CN104290864A - Height positioning method of container body stand columns - Google Patents

Height positioning method of container body stand columns Download PDF

Info

Publication number
CN104290864A
CN104290864A CN201310301242.XA CN201310301242A CN104290864A CN 104290864 A CN104290864 A CN 104290864A CN 201310301242 A CN201310301242 A CN 201310301242A CN 104290864 A CN104290864 A CN 104290864A
Authority
CN
China
Prior art keywords
casing
hatch cover
hatch
height
container body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310301242.XA
Other languages
Chinese (zh)
Other versions
CN104290864B (en
Inventor
苏龙
姜旭枫
刘保华
常志军
张文真
孙少华
陈江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangnan Shipyard Group Co Ltd
Original Assignee
Jiangnan Shipyard Group Co Ltd
Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangnan Shipyard Group Co Ltd, Shanghai Jiangnan Changxing Heavy Industry Co Ltd filed Critical Jiangnan Shipyard Group Co Ltd
Priority to CN201310301242.XA priority Critical patent/CN104290864B/en
Publication of CN104290864A publication Critical patent/CN104290864A/en
Application granted granted Critical
Publication of CN104290864B publication Critical patent/CN104290864B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a height positioning method of container body stand columns. Through such steps as drawing of a center line, drawing of squaring lines, measurement of the levelness, determination of positioning reference points and calculation of the levelness difference by mapping equipment, the hatch cover positioning reference and the container body stand column positioning reference are unified, so that the installation and positioning of the container body stand columns in a dock can be successfully finished before the installation and positioning of a hatch cover and the problem that the dock building period is influenced because the hatch cover is positioned ahead of the container body stand columns is solved. The method can largely shorten the mounting period of the container body stand columns, shorten the mounting period of the whole hatch cover, container body stand column and lashing bridge system of a container ship, and improve the enterprise production efficiency.

Description

Casing stem height localization method
Technical field
The present invention relates to box ship dock internal box stem height localization method, particularly utilize mapping equipment to adopt convenient height positioning method efficiently, accurately to carry out the method for box ship casing stem height location in the dock stage.
Background technology
Nowadays, Container shipping ship is built and is just kept the large-scale development, and is domesticly just accepting construction super-container vessel, but on the crucial large-scale fittings installation method of box ship, still advanced shipbuilding yard exists larger gap to China's shipyard with the world.In order to win initiative in the market competition of fierceness, obtain the space of sustainable development, just necessary ship-lifting build process level, traditional marine technology and theory must be reformed.Box ship build process can not stay in traditional handicraft production level, be conceived to raising efficiency, set up science, modern construction technology, improve production level, for ship building enterprise of China can establish oneself in an unassailable position in the market competition of fierceness, establish deep basis.
One of important carrier that box ship casing column is stacked as box ship main deck container ship, itself and hatch cover cooperatively interact, carry the freight container amount of whole case ship more than 1/2nd, the quality of its installation quality directly determines the build guality of box ship.The main shipbuilding enterprise of past China is installed for casing column and is adopted traditional handicraft always, namely after installing according to hatch cover actual location, again according to hatch cover altitude location casing column, directly results in the prolongation of casing column installation period like this, integral cycle built by extreme influence case ship, becomes the key factor in restriction deliver the vessel cycle.And along with our times shipbuilding environment increasingly serious, in order to ship-lifting construction speed and quality, shorten boats and ships integral cycle, save ship building cost, adopt the convenient installation method of modernization to replace conventional mounting mode imperative.
Summary of the invention
For above-mentioned prior art Problems existing, the technical problem to be solved in the present invention is to provide and utilizes mapping equipment to adopt convenient height positioning method efficiently, accurately to carry out box ship casing stem height location in the dock stage.Adopt this process in hatch cover no-fix situation, can carry out casing stem height location, by casing column installation phase in advance, erection & lift convenience and accuracy, raise labour efficiency.
For achieving the above object and other relevant objects, the invention provides a kind of casing stem height localization method, be applied to box ship, comprise hatch coaming in the single cargo hold of described box ship, be arranged on hatch cover on hatch coaming and six casing columns, described hatch cover is arranged on hatch coaming end face by multiple hatch cover back-up block, described six casing columns are that two row three arrangements are located at cargo vessel cross direction both sides, and described casing stem height localization method comprises the following steps:
1) the captain direction line of centers that mapping equipment is determined in single cargo hold is utilized;
2) mapping equipment is utilized to determine often with two casing columns of row and the angle square line of captain direction line of centers;
3) make the parallel lines with captain direction line of centers along the center being positioned at all hatch cover back-up blocks of cargo vessel cross direction homonymy, draw each intersection point of parallel lines and angle square line;
4) levelness of mapping equipment survey room lid back-up block installed position on hatch coaming is utilized, water intaking Pingdu vertex is the altitude location bench mark of casing column, and the distance between described altitude location datum hatch cover back-up block end face and hatch coaming end face is A;
5) calculate the levelness difference △ Z of each intersection point and described altitude location bench mark, and then draw the diff-H △ SH between the upper surface of each casing column and hatch coaming end face according to formula △ SH=A+ △ Z;
6) the hatch coaming height value H at each casing column place and the throwing gesture value B on deck is measured;
7) the altitude location value I of each casing column is calculated according to formula I=△ SH+H+B=A+ △ Z+H+B;
8) according to the casing stem height locator value calculated, casing stem height location is completed.
Further, in described step 8, according to the casing stem height locator value calculated, deduct preset height surplus, after mowing preset height surplus, positioning welding completes casing stem height location.
By above technical scheme, the present invention has following technique effect compared to prior art: by the enforcement of box ship dock internal box stem height localization method, for successfully completing dock internal box column, prior to hatch cover, location is installed, the impact of casing column on dock production cycle is located after having broken away from traditional first location hatch cover, complete the change of a box ship gordian technique, improve box ship large-scale fittings installation level.And adopt this technique casing column installation period significantly can be shifted to an earlier date, shorten the installation period of the whole hatch cover of box ship, casing column, colligation bridge system, contribute to enterprise production efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the single cargo hold of the present invention;
Fig. 2 is the structure principle chart of present pre-ferred embodiments;
Fig. 3 is the section-drawing along A-A line in Fig. 2;
Fig. 4 is the section-drawing along B-B line in Fig. 2;
detailed description of the invention
By particular specific embodiment, embodiments of the present invention are described below, person skilled in the art scholar the content disclosed by this specification sheets can understand other advantages of the present invention and effect easily.
Refer to Fig. 1 to Fig. 4.Notice, structure, ratio, size etc. that this specification sheets institute accompanying drawings illustrates, content all only in order to coordinate specification sheets to disclose, understand for person skilled in the art scholar and read, and be not used to limit the enforceable qualifications of the present invention, therefore the not technical essential meaning of tool, the adjustment of the modification of any structure, the change of proportionate relationship or size, do not affecting under effect that the present invention can produce and the object that can reach, still all should drop on disclosed technology contents and obtain in the scope that can contain.Simultaneously, quote in this specification sheets as " on ", D score, "left", "right", " centre " and " one " etc. term, also only for ease of understanding of describing, and be not used to limit the enforceable scope of the present invention, the change of its relativeness or adjustment, under changing technology contents without essence, when being also considered as the enforceable category of the present invention.
The invention provides a kind of casing stem height localization method, be applied to box ship, comprise hatch coaming in the single cargo hold of described box ship, be arranged on hatch cover on hatch coaming and six casing columns (shown in Fig. 1), described hatch cover is arranged on hatch coaming end face by multiple hatch cover back-up block, described six casing columns are that two row three arrangements are located at cargo vessel cross direction both sides, and described casing stem height localization method comprises the following steps:
Step one: according to casing column drawing installation requirement, marks its installation site line (shown in Fig. 2) on main deck by six casing columns S1, S2, S3, S4, S5, S6 in single cargo hold along the beam (Y-direction), captain's (X-direction);
Step 2: in units of the single cargo hold of box ship, utilizes total powerstation (or other mapping equipment, as theodolite etc., below in like manner) to output shown in the line of centers C1-C2(Fig. 2 in single cargo hold hull captain direction);
Step 3: the angle square line T3-T6(Fig. 2 being respectively the angle square line T2-T5 of the angle square line T1-T4 of S1 and S4 two casing columns and hull captain direction line of centers, S2 and S5 two casing columns and hull captain direction line of centers, S3 and S6 two casing columns and hull captain direction line of centers is shown often with two casing columns of row and the angle square line of captain direction line of centers to utilize total powerstation to determine);
Step 4: according to the requirement of hatch cover installation dimension, mark the installation site line of hatch cover back-up block at hatch coaming end face, and the parallel lines with captain direction line of centers is made at the center utilizing total powerstation to output along being positioned at all hatch cover back-up blocks of cargo vessel cross direction homonymy, is respectively M-M, N-N.
Hatch coaming top board marks and marks out T1-T4 and M-M, N-N intersection point Z1, Z4 respectively, T2-T5 and M-M, N-N intersection point Z2, Z5, shown in T3-T6 and M-M, N-N intersection point Z3, Z6(Fig. 2);
Step 5: the levelness utilizing hatch cover back-up block installed position on hatch coaming in the single cargo hold of total station survey, and measure Z1, Z2, Z3, Z4, Z5, Z6 levelness, water intaking Pingdu vertex Z0 is casing stem height positioning datum point.After determining positioning datum point Z0, according to the requirement of hatch cover installation drawing, Z0 place hatch coaming top board distance hatch cover top board place height is shown in A(Fig. 3).The present invention, by by hatch cover positioning datum and the unification mutually of casing stud location benchmark, changes after conventional tank column relies on hatch cover to locate and determines height fashion.
Step 6: the levelness difference △ Z calculating Z1, Z2, Z3, Z4, Z5, Z6 and altitude location bench mark Z0 on hatch coaming.Calculate the height value of upper surface to hatch coaming end face of each casing column, be defined as casing column epimere height value.Each casing column upper surface to hatch coaming height difference is mainly converted into the computing value after based on altitude location bench mark Z0 comparison by this step.For casing column S1, see Fig. 4: casing column S1 upper surface is to hatch coaming apical side height value △ SH1=A+(Z0-Z1), in like manner other five casing column upper surfaces to hatch coaming apical side height value is respectively: △ SH2=A+(Z0-Z2), △ SH3=A+(Z0-Z3), △ SH4=A+(Z0-Z4), △ SH5=A+(Z0-Z5), △ SH6=A+(Z0-Z6).
Step 7: measure each casing column place hatch coaming height value H and main deck throwing gesture value B.
Step 8: throw gesture value according to each casing column upper surface to hatch coaming apical side height value and each casing column place hatch coaming height value and main deck and calculate each casing stem height locator value I.For casing column S1 (shown in Fig. 4): casing column S1 place hatch coaming height value is for H1, and it is B1 that main deck throws gesture value, calculates casing column hypomere height value SHI=H1+B1.Then casing column S1 positioning height value=SH1+ △ SH1=A+(Z0-Z1)+H1+B1.
In like manner measure and show that S2 to S6 casing column corresponding position hatch coaming height value and main deck throw gesture value: H2, H3, H4, H5, H6, B2, B3, B4, B5, B6.Then:
Casing column S2 positioning height is=SH2+ △ SH2=A+(Z0-Z2)+H2+B2;
Casing column S3 positioning height is=SH3+ △ SH3=A+(Z0-Z3)+H3+B3;
Casing column S4 positioning height is=SH4+ △ SH4=A+(Z0-Z4)+H4+B4;
Casing column S5 positioning height is=SH5+ △ SH5=A+(Z0-Z5)+H5+B5;
Casing column S6 positioning height is=SH6+ △ SH6=A+(Z0-Z6)+H6+B6.
Step 9: owing to considering hull construction error when casing column is built, be provided with surplus at hypomere, according to the casing stem height locator value calculated, mark casing stem height surplus mowing line, mowing surplus.Mowing casing stem height surplus, positioning welding completes casing stem height location.
In sum, the present invention is by the enforcement of box ship dock internal box stem height localization method, for successfully completing dock internal box column, prior to hatch cover, location is installed, the impact of casing column on dock production cycle is located after having broken away from traditional first location hatch cover, complete the change of a box ship gordian technique, improve box ship large-scale fittings installation level.And adopt this technique casing column installation period significantly can be shifted to an earlier date, shorten the installation period of the whole hatch cover of box ship, casing column, colligation bridge system, contribute to enterprise production efficiency.So the present invention effectively overcomes various shortcoming of the prior art and tool high industrial utilization.
Above-described embodiment is illustrative principle of the present invention and effect thereof only, but not for limiting the present invention.Any person skilled in the art scholar all without prejudice under spirit of the present invention and category, can modify above-described embodiment or changes.Therefore, such as have in art usually know the knowledgeable do not depart from complete under disclosed spirit and technological thought all equivalence modify or change, must be contained by claim of the present invention.

Claims (2)

1. a casing stem height localization method, be applied to box ship, comprise hatch coaming in the single cargo hold of described box ship, be arranged on hatch cover on hatch coaming and six casing columns, described hatch cover is arranged on hatch coaming end face by multiple hatch cover back-up block, described six casing columns are that two row three arrangements are located at cargo vessel cross direction both sides, it is characterized in that, described casing stem height localization method comprises the following steps:
1) the captain direction line of centers that mapping equipment is determined in single cargo hold is utilized;
2) mapping equipment is utilized to determine often with two casing columns of row and the angle square line of captain direction line of centers;
3) make the parallel lines with captain direction line of centers along the center being positioned at all hatch cover back-up blocks of cargo vessel cross direction homonymy, draw each intersection point of parallel lines and angle square line;
4) levelness of mapping equipment survey room lid back-up block installed position on hatch coaming is utilized, water intaking Pingdu vertex is the altitude location bench mark of casing column, and the distance between described altitude location datum hatch cover back-up block end face and hatch coaming end face is A;
5) calculate the levelness difference △ Z of each intersection point and described altitude location bench mark, and then draw the diff-H △ SH between the upper surface of each casing column and hatch coaming end face according to formula △ SH=A+ △ Z;
6) the hatch coaming height value H at each casing column place and the throwing gesture value B on deck is measured;
7) the altitude location value I of each casing column is calculated according to formula I=△ SH+H+B=A+ △ Z+H+B;
8) according to the casing stem height locator value calculated, casing stem height location is completed.
2. casing stem height localization method according to claim 1, is characterized in that, in described step 8, according to the casing stem height locator value calculated, deduct preset height surplus, after mowing preset height surplus, positioning welding completes casing stem height location.
CN201310301242.XA 2013-07-17 2013-07-17 Casing stem height localization method Active CN104290864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310301242.XA CN104290864B (en) 2013-07-17 2013-07-17 Casing stem height localization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310301242.XA CN104290864B (en) 2013-07-17 2013-07-17 Casing stem height localization method

Publications (2)

Publication Number Publication Date
CN104290864A true CN104290864A (en) 2015-01-21
CN104290864B CN104290864B (en) 2016-09-07

Family

ID=52310870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310301242.XA Active CN104290864B (en) 2013-07-17 2013-07-17 Casing stem height localization method

Country Status (1)

Country Link
CN (1) CN104290864B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106114752A (en) * 2016-06-27 2016-11-16 广州文冲船厂有限责任公司 A kind of container ship deck pillar installation method
CN109018194A (en) * 2017-06-12 2018-12-18 上海船厂船舶有限公司 Container case foot column installation method
CN110182312A (en) * 2019-06-24 2019-08-30 大连中远海运川崎船舶工程有限公司 From the container ship banding system accuracy control method of real ship case examination
CN111661274A (en) * 2020-05-25 2020-09-15 广州文冲船舶修造有限公司 Large container ship lashing bridge refitting process
CN111942541A (en) * 2020-07-16 2020-11-17 上海江南长兴造船有限责任公司 Container column mounting method
CN112478080A (en) * 2020-12-09 2021-03-12 江南造船(集团)有限责任公司 Digital positioning method for hoisting container ship hatch cover

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11180383A (en) * 1997-12-24 1999-07-06 Ishikawajima Harima Heavy Ind Co Ltd Container supporting device
KR20100043341A (en) * 2008-10-20 2010-04-29 대우조선해양 주식회사 Container supporting structure for hatchless container ship
CN102139743A (en) * 2010-01-29 2011-08-03 上海东团船舶工程有限公司 Inland river container transport ship
CN101797954B (en) * 2010-03-29 2012-09-26 扬帆集团股份有限公司 Method for mounting container hatch cover
KR20110139920A (en) * 2010-06-24 2011-12-30 삼성중공업 주식회사 Hatch cover for container ship and ship using the same
KR101177850B1 (en) * 2010-11-05 2012-08-28 삼성중공업 주식회사 Hatch cover of container cargo hold

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106114752A (en) * 2016-06-27 2016-11-16 广州文冲船厂有限责任公司 A kind of container ship deck pillar installation method
CN109018194A (en) * 2017-06-12 2018-12-18 上海船厂船舶有限公司 Container case foot column installation method
CN109018194B (en) * 2017-06-12 2022-03-22 上海外高桥造船海洋工程项目管理有限公司 Container foot column mounting method
CN110182312A (en) * 2019-06-24 2019-08-30 大连中远海运川崎船舶工程有限公司 From the container ship banding system accuracy control method of real ship case examination
CN110182312B (en) * 2019-06-24 2021-05-11 大连中远海运川崎船舶工程有限公司 Precision control method for container ship binding system free of actual ship box test
CN111661274A (en) * 2020-05-25 2020-09-15 广州文冲船舶修造有限公司 Large container ship lashing bridge refitting process
CN111942541A (en) * 2020-07-16 2020-11-17 上海江南长兴造船有限责任公司 Container column mounting method
CN111942541B (en) * 2020-07-16 2021-12-21 上海江南长兴造船有限责任公司 Container column mounting method
CN112478080A (en) * 2020-12-09 2021-03-12 江南造船(集团)有限责任公司 Digital positioning method for hoisting container ship hatch cover
CN112478080B (en) * 2020-12-09 2022-03-08 江南造船(集团)有限责任公司 Digital positioning method for hoisting container ship hatch cover

Also Published As

Publication number Publication date
CN104290864B (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN104290864A (en) Height positioning method of container body stand columns
CN101441267B (en) Three-measuring point high precision alignment calibration method of seabed answering machine absolute location
CN108163143B (en) Arc saddle web amendment technique in liquefied gas carrier with c-type flow container
CN107264724A (en) It is used for the baseline design method that fitting-out piping is installed in the anti-state segmentation of cabin curved surface
CN104058064A (en) Method for mounting container foot base cones of container ship
CN106289193B (en) The dynamic positioning method of FPSO large area marine worker module
CN104897061A (en) Total station and three-dimensional laser scanning combined large-scale maritime work equipment measuring method
CN102538646A (en) Tolerance test template for master node of ship hull and detection method thereof
CN102706361A (en) Attitude precision estimation method of multiple high-accuracy inertial navigations system
CN107560525B (en) Ship body baseline measuring method
CN107560605A (en) A kind of ship equipment pedestal roughness measurement method based on total powerstation
CN103175506B (en) Large bridge clearance height measurement method
CN102927984A (en) Method of eliminating influence of carrier magnetizing field on geomagnetic measurement
CN105823414A (en) Three-dimensional scanner technology-based embedded part position detection method
CN109018194A (en) Container case foot column installation method
CN108759863A (en) A kind of Laser strapdown is used to grouping error parameter quick calibrating method and system
CN112129221B (en) Prefabricated measuring method for segmented folding pipe
CN103353279B (en) A kind of LNG ship cargo tank insulated case and the pinpoint method of flange bolt
CN108036763A (en) Ranging total powerstation
CN104392078B (en) A kind of low clearance sun surveys the three-dimensional training system of autodyne
CN104608876A (en) Digitized dock building method
CN210572711U (en) Ultrashort baseline calibration system based on multiple beacons
CN203053442U (en) Ship carrying locating target
CN108088408A (en) The method that a kind of smart mobile phone/tablet measures national territorial area
Krupina et al. Full-scale ice impact study of icebreaker Kapitan Nikolaev: General description

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181220

Address after: 201913 No. 988 Changxing Jiangnan Avenue, Chongming County, Shanghai

Patentee after: Jiannan Shipbuilding (Group) Co., Ltd.

Address before: 201913 No. 988 Changxing Jiangnan Avenue, Chongming County, Shanghai

Co-patentee before: Shanghai Jiangnan Changxing Heavy Industry Co.,Ltd.

Patentee before: Jiannan Shipbuilding (Group) Co., Ltd.