CN101797954A - Method for mounting container hatch cover - Google Patents

Method for mounting container hatch cover Download PDF

Info

Publication number
CN101797954A
CN101797954A CN 201010133958 CN201010133958A CN101797954A CN 101797954 A CN101797954 A CN 101797954A CN 201010133958 CN201010133958 CN 201010133958 CN 201010133958 A CN201010133958 A CN 201010133958A CN 101797954 A CN101797954 A CN 101797954A
Authority
CN
China
Prior art keywords
hatch cover
container
cover
hatch
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010133958
Other languages
Chinese (zh)
Other versions
CN101797954B (en
Inventor
夏小浩
胡加永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGFAN GROUP CO Ltd
Original Assignee
YANGFAN GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGFAN GROUP CO Ltd filed Critical YANGFAN GROUP CO Ltd
Priority to CN201010133958XA priority Critical patent/CN101797954B/en
Publication of CN101797954A publication Critical patent/CN101797954A/en
Application granted granted Critical
Publication of CN101797954B publication Critical patent/CN101797954B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a method for mounting a container hatch cover, comprising the following steps: a, preparing before mounting the container hatch cover; b, adjusting the container hatch cover to make the container hatch cover horizontal; c, assembling the triangle blocks among transverse cover plates; d, positioning container columns for a board-side deck; e, checking the container hatch cover and the pre-positioning of accessories; f, mounting and fixing in such a way of cutting positioning pin holes, mounting stainless steel compressing flat bars, supporting block adjusting plates, adjusting sheet plats and the triangle blocks among the transverse cover plates and welding the accessories; g, rechecking the container hatch cover and the pre-positioning of the accessories; h drawing lines to determine the mounting positions of container pins on container columns, chutes and tensioning hole plates, and mounting the container pins, the chutes and the tensioning hole plates; i, embedding sealing rubber strips on the stainless steel compressing flat bars and the triangle blocks after finishing mounting the container pins, the chutes and the tensioning hole plates; and j, doing sealing experiment. The invention overcomes the influence from the top plate evenness, the large-opening length, the width and the tetragonal deviation when a container hatch coaming is folded by section, thereby greatly improving the container hatch cover mounting precision and ensuring the container hatch sealing performance, the normal stacking of containers on the container hatch cover and the safety and the reliability of the whole container hatch cover during navigation.

Description

A kind of installation method of container hatch cover
Technical field
The present invention relates to the installation method of kit in the shipbuilding industry, especially relate to the installation method of container hatch cover.
Background technology
Container hatch cover is arranged on the sealing arrangement of cargo hatch, it is very important goods channel unit on the ship, play the effect of closing cargo hold, hatch cover should guarantee that wave and rainwater do not invade the freight container that cargo hold also will be carried on its surface shipment, so will have certain water tightness and impregnability.Modern ships is generally all used the hatch cover of weather tightness formula, and common ground promptly all is the cover plate of steel, has notch at the periphery of cover plate, and the rubber bedding and padding are housed in notch.When batten down, the rubber bedding and padding of hatchway cover directly are pressed on the upper limb of hatch coaming, and hatchway cover is compressed keep the wind and rain sealing with being contained in around the hatch clip bolt on the coaming plate.
General box ship all has several cargo holds, and each cargo hold has a hatch cover that is used to seal cargo hatch at least.Members such as branch gap triangle keep plate between drafting apparatus, anchor plate device, rubber bumper, cross spacing piece (or bidirectionally limited), twistlock formula compactor, two-way locating dowel pin and hatchcover and hatchcover are arranged on each cargo hold hatchcover.The hatchcover overall dimensions is big and weight is bigger, and there are top board planeness, big opening length, width, tetragonality deviation behind the hatch coaming segment folding, this requirement to lifting and setting accuracy is very high, the critical process of line and setting accuracy was started with when collateral security hatch cover of the present invention was installed, actv. mounting process scheme has been proposed, for the installation of like product hatch cover later on provides significant reference.
Summary of the invention
Technical matters to be solved by this invention is at the state of the art, and a kind of installation method of container hatch cover is provided, setting accuracy height, the normal stacking of freight container on the leak tightness of assurance cargo hatch and the hatch cover.
The present invention solves the problems of the technologies described above the technical scheme that is adopted to be: a kind of installation method of container hatch cover may further comprise the steps:
Pre-preparation before a, the installation;
B, adjustment hatch cover level;
Corner block between c, the horizontal cover plate of assembly unit, line and pre-determined bit;
D, the box column of harbor deck is positioned;
The pre-determined bit of e, check hatch cover and annex;
F, install and fix: the perforate of cutting locating dowel pin, corrosion-resistant steel is installed is compressed band steel, anchor plate regulating plate, regulate the corner block between thin plate and horizontal cover plate, welded attachment;
G, check hatch cover and pre-determined bit once more;
H, carry out limit mounting and to the installation of ruling of the container pin on the box column, chute and tension eye plate installation site;
Compressing band steel and corner block place setting-in leak free rubber bar after i, the installation;
J, leak test.
As improvement, the preceding pre-preparation of described installation comprises to be checked hatch cover, finishes the hatch line of centers, is ready to the annex material, and the welding of colligation bridges location is pieced together in the cooresponding front and back two of hatch cover.
As improvement, described annex material comprises stainless steel sheet, regulates backing plate, anchor plate device, limiting stopper, twistlock formula compactor, two-way locating dowel pin and compresses band iron.
As improvement, described adjustment hatch cover level is meant levelness and the level attitude of adjusting hatch cover with oil pump, make hatch cover line of centers and hull centerline error be controlled at ± 10mm in, the hatch cover spacing is 30mm ± 5mm.
As improvement, described line concrete steps comprise: mark line of centers on the corner block; Mark the opening of locating dowel pin; Mark the location dimension of limiting device and guide piece; The position of back-up block device; The position location of twistlock formula compactor.
As improvement, the pre-determined bit of described check hatch cover and annex is meant that hatch cover is put down check hatch cover and all hatch cover annex pre-determined bit to be consistent, the original position of after the inspection hatch cover being sling.
Improve, described welded attachment is meant hatch coaming that welding is all and the good annex of pre-determined bit on the colligation bridge again, comprises limiting stopper, only jumps device, guide piece, stop pin and anchor plate.
Improve again, described check hatch cover and pre-determined bit to be meant once more for the second time to put down hatch cover test, be consistent with pre-determined bit, assurance hatch cover and stop lock ring deviation are less than 2mm; Only jump the device centre deviation less than 2mm; Limiting stopper gap on limiting device and the hatch cover is not more than 1mm.
At last, described leak test comprises:
A, white powder test: hatchcover is installed at real ship and is finished substantially, rubber bar setting-in carries out after finishing, coat white powder on the band steel compressing, close after cover plate buckles compactor, open cover plate again, inspection white powder seal, defectives such as it is not wide to find that powder is printed on, and is interrupted, fuzzy, should be repaired or be adjusted the rubber bar and be compressed band steel, until satisfaction;
Leak tightness is checked in b, hose test.
Compared with prior art, the invention has the advantages that: before hatch cover is installed, prepare to install line, install to operation such as fixing, limit mounting is carried out the cargo hold tightness test at last again, make the error<1mm of hatch cover and pre-determined bit; On the hatch coaming only jump on device and the hatch cover only jump tile height poor≤3mm; Limiting stopper gap on limiting device and the hatch cover is not more than 1mm, the gap maximum of hatchcover and back-up block is no more than 2mm, there are top board planeness, the influence of opening length, width, tetragonality deviation greatly after having overcome the hatch coaming segment folding, the setting accuracy of hatch cover is improved greatly, guaranteed the leak tightness of cargo hatch, guaranteed that simultaneously the normal stacking of freight container on the hatch cover and whole hatch cover are navigating by water process safe, reliable.
The specific embodiment
Below in conjunction with embodiment the present invention is described in further detail.
The installation method of present embodiment comprises the steps: a, preceding pre-preparation is installed; B, adjustment hatch cover level; Corner block between c, the horizontal cover plate of assembly unit, line and pre-determined bit; D, the box column of harbor deck is positioned; The pre-determined bit of e, check hatch cover and annex; F, the perforate of cutting locating dowel pin are installed corrosion-resistant steel and are compressed band steel, anchor plate regulating plate, regulate the corner block between thin plate and horizontal cover plate; G, welded attachment; H, check hatch cover and pre-determined bit once more; The installation of ruling of i, container pin, chute and tension eye plate installation site on the box column; J, put down hatch cover, compressing band steel and corner block place setting-in leak free rubber bar; K, tightness test.
The preceding pre-preparation of described installation comprises to be checked hatch cover, finishes the hatch line of centers, is ready to the annex material, and the welding of colligation bridges location is pieced together in the cooresponding front and back two of hatch cover.Described annex material comprises stainless steel sheet, regulates backing plate, anchor plate device, limiting stopper, twistlock formula compactor, two-way locating dowel pin and compresses band iron.
Described adjustment hatch cover level is meant levelness and the level attitude of adjusting hatch cover with oil pump, make hatch cover line of centers and hull centerline error be controlled at ± 10mm in, the hatch cover spacing is 30mm ± 5mm.
Described line specifically comprises: mark line of centers on the corner block; Mark the opening of flush type locating dowel pin; Mark the location dimension of limiting device and guide piece; The position of back-up block device; The position location of twistlock formula compactor.
As improvement, the pre-determined bit of described check hatch cover and annex is meant that hatch cover is put down check hatch cover and all hatch cover annex pre-determined bit to be consistent, the original position of after the inspection hatch cover being sling.
Improve, described welded attachment is meant the good annex of pre-determined bit on hatch coaming that welding is all and the colligation bridge again, specifically comprises limiting stopper, only jumps device, guide piece, stop pin and anchor plate
Improve again, described check hatch cover and pre-determined bit to be meant once more for the second time to put down hatch cover test, be consistent with pre-determined bit, assurance hatch cover and stop lock ring deviation are less than 2mm; Only jump the device centre deviation less than 2mm; Limiting stopper gap on limiting device and the hatch cover is not more than 1mm.
At last, described leak test comprises:
A, white powder test: hatchcover is installed at real ship and is finished substantially, rubber bar setting-in carries out after finishing, coat white powder on the band steel compressing, close after cover plate buckles compactor, open cover plate again, inspection white powder seal, defectives such as it is not wide to find that powder is printed on, and is interrupted, fuzzy, should be repaired or be adjusted the rubber bar and be compressed band steel, until satisfaction;
Leak tightness is checked in b, hose test.
Below the invention will be further described:
One, hatch cover is installed the precision control requirement to the hatch coaming structure:
Hatch coaming closes up, adorns the accuracy standard after weldering is corrected,
Length, width error should≤± 10mm, the hatch coaming opening Diagonal Dimension in whole cabin should≤± 10mm;
Top panel integral planar degree error should≤± 3mm, the whole straightness error of coaming plate should≤5mm;
3. long planeness (end, the side panel) error of any 1m is answered≤2mm, and hatch panel four angle plane degree errors are answered≤4mm;
The horizontal hatch of whole piece ship surround separation section line of centers should be at ± 10mm.
Two, dead work before hatch cover is installed:
1. by building berth line group, installation personnel and quality inspection place the planeness and the line of centers equidimension of each hatch coaming are carried out repetition measurement, will in time propose rectification to the relatively poor position of size by the repetition measurement result.Carry out signs such as hatch line of centers after the school inspection is qualified.
2. provide by the hatch cover manufacturer, the finish size of survey room flap strictly according to the facts before hatch cover hangs total group of moulding bed is checked its finish size by installation personnel and quality inspection place.
3. check by installation personnel and quality inspection place whether hatch cover has or not damage in transportation, lifting, stacking process, arrange rectification, please repair by drawing or under technical personnel instructs if there is damage please reach Times Production Management Section.(particularly important component such as rubber bumper, back-up block)
Stainless steel sheet, regulate backing plate, anchor plate device, limiting stopper, twistlock formula compactor, two-way locating dowel pin, to compress hatchcover annex material such as band iron ready.
By building berth line group, installation personnel according to colligation bridge installing and locating size, reach the hatchcover finish size after checking marks colligation bridge, hatchcover on hatch coaming position location, and set interim back-up block (every hatchcover 4 or 6 interim back-up blocks of hatchcover, the requirement for height of back-up block is equally high, accuracy requirement is the same, highly by on-the-spot fixed).
6. the end of colligation bridge tack welding is pieced together in the cooresponding front and back two of hatchcover, and eye thimble and reinforcement channel-section steel remove and melt is put down.
7. the flat something that gives the game away of dismounting safety rail, and melt.Whether inspection has influences such as cool air hose, cable to cover the factor of hatchcover and eliminating in time.
Three, hatch cover installation steps and requirement:
1. ship time will have the assembler to cooperate on the hatchcover, and laterally hatch is placed the little hatchcover of high pin and will be closed and prevent to break.
2. close down in building berth line assembly, adjust the levelness and the level attitude of hatch cover with oil pump.Make hatchcover line of centers and hull centerline error be controlled at ± 10mm in, the hatchcover spacing is 30mm, and will note the spacing and the error of the colligation bridge hatchcover orienting lug of hatchcover sideline and top.Notice that each colligation bridge has different requirement.
3. measure corner block between horizontal cover plate, and assembly unit.When measuring, on the hatch coaming panel, mark the line of centers of corner block and strike sample dotting punch, also should on corner block, mark line of centers during assembly unit.
4. mark the opening of flush type locating dowel pin, bore size is theoretical φ 230mm.Note vertical and horizontal accuracy requirement.
5. mark bidirectionally limited device and cross spacing device on the hatch coaming panel, the location dimension of guide piece is answered strict control gap size, notes the precision of various limiting devices and guide piece and the different requirements in each cabin.
6. mark position horizontal, the longitudinal ligament piece around hatch, the thickness of measuring the hatchcover back-up block also writes down combined data, requires every back-up block will survey four height of four jiaos.Determine, adjust the thickness of back-up block according to the survey data.All anchor plates and hatch coaming supporting place must guarantee excellent contact, and the anchor plate area of contact is no less than 50%, and the gap of contact portion must be less than 2mm.Contact area can not be passed through by the thick ruler card of 0.2mm.
7. measure the actual gap of hatchcover and hatch coaming panel every 500mm, and record, determine that each position compresses the thickness of band iron.
8. on the hatch coaming panel, mark the position location of twistlock formula compactor, reach gap up and down around the strict control, guarantee when cover plate hangs with easy access.
9. position according to the position of the container pin on the hatch cover box column harbor deck.
10. whether hatch cover is put down for the first time the check hatchcover is consistent with all hatchcover annex pre-determined bit.
The original position of after the inspection hatch cover being sling.
11. the perforate of cutting locating dowel pin, the cutting edge squareness should be in 1mm, and transcerse bulkhead wallboard and reinforcement cut according to locating dowel pin, and determine according to the height of hatchcover locating dowel pin perforate whether locating dowel pin need add compound plate and raise.
12. the corrosion-resistant steel after on the hatch coaming panel processing being installed compresses band steel, anchor plate regulating plate and regulates thin plate.
13. laterally aboard ship install after the corner block welding polishing fairing between cover plate, will notice during installation that the line of centers of corner block aims at the previous line of centers of indicating at the hatch coaming panel.
14. weld the annex on all hatch coamings and the colligation bridge, specifically comprise limiting stopper, only jump device, members such as guiding regulating block, stop pin and anchor plate etc.
15. check the annex weld defect and repair that start plate etc. of hatch coaming panel cuts off and polishes.
16. whether hatch cover is put down the check hatchcover for the second time consistent with pre-determined bit; And guarantee that hatch cover and stop lock ring deviation are less than 2mm; Only jump the device centre deviation less than 2mm; Limiting stopper gap on limiting device and the hatch cover is not more than 1mm;
17. four jiaos of level heights of survey room flap under crane cooperates are adjusted the adjusting pad in the anchor plate eye groove, make hatch cover return to the state of original pre-determined bit, error<1mm; On the hatch coaming only jump on device and the hatch cover only jump tile height poor<=3mm;
18. survey room flap hatch coaming gap is calculated and is compressed band steel and the corner block place rubber amount of being pressed into, and defective is adjusted, reprocessed;
19. guarantee the upper surface level of container pin by laser, to the installation of ruling of the container pin on the box column, chute and tension eye plate installation site.
20. check limiting stopper, only jump the reverse reinforcement of device, guiding regulating block, stop pin and anchor plate etc., what have dislocation will mend dress.
21. submit to the shipowner.
Four, test
1. support the packaged area of contact that the mode of using clearance gauge or being coated with blue oil in the back is checked anchor plate that welds.If any should being regulated of not meeting the demands.
2. hatchcover is installed at real ship and is finished substantially, after rubber bar setting-in finishes, should do the white powder test earlier, promptly on tight band steel, coat white powder, close after cover plate buckles compactor, open cover plate again, check the white powder seal, find that powder is printed on not wide, be interrupted, defective such as fuzzy should be repaired or be adjusted the rubber bar and be compressed band steel, until satisfaction.
3. do hose test on request.
4. the hatchcover steel structure is made last exterior check, distortion and welding damage that welding causes partly be should give repairing, and the polishing japanning.
Five, attention problem:
1, welding of high strength steel zone and repairing want strictness to be undertaken by working specification.
2, box column location must be according to hatch coaming horizontal surface location, and tack welding after the cutting surplus is treated that hatch cover is gone on board to transfer box column position and final electric welding to finish again behind the level-off.
Don't fail to measure the thickness and the record of four jiaos of every back-up blocks when 3, measuring back-up block thickness, be adjusted, the phenomenon that contacts with the hatch cover part with the back-up block of avoiding occurring causing because of hatch coaming panel injustice at the back-up block contrast record of going on board when installing.
4, the measurement of corner block and location are the difficult points that hatch cover is installed, and must mark every line of centers on around corner block and the hatch when measurement and assembly unit.
5, the tolerance clearance of hatch cover and colligation bridge is to guarantee the smooth in the future necessary condition up and down of hatchcover, to guarantee the squareness of guidepost during colligation bridge location, must check during ship positionning for the first time and the tolerance clearance of colligation bridge at hatchcover, confirm that back colligation bridge could final welding.

Claims (9)

1. the installation method of a container hatch cover is characterized in that may further comprise the steps:
Pre-preparation before a, the installation;
B, adjustment hatch cover level;
Corner block between c, the horizontal cover plate of assembly unit, line and pre-determined bit;
D, the box column of harbor deck is positioned;
The pre-determined bit of e, check hatch cover and annex;
F, install and fix: the perforate of cutting locating dowel pin, corrosion-resistant steel is installed is compressed band steel, anchor plate regulating plate, regulate the corner block between thin plate and horizontal cover plate, welded attachment;
G, check hatch cover and pre-determined bit once more;
H, carry out limit mounting: to the installation of ruling of the container pin on the box column, chute and tension eye plate installation site;
Compressing band steel and corner block place setting-in leak free rubber bar after i, the installation;
J, leak test.
2. installation method according to claim 1 is characterized in that: the preceding pre-preparation of described installation comprises to be checked hatch cover, finishes the hatch line of centers, is ready to the annex material, and the welding of colligation bridges location is pieced together in the cooresponding front and back two of hatch cover.
3. installation method according to claim 2 is characterized in that: described annex material comprises stainless steel sheet, regulates backing plate, anchor plate device, limiting stopper, twistlock formula compactor, two-way locating dowel pin and compresses band iron.
4. according to the described installation method of arbitrary claim in the claim 1 to 3, it is characterized in that: described adjustment hatch cover level is meant levelness and the level attitude of adjusting hatch cover with oil pump, make hatch cover line of centers and hull centerline error be controlled at ± 10mm in, the hatch cover spacing is 30mm ± 5mm.
5. according to the described installation method of arbitrary claim in the claim 1 to 3, it is characterized in that: described line concrete steps comprise: mark line of centers on the corner block; Mark the opening of locating dowel pin; Mark the location dimension of limiting device and guide piece; The position of back-up block device; The position location of twistlock formula compactor.
6. according to the described installation method of arbitrary claim in the claim 1 to 3, it is characterized in that: the pre-determined bit of described check hatch cover and annex is meant that hatch cover is put down check hatch cover and all hatch cover annex pre-determined bit to be consistent, the original position of after the inspection hatch cover being sling.
7. according to the described installation method of arbitrary claim in the claim 1 to 3, it is characterized in that: described welded attachment is meant all hatch coaming of welding and the good annex of pre-determined bit on the colligation bridge, specifically comprises limiting stopper, only jumps device, guide piece, stop pin and anchor plate.
8. installation method according to claim 7 is characterized in that: described check hatch cover and pre-determined bit to be meant once more for the second time to put down hatch cover test, be consistent with pre-determined bit, guarantee that hatch cover and stop lock ring deviation are less than 2mm; Only jump the device centre deviation less than 2mm; Limiting stopper gap on limiting device and the hatch cover is not more than 1mm.
9. according to the described installation method of arbitrary claim in the claim 1 to 3, it is characterized in that: described leak test comprises:
A, white powder test: hatchcover is installed at real ship and is finished substantially, rubber bar setting-in carries out after finishing, coat white powder on the band steel compressing, close after cover plate buckles compactor, open cover plate again, inspection white powder seal, defectives such as it is not wide to find that powder is printed on, and is interrupted, fuzzy, should be repaired or be adjusted the rubber bar and be compressed band steel, until satisfaction;
Leak tightness is checked in b, hose test.
CN201010133958XA 2010-03-29 2010-03-29 Method for mounting container hatch cover Expired - Fee Related CN101797954B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010133958XA CN101797954B (en) 2010-03-29 2010-03-29 Method for mounting container hatch cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010133958XA CN101797954B (en) 2010-03-29 2010-03-29 Method for mounting container hatch cover

Publications (2)

Publication Number Publication Date
CN101797954A true CN101797954A (en) 2010-08-11
CN101797954B CN101797954B (en) 2012-09-26

Family

ID=42593831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010133958XA Expired - Fee Related CN101797954B (en) 2010-03-29 2010-03-29 Method for mounting container hatch cover

Country Status (1)

Country Link
CN (1) CN101797954B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102721413A (en) * 2012-06-29 2012-10-10 武汉一冶钢结构有限责任公司 Simulated positioning method for storage tank deep-well pump installation for total-pressure type liquefied petroleum gas (LPG) transport ship
CN104192265A (en) * 2014-09-10 2014-12-10 广州文冲船厂有限责任公司 Deck face hatch cover system installing method
CN104290864B (en) * 2013-07-17 2016-09-07 江南造船(集团)有限责任公司 Casing stem height localization method
CN107031789A (en) * 2017-04-14 2017-08-11 上海外高桥造船有限公司 The cross spacing method of hatch board
CN108189973A (en) * 2017-12-21 2018-06-22 沪东中华造船(集团)有限公司 A kind of method for supporting for super-container vessel normal state installation hatch coaming
CN108927591A (en) * 2018-08-15 2018-12-04 江苏润邦重工股份有限公司 Structure welding technique is organized in a kind of container hatch cover of ship
CN109591956A (en) * 2018-11-16 2019-04-09 天津市宝洪源机械制造有限公司 A kind of container ship closes up the manufacturing process of mouth with corrosion-resistant hatch board
CN110182309A (en) * 2019-06-05 2019-08-30 上海外高桥造船海洋工程有限公司 The method of construction of the hatch coaming of ship
CN110877677A (en) * 2019-10-30 2020-03-13 沪东中华造船(集团)有限公司 Integrated flat ground manufacturing method for translation type hatch cover system of large-scale ocean bulk cargo ship
CN111439352A (en) * 2020-04-22 2020-07-24 上海电力大学 Installation process of folding hatch cover
CN111661274A (en) * 2020-05-25 2020-09-15 广州文冲船舶修造有限公司 Large container ship lashing bridge refitting process
CN112478080A (en) * 2020-12-09 2021-03-12 江南造船(集团)有限责任公司 Digital positioning method for hoisting container ship hatch cover
CN112589315A (en) * 2020-12-01 2021-04-02 江南造船(集团)有限责任公司 Installation and tightness test method for watertight bottom cover of moon pool
CN114275116A (en) * 2021-12-06 2022-04-05 上海江南长兴造船有限责任公司 Method for controlling installation precision of container ship hatch cover supporting box
CN115123487A (en) * 2022-07-25 2022-09-30 广州黄船海洋工程有限公司 Integrated hoisting deformation control installation method for hatch coaming of translational hatch cover of bulk cargo ship
CN115195968A (en) * 2022-07-15 2022-10-18 中船澄西扬州船舶有限公司 Installation method for aligning hinge at end of folding hatch cover and strengthening opposite sides of oil cylinder base

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI350774A (en) * 1973-12-07 1975-06-08 Mac Gregor International Sa
CN87104569A (en) * 1986-07-03 1988-01-13 卡耶·勒内 Be specially adapted to the hatchboard that improves sealing arrangement that has of equipment container carrier
CN2647742Y (en) * 2003-06-27 2004-10-13 上海外高桥造船有限公司 Cargo ship hatch door sealing device
CN1583502A (en) * 2003-08-21 2005-02-23 沪东中华造船(集团)有限公司 Unitary pre-assembling method for cross piece, anti-twist deck, hatching coaming and railing frame
KR20050043060A (en) * 2003-11-05 2005-05-11 현대중공업 주식회사 Leveling plate for resting system of hatch cover
KR100596188B1 (en) * 2005-05-27 2006-07-04 대우조선해양 주식회사 Piece for cell guide block setting
DE102007036022A1 (en) * 2007-05-16 2008-11-20 Jan Papierok Sealing system for hatch cover, particularly of container hatches, has two parallel groove walls which are connected to groove base

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI350774A (en) * 1973-12-07 1975-06-08 Mac Gregor International Sa
CN87104569A (en) * 1986-07-03 1988-01-13 卡耶·勒内 Be specially adapted to the hatchboard that improves sealing arrangement that has of equipment container carrier
CN2647742Y (en) * 2003-06-27 2004-10-13 上海外高桥造船有限公司 Cargo ship hatch door sealing device
CN1583502A (en) * 2003-08-21 2005-02-23 沪东中华造船(集团)有限公司 Unitary pre-assembling method for cross piece, anti-twist deck, hatching coaming and railing frame
KR20050043060A (en) * 2003-11-05 2005-05-11 현대중공업 주식회사 Leveling plate for resting system of hatch cover
KR100596188B1 (en) * 2005-05-27 2006-07-04 대우조선해양 주식회사 Piece for cell guide block setting
DE102007036022A1 (en) * 2007-05-16 2008-11-20 Jan Papierok Sealing system for hatch cover, particularly of container hatches, has two parallel groove walls which are connected to groove base

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《造船技术》 20000229 杨志华 1100TEU集装箱船舱口盖安装工艺探讨 , 2 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102721413A (en) * 2012-06-29 2012-10-10 武汉一冶钢结构有限责任公司 Simulated positioning method for storage tank deep-well pump installation for total-pressure type liquefied petroleum gas (LPG) transport ship
CN104290864B (en) * 2013-07-17 2016-09-07 江南造船(集团)有限责任公司 Casing stem height localization method
CN104192265A (en) * 2014-09-10 2014-12-10 广州文冲船厂有限责任公司 Deck face hatch cover system installing method
CN104192265B (en) * 2014-09-10 2017-06-13 广州文冲船厂有限责任公司 The installation method of deck plane hatchcover system
CN107031789A (en) * 2017-04-14 2017-08-11 上海外高桥造船有限公司 The cross spacing method of hatch board
CN107031789B (en) * 2017-04-14 2019-01-01 上海外高桥造船有限公司 The cross spacing method of hatch board
CN108189973A (en) * 2017-12-21 2018-06-22 沪东中华造船(集团)有限公司 A kind of method for supporting for super-container vessel normal state installation hatch coaming
CN108927591A (en) * 2018-08-15 2018-12-04 江苏润邦重工股份有限公司 Structure welding technique is organized in a kind of container hatch cover of ship
CN109591956A (en) * 2018-11-16 2019-04-09 天津市宝洪源机械制造有限公司 A kind of container ship closes up the manufacturing process of mouth with corrosion-resistant hatch board
CN110182309A (en) * 2019-06-05 2019-08-30 上海外高桥造船海洋工程有限公司 The method of construction of the hatch coaming of ship
CN110877677A (en) * 2019-10-30 2020-03-13 沪东中华造船(集团)有限公司 Integrated flat ground manufacturing method for translation type hatch cover system of large-scale ocean bulk cargo ship
CN111439352A (en) * 2020-04-22 2020-07-24 上海电力大学 Installation process of folding hatch cover
CN111661274A (en) * 2020-05-25 2020-09-15 广州文冲船舶修造有限公司 Large container ship lashing bridge refitting process
CN112589315A (en) * 2020-12-01 2021-04-02 江南造船(集团)有限责任公司 Installation and tightness test method for watertight bottom cover of moon pool
CN112589315B (en) * 2020-12-01 2022-07-05 江南造船(集团)有限责任公司 Installation and tightness test method for watertight bottom cover of moon pool
CN112478080A (en) * 2020-12-09 2021-03-12 江南造船(集团)有限责任公司 Digital positioning method for hoisting container ship hatch cover
CN114275116A (en) * 2021-12-06 2022-04-05 上海江南长兴造船有限责任公司 Method for controlling installation precision of container ship hatch cover supporting box
CN115195968A (en) * 2022-07-15 2022-10-18 中船澄西扬州船舶有限公司 Installation method for aligning hinge at end of folding hatch cover and strengthening opposite sides of oil cylinder base
CN115195968B (en) * 2022-07-15 2024-04-19 中船澄西扬州船舶有限公司 Mounting method for aligning and reverse reinforcement of hinge at end of folding hatch cover and oil cylinder base
CN115123487A (en) * 2022-07-25 2022-09-30 广州黄船海洋工程有限公司 Integrated hoisting deformation control installation method for hatch coaming of translational hatch cover of bulk cargo ship

Also Published As

Publication number Publication date
CN101797954B (en) 2012-09-26

Similar Documents

Publication Publication Date Title
CN101797954B (en) Method for mounting container hatch cover
CN101367425B (en) Process for manufacturing ten-thousand-ton grade special multipurpose vessel
CN101885368B (en) Method for manufacturing and installing guide rail in container ship cargo hold
CN101323351B (en) Shipping rudder system lighting and mounting method
CN110937096B (en) Ship chimney desulfurization modification process
CN101168380A (en) Method for mounting ship three-main-engine three-airscrew main frame shafting
CN110758674B (en) Method for installing ship anchor winch block section
CN113247205B (en) Installation method of embedded container fixing seat of ship deck
CN104210619B (en) Container ship embedded type block installation method
CN102874379A (en) Manufacture method of offshore riprap leveling ship
CN103693164B (en) The method of measurement of box ship floading condition hatch cover level is built for harbour
CN104890811A (en) Installation method of ship bow telescopic paddle based on omega sealing principle
CN101723056A (en) Ship multi-beam acoustic equipment mounting process
CN102923254A (en) Retrofit technology for cutting and lengthening ships via dry-type trolley method
CN110481701B (en) Installation and debugging method of cabin cover supporting part
CN110104121B (en) Installation method of movable deck
KR102477624B1 (en) Simulation method of construction for hatch cover loading
CN102328731A (en) Method for arranging overlong guide rail of pipe stevedoring crane
CN205443895U (en) Modular shelter bridge
CN112109858B (en) Mounting precision control process for support base plate of liquefied gas carrier deck liquid cargo system
KR20140067648A (en) Installation method of apparatus of windlass and mooring
CN114735153A (en) Hoisting and positioning process and device for movable deck of roll-on-roll-off ship
CN113931216A (en) Construction method for hoisting pipe gallery steel members
CN221114286U (en) Self-unloading ship installation scaffold tool
CN115610613A (en) Ship water gauge installation precision control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120926

Termination date: 20150329

EXPY Termination of patent right or utility model