
Step 2: the replacing of shield tail brush:
1), after annular bamboo reinforcement grouted anchor bar slip casting, reinforcing water-stagnating effect that need to be to annular grouting curtain checks, leads to The injected hole for crossing out two detection peep holes or section of jurisdiction checked, determine it is anhydrous after carry out exchanging shield ventral brush again, removing Before section of jurisdiction, neighbouring section of jurisdiction must carry out inner support;
2), after above-mentioned preparation, you can exchanging shield ventral brush is carried out, it is first normal to promote, 1m or so is advanced to, The welding for carrying out pipe lengthens a thousand pieces of gold top, then is promoted, and until first of shield tail brush is completely exposed, stopping promotes, and directly enters The whole circle of row is changed, and after replacing, measurement and positioning, is welded with gap of the shield tail pad, pipe sheet assembling, pushing tow pipe are being carried out with extension arm Piece slides, and with upper ring distance 100mm, device to hole, wears bolt, pushing tow, the docking of the old and new section of jurisdiction, bolt fastening propulsion, pipe support Cut off after abjection;
3) 3 ring scope 2-3 injected holes of lower half circle after shield ring, and mounting ball valve are reserved when, changing shield tail brush, it is standby Leak grouting behind shaft or drift lining injects polyurethane, exposure shield tail brush, waste oil and mortar between removing shield tail brush in seal groove, to shield tail Brush is checked that the shield tail brush for not having use value to serious wear is directly cut off, and carries out polishing processing to cutting off region, mill Damage is relatively light simply to be cleared up by the shield tail brush of mortar consolidation, combs shield tail brush using Reinforced hook during cleaning, the cleaning of shield tail brush will Thoroughly, the part cut off will weld new shield tail brush again, sealing shield tail brush be welded again with Φ 5mm506 welding rods, phase Spacing between adjacent shield tail brush is not more than 3mm, and tail seal grease of shield is smeared again to the seal groove between shield tail brush and shield tail brush;
4), measure shield tail surrounding gap and record, manufacture and gap of the shield tail support pipe is welded with tail shield, pipe rises to section of jurisdiction To supporting role, avoid falling under section of jurisdiction on shield shell, section of jurisdiction is kept identical gap of the shield tail with a upper ring, it is ensured that new mounting ring It is concentric with a upper ring;
Step 3: installation section of jurisdiction:
Installation section of jurisdiction follows the order installed from bottom to top, the K blocks that bind selection ll points or l points position, when erecting ring in whole is complete Cheng Hou, section of jurisdiction is just elapsed backward, pushing tow erecting ring in whole section of jurisdiction, with a upper ring away from 1OOmm, is started when two endless tube pieces are at a distance of 10mm Penetrate bolt, segment bolt spells section of jurisdiction from having installed section of jurisdiction and wear to new, when section of jurisdiction in place when, 10 groups of jack reinforce simultaneously, with Just the contact of two endless tube pieces is close, fastens all bolts of the domain repeatedly, after section of jurisdiction is installed in place, with shield tail grease pump pumping shield tail Uncompacted shield tail brush groove and shield tail brush are manually smeared in seal grease, filling, and the operating pressure of shield tail grease pump can be set, reach It can stop after to setup pressure value, recover normal and promote, behind the supporting steel plate abjection section of jurisdiction of welding, be cut off, to shield shell Grinding process is done, soil pressure Conservation measures are taken in replacing, prevents body center of gravity from moving forward, causes posture, gap, shield tail full circle degree hair Changing, after completing a series of activities, segment assembly, gap of the shield tail is measured before pipe sheet assembling, segment selection is carried out, due to shield tail Bottom long-time stress, bottom gap of the shield tail is larger, and top gap of the shield tail is too small, when section of jurisdiction is installed, by first up and then down progress, After installation is completed in section of jurisdiction, it can recover to tunnel after injecting enough greases to shield tail;
Step 4: the safeguard measure after exchanging shield ventral brush:
Protect the work of shield tail brush synchronous with changing shield tail brush should carry out, to prevent the damage again of shield tail brush, Ying Cai Take the following precautionary measures:
1) grease, is filled:
In order to prevent the damage of shield tail brush, while increase the effect of sealing, carry out change shield tail brush during, it is necessary to Steel wire to every piece of shield tail brush fills in grease by hand again;
2), shield tail brush is put the oil:
During being reinstalled in section of jurisdiction, the steel spring plate for giving section of jurisdiction contact one side spreads butter, increase section of jurisdiction with Lubrication between steel spring plate;
3), seal groove filling grease:
After having changed sealing brush and again assembled good section of jurisdiction, before shield machine propulsion, shield tail injected grease system is first passed through to shield Ventral brush asks injection seal grease;
4) shield shell bottom, is cleared up in time:
In tunneling process install per endless tube piece when, it is necessary to shield shell bottom is cleaned out, prevent rubble be clipped in section of jurisdiction with Between shield shell, sealing brush is damaged to the rear shifting of section of jurisdiction, while avoids shield attitude from being mutated as far as possible.
Beneficial effects of the present invention:
1st, the present invention is compared with routine slip casting method is reinforced when exchanging shield ventral brush, ground adaptability is strong, grouting curtain it is continuous Property and uniformity is good, grouting curtain flexible and toughness is good, and localization slip casting can be oriented according to on-site actual situations.
2nd, compared with freezing consolidation of present invention when exchanging shield ventral brush, there is low cost, practical, reinforcing of constructing to set Standby the advantages that being not take up tunnel space, short time limit.
3rd, the present invention along section of jurisdiction compared with directly punching and laying one week freezing pipe or Grouting Pipe reinforcing sealing, simply in pipe 1-2 injected hole has been laid on piece, influenceed to caused by the structure durability of section of jurisdiction it is little, to shield tunnel construction stability without Adverse effect.
4th, the present invention have construct that practical, quality control on construction is convenient, consolidation effect particularly water-stagnating effect is good and Outstanding advantages of safe and reliable, there is larger application value.
Embodiment
The exchanging shield ventral brush method of shield machine provided by the invention, its method are as described below:
Step 1: annular bamboo reinforcement injected hole arrangement and mortar depositing construction:
1-2 root rings are buried on the precalculated position of the soil body outside the section of jurisdiction for changing shield tail brush by annular injected hole construction equipment Shape bamboo reinforcement grouted anchor bar, annular bamboo reinforcement grouted anchor bar soil body outside replacing shield tail brush section of jurisdiction are generally 1 arrangement and put, water shutoff requirement 2 rows can be arranged in the case of height, injecting paste material is ordinary cement single slurry combination ordinary cement-waterglass dual slurry, and slurries are matched somebody with somebody Than for ordinary cement single slurry W:C=0.6-0.8:1;Ordinary cement-waterglass dual slurry W:C=1:1, C:S=1:1;Slip casting Pressure 2-3MPa;Perforate is controlled in ± 10cm according to design attitude, deviation;When the more difficult pore-forming of stratum weakness, using sleeve pipe with Enter, pass through sleeve pipe tripping in annular bamboo reinforcement grouted anchor bar, it is ensured that projected depth is arrived under anchor pole;Annular bamboo reinforcement grouted anchor bar installs completion After moving back brill, orifice sealing is carried out, and carry out slip casting immediately to prevent because sediment outflow, draining cause surrounding soil displacement to aggravate, it is ensured that ring The anchor force of shape bamboo reinforcement anchor pole;
Step 2: the replacing of shield tail brush:
1), after annular bamboo reinforcement grouted anchor bar slip casting, reinforcing water-stagnating effect that need to be to annular grouting curtain checks, leads to The injected hole for crossing out two detection peep holes or section of jurisdiction checked, determine it is anhydrous after carry out exchanging shield ventral brush again, removing Before section of jurisdiction, neighbouring section of jurisdiction must carry out inner support;
2), after above-mentioned preparation, you can exchanging shield ventral brush is carried out, it is first normal to promote, 1m or so is advanced to, The welding for carrying out pipe lengthens a thousand pieces of gold top, then is promoted, and until first of shield tail brush is completely exposed, stopping promotes, and directly enters The whole circle of row is changed, and after replacing, measurement and positioning, is welded with gap of the shield tail pad, pipe sheet assembling, pushing tow pipe are being carried out with extension arm Piece slides, and with upper ring distance 100mm, device to hole, wears bolt, pushing tow, the docking of the old and new section of jurisdiction, bolt fastening propulsion, pipe support Cut off after abjection;
3) 3 ring scope 2-3 injected holes of lower half circle after shield ring, and mounting ball valve are reserved when, changing shield tail brush, it is standby Leak grouting behind shaft or drift lining injects polyurethane, exposure shield tail brush, waste oil and mortar between removing shield tail brush in seal groove, to shield tail Brush is checked that the shield tail brush for not having use value to serious wear is directly cut off, and carries out polishing processing to cutting off region, mill Damage is relatively light simply to be cleared up by the shield tail brush of mortar consolidation, combs shield tail brush using Reinforced hook during cleaning, the cleaning of shield tail brush will Thoroughly, the part cut off will weld new shield tail brush again, sealing shield tail brush be welded again with Φ 5mm506 welding rods, phase Spacing between adjacent shield tail brush is not more than 3mm, and tail seal grease of shield is smeared again to the seal groove between shield tail brush and shield tail brush;
4), measure shield tail surrounding gap and record, manufacture and gap of the shield tail support pipe is welded with tail shield, pipe rises to section of jurisdiction To supporting role, avoid falling under section of jurisdiction on shield shell, section of jurisdiction is kept identical gap of the shield tail with a upper ring, it is ensured that new mounting ring It is concentric with a upper ring;
Step 3: installation section of jurisdiction:
Installation section of jurisdiction follows the order installed from bottom to top, the K blocks that bind selection ll points or l points position, when erecting ring in whole is complete Cheng Hou, section of jurisdiction is just elapsed backward, pushing tow erecting ring in whole section of jurisdiction, with a upper ring away from 1OOmm, is started when two endless tube pieces are at a distance of 10mm Penetrate bolt, segment bolt spells section of jurisdiction from having installed section of jurisdiction and wear to new, when section of jurisdiction in place when, 10 groups of jack reinforce simultaneously, with Just the contact of two endless tube pieces is close, fastens all bolts of the domain repeatedly, after section of jurisdiction is installed in place, with shield tail grease pump pumping shield tail Uncompacted shield tail brush groove and shield tail brush are manually smeared in seal grease, filling, and the operating pressure of shield tail grease pump can be set, reach It can stop after to setup pressure value, recover normal and promote, behind the supporting steel plate abjection section of jurisdiction of welding, be cut off, to shield shell Grinding process is done, soil pressure Conservation measures are taken in replacing, prevents body center of gravity from moving forward, causes posture, gap, shield tail full circle degree hair Changing, after completing a series of activities, segment assembly, gap of the shield tail is measured before pipe sheet assembling, segment selection is carried out, due to shield tail Bottom long-time stress, bottom gap of the shield tail is larger, and top gap of the shield tail is too small, when section of jurisdiction is installed, by first up and then down progress, After installation is completed in section of jurisdiction, it can recover to tunnel after injecting enough greases to shield tail;
Step 4: the safeguard measure after exchanging shield ventral brush:
Protect the work of shield tail brush synchronous with changing shield tail brush should carry out, to prevent the damage again of shield tail brush, Ying Cai Take the following precautionary measures:
1) grease, is filled:
In order to prevent the damage of shield tail brush, while increase the effect of sealing, carry out change shield tail brush during, it is necessary to Steel wire to every piece of shield tail brush fills in grease by hand again;
2), shield tail brush is put the oil:
During being reinstalled in section of jurisdiction, the steel spring plate for giving section of jurisdiction contact one side spreads butter, increase section of jurisdiction with Lubrication between steel spring plate;
3), seal groove filling grease:
After having changed sealing brush and again assembled good section of jurisdiction, before shield machine propulsion, shield tail injected grease system is first passed through to shield Ventral brush asks injection seal grease;
4) shield shell bottom, is cleared up in time:
In tunneling process install per endless tube piece when, it is necessary to shield shell bottom is cleaned out, prevent rubble be clipped in section of jurisdiction with Between shield shell, sealing brush is damaged to the rear shifting of section of jurisdiction, while avoids shield attitude from being mutated as far as possible.

Claims (1)

1. a kind of exchanging shield ventral brush method of shield machine, it is characterised in that:Its method is as described below:
Step 1: annular bamboo reinforcement injected hole arrangement and mortar depositing construction:
1-2 root annular bamboos are buried on the precalculated position of the soil body outside the section of jurisdiction for changing shield tail brush by annular injected hole construction equipment Muscle grouted anchor bar, annular bamboo reinforcement grouted anchor bar soil body outside replacing shield tail brush section of jurisdiction are generally 1 arrangement and put, and water shutoff requires high In the case of can arrange 2 rows, injecting paste material is ordinary cement single slurry combination ordinary cement-waterglass dual slurry, and grout coordinate ratio is Ordinary cement single slurry W:C=0.6-0.8:1;Ordinary cement-waterglass dual slurry W:C=1:1, C:S=1:1;Grouting pressure 2-3MPa;Perforate is controlled in ± 10cm according to design attitude, deviation;When the more difficult pore-forming of stratum weakness, followed up, led to using sleeve pipe Cross sleeve pipe tripping in annular bamboo reinforcement grouted anchor bar, it is ensured that projected depth is arrived under anchor pole;Annular bamboo reinforcement grouted anchor bar installs completion and moves back brill Afterwards, orifice sealing is carried out, and carry out slip casting immediately to prevent because sediment outflow, draining cause surrounding soil displacement to aggravate, it is ensured that annular bamboo The anchor force of muscle anchor pole;
Step 2: the replacing of shield tail brush:
1), after annular bamboo reinforcement grouted anchor bar slip casting, reinforcing water-stagnating effect that need to be to annular grouting curtain checks, by opening Two detection peep holes or the injected hole of section of jurisdiction checked, determine it is anhydrous after carry out exchanging shield ventral brush again, removing section of jurisdiction Before, neighbouring section of jurisdiction must carry out inner support;
2), after above-mentioned preparation, you can exchanging shield ventral brush is carried out, it is first normal to promote, 1m or so is advanced to, is carried out The welding of pipe lengthens a thousand pieces of gold top, then is promoted, and until first of shield tail brush is completely exposed, stopping promotes, and directly carries out whole Circle is changed, and after replacing, measurement and positioning, is welded with gap of the shield tail pad, is carrying out pipe sheet assembling with extension arm, pushing tow section of jurisdiction is slided OK, with upper ring distance 100mm, device to hole, bolt, pushing tow, the docking of the old and new section of jurisdiction, bolt fastening propulsion, pipe support abjection are worn After cut off;
3) 3 ring scope 2-3 injected holes of lower half circle after shield ring, and mounting ball valve, standby leak are reserved when, changing shield tail brush Grouting behind shaft or drift lining injects polyurethane, exposure shield tail brush, waste oil and mortar between removing shield tail brush in seal groove, shield tail brush is entered Row checks that the shield tail brush for not having use value to serious wear directly cuts off, and carry out polishing processing to cutting off region, wear compared with It is light simply to be cleared up by the shield tail brush of mortar consolidation, shield tail brush is combed using Reinforced hook during cleaning, the cleaning of shield tail brush is thorough, The part cut off will weld new shield tail brush again, sealing shield tail brush be welded again with Φ 5mm506 welding rods, adjacent shield Spacing between ventral brush is not more than 3mm, and tail seal grease of shield is smeared again to the seal groove between shield tail brush and shield tail brush;
4), measure shield tail surrounding gap and record, manufacture and gap of the shield tail support pipe is welded with tail shield, pipe plays branch to section of jurisdiction Support acts on, and avoids falling under section of jurisdiction on shield shell, section of jurisdiction and a upper ring is kept identical gap of the shield tail, it is ensured that new mounting ring with it is upper One ring is concentric;
Step 3: installation section of jurisdiction:
Installation section of jurisdiction follows the order installed from bottom to top, the K blocks that bind selection ll points or l points position, after the completion of erecting ring in whole, Just section of jurisdiction is elapsed backward, pushing tow erecting ring in whole section of jurisdiction, with a upper ring away from 1OOmm, starts to penetrate when two endless tube pieces are at a distance of 10mm Bolt, segment bolt spell section of jurisdiction from having installed section of jurisdiction and wear to new, when section of jurisdiction in place when, 10 groups of jack reinforce simultaneously, so as to two The contact of endless tube piece is close, fastens all bolts of the domain repeatedly, after section of jurisdiction is installed in place, with shield tail grease pump pumping tail sealing Uncompacted shield tail brush groove and shield tail brush are manually smeared in grease, filling, and the operating pressure of shield tail grease pump can be set, reach and set It can stop after level pressure force value, recover normal and promote, behind the supporting steel plate abjection section of jurisdiction of welding, be cut off, shield shell is beaten Mill processing, takes soil pressure Conservation measures in replacing, prevent body center of gravity from moving forward, cause posture, gap, shield tail full circle degree to become Change, after completing a series of activities, segment assembly, gap of the shield tail is measured before pipe sheet assembling, segment selection is carried out, due to shield tail bottom Long-time stress, bottom gap of the shield tail is larger, and top gap of the shield tail is too small, when section of jurisdiction is installed, by first up and then down progress, section of jurisdiction After completing installation, it can recover to tunnel after injecting enough greases to shield tail;
Step 4: the safeguard measure after exchanging shield ventral brush:
Protect shield tail brush work should with change shield tail brush it is synchronous progress, to prevent the damage again of shield tail brush, should take with The lower precautionary measures:
1) grease, is filled:
In order to prevent the damage of shield tail brush, while increase the effect of sealing, during carrying out changing shield tail brush, it is necessary to every The steel wire of block shield tail brush fills in grease by hand again;
2), shield tail brush is put the oil:
During being reinstalled in section of jurisdiction, the steel spring plate for giving section of jurisdiction contact one side spreads butter, increases section of jurisdiction and spring Lubrication between steel plate;
3), seal groove filling grease:
After having changed sealing brush and again assembled good section of jurisdiction, before shield machine propulsion, first pass through shield tail injected grease system and give shield tail brush Ask injection seal grease;
4) shield shell bottom, is cleared up in time:
When being installed in tunneling process per endless tube piece, it is necessary to clean out shield shell bottom, prevent rubble to be clipped in section of jurisdiction and shield shell Between, sealing brush is damaged to the rear shifting of section of jurisdiction, while avoid shield attitude from being mutated as far as possible.
CN201710851920.8A 2017-09-19 2017-09-19 The exchanging shield ventral brush method of shield machine Pending CN107387101A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710851920.8A CN107387101A (en) 2017-09-19 2017-09-19 The exchanging shield ventral brush method of shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710851920.8A CN107387101A (en) 2017-09-19 2017-09-19 The exchanging shield ventral brush method of shield machine

Publications (1)

Publication Number Publication Date
CN107387101A true CN107387101A (en) 2017-11-24

Family

ID=60349946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710851920.8A Pending CN107387101A (en) 2017-09-19 2017-09-19 The exchanging shield ventral brush method of shield machine

Country Status (1)

Country Link
CN (1) CN107387101A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098721A (en) * 2018-08-10 2018-12-28 中铁局集团有限公司 A kind of shield repair shield tail brush method
CN109630144A (en) * 2018-12-05 2019-04-16 中交二航局第三工程有限公司 The method of the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel
CN109707386A (en) * 2018-12-18 2019-05-03 上海隧道工程有限公司 The method of disposable replacement first of shield tail brush of shield machine
CN109877088A (en) * 2019-01-15 2019-06-14 中铁工程装备集团技术服务有限公司 Shield machine shield shell is consolidated mortar package processing method
CN110067565A (en) * 2019-05-16 2019-07-30 中铁十二局集团有限公司 A method of acting on exchanging shield ventral brush in rich water sandy silt soil stratum shield-tunneling construction
CN111075457A (en) * 2019-11-28 2020-04-28 南宁轨道交通集团有限责任公司 In-hole repairing method for shield deformation of tail shield of shield tunneling machine under complex geological condition
CN111997633A (en) * 2020-07-23 2020-11-27 山东大学 Construction method for replacing shield tail sealing brush of shield tunneling machine
CN112228087A (en) * 2020-10-12 2021-01-15 中铁四局集团第二工程有限公司 Method for increasing and replacing shield tail brush of shield tunneling machine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000240397A (en) * 1999-02-23 2000-09-05 Penta Ocean Constr Co Ltd Method for replacing tail seal of shield machine
JP2002021486A (en) * 2000-07-05 2002-01-23 Taisei Corp Tail bush replacing device and replacing method for shield machine
CN101251015A (en) * 2008-04-02 2008-08-27 上海隧道工程股份有限公司 Construction method for exchanging shield ventral brush
CN102155237A (en) * 2011-03-22 2011-08-17 中建市政建设有限公司 Device for exchanging tail brush during shield tunneling, and construction method of device
CN102720506A (en) * 2012-05-31 2012-10-10 中铁隧道股份有限公司 Method for replacing tail brush in shield tunnel through liquid nitrogen freezing
CN104675408A (en) * 2015-01-27 2015-06-03 南京林业大学 Liquid nitrogen freezing system of high water pressure super-long-distance large-sectional tunnel and method of quickly changing shield tail brushes

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000240397A (en) * 1999-02-23 2000-09-05 Penta Ocean Constr Co Ltd Method for replacing tail seal of shield machine
JP2002021486A (en) * 2000-07-05 2002-01-23 Taisei Corp Tail bush replacing device and replacing method for shield machine
CN101251015A (en) * 2008-04-02 2008-08-27 上海隧道工程股份有限公司 Construction method for exchanging shield ventral brush
CN102155237A (en) * 2011-03-22 2011-08-17 中建市政建设有限公司 Device for exchanging tail brush during shield tunneling, and construction method of device
CN102720506A (en) * 2012-05-31 2012-10-10 中铁隧道股份有限公司 Method for replacing tail brush in shield tunnel through liquid nitrogen freezing
CN104675408A (en) * 2015-01-27 2015-06-03 南京林业大学 Liquid nitrogen freezing system of high water pressure super-long-distance large-sectional tunnel and method of quickly changing shield tail brushes

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
邵高波: "富水砂卵石地层盾尾刷更换技术", 《铁道建筑技术》 *
陈家冬等: "竹筋喷锚支护技术及工程应用", 《常州工学院学报》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098721A (en) * 2018-08-10 2018-12-28 中铁局集团有限公司 A kind of shield repair shield tail brush method
CN109098721B (en) * 2018-08-10 2019-11-12 中铁一局集团有限公司 A kind of shield repair shield tail brush method
CN109630144A (en) * 2018-12-05 2019-04-16 中交二航局第三工程有限公司 The method of the shield machine replacement twice shield tail brush ring of water rich strata constructing tunnel
CN109707386A (en) * 2018-12-18 2019-05-03 上海隧道工程有限公司 The method of disposable replacement first of shield tail brush of shield machine
CN109707386B (en) * 2018-12-18 2020-10-27 上海隧道工程有限公司 Method for replacing first shield tail brush of shield tunneling machine at one time
CN109877088A (en) * 2019-01-15 2019-06-14 中铁工程装备集团技术服务有限公司 Shield machine shield shell is consolidated mortar package processing method
CN110067565A (en) * 2019-05-16 2019-07-30 中铁十二局集团有限公司 A method of acting on exchanging shield ventral brush in rich water sandy silt soil stratum shield-tunneling construction
CN111075457A (en) * 2019-11-28 2020-04-28 南宁轨道交通集团有限责任公司 In-hole repairing method for shield deformation of tail shield of shield tunneling machine under complex geological condition
CN111997633A (en) * 2020-07-23 2020-11-27 山东大学 Construction method for replacing shield tail sealing brush of shield tunneling machine
CN112228087A (en) * 2020-10-12 2021-01-15 中铁四局集团第二工程有限公司 Method for increasing and replacing shield tail brush of shield tunneling machine

Similar Documents

Publication Publication Date Title
CN107387101A (en) The exchanging shield ventral brush method of shield machine
CN101864960B (en) Carst region double-arch road tunnel construction method
CN101737060B (en) Beneath-soil through-tunnel superlarge diameter pipe curtain construction method
CN103195442B (en) A kind of uniform slip casting structure of coal mine roadway and construction technology thereof
CN110005442A (en) Under wear existing building Urban Underground mining sectbn surrounding rock consolidation technique
CN104675408B (en) High hydraulic pressure extra long distance large cross-section tunnel liquid nitrogen freezing system and shield shield tail brush quick change method
CN108533272A (en) A kind of minimum clear-distance tunnel goes out cavity construction method
CN103410161B (en) Oblique control slip casting steel anchor tube framework and construction method thereof
CN107676097A (en) A kind of high hydraulic pressure soft soil layer HFE composite shield originating methods
CN108797598A (en) The construction technology of pre-loaded support struts in a kind of deep basal pit
CN109653777B (en) High-speed railway open cut tunnel water leakage and crack regional integral treatment method
CN103244128A (en) Method for constructing large-section karst tunnels through double sidewall pilot tunnel and reservation core soil methods
CN103981782A (en) Method and structure for reinforcing flat hole grouting roadbed without damaging road surface
CN109611102A (en) Construction of the flyover method is worn under a kind of cold excavation
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN103899318A (en) Medium ground tunnel milling excavating and mating mechanized construction method
CN112412496A (en) Full-section advanced curtain grouting construction method for water-rich broken geological zone tunnel
CN101481911A (en) Construction method for special underground continuous wall
CN108678753B (en) Reverse-slope tunnel construction method
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN112502720A (en) Method for breaking zone by passing open TBM through fault
CN113153367A (en) Quicksand stratum reinforcing method with different water inflow amounts
CN109236367A (en) A kind of tunnel structure and its frozen construction method with antiseepage drain function
CN104018865B (en) Bamboo reinforcement grouting anchor rod

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124