CN110332409A - The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure - Google Patents
The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure Download PDFInfo
- Publication number
- CN110332409A CN110332409A CN201910670204.9A CN201910670204A CN110332409A CN 110332409 A CN110332409 A CN 110332409A CN 201910670204 A CN201910670204 A CN 201910670204A CN 110332409 A CN110332409 A CN 110332409A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- repaired
- tubular structure
- drainage
- jurisdiction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 229910001220 stainless steel Inorganic materials 0.000 title claims abstract description 29
- 239000010935 stainless steel Substances 0.000 title claims abstract description 25
- 238000009412 basement excavation Methods 0.000 title claims abstract description 21
- 230000008439 repair process Effects 0.000 title claims abstract description 16
- 239000002002 slurry Substances 0.000 claims abstract description 21
- 238000003466 welding Methods 0.000 claims abstract description 7
- 238000004140 cleaning Methods 0.000 claims abstract description 4
- 239000000203 mixture Substances 0.000 claims abstract description 3
- 238000007789 sealing Methods 0.000 claims abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 20
- 238000011144 upstream manufacturing Methods 0.000 claims description 9
- 239000002689 soil Substances 0.000 claims description 8
- 239000011449 brick Substances 0.000 claims description 7
- 238000007689 inspection Methods 0.000 claims description 7
- 238000007711 solidification Methods 0.000 claims description 7
- 230000008023 solidification Effects 0.000 claims description 7
- 238000007569 slipcasting Methods 0.000 claims description 6
- 238000011156 evaluation Methods 0.000 claims description 5
- 239000002994 raw material Substances 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 125000004122 cyclic group Chemical group 0.000 claims description 3
- 238000005086 pumping Methods 0.000 claims description 3
- 239000000758 substrate Substances 0.000 claims description 3
- 230000008595 infiltration Effects 0.000 claims description 2
- 238000001764 infiltration Methods 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims 1
- 239000011150 reinforced concrete Substances 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000009156 water cure Methods 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000001723 curing Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- VIKNJXKGJWUCNN-XGXHKTLJSA-N norethisterone Chemical compound O=C1CC[C@@H]2[C@H]3CC[C@](C)([C@](CC4)(O)C#C)[C@@H]4[C@@H]3CCC2=C1 VIKNJXKGJWUCNN-XGXHKTLJSA-N 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000007363 ring formation reaction Methods 0.000 description 1
- 210000004911 serous fluid Anatomy 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
- 238000003911 water pollution Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/16—Devices for covering leaks in pipes or hoses, e.g. hose-menders
- F16L55/162—Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
Abstract
The invention discloses the methods of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining to repair structure, and liner repairs the tubular structure that structure uses several sections of jurisdiction composition;When repairing, pipe-repairing is treated first and carries out closure and temporary drainage, then treat pipe-repairing and carry out dredging and cleaning, nationality obtains local damage position and/or interface damaged part by television pickup equipment after the completion, and tubular structure is arranged;In setting, tubular structure enters pipeline to be repaired in the form of several sections of jurisdiction, and is spliced using welding manner;Ring-shaped rubber waterstop sealing band is set between the both ends of tubular structure and pipeline to be repaired, is fixed between tubular structure and pipeline to be repaired using hardening slurry filling, blocks injected hole with bolt after the completion.The present invention solves conventional non-excavation rehabilitation technique and is not suitable for the technical issues of heavy caliber reinforced concrete drainage pipe is integrally repaired, and the angle designed from structure has ensured the bearing capacity of pipeline, extended the service life of pipeline.
Description
Technical field
The present invention relates to urban discharging pipeline recovery technique field, in particular to the method for non-excavation rehabilitation drainage pipeline and
Dedicated stainless steel inner lining repairs structure.
Background technique
While drainage pipeline facility amount rapid growth, quantity are increasingly huge, pipeline of the remote past is largely built still
So using.
