CN110332409A - The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure - Google Patents

The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure Download PDF

Info

Publication number
CN110332409A
CN110332409A CN201910670204.9A CN201910670204A CN110332409A CN 110332409 A CN110332409 A CN 110332409A CN 201910670204 A CN201910670204 A CN 201910670204A CN 110332409 A CN110332409 A CN 110332409A
Authority
CN
China
Prior art keywords
pipeline
repaired
tubular structure
drainage
jurisdiction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910670204.9A
Other languages
Chinese (zh)
Inventor
郁片红
王诗烽
包松慰
崔昱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN201910670204.9A priority Critical patent/CN110332409A/en
Publication of CN110332409A publication Critical patent/CN110332409A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/162Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe

Abstract

The invention discloses the methods of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining to repair structure, and liner repairs the tubular structure that structure uses several sections of jurisdiction composition;When repairing, pipe-repairing is treated first and carries out closure and temporary drainage, then treat pipe-repairing and carry out dredging and cleaning, nationality obtains local damage position and/or interface damaged part by television pickup equipment after the completion, and tubular structure is arranged;In setting, tubular structure enters pipeline to be repaired in the form of several sections of jurisdiction, and is spliced using welding manner;Ring-shaped rubber waterstop sealing band is set between the both ends of tubular structure and pipeline to be repaired, is fixed between tubular structure and pipeline to be repaired using hardening slurry filling, blocks injected hole with bolt after the completion.The present invention solves conventional non-excavation rehabilitation technique and is not suitable for the technical issues of heavy caliber reinforced concrete drainage pipe is integrally repaired, and the angle designed from structure has ensured the bearing capacity of pipeline, extended the service life of pipeline.

Description

The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure
Technical field
The present invention relates to urban discharging pipeline recovery technique field, in particular to the method for non-excavation rehabilitation drainage pipeline and Dedicated stainless steel inner lining repairs structure.
Background technique
While drainage pipeline facility amount rapid growth, quantity are increasingly huge, pipeline of the remote past is largely built still So using.
And during drainage pipeline runs use, wastewater flow sequence, road caused by being damaged because of drain pipeline structure The accidents such as ponding, water pollution and land subsidence happen occasionally.Especially when tunnel, subway etc. pass through draining using shield-tunneling construction When pipeline, the disturbance of the soil body is easier that drainage pipeline joint is made to misplace, or even phenomena such as deformation, fracture occurs, once hair It is raw, city daily life, production and shield-tunneling construction will be caused to seriously affect.
The non-excavation rehabilitation of drainage pipeline is to pass through drainage pipeline electricity before pipeline configuration development of defects becomes accident Depending on the methods of sonar detection, pipeline configuration defect hazard rating is confirmed, the drainage pipeline more serious to structural failure carries out Non-excavation rehabilitation restores pipeline and uses function, extends pipeline service life.Meanwhile it can preferably solve soil body loss, underground water infiltration The problems in puzzlement sewerage system operational management such as leakage.
In practical applications, existing drainage pipeline no-dig technique integral restoration method mainly has: water cure method, ultraviolet light Solidification method, mechanical spiral winding method etc..
Wherein, water cure method, ultraviolet curing method are not suitable for repairing large-caliber drainage pipeline, generally reparation largest tube Diameter is 1200~Φ of Φ 1800, and buckling phenomena easily occurs in interface during pipeline rehabilitation, influences the use function of pipeline;It is mechanical The loss of pipeline water pipeline is larger after spiral winding integral repair technology is repaired, and pipe drainage ability is declined after reparation.
Therefore, how the large-scale pipeline for caliber at 1800 millimeters or more carries out non-excavation rehabilitation as art technology Personnel have a technical problem to be solved.
Summary of the invention
In view of the above drawbacks of the prior art, the present invention provide non-excavation rehabilitation drainage pipeline method and it is dedicated not The steel lining that becomes rusty repairs structure, and the purpose of realization is to solve conventional non-excavation rehabilitation technique not being suitable for large-diameter steel reinforced concrete row The technical issues of waterpipe is integrally repaired, the angle designed from structure, has ensured the bearing capacity of pipeline, has extended pipeline Service life;Suitable for passing through the significant obstacles object such as subway, railway, main sewer, and the big mouth of trenchless rehabilitation can not be carried out Diameter drainage pipeline is integrally repaired.
To achieve the above object, the invention discloses the method for non-excavation rehabilitation drainage pipeline, steps are as follows:
A, pipe plugging and temporary drainage: setting carries out interim in the upstream and downstream inspection shaft of the pipeline to be repaired The brick wall of closure;The water of the ducts upstream to be repaired is imported into downstream line by temporary drainage measure simultaneously;
B, pipe dredging and cleaning: by silt pumping car draw water in the way of, dredging of drawing water is carried out to the pipeline to be repaired, dredge Lead to the pipeline to be repaired;
C, telephotography detects: television pickup equipment being put into pipeline to be repaired, is detected to pipeline inside, institute is obtained State the position damaged in pipe-repairing and damaged condition;
D, segment prefabricated: stainless steel plate raw material being pressed to the diameter of pipeline to be repaired, is rolled into corresponding tubular structure;And institute It states and is positioned on tubular structure and injected hole is set;The tubular structure is cut into parts the identical arch plate knot of several shapes Behind the section of jurisdiction of structure, the reparation scene of the pipeline to be repaired is transported to;
E, pipe joint and local damaged location reparation: according to telephotography testing result, to the pipeline to be repaired Local damage position and/or interface damaged part carry out pre- repair process;That is, at interface damaged part or local damage position Upstream and downstream tube wall installs cyclic annular rubber water-proof band respectively;
F, section of jurisdiction is mated formation and is welded in pipeline: one by one by several sections of jurisdiction from the decentralization of inspection shaft position enter it is described to Pipe-repairing by stainless steel substrates welding in the tubular structure in pipeline, and checks weld seam;
G, it slip casting: is fixed between the tubular structure and the inner wall of the pipeline to be repaired using hardening slurry filling; The hardening slurry nationality is injected out of described tubular structure by the injected hole;By the slip casting after hardening slurry solidification Hole is blocked with bolt;
H, restore water flowing: removing the brick wall after hardening slurry solidification, restore water flowing;
I, telephotography check and evaluation: the shape of nationality tubular structure as described in telephotography detection system acquisition water flowing engineering State saves filing as the image data after reparation.
Preferably, the local damage position be include leakage and/or pipe wall crack.
Preferably, the diameter of the diameter of the pipeline to be repaired is at 1800 millimeters or more.
Preferably, in step G, local damage position and/or interface of the hardening slurry through the pipeline to be repaired are broken Damage position penetrate into the periphery soil body, it is described penetrate into the periphery soil body range include 1000 millimeters of the pipeline radius to be repaired extremely 2000 millimeters of region.
The present invention also provides the dedicated stainless steel inner lining reparation structures of the method for non-excavation rehabilitation drainage pipeline institute, including by The tubular structure of several section of jurisdiction compositions;The side wall of the tubular structure is equipped with several injected holes;The pipe The local damage position and/or the interface damaged part of the shape structure setting in the pipeline to be repaired;The tubulose knot The ring-shaped rubber waterstop sealing band is equipped between the both ends of structure and the pipeline to be repaired;The tubular structure with it is described to be repaired It is fixed between multiple pipeline using hardening slurry filling.
Preferably, the tubular structure is at least made of 4 pieces of sections of jurisdiction.
It is furthermore preferred that the thickness of each section of jurisdiction is 10mm, and it is made of 304 stainless steels.
Beneficial effects of the present invention:
The present invention is preferable using the structural preferable and plasticity of stainless steel material itself, can repair the serious, deformation that misplaces The serious pipeline of serious isostructuralism.
Stainless steel thinner thickness in the present invention loses pipe drainage section after reparation smaller.
Application of the invention can be improved speed of application, method simplicity and be not necessarily to excavated pavement, and high degree shortens construction Period, construction risk and reduction engineering cost.
Of the invention is applied widely, due to the property of stainless steel material, can be used for repairing round, oval pipe The drainage structures such as road, box culvert, inspection shaft are applicable in complicated working condition, and are suitable for the certain sinking of former pipeline, dislocation, change Shape can be widely applied to large-caliber drainage pipeline reparation.
It is described further below with reference to technical effect of the attached drawing to design of the invention, specific structure and generation, with It is fully understood from the purpose of the present invention, feature and effect.
Detailed description of the invention
Fig. 1 shows the schematic diagram that stainless steel inner lining in one embodiment of the invention repairs structure.
Fig. 2 shows one embodiment of the invention to be rolled into stainless steel plate in the schematic diagram of tubular structure.
Fig. 3 shows the schematic diagram of range of grouting in the place present invention-embodiment.
Specific embodiment
Embodiment
As depicted in figs. 1 and 2, the method for non-excavation rehabilitation drainage pipeline, steps are as follows:
A, the closure of pipeline 1 to be repaired and temporary drainage: be arranged in the upstream and downstream inspection shaft of pipeline 1 to be repaired into The brick wall of row temporary plugging;The water of 1 upstream of pipeline to be repaired is imported into downstream line by temporary drainage measure simultaneously;
B, the dredging and cleaning of pipeline 1 to be repaired: by silt pumping car draw water in the way of, treat pipe-repairing 1 and draw water Pipeline 1 to be repaired is dredged in dredging;
C, telephotography detects: television pickup equipment being put into pipeline 1 to be repaired, is detected to pipeline inside, is obtained The position damaged in pipe-repairing and damaged condition;
D, section of jurisdiction 3 is prefabricated: stainless steel plate raw material being pressed to the diameter of pipeline 1 to be repaired, is rolled into corresponding tubular structure;And It is positioned on tubular structure and injected hole 4 is set;Tubular structure is cut into parts the identical arch plate structure of several shapes Section of jurisdiction 3 after, transport to pipeline 1 to be repaired reparation scene;
E, pipeline 1 to be repaired pre-processes: according to telephotography testing result, treating the local damage position of pipe-repairing 1 And/or interface damaged part carries out pre- repair process;That is, the upstream and downstream pipe at interface damaged part or local damage position Wall installs cyclic annular rubber water-proof band respectively;
F, section of jurisdiction 3 is mated formation and is welded: several sections of jurisdiction are transferred from inspection shaft position enter pipeline 1 to be repaired one by one, In pipeline in tubular construction by stainless steel substrates welding, and weld seam is checked;
G, it slip casting: is fixed between tubular structure and the inner wall of pipeline to be repaired 1 using the filling of hardening slurry 2;Solidification slurry 2 nationality of liquid is injected out of tubular structure by injected hole 4;Slurries 2 to be solidified block injected hole 4 with bolt after solidifying;
H, restore water flowing: slurries 2 to be solidified remove brick wall after solidifying, and restore water flowing;
I, telephotography check and evaluation: nationality is acquired the state of tubular structure in water flowing engineering by television pickup equipment, as Image data after reparation saves filing.
In practical applications, the former pipe of reparation is drainage pipeline, and tubing is concrete reinforced pipe, brick arch pipe, and caliber exists 1800 millimeters or more.
Stainless steel tube sheet is the identical arch of shape, and quantity is 3 to 8, and length is 0.3 millimeter to 0.8m, and weight is less than 100kg, using 304 stainless steels make, raw material should meet GB/T20878-2007 " the stainless steel and refractory steel trade mark and chemistry at Point " requirement.
Butt welding between adjacent stainless steel tube sheet, connection cyclization.Welding rod uses E316-16, Ying Fuhe " stainless steel weldering Item " (GB/T 983-2012) requirement.
Weld seam grade is second level, and Ying Fuhe " code for acceptance of construction quality of steel structures " (GB 50205-2001's) wants It asks.It repeats the above process to whole segment pipe to be repaired.
It is connected and fixed between stainless steel tube sheet and former pipe using hardening slurry filling.
Hardening slurry material system passes through reserved injected hole slip casting filling.Reserved slip casting hole number is 4~8, is distributed in pipe It on piece perimeter, is blocked after cutting off preformed hole after grouting serous fluid solidification using bolt, asks money administration can be with repair welding hole certain Hole.
In certain embodiments, local damage position be include leakage and/or pipe wall crack.
In certain embodiments, the diameter of the diameter of pipeline 1 to be repaired is at 1800 millimeters or more.
As shown in figure 3, in certain embodiments, in step G, local damage position of the hardening slurry 2 through pipeline 1 to be repaired And/or interface damaged part penetrates into the periphery soil body, the range for penetrating into the periphery soil body includes 1 surrounding radius of pipeline, 1000 milli to be repaired The region of rice to 2000 millimeters.
The present invention also provides the dedicated stainless steel inner lining reparation structures of the method for non-excavation rehabilitation drainage pipeline institute, including by The tubular structure that several sections of jurisdiction 3 form;The side wall of tubular structure is equipped with several injected holes 4;Tubular structure is set to be repaired The local damage position of pipeline 1 and/or interface damaged part;Ring-type is equipped between the both ends of tubular structure and pipeline to be repaired 1 Rubber water-proof band;It is fixed between tubular structure and pipeline to be repaired 1 using the filling of hardening slurry 2.
In certain embodiments, tubular structure is at least made of 4 pieces of sections of jurisdiction 3.
In certain embodiments, the thickness of each section of jurisdiction 3 is 10mm, and is made of 304 stainless steels.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that those skilled in the art without It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical solution, all should be within the scope of protection determined by the claims.

Claims (7)

1. the method for non-excavation rehabilitation drainage pipeline, steps are as follows:
A, the closure of the pipeline to be repaired (1) and temporary drainage: in the upstream and downstream inspection shaft of the pipeline (1) to be repaired Interior setting carries out the brick wall of temporary plugging;The water of pipeline (1) upstream to be repaired is imported by temporary drainage measure simultaneously Downstream line;
B, the dredging and cleaning of the pipeline to be repaired (1): by silt pumping car draw water in the way of, to the pipeline (1) to be repaired Dredging of drawing water is carried out, the pipeline (1) to be repaired is dredged;
C, telephotography check and evaluation: television pickup equipment is put into pipeline to be repaired (1), pipeline inside is detected, is obtained Take the position damaged in the pipe-repairing and damaged condition;
D, section of jurisdiction (3) it is prefabricated: stainless steel plate raw material is pressed to the diameter of pipeline to be repaired (1), is rolled into corresponding tubular structure;And It is positioned on the tubular structure and injected hole (4) is set;The tubular structure is cut into parts the identical arch of several shapes Behind the section of jurisdiction (3) of shape plate structure, the reparation scene of the pipeline to be repaired (1) is transported to;
E, pipeline to be repaired (1) pretreatment: according to telephotography check and evaluation as a result, to the pipeline (1) to be repaired Local damage position and/or interface damaged part carry out pre- repair process;That is, at interface damaged part or local damage position Upstream and downstream tube wall installs cyclic annular rubber water-proof band respectively;
F, the section of jurisdiction (3) is mated formation and is welded: one by one entering several sections of jurisdiction from the decentralization of inspection shaft position described to be repaired Multiple pipeline (1) by stainless steel substrates welding in the tubular structure in pipeline, and checks weld seam;
G, slip casting: solid using hardening slurry (2) filling between the tubular structure and the inner wall of the pipeline to be repaired (1) It is fixed;Hardening slurry (2) nationality is injected out of described tubular structure by the injected hole (4);Solidify to the hardening slurry (2) The injected hole (4) is blocked with bolt afterwards;
H, restore water flowing: removing the brick wall after the hardening slurry (2) solidification, restore water flowing;
I, telephotography check and evaluation: the state of nationality tubular structure as described in television pickup equipment acquisition water flowing engineering, as Image data after reparation saves filing.
2. the method for non-excavation rehabilitation drainage pipeline according to claim 1, which is characterized in that the local damage position Being includes leakage and/or pipe wall crack.
3. the method for non-excavation rehabilitation drainage pipeline according to claim 1, which is characterized in that the pipeline to be repaired (1) diameter of diameter is at 1800 millimeters or more.
4. the method for non-excavation rehabilitation drainage pipeline according to claim 1, which is characterized in that in step G, the solidification The periphery soil body, the infiltration are penetrated into local damage position and/or interface damaged part of the slurries (2) through the pipeline (1) to be repaired The range for entering the periphery soil body includes the region of 1000 millimeters to 2000 millimeters of surrounding radius of the pipeline to be repaired (1).
5. the dedicated stainless steel inner lining of method institute of non-excavation rehabilitation drainage pipeline repairs structure, which is characterized in that if including by Do the tubular structure of the section of jurisdiction (3) composition;The side wall of the tubular structure is equipped with several injected holes (4);Institute State tubular structure be set to the pipeline to be repaired (1) the local damage position and/or the interface damaged part;It is described The ring-shaped rubber waterstop sealing band is equipped between the both ends of tubular structure and the pipeline to be repaired (1);The tubular structure It is fixed between the pipeline (1) to be repaired using hardening slurry (2) filling.
6. the dedicated stainless steel inner lining of method institute of non-excavation rehabilitation drainage pipeline according to claim 5 repairs structure, It is characterized in that, the tubular structure is at least made of 4 pieces of sections of jurisdiction (3).
7. the dedicated stainless steel inner lining of method institute of non-excavation rehabilitation drainage pipeline according to claim 6 repairs structure, It is characterized in that, the thickness of each section of jurisdiction (3) is 10mm, and it is made of 304 stainless steels.
CN201910670204.9A 2019-07-24 2019-07-24 The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure Pending CN110332409A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910670204.9A CN110332409A (en) 2019-07-24 2019-07-24 The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910670204.9A CN110332409A (en) 2019-07-24 2019-07-24 The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure

Publications (1)

Publication Number Publication Date
CN110332409A true CN110332409A (en) 2019-10-15

Family

ID=68147255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910670204.9A Pending CN110332409A (en) 2019-07-24 2019-07-24 The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure

Country Status (1)

Country Link
CN (1) CN110332409A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110715138A (en) * 2019-10-28 2020-01-21 南京华享环境科技有限公司 Non-excavation type repairing method for drainage pipeline
CN111075994A (en) * 2019-12-03 2020-04-28 上海市基础工程集团有限公司 Flexible pipeline repairing construction method
CN111456196A (en) * 2020-04-20 2020-07-28 福光环境工程(上海)有限公司 Grouting structure for repairing sewage pipeline and pipeline grouting repairing method
CN112878724A (en) * 2021-01-14 2021-06-01 杭州临安排水有限公司 Novel anti-seepage treatment method
CN112900294A (en) * 2021-01-22 2021-06-04 上海城建水务工程有限公司 Lining structure for box culvert repair and construction method thereof
CN113063052A (en) * 2021-03-17 2021-07-02 中核四平市政工程有限公司 Pipeline lining grouting repair method
CN113251236A (en) * 2021-04-28 2021-08-13 上海海潜市政工程有限公司 Municipal pipeline repairing process
CN113483163A (en) * 2021-06-22 2021-10-08 合肥慧源铝业有限公司 Centrifugal casting composite pump pipe and processing technology thereof
CN114382153A (en) * 2022-01-25 2022-04-22 中建鹭港建设有限公司 Drainage pipeline steel lining local repair structure
CN115056337A (en) * 2022-06-06 2022-09-16 中建八局第三建设有限公司 Non-destructive non-excavation adjustable concrete pipeline lining guniting repair device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1755184A (en) * 2004-09-29 2006-04-05 孙跃平 Excavation-free integral restoration method of underground conduit and inspection well
CN101509589A (en) * 2009-03-31 2009-08-19 崔同悦 Non-digging pipe repairing method
CN103437417A (en) * 2013-08-24 2013-12-11 无锡市政设计研究院有限公司 Part repair structure for steel lining of drainage pipeline
CN103542226A (en) * 2012-07-17 2014-01-29 中国长江三峡集团公司 Method for repairing large-diameter concrete water supply pipeline
CN105371049A (en) * 2015-12-01 2016-03-02 无锡琛华复合材料有限公司 Large-diameter underground pipeline non-excavation rehabilitation method
CN210372526U (en) * 2019-07-24 2020-04-21 上海市城市建设设计研究总院(集团)有限公司 Stainless steel lining repairing structure special for trenchless repairing method of drainage pipeline

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1755184A (en) * 2004-09-29 2006-04-05 孙跃平 Excavation-free integral restoration method of underground conduit and inspection well
CN101509589A (en) * 2009-03-31 2009-08-19 崔同悦 Non-digging pipe repairing method
CN103542226A (en) * 2012-07-17 2014-01-29 中国长江三峡集团公司 Method for repairing large-diameter concrete water supply pipeline
CN103437417A (en) * 2013-08-24 2013-12-11 无锡市政设计研究院有限公司 Part repair structure for steel lining of drainage pipeline
CN105371049A (en) * 2015-12-01 2016-03-02 无锡琛华复合材料有限公司 Large-diameter underground pipeline non-excavation rehabilitation method
CN210372526U (en) * 2019-07-24 2020-04-21 上海市城市建设设计研究总院(集团)有限公司 Stainless steel lining repairing structure special for trenchless repairing method of drainage pipeline

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110715138A (en) * 2019-10-28 2020-01-21 南京华享环境科技有限公司 Non-excavation type repairing method for drainage pipeline
CN111075994A (en) * 2019-12-03 2020-04-28 上海市基础工程集团有限公司 Flexible pipeline repairing construction method
CN111456196A (en) * 2020-04-20 2020-07-28 福光环境工程(上海)有限公司 Grouting structure for repairing sewage pipeline and pipeline grouting repairing method
CN111456196B (en) * 2020-04-20 2021-05-07 福光环境工程(上海)有限公司 Grouting structure for repairing sewage pipeline and pipeline grouting repairing method
CN112878724A (en) * 2021-01-14 2021-06-01 杭州临安排水有限公司 Novel anti-seepage treatment method
CN112900294A (en) * 2021-01-22 2021-06-04 上海城建水务工程有限公司 Lining structure for box culvert repair and construction method thereof
CN113063052A (en) * 2021-03-17 2021-07-02 中核四平市政工程有限公司 Pipeline lining grouting repair method
CN113251236A (en) * 2021-04-28 2021-08-13 上海海潜市政工程有限公司 Municipal pipeline repairing process
CN113483163A (en) * 2021-06-22 2021-10-08 合肥慧源铝业有限公司 Centrifugal casting composite pump pipe and processing technology thereof
CN114382153A (en) * 2022-01-25 2022-04-22 中建鹭港建设有限公司 Drainage pipeline steel lining local repair structure
CN114382153B (en) * 2022-01-25 2023-12-08 中建鹭港建设有限公司 Drainage pipe steel lining local repair structure
CN115056337A (en) * 2022-06-06 2022-09-16 中建八局第三建设有限公司 Non-destructive non-excavation adjustable concrete pipeline lining guniting repair device

Similar Documents

Publication Publication Date Title
CN110332409A (en) The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure
CN102486247B (en) Water supply and drainage pipeline repair technique adopting size film lining method
WO2014012305A1 (en) Method for repairing large diameter concrete water-supply pipe
CN105179875B (en) The trenchless repairing method that a kind of soft stratum drainage pipeline deformation is collapsed
CN110645418B (en) Connecting method for mounting large-diameter pipeline
CN103437417B (en) Part repair structure for steel lining of drainage pipeline
Damvergis Sewer systems: Failures and rehabilitation
CN108591614A (en) Multi-pipe crossing construction method in combustion gas old pipeline
CN108590752B (en) Drainage repair system after lining of underdrain type tunnel and construction method thereof
CN104727425A (en) Traction-type non-excavation pipeline repairing method
CN210372526U (en) Stainless steel lining repairing structure special for trenchless repairing method of drainage pipeline
CN101705717B (en) Internal liner of drainage pipe or dirt discharge pipe for operation with water and construction method thereof for operation with water
CN211666735U (en) Existing subway tunnel structure is consolidated in slip casting pipe interpolation shaped steel slip casting
CN112112248A (en) Method for repairing defect of channel box
CN203498985U (en) Local repair structure for steel lining of exhaust pipeline
CN113863268A (en) Construction and debugging process for fabricated sewage treatment station of epidemic prevention emergency project
CN113175058A (en) Existing underground jacking pipe access construction method
CN105507172B (en) A kind of inner bearing type connection structure for steel reinforced concrete pipe culvert reparation
CN108487908A (en) A kind of basil device and its construction method of the shoveling of jacking construction auxiliary
CN217603641U (en) Integral repair structure for non-excavation lining of drainage pipeline
CN218671144U (en) Be used for burying prosthetic device of buried water supply and drainage pipeline inside lining non-excavation
CN113217020B (en) Mountain sleeve valve pipe reinforcing construction method
CN214363618U (en) Construction structure of concrete inverted hanging well suitable for mucky soil
CN110560467B (en) Harmless treatment method for waste and old pipelines
CN209587393U (en) A kind of pipeline mismatch no-dig technique liner steel collar prosthetic device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination