CN109604926A - Steel blank constructs interface healing method - Google Patents

Steel blank constructs interface healing method Download PDF

Info

Publication number
CN109604926A
CN109604926A CN201811350464.XA CN201811350464A CN109604926A CN 109604926 A CN109604926 A CN 109604926A CN 201811350464 A CN201811350464 A CN 201811350464A CN 109604926 A CN109604926 A CN 109604926A
Authority
CN
China
Prior art keywords
steel blank
pressure maintaining
minutes
interface
deflection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811350464.XA
Other languages
Chinese (zh)
Other versions
CN109604926B (en
Inventor
李雅平
徐海涛
燕春光
王明政
张东辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Atomic of Energy
Original Assignee
China Institute of Atomic of Energy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Atomic of Energy filed Critical China Institute of Atomic of Energy
Priority to CN202110458506.7A priority Critical patent/CN113523707B/en
Priority to CN201811350464.XA priority patent/CN109604926B/en
Publication of CN109604926A publication Critical patent/CN109604926A/en
Application granted granted Critical
Publication of CN109604926B publication Critical patent/CN109604926B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P6/00Restoring or reconditioning objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)

Abstract

The present invention provides a kind of steel blanks to construct interface healing method.Method includes the following steps: step 1: the good steel blank of soldering and sealing being heated, and makes to construct interface and is located at horizontal direction;Step 2: smooth anvil upsetting is used, and avoids wrong anvil, the jumping-up mode is as follows: used disposable depressed fast first, then carry out pressure maintaining;Step 3: melting down, and is diffused connection by heating, keeps the temperature after samming;Step 4: forging and controls total deformation.Steel blank construction method of the invention is used in combination by special jumping-up mode and heating diffusion connection, is efficiently solved the healing problems that steel blank constructs interface, is significantly improved and subsequent construct molding yield rate.