And during drainage pipeline runs use, wastewater flow sequence, road caused by being damaged because of drain pipeline structure
The accidents such as ponding, water pollution and land subsidence happen occasionally.Especially when tunnel, subway etc. pass through draining using shield-tunneling construction
When pipeline, the disturbance of the soil body is easier that drainage pipeline joint is made to misplace, or even phenomena such as deformation, fracture occurs, once hair
It is raw, city daily life, production and shield-tunneling construction will be caused to seriously affect.
The non-excavation rehabilitation of drainage pipeline is to pass through drainage pipeline electricity before pipeline configuration development of defects becomes accident
Depending on the methods of sonar detection, pipeline configuration defect hazard rating is confirmed, the drainage pipeline more serious to structural failure carries out
Non-excavation rehabilitation restores pipeline and uses function, extends pipeline service life.Meanwhile it can preferably solve soil body loss, underground water infiltration
The problems in puzzlement sewerage system operational management such as leakage.
In practical applications, existing drainage pipeline no-dig technique integral restoration method mainly has: water cure method, ultraviolet light
Solidification method, mechanical spiral winding method etc..
Wherein, water cure method, ultraviolet curing method are not suitable for repairing large-caliber drainage pipeline, generally reparation largest tube
Diameter is 1200~Φ of Φ 1800, and buckling phenomena easily occurs in interface during pipeline rehabilitation, influences the use function of pipeline;It is mechanical
The loss of pipeline water pipeline is larger after spiral winding integral repair technology is repaired, and pipe drainage ability is declined after reparation.
Therefore, how the large-scale pipeline for caliber at 1800 millimeters or more carries out non-excavation rehabilitation as art technology
Personnel have a technical problem to be solved.
Summary of the invention
In view of the above drawbacks of the prior art, the present invention provide non-excavation rehabilitation drainage pipeline method and it is dedicated not
The steel lining that becomes rusty repairs structure, and the purpose of realization is to solve conventional non-excavation rehabilitation technique not being suitable for large-diameter steel reinforced concrete row
The technical issues of waterpipe is integrally repaired, the angle designed from structure, has ensured the bearing capacity of pipeline, has extended pipeline
Service life;Suitable for passing through the significant obstacles object such as subway, railway, main sewer, and the big mouth of trenchless rehabilitation can not be carried out
Diameter drainage pipeline is integrally repaired.
To achieve the above object, the invention discloses the method for non-excavation rehabilitation drainage pipeline, steps are as follows:
A, pipe plugging and temporary drainage: setting carries out interim in the upstream and downstream inspection shaft of the pipeline to be repaired
The brick wall of closure;The water of the ducts upstream to be repaired is imported into downstream line by temporary drainage measure simultaneously;
B, pipe dredging and cleaning: by silt pumping car draw water in the way of, dredging of drawing water is carried out to the pipeline to be repaired, dredge
Lead to the pipeline to be repaired;
C, telephotography detects: television pickup equipment being put into pipeline to be repaired, is detected to pipeline inside, institute is obtained
State the position damaged in pipe-repairing and damaged condition;
D, segment prefabricated: stainless steel plate raw material being pressed to the diameter of pipeline to be repaired, is rolled into corresponding tubular structure;And institute
It states and is positioned on tubular structure and injected hole is set;The tubular structure is cut into parts the identical arch plate knot of several shapes
Behind the section of jurisdiction of structure, the reparation scene of the pipeline to be repaired is transported to;
E, pipe joint and local damaged location reparation: according to telephotography testing result, to the pipeline to be repaired
Local damage position and/or interface damaged part carry out pre- repair process;That is, at interface damaged part or local damage position
Upstream and downstream tube wall installs cyclic annular rubber water-proof band respectively;
F, section of jurisdiction is mated formation and is welded in pipeline: one by one by several sections of jurisdiction from the decentralization of inspection shaft position enter it is described to
Pipe-repairing by stainless steel substrates welding in the tubular structure in pipeline, and checks weld seam;
G, it slip casting: is fixed between the tubular structure and the inner wall of the pipeline to be repaired using hardening slurry filling;
The hardening slurry nationality is injected out of described tubular structure by the injected hole;By the slip casting after hardening slurry solidification
Hole is blocked with bolt;
H, restore water flowing: removing the brick wall after hardening slurry solidification, restore water flowing;
I, telephotography check and evaluation: the shape of nationality tubular structure as described in telephotography detection system acquisition water flowing engineering
State saves filing as the image data after reparation.
Preferably, the local damage position be include leakage and/or pipe wall crack.
Preferably, the diameter of the diameter of the pipeline to be repaired is at 1800 millimeters or more.
Preferably, in step G, local damage position and/or interface of the hardening slurry through the pipeline to be repaired are broken
Damage position penetrate into the periphery soil body, it is described penetrate into the periphery soil body range include 1000 millimeters of the pipeline radius to be repaired extremely
2000 millimeters of region.
The present invention also provides the dedicated stainless steel inner lining reparation structures of the method for non-excavation rehabilitation drainage pipeline institute, including by
The tubular structure of several section of jurisdiction compositions;The side wall of the tubular structure is equipped with several injected holes;The pipe
The local damage position and/or the interface damaged part of the shape structure setting in the pipeline to be repaired;The tubulose knot
The ring-shaped rubber waterstop sealing band is equipped between the both ends of structure and the pipeline to be repaired;The tubular structure with it is described to be repaired
It is fixed between multiple pipeline using hardening slurry filling.
Preferably, the tubular structure is at least made of 4 pieces of sections of jurisdiction.
It is furthermore preferred that the thickness of each section of jurisdiction is 10mm, and it is made of 304 stainless steels.
Beneficial effects of the present invention:
The present invention is preferable using the structural preferable and plasticity of stainless steel material itself, can repair the serious, deformation that misplaces
The serious pipeline of serious isostructuralism.
Stainless steel thinner thickness in the present invention loses pipe drainage section after reparation smaller.
Application of the invention can be improved speed of application, method simplicity and be not necessarily to excavated pavement, and high degree shortens construction
Period, construction risk and reduction engineering cost.
Of the invention is applied widely, due to the property of stainless steel material, can be used for repairing round, oval pipe
The drainage structures such as road, box culvert, inspection shaft are applicable in complicated working condition, and are suitable for the certain sinking of former pipeline, dislocation, change
Shape can be widely applied to large-caliber drainage pipeline reparation.
It is described further below with reference to technical effect of the attached drawing to design of the invention, specific structure and generation, with
It is fully understood from the purpose of the present invention, feature and effect.
Detailed description of the invention
Fig. 1 shows the schematic diagram that stainless steel inner lining in one embodiment of the invention repairs structure.
Fig. 2 shows one embodiment of the invention to be rolled into stainless steel plate in the schematic diagram of tubular structure.
Fig. 3 shows the schematic diagram of range of grouting in the place present invention-embodiment.
Specific embodiment
Embodiment
As depicted in figs. 1 and 2, the method for non-excavation rehabilitation drainage pipeline, steps are as follows:
A, the closure of pipeline 1 to be repaired and temporary drainage: be arranged in the upstream and downstream inspection shaft of pipeline 1 to be repaired into
The brick wall of row temporary plugging;The water of 1 upstream of pipeline to be repaired is imported into downstream line by temporary drainage measure simultaneously;
B, the dredging and cleaning of pipeline 1 to be repaired: by silt pumping car draw water in the way of, treat pipe-repairing 1 and draw water
Pipeline 1 to be repaired is dredged in dredging;
C, telephotography detects: television pickup equipment being put into pipeline 1 to be repaired, is detected to pipeline inside, is obtained
The position damaged in pipe-repairing and damaged condition;
D, section of jurisdiction 3 is prefabricated: stainless steel plate raw material being pressed to the diameter of pipeline 1 to be repaired, is rolled into corresponding tubular structure;And
It is positioned on tubular structure and injected hole 4 is set;Tubular structure is cut into parts the identical arch plate structure of several shapes
Section of jurisdiction 3 after, transport to pipeline 1 to be repaired reparation scene;
E, pipeline 1 to be repaired pre-processes: according to telephotography testing result, treating the local damage position of pipe-repairing 1
And/or interface damaged part carries out pre- repair process;That is, the upstream and downstream pipe at interface damaged part or local damage position
Wall installs cyclic annular rubber water-proof band respectively;
F, section of jurisdiction 3 is mated formation and is welded: several sections of jurisdiction are transferred from inspection shaft position enter pipeline 1 to be repaired one by one,
In pipeline in tubular construction by stainless steel substrates welding, and weld seam is checked;
G, it slip casting: is fixed between tubular structure and the inner wall of pipeline to be repaired 1 using the filling of hardening slurry 2;Solidification slurry
2 nationality of liquid is injected out of tubular structure by injected hole 4;Slurries 2 to be solidified block injected hole 4 with bolt after solidifying;
H, restore water flowing: slurries 2 to be solidified remove brick wall after solidifying, and restore water flowing;
I, telephotography check and evaluation: nationality is acquired the state of tubular structure in water flowing engineering by television pickup equipment, as
Image data after reparation saves filing.
In practical applications, the former pipe of reparation is drainage pipeline, and tubing is concrete reinforced pipe, brick arch pipe, and caliber exists
1800 millimeters or more.
Stainless steel tube sheet is the identical arch of shape, and quantity is 3 to 8, and length is 0.3 millimeter to 0.8m, and weight is less than
100kg, using 304 stainless steels make, raw material should meet GB/T20878-2007 " the stainless steel and refractory steel trade mark and chemistry at
Point " requirement.
Butt welding between adjacent stainless steel tube sheet, connection cyclization.Welding rod uses E316-16, Ying Fuhe " stainless steel weldering
Item " (GB/T 983-2012) requirement.
Weld seam grade is second level, and Ying Fuhe " code for acceptance of construction quality of steel structures " (GB 50205-2001's) wants
It asks.It repeats the above process to whole segment pipe to be repaired.
It is connected and fixed between stainless steel tube sheet and former pipe using hardening slurry filling.
Hardening slurry material system passes through reserved injected hole slip casting filling.Reserved slip casting hole number is 4~8, is distributed in pipe
It on piece perimeter, is blocked after cutting off preformed hole after grouting serous fluid solidification using bolt, asks money administration can be with repair welding hole certain
Hole.
In certain embodiments, local damage position be include leakage and/or pipe wall crack.
In certain embodiments, the diameter of the diameter of pipeline 1 to be repaired is at 1800 millimeters or more.
As shown in figure 3, in certain embodiments, in step G, local damage position of the hardening slurry 2 through pipeline 1 to be repaired
And/or interface damaged part penetrates into the periphery soil body, the range for penetrating into the periphery soil body includes 1 surrounding radius of pipeline, 1000 milli to be repaired
The region of rice to 2000 millimeters.
The present invention also provides the dedicated stainless steel inner lining reparation structures of the method for non-excavation rehabilitation drainage pipeline institute, including by
The tubular structure that several sections of jurisdiction 3 form;The side wall of tubular structure is equipped with several injected holes 4;Tubular structure is set to be repaired
The local damage position of pipeline 1 and/or interface damaged part;Ring-type is equipped between the both ends of tubular structure and pipeline to be repaired 1
Rubber water-proof band;It is fixed between tubular structure and pipeline to be repaired 1 using the filling of hardening slurry 2.
In certain embodiments, tubular structure is at least made of 4 pieces of sections of jurisdiction 3.
In certain embodiments, the thickness of each section of jurisdiction 3 is 10mm, and is made of 304 stainless steels.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that those skilled in the art without
It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art
Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea
Technical solution, all should be within the scope of protection determined by the claims.
Claims (7)
1. the method for non-excavation rehabilitation drainage pipeline, steps are as follows:
A, the closure of the pipeline to be repaired (1) and temporary drainage: in the upstream and downstream inspection shaft of the pipeline (1) to be repaired
Interior setting carries out the brick wall of temporary plugging;The water of pipeline (1) upstream to be repaired is imported by temporary drainage measure simultaneously
Downstream line;
B, the dredging and cleaning of the pipeline to be repaired (1): by silt pumping car draw water in the way of, to the pipeline (1) to be repaired
Dredging of drawing water is carried out, the pipeline (1) to be repaired is dredged;
C, telephotography check and evaluation: television pickup equipment is put into pipeline to be repaired (1), pipeline inside is detected, is obtained
Take the position damaged in the pipe-repairing and damaged condition;
D, section of jurisdiction (3) it is prefabricated: stainless steel plate raw material is pressed to the diameter of pipeline to be repaired (1), is rolled into corresponding tubular structure;And
It is positioned on the tubular structure and injected hole (4) is set;The tubular structure is cut into parts the identical arch of several shapes
Behind the section of jurisdiction (3) of shape plate structure, the reparation scene of the pipeline to be repaired (1) is transported to;
E, pipeline to be repaired (1) pretreatment: according to telephotography check and evaluation as a result, to the pipeline (1) to be repaired
Local damage position and/or interface damaged part carry out pre- repair process;That is, at interface damaged part or local damage position
Upstream and downstream tube wall installs cyclic annular rubber water-proof band respectively;
F, the section of jurisdiction (3) is mated formation and is welded: one by one entering several sections of jurisdiction from the decentralization of inspection shaft position described to be repaired
Multiple pipeline (1) by stainless steel substrates welding in the tubular structure in pipeline, and checks weld seam;
G, slip casting: solid using hardening slurry (2) filling between the tubular structure and the inner wall of the pipeline to be repaired (1)
It is fixed;Hardening slurry (2) nationality is injected out of described tubular structure by the injected hole (4);Solidify to the hardening slurry (2)
The injected hole (4) is blocked with bolt afterwards;
H, restore water flowing: removing the brick wall after the hardening slurry (2) solidification, restore water flowing;
I, telephotography check and evaluation: the state of nationality tubular structure as described in television pickup equipment acquisition water flowing engineering, as
Image data after reparation saves filing.
2. the method for non-excavation rehabilitation drainage pipeline according to claim 1, which is characterized in that the local damage position
Being includes leakage and/or pipe wall crack.
3. the method for non-excavation rehabilitation drainage pipeline according to claim 1, which is characterized in that the pipeline to be repaired
(1) diameter of diameter is at 1800 millimeters or more.
4. the method for non-excavation rehabilitation drainage pipeline according to claim 1, which is characterized in that in step G, the solidification
The periphery soil body, the infiltration are penetrated into local damage position and/or interface damaged part of the slurries (2) through the pipeline (1) to be repaired
The range for entering the periphery soil body includes the region of 1000 millimeters to 2000 millimeters of surrounding radius of the pipeline to be repaired (1).
5. the dedicated stainless steel inner lining of method institute of non-excavation rehabilitation drainage pipeline repairs structure, which is characterized in that if including by
Do the tubular structure of the section of jurisdiction (3) composition;The side wall of the tubular structure is equipped with several injected holes (4);Institute
State tubular structure be set to the pipeline to be repaired (1) the local damage position and/or the interface damaged part;It is described
The ring-shaped rubber waterstop sealing band is equipped between the both ends of tubular structure and the pipeline to be repaired (1);The tubular structure
It is fixed between the pipeline (1) to be repaired using hardening slurry (2) filling.
6. the dedicated stainless steel inner lining of method institute of non-excavation rehabilitation drainage pipeline according to claim 5 repairs structure,
It is characterized in that, the tubular structure is at least made of 4 pieces of sections of jurisdiction (3).
7. the dedicated stainless steel inner lining of method institute of non-excavation rehabilitation drainage pipeline according to claim 6 repairs structure,
It is characterized in that, the thickness of each section of jurisdiction (3) is 10mm, and it is made of 304 stainless steels.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910670204.9A CN110332409A (en) | 2019-07-24 | 2019-07-24 | The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910670204.9A CN110332409A (en) | 2019-07-24 | 2019-07-24 | The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110332409A true CN110332409A (en) | 2019-10-15 |
Family
ID=68147255
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910670204.9A Pending CN110332409A (en) | 2019-07-24 | 2019-07-24 | The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110332409A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110715138A (en) * | 2019-10-28 | 2020-01-21 | 南京华享环境科技有限公司 | Non-excavation type repairing method for drainage pipeline |
CN111075994A (en) * | 2019-12-03 | 2020-04-28 | 上海市基础工程集团有限公司 | Flexible pipeline repairing construction method |
CN111456196A (en) * | 2020-04-20 | 2020-07-28 | 福光环境工程(上海)有限公司 | Grouting structure for repairing sewage pipeline and pipeline grouting repairing method |
CN112878724A (en) * | 2021-01-14 | 2021-06-01 | 杭州临安排水有限公司 | Novel anti-seepage treatment method |
CN112900294A (en) * | 2021-01-22 | 2021-06-04 | 上海城建水务工程有限公司 | Lining structure for box culvert repair and construction method thereof |
CN113063052A (en) * | 2021-03-17 | 2021-07-02 | 中核四平市政工程有限公司 | Pipeline lining grouting repair method |
CN113251236A (en) * | 2021-04-28 | 2021-08-13 | 上海海潜市政工程有限公司 | Municipal pipeline repairing process |
CN113483163A (en) * | 2021-06-22 | 2021-10-08 | 合肥慧源铝业有限公司 | Centrifugal casting composite pump pipe and processing technology thereof |
CN114382153A (en) * | 2022-01-25 | 2022-04-22 | 中建鹭港建设有限公司 | Drainage pipeline steel lining local repair structure |
CN115056337A (en) * | 2022-06-06 | 2022-09-16 | 中建八局第三建设有限公司 | Non-destructive non-excavation adjustable concrete pipeline lining guniting repair device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1755184A (en) * | 2004-09-29 | 2006-04-05 | 孙跃平 | Excavation-free integral restoration method of underground conduit and inspection well |
CN101509589A (en) * | 2009-03-31 | 2009-08-19 | 崔同悦 | Non-digging pipe repairing method |
CN103437417A (en) * | 2013-08-24 | 2013-12-11 | 无锡市政设计研究院有限公司 | Part repair structure for steel lining of drainage pipeline |
CN103542226A (en) * | 2012-07-17 | 2014-01-29 | 中国长江三峡集团公司 | Method for repairing large-diameter concrete water supply pipeline |
CN105371049A (en) * | 2015-12-01 | 2016-03-02 | 无锡琛华复合材料有限公司 | Large-diameter underground pipeline non-excavation rehabilitation method |
CN210372526U (en) * | 2019-07-24 | 2020-04-21 | 上海市城市建设设计研究总院(集团)有限公司 | Stainless steel lining repairing structure special for trenchless repairing method of drainage pipeline |
-
2019
- 2019-07-24 CN CN201910670204.9A patent/CN110332409A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1755184A (en) * | 2004-09-29 | 2006-04-05 | 孙跃平 | Excavation-free integral restoration method of underground conduit and inspection well |
CN101509589A (en) * | 2009-03-31 | 2009-08-19 | 崔同悦 | Non-digging pipe repairing method |
CN103542226A (en) * | 2012-07-17 | 2014-01-29 | 中国长江三峡集团公司 | Method for repairing large-diameter concrete water supply pipeline |
CN103437417A (en) * | 2013-08-24 | 2013-12-11 | 无锡市政设计研究院有限公司 | Part repair structure for steel lining of drainage pipeline |
CN105371049A (en) * | 2015-12-01 | 2016-03-02 | 无锡琛华复合材料有限公司 | Large-diameter underground pipeline non-excavation rehabilitation method |
CN210372526U (en) * | 2019-07-24 | 2020-04-21 | 上海市城市建设设计研究总院(集团)有限公司 | Stainless steel lining repairing structure special for trenchless repairing method of drainage pipeline |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110715138A (en) * | 2019-10-28 | 2020-01-21 | 南京华享环境科技有限公司 | Non-excavation type repairing method for drainage pipeline |
CN111075994A (en) * | 2019-12-03 | 2020-04-28 | 上海市基础工程集团有限公司 | Flexible pipeline repairing construction method |
CN111456196A (en) * | 2020-04-20 | 2020-07-28 | 福光环境工程(上海)有限公司 | Grouting structure for repairing sewage pipeline and pipeline grouting repairing method |
CN111456196B (en) * | 2020-04-20 | 2021-05-07 | 福光环境工程(上海)有限公司 | Grouting structure for repairing sewage pipeline and pipeline grouting repairing method |
CN112878724A (en) * | 2021-01-14 | 2021-06-01 | 杭州临安排水有限公司 | Novel anti-seepage treatment method |
CN112900294A (en) * | 2021-01-22 | 2021-06-04 | 上海城建水务工程有限公司 | Lining structure for box culvert repair and construction method thereof |
CN113063052A (en) * | 2021-03-17 | 2021-07-02 | 中核四平市政工程有限公司 | Pipeline lining grouting repair method |
CN113251236A (en) * | 2021-04-28 | 2021-08-13 | 上海海潜市政工程有限公司 | Municipal pipeline repairing process |
CN113483163A (en) * | 2021-06-22 | 2021-10-08 | 合肥慧源铝业有限公司 | Centrifugal casting composite pump pipe and processing technology thereof |
CN114382153A (en) * | 2022-01-25 | 2022-04-22 | 中建鹭港建设有限公司 | Drainage pipeline steel lining local repair structure |
CN114382153B (en) * | 2022-01-25 | 2023-12-08 | 中建鹭港建设有限公司 | Drainage pipe steel lining local repair structure |
CN115056337A (en) * | 2022-06-06 | 2022-09-16 | 中建八局第三建设有限公司 | Non-destructive non-excavation adjustable concrete pipeline lining guniting repair device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110332409A (en) | The method of non-excavation rehabilitation drainage pipeline and dedicated stainless steel inner lining repair structure | |
CN102486247B (en) | Water supply and drainage pipeline repair technique adopting size film lining method | |
WO2014012305A1 (en) | Method for repairing large diameter concrete water-supply pipe | |
CN105179875B (en) | The trenchless repairing method that a kind of soft stratum drainage pipeline deformation is collapsed | |
CN110645418B (en) | Connecting method for mounting large-diameter pipeline | |
CN103437417B (en) | Part repair structure for steel lining of drainage pipeline | |
Damvergis | Sewer systems: Failures and rehabilitation | |
CN108591614A (en) | Multi-pipe crossing construction method in combustion gas old pipeline | |
CN108590752B (en) | Drainage repair system after lining of underdrain type tunnel and construction method thereof | |
CN104727425A (en) | Traction-type non-excavation pipeline repairing method | |
CN210372526U (en) | Stainless steel lining repairing structure special for trenchless repairing method of drainage pipeline | |
CN101705717B (en) | Internal liner of drainage pipe or dirt discharge pipe for operation with water and construction method thereof for operation with water | |
CN211666735U (en) | Existing subway tunnel structure is consolidated in slip casting pipe interpolation shaped steel slip casting | |
CN112112248A (en) | Method for repairing defect of channel box | |
CN203498985U (en) | Local repair structure for steel lining of exhaust pipeline | |
CN113863268A (en) | Construction and debugging process for fabricated sewage treatment station of epidemic prevention emergency project | |
CN113175058A (en) | Existing underground jacking pipe access construction method | |
CN105507172B (en) | A kind of inner bearing type connection structure for steel reinforced concrete pipe culvert reparation | |
CN108487908A (en) | A kind of basil device and its construction method of the shoveling of jacking construction auxiliary | |
CN217603641U (en) | Integral repair structure for non-excavation lining of drainage pipeline | |
CN218671144U (en) | Be used for burying prosthetic device of buried water supply and drainage pipeline inside lining non-excavation | |
CN113217020B (en) | Mountain sleeve valve pipe reinforcing construction method | |
CN214363618U (en) | Construction structure of concrete inverted hanging well suitable for mucky soil | |
CN110560467B (en) | Harmless treatment method for waste and old pipelines | |
CN209587393U (en) | A kind of pipeline mismatch no-dig technique liner steel collar prosthetic device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |