CN109610706A - 一种装配式组合空心楼板及其制作方法 - Google Patents
一种装配式组合空心楼板及其制作方法 Download PDFInfo
- Publication number
- CN109610706A CN109610706A CN201811326623.2A CN201811326623A CN109610706A CN 109610706 A CN109610706 A CN 109610706A CN 201811326623 A CN201811326623 A CN 201811326623A CN 109610706 A CN109610706 A CN 109610706A
- Authority
- CN
- China
- Prior art keywords
- profiled sheet
- sheet
- combination floor
- steel
- profiled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/10—Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
一种装配式空心组合楼板及其制作方法,包括H型钢,H型钢的顶部设置有两层相互叠加的压型钢板,所述的两层相互叠加的压型钢板之间形成多边形空心局域;压型钢板上方浇筑混凝土;使用时,两层相互叠加的压型钢板之间形成多边形空心局域,方便通过管线,并且压型钢板作为底板可减少钢筋配置,本发明具有无需对钢梁截面进行损耗亦可达到相同效果,省去了复杂的施工工艺,减少了钢材浪费的优点。
Description
技术领域
本发明涉及土木工程建筑技术领域,具体涉及一种装配式组合空心楼板及其制作方法。
背景技术
蜂窝钢是一种新型结构,其目的是为了减轻构件的自重,节约钢材,便于通过管线,但传统蜂窝钢的施工有二种工艺,一是在型钢腹板进行曲线切割,并将切割后的型钢错位焊接形成,二是在腹板直接开孔处理,这二种施工工艺均需要较高的施工工艺和施工成本,其成本主要来源于曲线切割工艺、焊接工艺,若焊接不得当都将引起梁内变形和较高的缺陷,其实蜂窝钢的设计是以钢梁腹板局部空心为核心目的,这种设计虽然有较好的收益,但对钢梁截面损伤较大,对强度和刚度均匀不同程度的影响。
发明内容
为了克服上述现有技术的不足,本发明提供了一种装配式空心组合楼板及其制作方法,能够取消传统蜂窝钢的腹板开洞,将空心区域转移至上部,解决传统蜂窝钢截面损耗大,施工工艺复杂的问题。
为了达到上述目的,本发明采用的技术方案为:
一种装配式空心组合楼板,包括H型钢1,H型钢1的顶部设置有两层相互叠加的压型钢板2,所述的两层相互叠加的压型钢板2之间形成多边形空心局域;压型钢板2上方浇筑混凝土3。
进一步的,所述的两层相互叠加的压型钢板2之间以及压型钢板2与压型钢板1之间通过高强螺栓4连接。
进一步的,所述的高强螺栓4位于压型钢板2的端部。
进一步的,所述的压型钢板2设置有放置高强螺栓4的预留孔,所述高强螺栓4提前埋置于压型钢板2内,后浇筑混凝土3成为一体。
进一步的,所述的H型钢1为H型截面钢梁。
进一步的,所述的压型钢板2为薄钢板经冷压或冷轧成波型的钢材。
进一步的,所述的高强螺栓4为抗剪连接件。
一种装配式空心组合楼板的制备方法,其步骤为:
步骤1、将薄钢板经冷压或冷轧成波型,得到压型钢板2;
步骤2、给压型钢板2上浇筑混凝土3,得到压型钢板组合楼板;混凝土浇筑在工厂预制完成或者在施工现场浇筑完成;
步骤3、将所述压型钢板2和所述压型钢板组合楼板下部开预留孔,其开预留孔一一对应,并通过将高强螺栓4穿过预留孔洞进行预埋;
步骤4、所述压型钢板2预留孔洞,需预先通过高强螺栓4连接于H型钢上翼缘,并通过压型钢板组合楼板中预埋的高强螺栓4穿过压型钢板预留孔洞进行连接。
本发明的有益效果:
本发明采用两层相互叠加的压型钢板2之间形成多边形空心局域,方便通过管线,并且压型钢板作为底板可减少钢筋配置,本发明无需对钢梁截面进行损耗亦可达到相同效果,省去了复杂的施工工艺,减少了钢材浪费。
所述的高强螺栓4位于压型钢板2的端部,方便施工,可埋置一列或者多列。
附图说明
图1为本发明三维示意图。
图2为本发明剖面图。
图3为本发明截面布置图。
具体实施方式
下面结合附图对本发明作进一步说明。
参照图1、图2、图3所示,一种装配式空心组合楼板,包括H型钢1,H型钢1的顶部设置有两层相互叠加的压型钢板2,所述的两层相互叠加的压型钢板2之间形成多边形空心局域;压型钢板2上方浇筑混凝土3。所述的两层相互叠加的压型钢板2之间以及压型钢板2与压型钢板1之间通过高强螺栓4连接。所述的高强螺栓4位于压型钢板2的端部。所述的压型钢板2设置有放置高强螺栓4的预留孔,所述高强螺栓4提前埋置于压型钢板2内,后浇筑混凝土3成为一体。
一种装配式空心组合楼板的制备方法,其步骤为:
步骤1、将薄钢板经冷压或冷轧成波型,得到压型钢板2;
步骤2、将得到压型钢板2上浇筑混凝土3,得到压型钢板组合楼板;混凝土浇筑是可以在工厂预制完成或者在施工现场浇筑完成;
步骤3、将所述压型钢板2和所述压型钢板组合楼板下部开预留孔,其开预留孔一一对应,并通过将高强螺栓4穿过预留孔洞进行预埋;
步骤4、所述压型钢板2预留孔洞,需预先通过高强螺栓4连接于H型钢上翼缘,并通过压型钢板组合楼板中预埋的高强螺栓4穿过压型钢板预留孔洞进行连接。
Claims (8)
1.一种装配式空心组合楼板,其特征在于,包括H型钢(1),H型钢(1)的顶部设置有两层相互叠加的压型钢板(2),所述的两层相互叠加的压型钢板(2)之间形成多边形空心局域;压型钢板(2)上方浇筑混凝土(3)。
2.根据权利要求1所述的一种装配式空心组合楼板,其特征在于,所述的两层相互叠加的压型钢板(2)之间以及压型钢板(2)与压型钢板(1)之间通过高强螺栓(4)连接。
3.根据权利要求1所述的一种装配式空心组合楼板,其特征在于,所述的高强螺栓(4)位于压型钢板(2)的端部。
4.根据权利要求1所述的一种装配式空心组合楼板,其特征在于,所述的压型钢板(2)设置有放置高强螺栓(4)的预留孔,所述高强螺栓(4)提前埋置于压型钢板(2)内,后浇筑混凝土(3)成为一体。
5.根据权利要求1所述的一种装配式空心组合楼板,其特征在于,所述的H型钢(1)为H型截面钢梁。
6.根据权利要求1所述的一种装配式空心组合楼板,其特征在于,所述的压型钢板(2)为薄钢板经冷压或冷轧成波型的钢材。
7.根据权利要求2所述的一种装配式空心组合楼板,其特征在于,所述的高强螺栓(4)为抗剪连接件。
8.根据权利要求2所述的一种装配式空心组合楼板,其特征在于,其制备方法,步骤为:
步骤1、将薄钢板经冷压或冷轧成波型,得到压型钢板(2);
步骤2、将得到压型钢板(2)上浇筑混凝土(3),得到压型钢板组合楼板;
步骤3、将所述压型钢板(2)和所述压型钢板组合楼板下部开预留孔,其开预留孔一一对应,并通过将高强螺栓(4)穿过预留孔洞进行预埋;
步骤4、所述压型钢板(2)预留孔洞,需预先通过高强螺栓(4)连接于H型钢上翼缘,并通过压型钢板组合楼板中预埋的高强螺栓(4)穿过压型钢板预留孔洞进行连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811326623.2A CN109610706A (zh) | 2018-11-08 | 2018-11-08 | 一种装配式组合空心楼板及其制作方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811326623.2A CN109610706A (zh) | 2018-11-08 | 2018-11-08 | 一种装配式组合空心楼板及其制作方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109610706A true CN109610706A (zh) | 2019-04-12 |
Family
ID=66003142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811326623.2A Pending CN109610706A (zh) | 2018-11-08 | 2018-11-08 | 一种装配式组合空心楼板及其制作方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109610706A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029780A (zh) * | 2019-05-13 | 2019-07-19 | 中州装备制造股份有限公司 | 加劲骨架与其制作方法与设备及结构加强体 |
CN110067333A (zh) * | 2019-05-13 | 2019-07-30 | 中州装备制造股份有限公司 | 刚性梁架及其制作方法和刚性结构体 |
CN112343232A (zh) * | 2020-10-30 | 2021-02-09 | 山东建筑大学 | 一种组合式楼板、建筑物及施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014173389A (ja) * | 2013-03-12 | 2014-09-22 | Asahi Kasei Construction Materials Co Ltd | 床構造 |
WO2014153070A1 (en) * | 2013-03-14 | 2014-09-25 | Firouz Amir | Structural component system |
CN206971503U (zh) * | 2017-02-24 | 2018-02-06 | 袁兴林 | 一种拼接式楼板 |
CN108130969A (zh) * | 2018-02-14 | 2018-06-08 | 上海欧本钢结构有限公司 | 一种可拆卸的楼层板系统及其施工方法 |
-
2018
- 2018-11-08 CN CN201811326623.2A patent/CN109610706A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014173389A (ja) * | 2013-03-12 | 2014-09-22 | Asahi Kasei Construction Materials Co Ltd | 床構造 |
WO2014153070A1 (en) * | 2013-03-14 | 2014-09-25 | Firouz Amir | Structural component system |
CN206971503U (zh) * | 2017-02-24 | 2018-02-06 | 袁兴林 | 一种拼接式楼板 |
CN108130969A (zh) * | 2018-02-14 | 2018-06-08 | 上海欧本钢结构有限公司 | 一种可拆卸的楼层板系统及其施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029780A (zh) * | 2019-05-13 | 2019-07-19 | 中州装备制造股份有限公司 | 加劲骨架与其制作方法与设备及结构加强体 |
CN110067333A (zh) * | 2019-05-13 | 2019-07-30 | 中州装备制造股份有限公司 | 刚性梁架及其制作方法和刚性结构体 |
CN110067333B (zh) * | 2019-05-13 | 2020-11-27 | 中州装备制造股份有限公司 | 刚性梁架及其制作方法和刚性结构体 |
CN112343232A (zh) * | 2020-10-30 | 2021-02-09 | 山东建筑大学 | 一种组合式楼板、建筑物及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104532997B (zh) | 一种装配式楼盖体系及其施工方法 | |
CN109610706A (zh) | 一种装配式组合空心楼板及其制作方法 | |
CN106567458B (zh) | 装配式钢-混结合梁柱框架结构体系 | |
CN206707124U (zh) | 带有钢结构接头的预制装配式钢筋混凝土构件 | |
CN102086677A (zh) | 预制钢筋砼梁及钢筋砼柱与梁连接节点 | |
CN108149825B (zh) | 一种用于装配式建筑的预制板、预制板与梁的连接方式及施工方法 | |
CN106481023B (zh) | 装配式钢混结合梁结构及其实施方法 | |
CN110056085A (zh) | 可快速装配的frp型材梁柱节点 | |
CN106284655A (zh) | 预制混凝土梁柱栓接连接节点及连接方法 | |
CN108894431A (zh) | 摩擦抗剪型钢-预制混凝土组合梁的制备及其施工方法 | |
CN107130715A (zh) | 一种后浇齿槽连接装配式楼屋盖的施工方法 | |
CN206736696U (zh) | 一种预制装配式锚栓连接钢混组合梁 | |
CN103437493A (zh) | 预制钢筋混凝土梁的连接节点及施工方法 | |
CN108532795A (zh) | 装配式混凝土剪力墙结构竖向刚性连接节点及施工方法 | |
CN105089182B (zh) | 一种用于钢结构的混凝土隔墙体系及其施工方法 | |
CN207891714U (zh) | 腹包底梯形/波形钢板组合箱梁 | |
CN207812307U (zh) | 斜拉桥主塔及钢锚梁的施工系统 | |
CN109281422A (zh) | 装配式混凝土结构墙-柱全钢键连接结构及拼装方法 | |
CN106149877A (zh) | 混凝土框架结构预制柱与梁板节点处的对接结构及方法 | |
CN106149878A (zh) | 混凝土框架结构预制柱与梁板节点处的连接结构及方法 | |
CN205874944U (zh) | 一种双t型波形钢腹板‑压型钢板组合梁 | |
CN106337530B (zh) | 一种框架梁施工缝封堵的施工方法 | |
CN109235251A (zh) | 一种新型空心板漏斗铰缝结构及其施工方法 | |
CN112144859A (zh) | 一种装配式叠合板悬挑架预埋装置及建筑构件成品、悬挑架结构 | |
CN105133789B (zh) | 内桁架式钢管混凝土t形柱及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190412 |