Description

Steel blank constructs interface healing method
Technical field
The invention belongs to field of material processing, in particular to a kind of steel blank constructs interface healing method.
Background technique
Constructing forming technique is a kind of newly developed technology.During steel blank constructs molding, adopted between steel blank It is linked together with soldering and sealing, but there are a large amount of intermittence interfaces for inside, these intermittence interfaces can quilt in subsequent forging process It is considered as internal flaw, the healing of these internal flaws needs just to be able to achieve by the multiway forging of large deformation.However, large deformation is forged It makes and steel blank is be easy to cause to generate forge crack, easily cause to crack, cause to construct molding failure, it is therefore necessary to develop one kind The method for promoting steel blank to construct interface healing.
Summary of the invention
The above problem present in molding is constructed to solve current steel blank, the present invention provides a kind of steel blanks to construct boundary Face healing process.Method includes the following steps:
Step 1: the good steel blank of soldering and sealing is heated, and is made to construct interface and be located at horizontal direction;
Step 2: smooth anvil upsetting is used, and avoids wrong anvil, the jumping-up mode is as follows: using disposable depressed fast first, It pushes deflection and is greater than 30%, pressing time was less than 2 minutes;Then carry out pressure maintaining 20 minutes or more, the deformation in pressure maintaining period Amount control is between 10~25%;
Step 3: melting down, and is diffused connection by heating, keeps the temperature 12 hours or more after samming;
Step 4: forging make it is each to total deformation not less than 20%, be finally reached required size.
According to one embodiment, can also be performed the following operation 1-2 times between the step 3 and the step 4: under It pressure 20 minutes or more, melts down, connection is diffused by heating, keeps the temperature 12 hours or more after samming;Under in the operation 1-2 times The sum of deflection in the total deformation of pressure and the step 2 in pressure maintaining period controls between 10~25%;At the same time, Deflection in pressure maintaining period described in step 2 can be less than 10%.
According to one embodiment, when the shape of the steel blank is hourglass shape, the jumping-up mode can also use with Under type replaces: using disposable depressed fast first, pushes deflection and be greater than 15%, pressing time was less than 2 minutes;Then into Row pressure maintaining 20 minutes or more, the deformation amount controlling in pressure maintaining period was between 5~20%.
According to one embodiment, the steel blank can be stainless steel blank or carbon steel blank.
Further, the shape of the steel blank can be cuboid, cube or cylindrical body.
Steel blank construction method of the invention is used in combination by what special jumping-up mode and heating diffusion connected, is effectively solved Steel blank of having determined constructs the healing problems at interface, significantly improves and subsequent constructs molding yield rate.
Detailed description of the invention
Fig. 1 is the jumping-up schematic diagram according to the embodiment of the present invention.
Fig. 2 is to construct the processed steel blank of interface healing method without steel blank of the invention to construct interface electron microscope.
Fig. 3 is to construct the processed steel blank of interface healing method without steel blank of the invention to construct interface micrograph.
Fig. 4 is to construct the processed steel blank of interface healing method by steel blank of the invention to construct interface electron microscope.
Appended drawing reference: the good steel blank of 1. soldering and sealing, flat anvil on 2., 3. lower flat anvils.
Specific embodiment
Below with reference to the embodiments and with reference to the accompanying drawing the technical solutions of the present invention will be further described.
In the following detailed description, for convenient for explain, elaborate many concrete details with provide to the present invention implement The comprehensive understanding of example.It should be apparent, however, that one or more embodiments without these specific details can also be by reality It applies.
Although in conjunction with attached drawing, the present invention is described, and embodiment disclosed in attached drawing is intended to reality of the invention The mode of applying illustrates, and should not be understood as to a kind of limitation of the invention.
Steel blank of the invention construct interface healing method the following steps are included:
Step 1: the good steel blank of soldering and sealing is heated, and is made to construct interface and be located at horizontal direction;
Step 2: smooth anvil upsetting is used, and avoids wrong anvil, the jumping-up mode is as follows: using disposable depressed fast first, It pushes deflection and is greater than 30%, pressing time was less than 2 minutes;Then carry out pressure maintaining 20 minutes or more, the deformation in pressure maintaining period Amount control is between 10~25%;
Step 3: melting down, and is diffused connection by heating, keeps the temperature 12 hours or more after samming;
Step 4: forging make it is each to total deformation not less than 20%, be finally reached required size.
As Figure 2-3, before constructing the processing of interface healing method without steel blank of the invention, exist between steel blank Sharp interface.Then, it constructs interface healing method using steel blank of the invention to be handled, with disposable quick large deformation Pushing-pressure maintaining-heating diffusion connection alternating action, interface are faded away, and the oxide particle of interface gradually decreases, boundary Face bond strength is continuously improved;Simultaneously because the generation of large deformation, can generate recrystallization.When total deformation is accumulative close to 50% When, as shown in figure 4, interface completely disappears, recrystallization degree is abundant, and bond strength significantly improves.
Emphasis of the invention is the use of above-mentioned jumping-up mode and heating diffusion connection.By the study found that passing through one The alternating action of connection is spread in secondary property large deformation depressed fast-pressure maintaining-heating, in addition the synergistic effect between each parameter, energy Enough under the premise of ensuring that steel blank does not crack, promotes steel blank to construct interface and effectively healing occurs.
Since with the presence of a large amount of gaps and interface, wrong anvil will lead to distal end warping and cracking, therefore interface among steel blank Wrong anvil should be strictly avoided in upsetting process before all healed.
In step 5, forging make it is each be conducive to inside not less than 20% to total deformation and homogenize, further decrease cracking Risk.
It according to an example, can also perform the following operation 1-2 times: push between the step 3 and the step 4 It 20 minutes or more, melts down, connection is diffused by heating, keeps the temperature 12 hours or more after samming;It is pushed in the operation 1-2 times Total deformation and the step 2 in the control of the sum of deflection in pressure maintaining period between 10~25%;At the same time, it walks Deflection in pressure maintaining period described in rapid two can be conducive to preferably promote to construct interface healing less than 10%.
According to an example, when the shape of the steel blank is hourglass shape, the jumping-up mode can also use following Mode replaces: using disposable depressed fast first, pushes deflection and be greater than 15%, pressing time was less than 2 minutes;Then it carries out Pressure maintaining 20 minutes or more, the deformation amount controlling in pressure maintaining period was conducive to preferably promote to construct interface and be cured between 5~15% It closes.
According to an example, the steel blank can be stainless steel blank or carbon steel blank.
Further, the shape of the steel blank can be cuboid, cube or cylindrical body, i.e., steel blank of the invention It is relatively broad to construct the applicable blank shape of interface healing method.
Embodiment 1
It constructs interface healing method using steel blank of the invention to handle the stainless steel blank of certain cube, this is stainless Steel blank long 1000mm, wide 1000mm, high 1500mm, processing step are as follows:
One, by the good stainless steel blank heating of soldering and sealing to 1240 ± 20 DEG C, and make to construct interface and be located at horizontal direction;
Two, stainless steel blank is placed on 10000 tons of hydraulic press stations for being equipped with heat-preservation cotton, with smooth anvil upsetting, and Wrong anvil is avoided, the jumping-up mode is as follows: first using disposable depressed fast, pushing deflection 35%, pressing time 30 seconds; Then pressure maintaining 30 minutes, the deflection in pressure maintaining period are 25%;
Three, it melts down, is heated to 1240 ± 20 DEG C and is diffused connection, keep the temperature 24 hours after samming;
Four, the total deformation 40% for making three directions of length, width and height by forging repeatedly, is finally reached required size.
Embodiment 2
It constructs interface healing method using steel blank of the invention to handle the stainless steel blank of certain cylindrical body, this is stainless Steel blank basal diameter is 800mm, a height of 1600mm, and processing step is as follows:
One, by the good stainless steel blank heating of soldering and sealing to 1200 ± 20 DEG C, and make to construct interface and be located at horizontal direction;
Two, stainless steel blank is placed on 10000 tons of hydraulic press stations for being equipped with heat-preservation cotton, with smooth anvil upsetting, and Wrong anvil is avoided, the jumping-up mode is as follows: first using disposable depressed fast, pushing deflection 35%, pressing time 1 divides Clock;Then pressure maintaining 20 minutes, the deflection in pressure maintaining period are 10%;
Three, it melts down, is heated to 1200 ± 20 DEG C and is diffused connection, keep the temperature 12 hours after samming;
Four, it pushes 25 minutes, melts down, be heated to 1200 ± 20 DEG C and be diffused connection, keep the temperature 12 hours after samming;It pushes Deflection is 10%;
Five, the total deformation 20% for making radial dimension and height by forging repeatedly, is finally reached required size.
Embodiment 3
It constructs interface healing method using steel blank of the invention to handle certain cuboid carbon steel blank, the carbon steel base Expect long 1000mm, wide 800mm, high 1800mm, processing step is as follows:
One, by the good carbon steel blank heating of soldering and sealing to 1100 ± 20 DEG C, and make to construct interface and be located at horizontal direction;
Two, carbon steel blank is placed on 10000 tons of hydraulic press stations for being equipped with heat-preservation cotton, with smooth anvil upsetting, and is kept away Fault-avoidance anvil, the jumping-up mode are as follows: first use disposable depressed fast, push deflection 30%, pressing time 1 minute; Then pressure maintaining 25 minutes, the deflection in pressure maintaining period are 10%;
Three, it melts down, is heated to 1100 ± 20 DEG C and is diffused connection, keep the temperature 15 hours after samming;
Four, it performs the following operation 2 times: pushing 20 minutes, pushing deflection is 7%;Melt down, be heated to 1100 ± 20 DEG C into Row diffusion connects, and keeps the temperature 15 hours after samming;
Five, the total deformation 30% for making three directions of length, width and height by forging repeatedly, is finally reached required size.
To embodiment 1-3, treated that steel blank is tested, as the result is shown: constructing interface through steel blank of the invention and be cured After the processing of conjunction method, the interface inside steel blank is completely disappeared, and interface bond strength reaches base material matrix strength, while not occurring Blank problem of Cracking obtains and good constructs interface healing effect.
Although some embodiments of general plotting have been shown and have illustrated according to the present invention, however, ordinary skill Personnel should be understood that in the case where the principle and spirit without departing substantially from the present general inventive concept, can make to these embodiments Change, the scope of the present invention is limited with claim and their equivalent.

Claims (6)

1. a kind of steel blank constructs interface healing method, it is characterised in that method includes the following steps:
Step 1: the good steel blank of soldering and sealing is heated, and is made to construct interface and be located at horizontal direction;
Step 2: smooth anvil upsetting is used, and avoids wrong anvil, the jumping-up mode is as follows: using disposable depressed fast first, pushed Deflection is greater than 30%, and pressing time was less than 2 minutes;Then carry out pressure maintaining 20 minutes or more, the deflection control in pressure maintaining period System is between 10~25%;
Step 3: melting down, and is diffused connection by heating, keeps the temperature 12 hours or more after samming;
Step 4: forging make it is each to total deformation not less than 20%, be finally reached required size.
2. steel blank according to claim 1 constructs interface healing method, it is characterised in that: the step 3 with it is described It can also be performed the following operation 1-2 times between step 4: push 20 minutes or more, it melts down, connection is diffused by heating, 12 hours or more are kept the temperature after temperature;Change in the total deformation and the step 2 pushed in the operation 1-2 times in pressure maintaining period The sum of shape amount controls between 10~25%;At the same time, the deflection in pressure maintaining period described in step 2 can be less than 10%.
3. steel blank according to claim 1 constructs interface healing method, it is characterised in that: when the shape of the steel blank When for hourglass shape, the jumping-up mode can also replace in the following ways: use disposable depressed fast, lower compressive strain first Amount is greater than 15%, and pressing time was less than 2 minutes;Then carry out pressure maintaining 20 minutes or more, the deformation amount controlling in pressure maintaining period is 5 Between~20%.
4. steel blank according to claim 3 constructs interface healing method, it is characterised in that: in the step 3 and institute Stating can also perform the following operation 1-2 times between step 4: push 20 minutes or more, it melts down, connection is diffused by heating, 12 hours or more are kept the temperature after samming;In the total deformation and the step 2 pushed in the operation 1-2 times in pressure maintaining period The sum of deflection controls between 5~20%;At the same time, the deflection in pressure maintaining period described in step 2 can be less than 5%.
5. steel blank described in -4 constructs interface healing method according to claim 1, it is characterised in that: the steel blank is stainless Steel blank or carbon steel blank.
6. steel blank according to claim 1 or 2 constructs interface healing method, it is characterised in that: outside the steel blank Shape is cuboid, cube or cylindrical body.
CN201811350464.XA 2018-11-14 2018-11-14 Steel blank construction interface healing method Active CN109604926B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202110458506.7A CN113523707B (en) 2018-11-14 2018-11-14 Method for healing deformation of construction interface
CN201811350464.XA CN109604926B (en) 2018-11-14 2018-11-14 Steel blank construction interface healing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811350464.XA CN109604926B (en) 2018-11-14 2018-11-14 Steel blank construction interface healing method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202110458506.7A Division CN113523707B (en) 2018-11-14 2018-11-14 Method for healing deformation of construction interface

Publications (2)

Publication Number Publication Date
CN109604926A true CN109604926A (en) 2019-04-12
CN109604926B CN109604926B (en) 2021-10-15

Family

ID=66004363

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201811350464.XA Active CN109604926B (en) 2018-11-14 2018-11-14 Steel blank construction interface healing method
CN202110458506.7A Active CN113523707B (en) 2018-11-14 2018-11-14 Method for healing deformation of construction interface

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202110458506.7A Active CN113523707B (en) 2018-11-14 2018-11-14 Method for healing deformation of construction interface

Country Status (1)

Country Link
CN (2) CN109604926B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111036812A (en) * 2019-12-27 2020-04-21 天津重型装备工程研究有限公司 Method for controlling oxide on bonding interface of metal composite product
CN112845744A (en) * 2021-01-05 2021-05-28 中国第一重型机械股份公司 Preparation method of metal solid-solid composite additive blank
CN112903954A (en) * 2021-01-22 2021-06-04 大连理工大学 Interface healing performance evaluation method for metal substrate construction forming

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS579553A (en) * 1980-06-23 1982-01-19 Daido Steel Co Ltd Forging method
JP2001340938A (en) * 2000-05-30 2001-12-11 Daido Steel Co Ltd Forging method for discoidal forging
CN102500733A (en) * 2011-09-22 2012-06-20 中国科学院金属研究所 Forging method for efficiently healing internal hole-type defects of steel ingot
CN102581543A (en) * 2012-03-01 2012-07-18 宁夏天地奔牛实业集团有限公司 Repair method for forging die
CN102756062A (en) * 2012-07-02 2012-10-31 中国科学院金属研究所 Forging method for efficiently healing hole flaws inside blank with large height-diameter ratio
CN105618506A (en) * 2015-03-26 2016-06-01 中国科学院金属研究所 Metal construction forming method
CN106975719A (en) * 2017-06-01 2017-07-25 东南大学 A kind of forging method of cogging
CN107520584A (en) * 2017-09-15 2017-12-29 中国原子能科学研究院 Profiled metal constructs manufacturing process
CN108188659A (en) * 2017-12-21 2018-06-22 中国原子能科学研究院 A kind of manufacturing process of steel billet

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3794805A (en) * 1971-07-02 1974-02-26 W Rudd Magnetic pulse welding using spaced proximity conductor
EP2762247A4 (en) * 2011-09-22 2015-08-19 Inst Metal Res Chinese Acad Sc Forging method for high-efficiency closing of porous defects in steel ingots or billets
CN104624900B (en) * 2015-02-11 2017-04-19 中国科学院金属研究所 Forging method for efficiently recovering internal defects of thin plate forged pieces
CN106312454B (en) * 2016-08-29 2018-11-13 辽宁北祥重工机械制造有限公司 The method of the folded forging production main shaft forging of multiple-unit homogenous metal
CN106475679B (en) * 2016-11-30 2018-07-27 山东大学 A kind of discontinuous pressure process diffusion connecting process of unrepeatered transmission of copper and aluminium alloy
CN107717341A (en) * 2017-09-15 2018-02-23 中国原子能科学研究院 Modular metal constructs manufacturing process
CN108435998A (en) * 2018-02-28 2018-08-24 武汉理工大学 A kind of compound base hot rolling manufacturing process of ring

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS579553A (en) * 1980-06-23 1982-01-19 Daido Steel Co Ltd Forging method
JP2001340938A (en) * 2000-05-30 2001-12-11 Daido Steel Co Ltd Forging method for discoidal forging
CN102500733A (en) * 2011-09-22 2012-06-20 中国科学院金属研究所 Forging method for efficiently healing internal hole-type defects of steel ingot
CN102581543A (en) * 2012-03-01 2012-07-18 宁夏天地奔牛实业集团有限公司 Repair method for forging die
CN102756062A (en) * 2012-07-02 2012-10-31 中国科学院金属研究所 Forging method for efficiently healing hole flaws inside blank with large height-diameter ratio
CN105618506A (en) * 2015-03-26 2016-06-01 中国科学院金属研究所 Metal construction forming method
CN106975719A (en) * 2017-06-01 2017-07-25 东南大学 A kind of forging method of cogging
CN107520584A (en) * 2017-09-15 2017-12-29 中国原子能科学研究院 Profiled metal constructs manufacturing process
CN108188659A (en) * 2017-12-21 2018-06-22 中国原子能科学研究院 A kind of manufacturing process of steel billet

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
国家机械工业委员会: "《高级锻压工工艺学》", 31 December 1988 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111036812A (en) * 2019-12-27 2020-04-21 天津重型装备工程研究有限公司 Method for controlling oxide on bonding interface of metal composite product
CN111036812B (en) * 2019-12-27 2022-03-01 天津重型装备工程研究有限公司 Method for controlling oxide on bonding interface of metal composite product
CN112845744A (en) * 2021-01-05 2021-05-28 中国第一重型机械股份公司 Preparation method of metal solid-solid composite additive blank
CN112845744B (en) * 2021-01-05 2022-04-08 中国第一重型机械股份公司 Preparation method of metal solid-solid composite additive blank
CN112903954A (en) * 2021-01-22 2021-06-04 大连理工大学 Interface healing performance evaluation method for metal substrate construction forming

Also Published As

Publication number Publication date
CN113523707B (en) 2022-05-13
CN113523707A (en) 2021-10-22
CN109604926B (en) 2021-10-15

Similar Documents

Publication Publication Date Title
CN109604926A (en) Steel blank constructs interface healing method
CN106475500B (en) A kind of Heavy Pan Forgings forging technology
CN103817283B (en) A kind of forged shaft and forging production technique thereof
CN107520584A (en) Profiled metal constructs manufacturing process
CN103706743B (en) Die-forging forming process of titanium-alloy forged drum piece
CN108465762A (en) A kind of forging method of efficient whole uniform compaction deformation
CN108188659A (en) A kind of manufacturing process of steel billet
CN106078090A (en) A kind of Forging Technology of large axis forging
CN104148446B (en) A kind of utilize the graphite jig antidote to wrought titanium alloy foundry goods
CN109182679A (en) A kind of laser instantaneous annealing softening method
CN104625627B (en) A kind of preparation method of plasma rotating electrode titanium alloy electrode rod
CN107321901A (en) Improve the forging method of the crystal grain uniformity of high temperature alloy diskware or ring
CN101773963A (en) New process for shaping large disk-shaped forging
CN109604939A (en) Steel blank construction method
CN104233143B (en) A kind of ZrTiAlV sheet alloy electric field-assisted heat treating method
CN106735831B (en) A kind of diffusion welding method of ball bottle structure
CN104624899B (en) A kind of 200 feather weight TC4-DT titanium alloys change forging method
CN103962486A (en) Whole forging process method of super-high pressure valve body
CN105033131A (en) Die steel corner forging process
CN104525814A (en) Mold tooling for straight pipe forging stock for nuclear main pipe and forging method
CN105710265A (en) Forging process for vent valve forming die
CN105170869A (en) Forging method capable of improving transverse mechanical property of 17-4PH forge pieces
CN111014528B (en) Forging forming method of large plate part
CN103343292B (en) Production method of large explosive pressing mould
CN206794645U (en) A kind of metal forging equipment with cambered surface tup at an angle to each other

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant