CN104290864B - Casing stem height localization method - Google Patents

Casing stem height localization method Download PDF

Info

Publication number
CN104290864B
CN104290864B CN201310301242.XA CN201310301242A CN104290864B CN 104290864 B CN104290864 B CN 104290864B CN 201310301242 A CN201310301242 A CN 201310301242A CN 104290864 B CN104290864 B CN 104290864B
Authority
CN
China
Prior art keywords
casing
hatch
height
column
stem height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310301242.XA
Other languages
Chinese (zh)
Other versions
CN104290864A (en
Inventor
苏龙
姜旭枫
刘保华
常志军
张文真
孙少华
陈江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangnan Shipyard Group Co Ltd
Original Assignee
Jiangnan Shipyard Group Co Ltd
Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangnan Shipyard Group Co Ltd, Shanghai Jiangnan Changxing Heavy Industry Co Ltd filed Critical Jiangnan Shipyard Group Co Ltd
Priority to CN201310301242.XA priority Critical patent/CN104290864B/en
Publication of CN104290864A publication Critical patent/CN104290864A/en
Application granted granted Critical
Publication of CN104290864B publication Critical patent/CN104290864B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Cylinder Crankcases Of Internal Combustion Engines (AREA)

Abstract

Casing stem height localization method of the present invention by mapping equipment draw center line, make angle square line, survey levelness, determine positioning datum point, calculated level degree difference etc. step, hatch board positioning datum is unified mutually with casing stud location benchmark, for successfully completing dock internal box column, prior to hatch board, location is installed, after having broken away from traditional first location hatch board, position the impact on dock construction period of the casing column.Use this method significantly to be shifted to an earlier date by casing column installation period, shorten the whole hatch board of container ship, casing column, the installation period of lashing bridge system, contribute to enterprise production efficiency.

Description

Casing stem height localization method
Technical field
The present invention relates to container ship dock internal box stem height localization method, utilize mapping equipment particularly in the dock stage Use the method that convenient height positioning method efficiently, accurately carries out container ship casing stem height location.
Background technology
Nowadays, Container shipping ship is built and is just kept the large-scale development, and domestic is just accepting construction super-container vessel, but at container ship On crucial large-scale outfititem installation method, still there is bigger gap with advanced person shipyard, the world in China's shipyard.In order to enable in fierceness Market competition in win initiative, it is thus achieved that the space of sustainable development, be necessary for ship-lifting build process level, traditional makes Ship technology and theory must be reformed.Container ship build process can not stay in conventionally produced level, is conceived to raising efficiency, Set up science, modern construction technology, improve the level of production, can be in fierce market competition for shipbuilding enterprise of China Establish oneself in an unassailable position, establish deep basis.
One of important carrier that container ship casing column is stacked as container ship main deck container ship, itself and hatch board phase Coordinating mutually, carry the whole case ship container amount more than 1/2nd, the quality of its installation quality directly determines container ship Build guality.The main shipbuilding enterprise of past China is installed for casing column and is had been used up traditional handicraft, i.e. real according to hatch board After the location and installation of border, further according to hatch board altitude location casing column, so directly results in the prolongation of casing column installation period, Significantly impact case ship and build integral cycle, become the key factor in restriction delivery cycle.And along with our times shipbuilding Environment Day Benefit is severe, for ship-lifting construction speed and quality, shortens boats and ships integral cycle, saves shipbuilding cost, uses the modern times Change convenient installation method replacement conventional mounting mode imperative.
Summary of the invention
The problem existed for above-mentioned prior art, the technical problem to be solved in the present invention is to provide for the dock stage and utilizes mapping to set The convenient height positioning method of standby employing efficiently, accurately carries out container ship casing stem height location.Use this process can With in the case of hatch board no-fix, carrying out casing stem height location, by casing column erection stage in advance, erection & lift is just Victory and the degree of accuracy, raise labour efficiency.
For achieving the above object and other relevant purposes, the present invention provides a kind of casing stem height localization method, is applied to packaging Case ship, includes hatch coaming, the hatch board being arranged on hatch coaming and six casing columns in the single cargo hold of described container ship, Described hatch board props up bracer by multiple hatch boards and is arranged on hatch coaming end face, and described six casing columns are that two row three arrangements are located at Cargo vessel cross direction both sides, described casing stem height localization method comprises the following steps:
1) the captain direction center line in utilizing mapping equipment to determine single cargo hold;
2) mapping equipment is utilized to determine two casing columns of often same row and the angle square line of captain direction center line;
3) flat along be positioned at that the cargo vessel all of hatch board of cross direction homonymy props up that the center of bracer makes with captain direction center line Line, draws each intersection point of parallel lines and angle square line;
4) utilizing mapping equipment survey room lid to prop up bracer levelness of installed position on hatch coaming, water intaking Pingdu is the highest Point is the altitude location datum mark of casing column, and described altitude location datum hatch board props up bracer end face and hatch coaming top Distance between face is A;
5) the levelness difference △ Z of each intersection point and described altitude location datum mark is calculated, and then according to formula △ SH=A+ △ Z draws the difference in height △ SH between the upper surface of each casing column and hatch coaming end face;
6) throwing gesture value B on the hatch coaming height value H at each casing column and deck is measured;
7) altitude location value I of each casing column is calculated according to formula I=△ SH+H+B=A+ △ Z+H+B;
8) according to the casing stem height locator value calculated, casing stem height location is completed.
Further, in described step 8, according to the casing stem height locator value calculated, deduct preset height surplus, repair After cutting preset height surplus, positioning welding completes casing stem height location.
By above technical scheme, the present invention has following technical effect that by case in container ship dock compared to prior art The enforcement of body stem height localization method, for successfully completing dock internal box column and installs location prior to hatch board, broken away from tradition First location hatch board after position the impact on dock construction period of the casing column, complete the change of one key technology of container ship Leather, improves container ship large-scale outfititem installation level.And use this technique can by casing column installation period significantly In advance, shorten the whole hatch board of container ship, casing column, the installation period of lashing bridge system, contribute to enterprise raw Produce efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the single cargo hold of the present invention;
Fig. 2 is the structure principle chart of present pre-ferred embodiments;
Fig. 3 is the profile of line A-A along Fig. 2;
Fig. 4 is the profile of line B-B along Fig. 2;
Detailed description of the invention
By particular specific embodiment, embodiments of the present invention being described below, those skilled in the art can be taken off by this specification The content of dew understands other advantages and effect of the present invention easily.
Refer to Fig. 1 to Fig. 4.It should be clear that structure depicted in this specification institute accompanying drawings, ratio, size etc., the most only in order to Coordinating the content disclosed in specification, understand for those skilled in the art and read, being not limited to the present invention can implement Qualifications, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, Under not affecting effect that the present invention can be generated by and the purpose that can reach, all should still fall at disclosed technology contents Obtain in the range of containing.Meanwhile, in this specification cited as " on ", D score, "left", "right", " in Between " and the term of " " etc., it is merely convenient to understanding of narration, and is not used to limit the enforceable scope of the present invention, its phase Relation is altered or modified, is changing under technology contents without essence, when being also considered as the enforceable category of the present invention.
The present invention provides a kind of casing stem height localization method, is applied to container ship, in the single cargo hold of described container ship The hatch board including hatch coaming, being arranged on hatch coaming and six casing columns (shown in Fig. 1), described hatch board is by multiple Hatch board props up bracer and is arranged on hatch coaming end face, and described six casing columns are that two row three arrangements are located at cargo vessel cross direction both sides, Described casing stem height localization method comprises the following steps:
Step one: according to casing column drawing installation requirement, by six casing column S1 in single cargo hold, S2, S3, S4, S5, S6 marks its installation site line (shown in Fig. 2) on main deck along the beam (Y-direction), captain's (X-direction);
Step 2: in units of the single cargo hold of container ship, utilize total powerstation (or other mapping equipment, such as theodolite etc., with Under in like manner) output shown in the center line C1-C2(Fig. 2 in single cargo hold hull captain direction);
Step 3: utilize total powerstation to determine two casing columns of often same row and the angle square line of captain direction center line, respectively S1 Angle square line T1-T4, S2 and two casing columns of S5 and hull ship with two casing columns of S4 and hull captain direction center line Angle square line T2-T5, S3 of length direction center line and two casing columns of S6 and the angle square line T3-T6 of hull captain direction center line (shown in Fig. 2);
Step 4: according to hatch board installation dimension requirement, marks hatch board and props up the bracer installation site line at hatch coaming end face, and Utilize total powerstation to output along being positioned at the cargo vessel all hatch boards of cross direction homonymy to prop up the center of bracer and make and captain direction center line Parallel lines, respectively M-M, N-N.
Marking on hatch coaming top board and mark out T1-T4 Yu M-M, N-N intersection point Z1, Z4 respectively, T2-T5 Yu M-M, N-N hand over Point Z2, Z5, shown in T3-T6 Yu M-M, N-N intersection point Z3, Z6(Fig. 2);
Step 5: in utilizing the single cargo hold of total station survey, hatch board props up bracer levelness of installed position on hatch coaming, and surveys Amount Z1, Z2, Z3, Z4, Z5, Z6 levelness, water intaking Pingdu peak Z0 is casing stem height positioning datum point.Determine After going out positioning datum point Z0, according to hatch board installation drawing requirement, at Z0, at hatch coaming top board distance hatch board top board, height is A (shown in Fig. 3).The present invention, by being unified mutually with casing stud location benchmark by hatch board positioning datum, changes conventional tank and stands Post relies on hatch board to determine height fashion after having positioned.
Step 6: calculate Z1, Z2, Z3, Z4, Z5, Z6 and the levelness difference of altitude location datum mark Z0 on hatch coaming △Z.Calculate the upper surface height value to hatch coaming end face of each casing column, be defined as casing column epimere height value.This After each casing column upper surface to hatch coaming height difference is mainly converted into based on altitude location datum mark Z0 comparison by step Calculated value.As a example by casing column S1, see that Fig. 4: casing column S1 upper surface is to hatch coaming apical side height value △ SH1=A+ (Z0-Z1), in like manner other five casing column upper surfaces are respectively as follows: △ SH2=A+(Z0-Z2 to hatch coaming apical side height value), △ SH3=A+(Z0-Z3), △ SH4=A+(Z0-Z4), △ SH5=A+(Z0-Z5) and, △ SH6=A+(Z0-Z6).
Step 7: measure hatch coaming height value H and main deck at each casing column and throw gesture value B.
Step 8: according to hatch coaming height at each casing column upper surface to hatch coaming apical side height value and each casing column Value and main deck are thrown gesture value and are calculated each casing stem height locator value I.As a example by casing column S1 (shown in Fig. 4): At casing column S1, hatch coaming height value is H1, and it is B1 that main deck throws gesture value, calculates casing column hypomere height value SHI=H1+B1.Then casing column S1 positioning height value=SH1+ △ SH1=A+(Z0-Z1)+H1+B1.
In like manner measure draw S2 to S6 casing column corresponding position hatch coaming height value and main deck throw gesture value: H2, H3, H4, H5, H6, B2, B3, B4, B5, B6.Then:
Casing column S2 positioning height is=SH2+ △ SH2=A+(Z0-Z2)+H2+B2;
Casing column S3 positioning height is=SH3+ △ SH3=A+(Z0-Z3)+H3+B3;
Casing column S4 positioning height is=SH4+ △ SH4=A+(Z0-Z4)+H4+B4;
Casing column S5 positioning height is=SH5+ △ SH5=A+(Z0-Z5)+H5+B5;
Casing column S6 positioning height is=SH6+ △ SH6=A+(Z0-Z6)+H6+B6.
Step 9: owing to considering hull construction error when casing column is built, be provided with surplus at hypomere, according to calculate Casing stem height locator value, marks casing stem height surplus mowing line, mowing surplus.Mowing casing stem height surplus, Positioning welding completes casing stem height location.
In sum, the present invention enforcement by container ship dock internal box stem height localization method, for successfully completing dock Internal box column installs location prior to hatch board, positions casing column dock is built week after having broken away from traditional first location hatch board The impact of phase, completes the change of one key technology of container ship, improves container ship large-scale outfititem installation level.And And use this technique significantly to be shifted to an earlier date by casing column installation period, shorten the whole hatch board of container ship, casing column, The installation period of lashing bridge system, contributes to enterprise production efficiency.So, the present invention effectively overcomes of the prior art Various shortcoming and have high industrial utilization.
The principle of above-described embodiment only illustrative present invention and effect thereof, not for limiting the present invention.Any it is familiar with this skill Above-described embodiment all can be modified under the spirit and the scope of the present invention or change by the personage of art.Therefore, such as All that in art, tool usually intellectual is completed under without departing from disclosed spirit and technological thought etc. Effect is modified or changes, and must be contained by the claim of the present invention.

Claims (2)

1. a casing stem height localization method, is applied to container ship, include in the single cargo hold of described container ship hatch coaming, The hatch board being arranged on hatch coaming and six casing columns, described hatch board props up bracer by multiple hatch boards and is arranged on Hatch coaming end face, described six casing columns are that two row three arrangements are located at cargo vessel cross direction both sides, it is characterised in that institute State casing stem height localization method to comprise the following steps:
1) the captain direction center line in utilizing mapping equipment to determine single cargo hold;
2) mapping equipment is utilized to determine two casing columns of often same row and the angle square line of captain direction center line;
3) flat along be positioned at that the cargo vessel all of hatch board of cross direction homonymy props up that the center of bracer makes with captain direction center line Line, draws each intersection point Z1, Z2, Z3, Z4, Z5, Z6 of parallel lines and angle square line;
4) utilize mapping equipment survey room lid to prop up bracer levelness of installed position on hatch coaming, and measure each friendship The levelness of some Z1, Z2, Z3, Z4, Z5, Z6, water intaking Pingdu peak is the altitude location datum mark of casing column, It is A that described altitude location datum hatch board props up the distance between bracer end face and hatch coaming end face;
5) the levelness difference △ Z of each intersection point and described altitude location datum mark is calculated, and then according to formula △ SH=A+ △ Z draws the difference in height △ SH between the upper surface of each casing column and hatch coaming end face;
6) throwing gesture value B on the hatch coaming height value H at each casing column and deck is measured;
7) altitude location value I of each casing column is calculated according to formula I=△ SH+H+B=A+ △ Z+H+B;
8) according to the casing stem height locator value calculated, casing stem height location is completed.
Casing stem height localization method the most according to claim 1, it is characterised in that in described step 8, according to calculating The casing stem height locator value gone out, deducts preset height surplus, and after mowing preset height surplus, positioning welding completes case Body stem height positions.
CN201310301242.XA 2013-07-17 2013-07-17 Casing stem height localization method Active CN104290864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310301242.XA CN104290864B (en) 2013-07-17 2013-07-17 Casing stem height localization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310301242.XA CN104290864B (en) 2013-07-17 2013-07-17 Casing stem height localization method

Publications (2)

Publication Number Publication Date
CN104290864A CN104290864A (en) 2015-01-21
CN104290864B true CN104290864B (en) 2016-09-07

Family

ID=52310870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310301242.XA Active CN104290864B (en) 2013-07-17 2013-07-17 Casing stem height localization method

Country Status (1)

Country Link
CN (1) CN104290864B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106114752A (en) * 2016-06-27 2016-11-16 广州文冲船厂有限责任公司 A kind of container ship deck pillar installation method
CN109018194B (en) * 2017-06-12 2022-03-22 上海外高桥造船海洋工程项目管理有限公司 Container foot column mounting method
CN110182312B (en) * 2019-06-24 2021-05-11 大连中远海运川崎船舶工程有限公司 Precision control method for container ship binding system free of actual ship box test
CN111661274B (en) * 2020-05-25 2021-06-08 广州文冲船舶修造有限公司 Large container ship lashing bridge refitting process
CN111942541B (en) * 2020-07-16 2021-12-21 上海江南长兴造船有限责任公司 Container column mounting method
CN112478080B (en) * 2020-12-09 2022-03-08 江南造船(集团)有限责任公司 Digital positioning method for hoisting container ship hatch cover

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11180383A (en) * 1997-12-24 1999-07-06 Ishikawajima Harima Heavy Ind Co Ltd Container supporting device
KR20100043341A (en) * 2008-10-20 2010-04-29 대우조선해양 주식회사 Container supporting structure for hatchless container ship
CN101797954A (en) * 2010-03-29 2010-08-11 扬帆集团股份有限公司 Method for mounting container hatch cover
CN102139743A (en) * 2010-01-29 2011-08-03 上海东团船舶工程有限公司 Inland river container transport ship
KR20110139920A (en) * 2010-06-24 2011-12-30 삼성중공업 주식회사 Hatch cover for container ship and ship using the same
KR20120048243A (en) * 2010-11-05 2012-05-15 삼성중공업 주식회사 Hatch cover of container cargo hold

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11180383A (en) * 1997-12-24 1999-07-06 Ishikawajima Harima Heavy Ind Co Ltd Container supporting device
KR20100043341A (en) * 2008-10-20 2010-04-29 대우조선해양 주식회사 Container supporting structure for hatchless container ship
CN102139743A (en) * 2010-01-29 2011-08-03 上海东团船舶工程有限公司 Inland river container transport ship
CN101797954A (en) * 2010-03-29 2010-08-11 扬帆集团股份有限公司 Method for mounting container hatch cover
KR20110139920A (en) * 2010-06-24 2011-12-30 삼성중공업 주식회사 Hatch cover for container ship and ship using the same
KR20120048243A (en) * 2010-11-05 2012-05-15 삼성중공업 주식회사 Hatch cover of container cargo hold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
5668TEU集装箱船舱口盖、绑扎桥和箱柱三大件一体化安装精度控制技术;柯于舫;《沪东中华技术情报》;20040930(第3期);29-31 *

Also Published As

Publication number Publication date
CN104290864A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN104290864B (en) Casing stem height localization method
CN107976169B (en) Ship-borne inertial navigation attitude angle time sequence detection method based on fixed star observation
CN107264724A (en) It is used for the baseline design method that fitting-out piping is installed in the anti-state segmentation of cabin curved surface
CN104058064B (en) Container ship case sole cone installation method
CN108163143B (en) Arc saddle web amendment technique in liquefied gas carrier with c-type flow container
CN105004252B (en) The detection method of verticality between the Mosaic face and datum level of square-section slender piece
KR20140050379A (en) Ship resetting method and coordinate measuring system for resetting ship
CN109018194A (en) Container case foot column installation method
CN101101332A (en) CCD laser theodolite dynamic radar calibration method
CN103523168B (en) CSS platform connecting bridge area segmentation manufacturing process and special skew moulding bed
CN102706361A (en) Attitude precision estimation method of multiple high-accuracy inertial navigations system
CN1970388A (en) Production method of spherical liquid container saddle seat for ship
CN102538646A (en) Tolerance test template for master node of ship hull and detection method thereof
CN106289193B (en) The dynamic positioning method of FPSO large area marine worker module
CN206248016U (en) A kind of rotating shaft angle measurement unit
CN101539397A (en) Method for measuring three-dimensional attitude of object on precision-optical basis
CN107560605A (en) A kind of ship equipment pedestal roughness measurement method based on total powerstation
CN102927984A (en) Method of eliminating influence of carrier magnetizing field on geomagnetic measurement
CN105823414A (en) Three-dimensional scanner technology-based embedded part position detection method
CN202177419U (en) Global position system-real time kinematic (GPS-RTK) real-time sea level measuring system based on ship posture correction
CN108036763A (en) Ranging total powerstation
CN105403144B (en) A kind of iGPS dynamic measurement error real-time compensation methods for aircraft Automated assembly
CN105510950B (en) A kind of real-time accurate method for determining posture based on common clock receiver
CN107764235B (en) Elevation vertical transmission measurement method for high-rise building construction
CN108733950A (en) A kind of linear measurement control method of more curved surface twisted shape head towers

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181220

Address after: 201913 No. 988 Changxing Jiangnan Avenue, Chongming County, Shanghai

Patentee after: Jiannan Shipbuilding (Group) Co., Ltd.

Address before: 201913 No. 988 Changxing Jiangnan Avenue, Chongming County, Shanghai

Co-patentee before: Shanghai Jiangnan Changxing Heavy Industry Co.,Ltd.

Patentee before: Jiannan Shipbuilding (Group) Co., Ltd.