CN109606548A CN201811291716.6A CN201811291716A CN109606548A CN 109606548 A CN109606548 A CN 109606548A CN 201811291716 A CN201811291716 A CN 201811291716A CN 109606548 A CN109606548 A CN 109606548A
Authority
CN
China
Prior art keywords
line
segmentation
topside
transverse bulkhead
middle body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811291716.6A
Other languages
Chinese (zh)
Inventor
余岚峰
李佳伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201811291716.6A priority Critical patent/CN109606548A/en
Publication of CN109606548A publication Critical patent/CN109606548A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The present invention relates to the localization method that a kind of ship parallel middle body area p-type block is always organized, the parallel middle body area p-type block include topside segmentation, while transverse bulkhead segmentation and while deck panel, which comprises the following steps that the first step, the positioning of topside segmentation;Second step, positioning side transverse bulkhead segmentation;Third step positions side deck panel.The topside block of method of the invention for ships such as oil tanker, chemical tanker, double topside bulk freighters always organizes positioning, avoids excessive the shortcomings that relying on instrument, while also solving the problems, such as positioning convenience and accuracy.

Description

The localization method that a kind of ship parallel middle body area p-type block is always organized
Technical field
The present invention relates to shipbuildings, are related specifically to a kind of method that ship parallel middle body p-type block always organizes positioning, Total group for ship parallel middle body p-type block positions.
Background technique
In modern ships engineering, in order to accelerate shipbuilding speed, one of most important method is exactly to carry out to segmentation Total group, for the ships such as chemical tanker, cruise, parallel middle body region ship side structure is duplex shell structure, and deck component Upward, there are groove profile transverse bulkhead, in building course often by topside segmentation, it is corresponding in deck panel and it is corresponding while it is horizontal Compartment segmentation carries out total group, and uses total group of side state, this just needs to position these three segmentations, and present localization method is past Toward the positioning mode using anchor point, but anchor point positioning mode has the following disadvantages:
1, anchor point positioning mode needs whole using total station, and excessively to instrument dependence, and instrument price is relatively high, protects Support it is costly and easy to damage, it is high-frequency to cause instrument damage using often too fast, once if instrument damage, cannot look for To substitution instrument if will cause production disruption, bring about great losses.
2, anchor point positioning mode requires the selection of anchor point stringenter, needs to comprehensively consider the convenience of positioning and determines Position accuracy, if choose segmentation section on point as anchor point, often will cause the decline of positioning accuracy, if The point at strong component is chosen as anchor point, some is segmented strong component range segment separating section farther out, and construction site Place is limited, often will cause positioning and is more troublesome, and needs secondary or even adjusts instrumented site three times.
Due to above, anchor point positioning mode often generates location difficulty, the low problem of positioning accuracy, or even generates It is the problems such as repositioning, time-consuming and laborious, and reduce the quality of product.
Summary of the invention
The present invention is comprehensive comprehensively using complete in order to overcome shortcoming of the anchor point positioning mode in the positioning of p-type block It stands instrument, because of a kind of total group of localization method of ship parallel middle body p-type block of the invention.It is relied on present method avoids excessive The shortcomings that instrument, while also solving the problems, such as positioning convenience and accuracy, it is used for oil tanker, chemical tanker, double topside bulk goods The topside block of the ships such as ship always organizes positioning.
In order to achieve the above object of the invention, technical solution provided by the invention is as follows:
The localization method that a kind of ship parallel middle body area p-type block is always organized, which includes topside Segmentation, while transverse bulkhead segmentation and while deck panel, which is characterized in that the localization method comprises the following steps that
The first step, the positioning of topside segmentation, in always group place setting grid line and elevation line, by grid line and elevation line Topside segmentation is positioned, first the topside as basic section is segmented and is substantially aligned with total grid line for organizing place, in adjustment The levelness of longitudinal wall, adjustment segmentation makes to be segmented the grid line in the total group place of alignment completely, then repetition measurement levelness, in the mark of elevation line The height value of interior longitudinal wall is made on bar;
Second step, positioning side transverse bulkhead segmentation, by elevation line, side transverse bulkhead hookup wire, determines zygonema and waterline Position, first by the side transverse bulkhead hookup wire in when transverse bulkhead is aligned on longitudinal wall, then by two waterlines and side tabula on interior longitudinal wall Two waterlines alignment on cabin, adjusts the verticality of side thwartship bulkhead, finally adjusts the straight plane line on the transverse bulkhead of side, guarantees and mark High line is consistent;
Third step positions side deck panel, by straight hatching line, waterline, positions to zygonema, first will be on the deck panel of side Zygonema is aligned zygonema with what topside was segmented, then by deck straight hatching line with while transverse bulkhead on straight hatching line be aligned, Last repetition measurement deck camber.
In the localization method that a kind of ship parallel middle body area p-type block of the invention is always organized, to base in the first step The positioning of quasi- segmentation, the position line in the total group place of foundation and the relationship of the position line in topside segmentation, the total group of place Position line is grid line and elevation line, and the position line in the topside segmentation is for straight hatching line, waterline and to zygonema.
In the localization method that a kind of ship parallel middle body area p-type block of the invention is always organized, the total group of place is determined Bit line is separately provided to measure.
In the localization method that a kind of ship parallel middle body area p-type block of the invention is always organized, the topside segmentation, Bian Heng Compartment segmentation should be consistent with the position line on the deck panel of side, need to synchronize setting.
In the localization method that a kind of ship parallel middle body area p-type block of the invention is always organized, total position line for organizing place With topside segmentation, while transverse bulkhead segmentation and while deck panel position line guarantee precision within ± 0.5mm.
Based on the above-mentioned technical proposal, localization method of the invention is used in total group of p-type block of ship parallel middle body area and obtains Following technical effect:
1. method of the invention is comprehensive comprehensively to use total station, excessive the shortcomings that relying on instrument is avoided, while also solving The problem of positioning convenience and accuracy of having determined, the topside block for ships such as oil tanker, chemical tanker, double topside bulk freighters are total Group positioning.
2. method of the invention, to be positioned as foundation by line, to position the position of each segmentation, the present invention can change segmentation Total group finder, simplifies position fixing process, modern instrument is used in combination with conventional tool, increase location efficiency and positioning accurate Degree.
Detailed description of the invention
Fig. 1 is topside split fix figure in localization method that a kind of ship parallel middle body area of the invention p-type block is always organized.
Fig. 2 is side transverse bulkhead split fix in localization method that a kind of ship parallel middle body area of the invention p-type block is always organized Figure.
Fig. 3 is side deck panel positioning figure in localization method that a kind of ship parallel middle body area of the invention p-type block is always organized.
Specific embodiment
Our positioning always to be organized to a kind of ship parallel middle body area of the invention p-type block in conjunction with specific embodiments below Method further describes in detail, and in the hope of providing a clearer understanding of its implementation, but therefore cannot limit this hair Bright protection scope.
The localization method that a kind of ship parallel middle body area p-type block of the invention is always organized, the parallel middle body area p-type block packet Included topside segmentation, while transverse bulkhead segmentation and while deck panel, which comprises the following steps that
The first step, the positioning of topside segmentation, in always group place setting grid line and elevation line, by grid line and elevation line Topside segmentation is positioned, first the topside as basic section is segmented and is substantially aligned with total grid line for organizing place, in adjustment The levelness of longitudinal wall, adjustment segmentation makes to be segmented the grid line in the total group place of alignment completely, then repetition measurement levelness, in the mark of elevation line The height value of interior longitudinal wall is made on bar;Positioning to basic section, according to the position line in total group place and determining in topside segmentation The relationship of bit line, the position line in the total group of place are grid line and elevation line, and the position line in the topside segmentation is Straight hatching line, waterline and to zygonema.
Second step, positioning side transverse bulkhead segmentation, by elevation line, side transverse bulkhead hookup wire, determines zygonema and waterline Position, first by the side transverse bulkhead hookup wire in when transverse bulkhead is aligned on longitudinal wall, then by two waterlines and side tabula on interior longitudinal wall Two waterlines alignment on cabin, adjusts the verticality of side thwartship bulkhead, finally adjusts the straight plane line on the transverse bulkhead of side, guarantees and mark High line is consistent.
Third step positions side deck panel, by straight hatching line, waterline, positions to zygonema, first will be on the deck panel of side Zygonema is aligned zygonema with what topside was segmented, then by deck straight hatching line with while transverse bulkhead on straight hatching line be aligned, Last repetition measurement deck camber.
In the localization method that a kind of ship parallel middle body area p-type block of the invention is always organized, the total group of place is determined Bit line can be separately provided, in order to measure.Topside segmentation, while transverse bulkhead segmentation and while deck panel on position line answer When consistent, setting need to be synchronized.The position line in total group place and topside segmentation, while transverse bulkhead segmentation and while deck panel position line Guarantee precision within ± 0.5mm.
Its method is to be positioned as foundation by line, and to position the position of each segmentation, the present invention can change block assembly positioning Program simplifies position fixing process, modern instrument is used in combination with conventional tool, increases location efficiency and positioning accuracy.
Embodiment 1
In certain chemicals building course, need to topside be segmented, while deck panel, while transverse bulkhead segmentation carry out total group, When total group, positioned according to the following steps:
1, positioning datum segmentation topside segmentation, firstly, confirming that bow stern 100mm pacifies zygonema, side transverse bulkhead on interior longitudinal wall Wiring, 2.8m waterline, 14.8m waterline etc. are high-visible, and segmented edges are tentatively then aligned grid line (segmented edges profile Line), the levelness of interior longitudinal wall is then adjusted, the levelness of interior longitudinal wall can measure the several points of P1, P2, P3, P4, P5, P6, to water After Pingdu is adjusted, segmented edges are aligned grid line again, then repetition measurement levelness, measure interior longitudinal wall in horizontal mark post Position simultaneously marks, and basic section positioning terminates, as shown in Figure 1.
2, positioning side transverse bulkhead segmentation, firstly, transverse bulkhead two sides confirm 2.8m waterline, 14.8m waterline, the straight hatching line of 6m and The straight hatching line of 13.5m is high-visible, then by the side transverse bulkhead hookup wire on longitudinal wall in paragraph alignment, then will be on the transverse bulkhead of side 2.8m waterline, 14.8m waterline are aligned respectively with 2.8m waterline, the 14.8m waterline on interior longitudinal wall, then by the 6m on the transverse bulkhead of side Straight hatching line and the straight hatching line of 13.5m and the position of longitudinal wall interior on mark post compare, it is ensured that the straight hatching line of 6m and the straight hatching line of 13.5m with it is interior Longitudinal wall distance is consistent with theoretical size, and side transverse bulkhead split fix terminates, as shown in Figure 2.
3, side deck panel is positioned, firstly, directly cuing open in the non-framework face confirmation bow stern 100mm of side deck panel to zygonema, 6m Line and the straight hatching line of 13.5m are high-visible, then will be aligned on the deck of deck panel with the deck on total bulkhead, then by side deck Bow stern 100mm in segmentation is aligned zygonema with bow stern 100mm on interior longitudinal wall to zygonema, then by the straight hatching line of 6m on the deck of side and The straight hatching line of 13.5m is aligned with the straight hatching line of 6m on interior longitudinal wall and the straight hatching line of 13.5m respectively, repetition measurement deck camber, side deck point Duan Dingwei terminates, as shown in Figure 3.
Although above-described embodiment makes specific descriptions to the present invention, come for those of ordinary skill in the art It says, it is understood that can be modified within spirit and scope of the invention based on present disclosure not departing from Or improve, these modification and improvement are all within spirit and scope of the invention.

Claims (5)

1. the localization method that a kind of ship parallel middle body area p-type block is always organized, which includes topside point Section, while transverse bulkhead segmentation and while deck panel, which is characterized in that the localization method comprises the following steps that
The first step, the positioning of topside segmentation, in always group place setting grid line and elevation line, by grid line and elevation line to the side of a ship Side segmentation is positioned, and the segmentation of the topside as basic section is first substantially aligned with to the grid line in total group place, longitudinal wall in adjustment Levelness, adjustment segmentation makes to be segmented the grid line in the total group place of alignment completely, then repetition measurement levelness, on the mark post of elevation line Make the height value of interior longitudinal wall;
Second step, positioning side transverse bulkhead segmentation, by elevation line, side transverse bulkhead hookup wire, positions zygonema and waterline, first By the side transverse bulkhead hookup wire in transverse bulkhead alignment on longitudinal wall, then will be on two waterlines and side transverse bulkhead on interior longitudinal wall Two waterline alignment, adjust the verticality of side thwartship bulkhead, finally adjust the straight plane line on the transverse bulkhead of side, guarantee and elevation line one It causes;
Third step positions side deck panel, by straight hatching line, waterline, positions to zygonema, first by pair on the deck panel of side Zygonema is aligned zygonema with what topside was segmented, then by deck straight hatching line with while transverse bulkhead on straight hatching line be aligned, finally Repetition measurement deck camber.
2. the localization method that a kind of ship parallel middle body area according to claim 1 p-type block is always organized, which is characterized in that The relationship for the position line that the positioning of basic section, position line and topside according to total group place are segmented in the first step, The position line in the total group of place is grid line and elevation line, and the position line in the topside segmentation is straight hatching line, waterline With to zygonema.
3. the localization method that a kind of ship parallel middle body area according to claim 1 p-type block is always organized, which is characterized in that The position line in the total group of place is separately provided in order to measure.
4. the localization method that a kind of ship parallel middle body area according to claim 1 p-type block is always organized, which is characterized in that Topside segmentation, while transverse bulkhead segmentation with while deck panel on position line should be consistent, setting need to be synchronized.
5. the localization method that a kind of ship parallel middle body area according to claim 4 p-type block is always organized, which is characterized in that The position line in total group place and topside segmentation, while transverse bulkhead segmentation and while deck panel position line guarantee precision in ± 0.5mm Within.
CN201811291716.6A 2018-10-31 2018-10-31 The localization method that a kind of ship parallel middle body area p-type block is always organized Pending CN109606548A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811291716.6A CN109606548A (en) 2018-10-31 2018-10-31 The localization method that a kind of ship parallel middle body area p-type block is always organized

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811291716.6A CN109606548A (en) 2018-10-31 2018-10-31 The localization method that a kind of ship parallel middle body area p-type block is always organized

Publications (1)

Publication Number Publication Date
CN109606548A true CN109606548A (en) 2019-04-12

Family

ID=66002758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811291716.6A Pending CN109606548A (en) 2018-10-31 2018-10-31 The localization method that a kind of ship parallel middle body area p-type block is always organized

Country Status (1)

Country Link
CN (1) CN109606548A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110329425A (en) * 2019-07-05 2019-10-15 沪东中华造船(集团)有限公司 A kind of U-shaped block accuracy control method of two phase stainless steel chemical tanker
CN110877689A (en) * 2019-10-22 2020-03-13 沪东中华造船(集团)有限公司 Positioning and scribing process for groove-shaped bulkhead
CN110877694A (en) * 2019-11-15 2020-03-13 沪东中华造船(集团)有限公司 Shipboard subsection belt bending angle position and trough-type bulkhead subsection butt joint assembly method
CN111634368A (en) * 2020-06-29 2020-09-08 芜湖造船厂有限公司 Ship ballast tank structure and processing method thereof
CN111678450A (en) * 2020-05-09 2020-09-18 东华大学 Visual detection method and device for precision part
CN113911284A (en) * 2021-11-01 2022-01-11 沪东中华造船(集团)有限公司 Precision control method for assembling and carrying P-type total sections on chemical ship

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03159895A (en) * 1989-11-20 1991-07-09 Ishikawajima Harima Heavy Ind Co Ltd Hull modifying method for tanker
CN101092161A (en) * 2007-07-25 2007-12-26 上海外高桥造船有限公司 Method for final assembling transverse bulkhead and deck on ship
CN103661807A (en) * 2013-11-29 2014-03-26 大连船舶重工集团有限公司 Positioning method for broadside block assembling of pre-mounting pressure guide rail bracket
CN106956747A (en) * 2017-03-31 2017-07-18 中船第九设计研究院工程有限公司 The accuracy control method of multi-purpose cargo ship cargo hold topside segment carrying

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03159895A (en) * 1989-11-20 1991-07-09 Ishikawajima Harima Heavy Ind Co Ltd Hull modifying method for tanker
CN101092161A (en) * 2007-07-25 2007-12-26 上海外高桥造船有限公司 Method for final assembling transverse bulkhead and deck on ship
CN103661807A (en) * 2013-11-29 2014-03-26 大连船舶重工集团有限公司 Positioning method for broadside block assembling of pre-mounting pressure guide rail bracket
CN106956747A (en) * 2017-03-31 2017-07-18 中船第九设计研究院工程有限公司 The accuracy control method of multi-purpose cargo ship cargo hold topside segment carrying

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
应长春: "《船舶工艺技术》", 31 January 2013 *
胡建耀: "双相不锈钢槽型隔舱安装精度控制研究", 《科技视界》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110329425A (en) * 2019-07-05 2019-10-15 沪东中华造船(集团)有限公司 A kind of U-shaped block accuracy control method of two phase stainless steel chemical tanker
CN110877689A (en) * 2019-10-22 2020-03-13 沪东中华造船(集团)有限公司 Positioning and scribing process for groove-shaped bulkhead
CN110877694A (en) * 2019-11-15 2020-03-13 沪东中华造船(集团)有限公司 Shipboard subsection belt bending angle position and trough-type bulkhead subsection butt joint assembly method
CN110877694B (en) * 2019-11-15 2021-09-21 沪东中华造船(集团)有限公司 Shipboard subsection belt bending angle position and trough-type bulkhead subsection butt joint assembly method
CN111678450A (en) * 2020-05-09 2020-09-18 东华大学 Visual detection method and device for precision part
CN111634368A (en) * 2020-06-29 2020-09-08 芜湖造船厂有限公司 Ship ballast tank structure and processing method thereof
CN111634368B (en) * 2020-06-29 2023-12-08 芜湖造船厂有限公司 Ship ballast tank structure and processing method thereof
CN113911284A (en) * 2021-11-01 2022-01-11 沪东中华造船(集团)有限公司 Precision control method for assembling and carrying P-type total sections on chemical ship

Similar Documents

Publication Publication Date Title
CN109606548A (en) The localization method that a kind of ship parallel middle body area p-type block is always organized
CN102167140B (en) Method for measuring continuously-variable load precision of large-scale floating dock in floating state
CN107264724A (en) It is used for the baseline design method that fitting-out piping is installed in the anti-state segmentation of cabin curved surface
CN104743059B (en) A kind of more block pre-modified methods of hull annular
CN106853861A (en) The localization method in marine main engine foundation bolt hole
CN109094724B (en) Anchor lip lofting design method
CN103979073A (en) Installation method for segmented pre-installation of anchor table, anchor mouth and hawse pipe
CN104527922B (en) Accurate positioning method of anchor bolt hole of marine main engine
CN108202846A (en) A kind of secondary localization method to lie up of ship
CN108163143A (en) Arc saddle web corrects technique in liquefied gas carrier with c-type flow container
CN110615064B (en) Equipment installation point positioning method of saturated diving system
CN104290864A (en) Height positioning method of container body stand columns
CN203542216U (en) Fin stabilizer circle drawing tool
CN110525582A (en) One kind large-scale pedestal peculiar to vessel always organizes prepackage accuracy control method
CN112918633B (en) Hatch cover installation method
CN113978649A (en) Openable side push cover mounting method on ship
CN114179999A (en) Quick positioning and mounting method for double I-beams on cabin sections of container ship
CN109823469B (en) Ship main engine positioning method
CN101746482A (en) Method of abutting joint of two total segments in shipbuilding process
CN111780648A (en) Semi-submerged propeller propulsion unit angle measurement tool and measurement method
CN204463472U (en) A kind of bridge district laser navigation guidance system
CN104608876B (en) A kind of method of construction for digitizing dock
CN105652262B (en) A kind of static calibration method of ultra-short baseline acoustic positioning system
RU2375249C1 (en) Method of mooring to partner ship
CN107554689B (en) The method positioned using three-dimensional coordinate Ship ' stern tube bore hole amount and host anchor hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190412

RJ01 Rejection of invention patent application after publication