CN106312454B - The method of the folded forging production main shaft forging of multiple-unit homogenous metal - Google Patents

The method of the folded forging production main shaft forging of multiple-unit homogenous metal Download PDF

Info

Publication number
CN106312454B
CN106312454B CN201610748584.XA CN201610748584A CN106312454B CN 106312454 B CN106312454 B CN 106312454B CN 201610748584 A CN201610748584 A CN 201610748584A CN 106312454 B CN106312454 B CN 106312454B
Authority
CN
China
Prior art keywords
forging
cell cube
slab
slab cell
main shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610748584.XA
Other languages
Chinese (zh)
Other versions
CN106312454A (en
Inventor
白仁伟
白润达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning North Heavy Machinery Manufacturing Co Ltd
Original Assignee
Liaoning North Heavy Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning North Heavy Machinery Manufacturing Co Ltd filed Critical Liaoning North Heavy Machinery Manufacturing Co Ltd
Priority to CN201610748584.XA priority Critical patent/CN106312454B/en
Publication of CN106312454A publication Critical patent/CN106312454A/en
Application granted granted Critical
Publication of CN106312454B publication Critical patent/CN106312454B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

A kind of method of the folded forging production main shaft forging of multiple-unit homogenous metal, ingot casting of the existing technology is solved in the process since misoperation or note speed, casting temperature control system are improper, so that there is the defects of cavity, crackle, segregation and the second phase inside the steel ingot cast, the problem of being scrapped so as to cause large forgings.This method includes:Using meeting the rolled slab of component requirements as metal unit body, fusion welding is carried out using laser beam in vacuum welding room, rational forging and heating process are made according to heavy forging interior void type defect closure condition, multiple metal slabs cell cubes are made to pass through high temperature dwell pressure welding synthesis integral blank, then the main shaft forging that blank forging is required at process.This method avoid large steel ingots to be segregated, be mingled with, shrinkage cavity, loose, crackle the defects of, improve the total quality of forging, improve the utilization rate of material, reduce energy consumption, there is significant economic benefit.

Description

The method of the folded forging production main shaft forging of multiple-unit homogenous metal
Technical field
The invention belongs to technical field of forging, and in particular to a kind of to pass through the metal slabs cell cube of multiple same materials Surface cleaning processing, vacuum welding, forging process high temperature pressurize, to eliminate the mostly single of the void-type defect between slab cell cube The method of the folded forging production main shaft forging of first homogenous metal.
Background technology
Heavy casting and forging industry is a very special industry, and development level is to weigh a national overall national strength One of mark.Heavy casting and forging product is electric power, metallurgy, petrochemical industry, shipbuilding, railway, mine, aerospace, military project and engineering etc. The basic components of equipment are the bases of major equipment manufacturing industry, are related to national security and lifelines of the national economy.
Since the original steel ingot of large forgings is usually to cast, and the metallurgical quality of steel and coagulating property can not be kept away Many genetic defects, common defect can be brought to have to steel ingot with exempting from:Be segregated, be mingled with, gas, bubble, shrinkage cavity, loose, crackle With splash scar.The formation and smelting of these defects, the processes such as casting and cooling are closely related, and steel ingot is bigger, and defect is more serious, These defects also tend to be to considerably reduce the billet yield of steel ingot the main reason for causing large forgings to scrap;And steel ingot Internal defect is not visible, these defects also are difficult to eliminate by the improvement of smelting process.In traditional forging process, The riser and ingot tail of steel ingot are more due to existing defect, it usually needs excision so that the utilization rate of material reduces, and the energy disappears Consumption increases.
It is reported according to Patents documents, notification number is a kind of " flat-die forging side of forge piece of rotary arms of CN101722260B Method ", rotating upset table are placed in mobile work platform, and loose tool is placed on rotating upset table, and forge piece blank reheating is placed in loose tool It is forged, then the big disc of smooth forge piece blank reheating, punching, forge piece of rotary arms product is made in round as a ball and multiple finishing.This method Forging appearance and size can be controlled by simple loose tool and jumping-up punching pin, realization is forged in the small flat-die forging equipment of capacity of equipment The physical constriction occurred when making complex-shaped forge piece of rotary arms, but becoming steel ingot for molten steel condensation, is formed by steel ingot Portion cavity and loose elimination ability are poor, and cannot be satisfied the forging requirement for promoting inside Heavy Forgings quality, production Efficiency is low.
" the dedicated multi-layered folding riffled iron of daggers and swords and its manufacturing method " of Publication No. CN1364667A, mainly with identical Or overlap and forge after the semi-hard steel of different ratio and hard steel heating, then through repeatedly folding or reversing, one layer of spring is finally sandwiched again Steel, and beat forging by required shape using pneumatic hammer, so that spring steel is combined as a whole with hard steel and semi-hard steel, is made with nature The multilayer folding riffled iron of decorative pattern.Sharp maintenance, easy grit and the impact resistance of manufactured multilayer folding riffled iron all exceed General Baogang, piece sword and folder steel, obdurability and wear resistance are better than general sword material, and resistant tarnishing is preferable.But this method is only It is suitble to the material of forging sheet, the forging of axial workpiece can not be applied to.
" a kind of forging method of high efficiency healing steel ingot inner void type defect " that notification number is CN102500733B, with And " forging method for improving steel side knock performance " that notification number is CN104399854B, it is studied using numerical simulation technology The distribution situation of steel ingot internal strain and the influence to steel ingot Hole type defect closure effect during traditional open die forging, and It is proposed on this basis include it is axial pre-upset, radial direction jumping-up and etc. forging method.Pass through the multiple upsetting before forging steel Pull out forging process so that steel etc. tropisms and transverse and longitudinal structural homogenity be improved, steel are not dropped in longitudinal performance Lateral performance increases while low, since upsetting pull of every completion melts down heating and thermal insulation, melts down and realizes that upsetting pull base is replied Recrystallization, the pier be conducive to next time pull out forging and crystal grain refinement.But such methods to destroy metallic continuity, cause it is micro- Crackle, reduce forgeability and forging after mechanical property out-phase particle class be mingled with and steel ingot in survival gas (such as oxygen, nitrogen, Hydrogen etc.) finally with oxide and nitride form, formed in steel ingot cause steel plasticity reduce forging inside white point and The defects of hydrogen embrittlement, can not play the role of effectively eliminating, therefore lack adaptability to the stringent forging of quality requirement.
And " dissimilar metal constructs manufacturing process " of Publication No. CN105499459A, it discloses a kind of dissimilar metal and constructs Manufacturing process, including prepare at least one first primitive and multiple second bases made of the second material made of the first material Multiple primitives are stacked to predetermined shape, the multiple primitives for being stacked to predetermined shape are packaged into pre- by multiple primitives that member is constituted Base, then interfacial weld between multiple primitives is made so that blank is made in prefabricated blank by smithwelding.The manufacturing process The middle process for preparing primitive is only simply described as " being specified size by polylith small dimension metal base blanking ", and there is no specific The determination foundation and mode of primitive sectional dimension are introduced, it is relatively more general, it is unfavorable for the implementation of method.The manufacturing process is to prefabricated blank It is identical as the mode of heating of common steel ingot to implement the mode heated before forging, but due to the prefabricated blank Jing Guo smithwelding, does not have after welding There is carry out stress relief annealing, so easily causing the deformation of commissure by common heating mode, influences dissimilar metal following process Quality.Also, the step of jumping-up and smithwelding of prefabricated blank implementation, is described in the manufacturing process, is also only simply described The pushing deflection of jumping-up, without reference to temperature, soaking time and welding in upsetting process than the relationship between pressure, it is difficult to realize The abundant soldering of multiple primitive underbead cracks, cannot completely eliminate the void-type defect of primitive, therefore cannot be satisfied homogenous metal class The forging quality requirement of large forgings.
Since misoperation or note speed, casting temperature control system are improper during ingot casting so that exist inside the steel ingot cast cavity, The defects of crackle, segregation and the second phase.These defects generally existing in steel ingot manufacturing process, and steel ingot is bigger, steel ingot Internal metallurgical quality gets over Customers ' Legal Right;Moreover, a lot of defects are not visible, and it is unpredictable, it is difficult to eliminate by simply forging.At present 80% or more the large forgings that the country is scrapped is caused by ingot quality is unqualified.Especially as the master of hydroelectric generation Forging shaft, mechanical property requirements are more stringent.Therefore it is necessary to the forging methods to existing large forgings to be improved.
Invention content
The present invention addresses the above problem, provides and a kind of the metal slabs cell cube of multiple same materials is passed through surface Purified treatment, vacuum welding, forging process high temperature pressurize are same come the multiple-unit of eliminating the void-type defect between slab cell cube The method of the folded forging production main shaft forging of matter metal.
The technical solution adopted in the present invention is:The method of the folded forging production main shaft forging of the multiple-unit homogenous metal includes such as Lower step:
Step 1: the influence of the factors such as dependent variable and temperature needed for soldering is calculated according to material, according to the life in heavy forging During production, the closure condition of macroscopic view and microscopic holes type defect inside forging stock:
In formula:γs--- octahedral shear strain
V0--- original voidage
Wherein,
The area for determining cavity, the sectional dimension of slab cell cube is determined further according to cyst areas, selects suitable dimension Rolled slab;
Step 2: the metal slabs cell cube of multiple same materials is before being stacked, the contact to slab cell cube Face is handled, and removes the oxide skin on slab cell cube surface first, the surface of slab cell cube is then cleaned with organic solvent; To ensure that slab cell cube needs the contact surface high level of cleanliness that welds, the residuals such as free from admixture, oil stain and oxide on surface, as far as possible Reduce the defect of main shaft forging in ground;
Step 3: the slab cell cube after cleaning is successively stacked, then rapidly it is transferred in vacuum welding room, uses Laser beam melts the mode of base material, and fusion welding is carried out to each junction of the slab cell cube of stacking;So that the slab stacked Cell cube forms an entirety, and prevents junction from entering impurity, influences forging effect;
Step 4: integrally welded stacking slab cell cube is lain on the parallels of heating furnace, the welding of cell cube Face is parallel to horizontal plane, then starts to heat slab cell cube, heating process is:After 10 hours being kept the temperature at 350 DEG C, with Temperature is increased to 750 DEG C by the heating rate less than or equal to 50 DEG C/h, 7 hours is kept the temperature at 750 DEG C, then again to be less than Or temperature is increased to 1080 DEG C by the heating rate equal to 50 DEG C/h, and after keeping the temperature 12 hours at 1080 DEG C, according to heating furnace Automatic heating power be rapidly heated to 1220 DEG C, finally keep the temperature 20 hours at 1220 DEG C;To add to slab cell cube While hot, the internal stress of the stacking slab cell cube by laser beam fusion welding is eliminated;
Step 5: the stacking slab cell cube after heating is lifted on the upset platform of hydraulic press, to stacking slab list First body carries out upset pressurize soldering, and temperature, soaking time and the welding of upset pressurize soldering meet Fick second than pressure three and determine Rule, makes the sufficient soldering of crack type defect of slab cell cube;Fick's second law is pointed out, during Unsteady Casting, At distance x, concentration changes with time rateEqual to the diffusion flux at this with range rateNegative value, i.e.,
It willAbove formula is substituted into, is obtained
In formula:T --- diffusion time (s)
Volumetric concentration (the kg/m of C --- diffusate3)
X --- distance (m)
The crackle of slab cell cube during upset pressurize soldering, by Crack blunting, crackle merogenesis, schizocele nodularization, In the stages such as cavity healing and uniform quality, it is finally completed healing;
Step 6: the stacking slab cell cube to upset pressurize soldering carries out High temperature diffusion processing, the weldering of crack type defect Conjunction realizes that the average distance that atoms permeating is passed by is directly proportional to the square root of diffusion time, generally by atoms permeating Meet following formula:
In formula:The average distance of X --- atom
τ --- soaking time
K --- constant, it is related with material
Step 7: upset punching and saddle forging forming.
The step 2, when handling the contact surface of slab cell cube, using milling machine removal slab cell cube surface Oxide skin.
The step 2 after handling the contact surface of slab cell cube, need to ensure the slab unit body surface after processing Surface roughness is less than 6.3.
The step 2, after the oxide skin on removal slab cell cube surface, for cleaning slab cell cube surface Organic solvent is acetone or alcohol.
The step 5, when using materials of the 20SiMn as main shaft forging, the welding temperature of the material is 1100~ 1150 DEG C, welding is 5~10MPa than pressure, and weld interval is 30~60min.
The step 6, the speed for stacking slab cell cube main shaft forging High temperature diffusion is 50~70mm/h.
Beneficial effects of the present invention:By proposing a kind of method of the folded forging production main shaft forging of multiple-unit homogenous metal:I.e. Using the rolled slab for meeting component requirements as metal unit body, fusion welding is carried out using laser beam in vacuum welding room, Rational forging and heating process are made according to heavy forging interior void type defect closure condition, makes multiple metal slabs units Body synthesizes integral blank by high temperature dwell pressure welding;The main shaft forging that blank forging is required at process.This method and tradition Forging raw material compared using steel ingot, multiple-unit homogenous metal heap be welded into forging blank mode, avoid large steel ingot segregation, folder The defects of miscellaneous, gas, bubble, shrinkage cavity, loose, crackle, improve the total quality of forging;Also, blank need not go to remove water Mouth Riser material, improves the utilization rate of material, reduces energy consumption, has significant economic benefit.Due to metal unit body one As be rolled slab, stacking is welded on progress, compared with the production technology of large steel ingot, production efficiency dedicated the vacuum welding room in Height, environmental pollution are small.
Description of the drawings
Fig. 1 is the schematic diagram that the slab cell cube of the present invention stacks.
Fig. 2 is the schematic diagram that the slab cell cube of the present invention is welded in vacuum welding room using laser beam.
Fig. 3 is the schematic diagram of the upset pressurize soldering of slab cell cube of the present invention.
Fig. 4 is the process route chart of the present invention.
Fig. 5 is the heating curves figure of the present invention.
Number explanation in figure:1 metal slabs cell cube, 2 vacuum welding chamber, 3 laser beam rifles, 4 welding turntables, 5 hydraulic presses Upper beam, upset plate, 8 hydraulic press lower platforms under upset plate, 7 on 6.
Specific implementation mode
According to Fig. 1~5 specific steps that the present invention will be described in detail.The folded forging production main shaft forging of the multiple-unit homogenous metal Method includes:
Step 1 calculates dependent variable and temperature needed for soldering to select the rolled slab of suitable dimension according to material Etc. factors influence, to determine the sectional dimension of slab cell cube.
According to the peaceful variation issue for waiting the cavernous defect of heavy forging of researchs in plastic processing of gold, using mathematical solution The technique study of analysis pressing mechanism, condition and criterion of the heavy forging interior void defect in plastic processing, with sky Based on the mechanics of hole, be deduced pressing heavy forging interior void defect criterion, and according to result of study inquired into FM methods, Closure rule, closed path and the closing speed in heavy forging inner cylindrical cavity in WHF methods and V-type anvil forging technology.With porous It is derived from based on the theory of plasticity of compressible material and empty mechanics, it is macro inside forging stock in the production process of heavy forging Seeing the closure condition lacked with microscopic holes type can be expressed as:
In formula:γs--- octahedral shear strain
V0--- original voidage
Wherein,
The area that can determine cavity according to above formula, the sectional dimension of slab cell cube is determined according to cyst areas, is selected The rolled slab for selecting out suitable dimension, to ensure to produce the product of reliable in quality by following process.
Before being stacked, the oxygen on the metal slabs cell cube surface of multiple same materials is removed using milling machine for step 2 Change skin, handled with the contact surface to slab cell cube, and ensures that the surface roughness after milling machine is processed is less than 6.3.So The surface for cleaning slab cell cube with organic solvents such as acetone or alcohol afterwards, to ensure that slab cell cube needs the contact surface welded High level of cleanliness, and the residuals such as free from admixture, oil stain and oxide on surface are reduced as far as lacking for final finished main shaft forging It falls into.
Step 3, in order to make the slab cell cube of stacking form an entirety, the plate that rapidly will successively be stacked after cleaning Base cell cube is transferred in vacuum welding room, in such a way that the laser beam of high-energy density melts base material as heat source, to heap Each junction of folded slab cell cube carries out fusion welding, to prevent junction from entering impurity, influences forging effect.Laser beam The requirement that welding can will enter heat and be preferably minimized, heat-affected zone metallographic variation range is small, and the change caused by heat transfer Shape amount is also minimum;Laser beam can focus on the region of very little, be suitable for the smaller component of weld interval, and can reduce slab weldering The use for connecing the required time, even saving filler metal.
Step 4 lifts integrally welded stacking slab cell cube, so that it is lain on the parallels of heating furnace, cell cube Welding surface be parallel to horizontal plane arrangement.The heating process curve of the slab cell cube of stacking and the heating curves phase of common steel ingot Than the soaking time of low-temperature zone, middle warm forging and high temperature section is all opposite to extend.It is moved back without destressing after being welded due to built-up welding slab Fire, to prevent welding stress from commissure being caused to deform, so the soaking time of middle-temperature section is appropriately extended.When high temperature section is kept the temperature, The soaking time of cell cube heap weldment can not calculate heating time according to the size of single-piece smallest cross-sectional size, but will be according to More than one piece blank stacking direction size calculates heating time, and soaking time keeps the temperature 1.5 hours according to every 100mm and calculates.
Due to the internal stress of the stacking slab cell cube of laser beam to be eliminated fusion welding, the slab cell cube of stacking adds Thermal process curve is compared with the heating curves of common steel ingot, 1.3 times of the holding time of low-temperature zone, middle-temperature section and high temperature section. Specifically heating process is:It first, will be warm with the heating rate less than or equal to 50 DEG C/h after keeping the temperature 10 hours at 350 DEG C Degree is increased to 750 DEG C, then keeps the temperature 7 hours at 750 DEG C, then with the heating rate less than or equal to 50 DEG C/h by temperature liter Height is to 1080 DEG C, and after keeping the temperature 12 hours at 1080 DEG C, according to heating furnace automatic heating power (improving heating power) quickly 1220 DEG C are warming up to, finally 20 hours is kept the temperature at 1220 DEG C, completes entire heating process.
Step 5 carries out upset pressurize soldering to the stacking slab cell cube after heating.With iron chains the stacking after heating Slab cell cube is hung on the upset platform of hydraulic press, in lifting elements body, to be always ensured that the welding surface of cell cube is parallel In horizontal plane.Upset pressurize soldering is the key that the present invention, and the crack type defect of slab cell cube is in temperature, soaking time and weldering When connecing than pressing three to meet Fick's second law, sufficient soldering can be realized.Fick's second law is the base in First Law It is derived on plinth, Fick's second law is pointed out, during Unsteady Casting, at distance x, concentration changes with time RateEqual to the diffusion flux at this with range rateNegative value, i.e.,
It willAbove formula is substituted into, is obtained
In formula:T --- diffusion time (s)
Volumetric concentration (the kg/m of C --- diffusate3)
X --- distance (m)
In fact, the diffusion coefficient D of Solute Atoms In Solid Solution is changed with concentration, in order to keep solution diffusion equation simple It is single, often approximatively D is treated as constant.According to the crackle of Fick's second law slab cell cube in upset pressurize During soldering, by stages such as Crack blunting, crackle merogenesis, schizocele nodularization, cavity healing and uniform qualities, it is finally completed Healing.
It is several that Crack Healing Process is divided into Crack blunting, crackle merogenesis, schizocele nodularization, cavity healing and uniform quality etc. Stage.For upset slab cell cube in place, according to welding than pressure (dwell pressure of press), the welding in crack The difference of time (dwell time) and material, optimal parameter are also not quite similar.When the material of main shaft forging is 20SiMn, By calculating, the best welding temperature of the material is 1100~1150 DEG C, and welding is 5~10MPa than pressure, weld interval is 30~ 60min。
The soaking time of step 6, High temperature diffusion is also extremely important to soldering process.In same deflection and heat preservation temperature Under the conditions of degree, extension soaking time appropriate can improve soldering effect.The soldering of crack type defect is by atoms permeating etc. What mechanism was realized, the average distance that atoms permeating is passed by is directly proportional to the square root of diffusion time.General satisfaction following formula:
In formula:The average distance of X --- atom
τ --- soaking time
K --- constant, related with material, general steel alloy is 1.5
According to calculating, when the High temperature diffusion soaking time for stacking slab cell cube main shaft forging is general steel ingot forging heat preservation Between 1.5~1.7 times.General carbon steel and low alloy steel steel ingot soaking time is usually calculated according to the speed of 100mm/h.
Step 7, subsequent handling are rule circle --- upset punching --- saddle forging --- shaping.These and common main shaft Forging step it is identical.

Claims (5)

1. a kind of method of the folded forging production main shaft forging of multiple-unit homogenous metal, it is characterised in that:Include the following steps:
Step 1: the influence of dependent variable and temperature factor needed for soldering is calculated according to material, according to the production process in heavy forging In, the closure condition of macroscopic view and microscopic holes type defect inside forging stock:
In formula:γs--- octahedral shear strain
V0--- original voidage
Wherein,
The area for determining cavity, the sectional dimension of slab cell cube is determined further according to cyst areas, selects rolling for suitable dimension Making sheet base;
Step 2: the metal slabs cell cube of multiple same materials is before being stacked, to the contact surface of slab cell cube into Row processing, removes the oxide skin on slab cell cube surface, the surface of slab cell cube is then cleaned with organic solvent first;With true Protecting slab cell cube needs the contact surface high level of cleanliness welded, the residuals such as free from admixture, oil stain and oxide on surface to subtract as much as possible The defect of few main shaft forging;
Step 3: the slab cell cube after cleaning is successively stacked, then rapidly it is transferred in vacuum welding room, using laser The mode of Shu Ronghua base materials carries out fusion welding to each junction of the slab cell cube of stacking;So that the slab unit stacked Body forms an entirety, and prevents junction from entering impurity, influences forging effect;
Step 4: integrally welded stacking slab cell cube is lain on the parallels of heating furnace, slab cell cube is stacked Welding surface is parallel to horizontal plane, then starts to heat to stacking slab cell cube, heating process is:10 are kept the temperature at 350 DEG C After hour, temperature is increased to 750 DEG C with the heating rate less than or equal to 50 DEG C/h, keeps the temperature 7 hours at 750 DEG C, then Temperature is increased to 1080 DEG C with the heating rate less than or equal to 50 DEG C/h again, and after keeping the temperature 12 hours at 1080 DEG C, pressed It is rapidly heated to 1220 DEG C according to the automatic heating power of heating furnace, finally keeps the temperature 20 hours at 1220 DEG C;With to stacking slab While cell cube is heated, the internal stress of the stacking slab cell cube by laser beam fusion welding is eliminated;
Step 5: the stacking slab cell cube after heating is lifted on the upset platform of hydraulic press, to stacking slab cell cube Upset pressurize soldering is carried out, temperature, soaking time and the welding of upset pressurize soldering meet Fick's second law than pressure three, make Stack the sufficient soldering of crack type defect of slab cell cube;Fick's second law is pointed out, during Unsteady Casting, away from At x, concentration changes with time rateEqual to the diffusion flux at this with range rateNegative value, i.e.,
It willAbove formula is substituted into, is obtained
In formula:T --- diffusion time (s)
Volumetric concentration (the kg/m of C --- diffusate3)
X --- distance (m)
Stack slab cell cube crackle during upset pressurize soldering, by Crack blunting, crackle merogenesis, schizocele nodularization, Cavity healing and uniform quality stage, it is finally completed healing;
Step 6: the stacking slab cell cube to upset pressurize soldering carries out High temperature diffusion processing, the soldering of crack type defect is It is realized by atoms permeating, the average distance that atoms permeating is passed by is directly proportional to the square root of diffusion time, general satisfaction Following formula:
In formula:The average distance of X --- atom
τ --- soaking time
K --- constant, it is related with material
The speed for stacking slab cell cube main shaft forging High temperature diffusion is 50~70mm/h;
Step 7: upset punching and saddle forging forming.
2. the method for the folded forging production main shaft forging of multiple-unit homogenous metal according to claim 1, it is characterised in that:It is described Step 2, when handling the contact surface of slab cell cube, using the oxide skin on milling machine removal slab cell cube surface.
3. the method for the folded forging production main shaft forging of multiple-unit homogenous metal according to claim 1, it is characterised in that:It is described Step 2 after handling the contact surface of slab cell cube, need to ensure that the slab cell cube surface roughness after processing is less than 6.3。
4. the method for the folded forging production main shaft forging of multiple-unit homogenous metal according to claim 1, it is characterised in that:It is described Step 2, after the oxide skin on removal slab cell cube surface, the organic solvent for cleaning slab cell cube surface is third Ketone or alcohol.
5. the method for the folded forging production main shaft forging of multiple-unit homogenous metal according to claim 1, it is characterised in that:It is described Step 5, when using materials of the 20SiMn as main shaft forging, the welding temperature of the material is 1100~1150 DEG C, and welding is than pressure For 5~10MPa, weld interval is 30~60min.
CN201610748584.XA 2016-08-29 2016-08-29 The method of the folded forging production main shaft forging of multiple-unit homogenous metal Active CN106312454B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610748584.XA CN106312454B (en) 2016-08-29 2016-08-29 The method of the folded forging production main shaft forging of multiple-unit homogenous metal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610748584.XA CN106312454B (en) 2016-08-29 2016-08-29 The method of the folded forging production main shaft forging of multiple-unit homogenous metal

Publications (2)

Publication Number Publication Date
CN106312454A CN106312454A (en) 2017-01-11
CN106312454B true CN106312454B (en) 2018-11-13

Family

ID=57788148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610748584.XA Active CN106312454B (en) 2016-08-29 2016-08-29 The method of the folded forging production main shaft forging of multiple-unit homogenous metal

Country Status (1)

Country Link
CN (1) CN106312454B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107671216B (en) * 2017-09-08 2020-05-05 中国科学院金属研究所 Hourglass-shaped metal construction forming method
CN107717341A (en) * 2017-09-15 2018-02-23 中国原子能科学研究院 Modular metal constructs manufacturing process
CN107520584B (en) * 2017-09-15 2020-03-24 中国原子能科学研究院 Special-shaped metal construction forming method
CN107626880B (en) * 2017-09-15 2020-10-09 中国原子能科学研究院 Manufacturing process of large annular forging
CN107626868B (en) * 2017-11-02 2020-05-05 中国科学院金属研究所 Hourglass-shaped metal grading construction forming method
CN113523707B (en) * 2018-11-14 2022-05-13 中国原子能科学研究院 Method for healing deformation of construction interface
CN109604939B (en) * 2018-11-14 2021-03-09 中国原子能科学研究院 Steel billet construction method
CN110405413B (en) * 2019-06-28 2022-04-22 伊莱特能源装备股份有限公司 Vacuum seal welding method for multilayer plate blank
CN113695502B (en) * 2021-07-08 2023-04-07 中国科学院金属研究所 Multi-layer metal cold deformation construction forming method
CN114192933B (en) * 2021-11-15 2024-06-04 成都先进金属材料产业技术研究院股份有限公司 Vacuum consumable electrode welding device and method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105522349A (en) * 2015-03-26 2016-04-27 中国科学院金属研究所 Homogeneous metal constructing and forming method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5614088A (en) * 1979-07-16 1981-02-10 Takefu Tokushu Kozai Kk Production of multilayer clad plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105522349A (en) * 2015-03-26 2016-04-27 中国科学院金属研究所 Homogeneous metal constructing and forming method
CN105563034A (en) * 2015-03-26 2016-05-11 中国科学院金属研究所 Packaging method for metal construction forming process
CN105598327A (en) * 2015-03-26 2016-05-25 中国科学院金属研究所 Layered multi-line stacking metal construction method
CN105598599A (en) * 2015-03-26 2016-05-25 中国科学院金属研究所 Cylindrical metal construction method
CN105618506A (en) * 2015-03-26 2016-06-01 中国科学院金属研究所 Metal construction forming method
CN105728927A (en) * 2015-03-26 2016-07-06 中国科学院金属研究所 Metal structure forming and manufacturing system and packaging unit thereof

Also Published As

Publication number Publication date
CN106312454A (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN106312454B (en) The method of the folded forging production main shaft forging of multiple-unit homogenous metal
CN104175062B (en) All-fiber-texture large-size double-flange fan main shaft forging method
CN104741499B (en) Sandwich layer forging die and preparation method of forging die sandwich layer surfacing
CN107385328B (en) The low-alloy super-thick steel plate with superior internal quality, low-temperature impact toughness and anti-lamellar tearing performance of two base laminating productions
CN104511726B (en) Five cylinder pressure break pump crankcase manufacture method of Whole fiber Integral die-forged
CN107699831A (en) Pack rolling as-cast state TiAl sheet alloy method based on composite structural design
CN109434390B (en) Processing method of large forging lifting hook
CN112676372B (en) Clad steel plate for multilayer cutter and preparation method thereof
CN106271482B (en) The method of the folded forging production mould steel moald-cavity of multiple-unit homogenous metal
CN110195186B (en) Ultra-thick hot-rolled high-alloy hot-work die steel and preparation method thereof
CN114055092B (en) Method for manufacturing wind tunnel ultrahigh pressure pipe fitting by high nickel alloy structural steel
CN108202226A (en) A kind of almag plate warm forming production line and its production technology
CN111014537B (en) Forging method of large multi-rib complex 7050 aluminum alloy forging
CN108213304A (en) A kind of fist formula biomimetic features heavy-duty forging die tool and its manufacturing method
Kobelev et al. Forging process flow development for plate production
KR20140006186A (en) Holding part forming type upsetting dies for a heavy metal forging process and the heavy metal forging process by it
Bhardwaj Handbook on Steel Bars, Wires, Tubes, Pipes, SS Sheets Production with Ferrous Metal Casting & Processing: Production of Steel Bars, Steel Bars Manufacturing, Manufacturing Process of Steel Bars, Steel Bars Manufacturing Process, Steel Bar Production Process, Steel Bar Production, Steel Making Process, Steel Production Process, Iron and Steel Manufacturing Process, Steel Bars Manufacturing Plant, Manufacturing of Steel, Production of Wires and Steel Bars, Manufacture of Steel Bars
RU2613266C1 (en) Method of producing hammer for shredding plant
Makarov et al. Additive technologies in the production of products by hot isostatic pressing
CN111644552B (en) Forging method of multistage step roller with cone frustum
CN114682723A (en) Method for manufacturing carbon manganese steel forged material with small forging ratio
CN114210893B (en) Manufacturing method of large-diameter stainless steel round tube blank
Semenov et al. Manufacture of welded designs from the carbon and alloyed steels in machine building
CN114054759B (en) Preparation method of composite board for high-end kitchen knife
CN114074458B (en) Composite steel plate for multi-layer kitchen knife and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: The Method of Producing Spindle Forging by Multi unit Homogeneous Metal Overlapping Forging

Effective date of registration: 20221206

Granted publication date: 20181113

Pledgee: Tieling Branch of Shengjing Bank Co.,Ltd.

Pledgor: LIAONING BEIXIANG HEAVY MACHINERY MANUFACTURING Co.,Ltd.

Registration number: Y2022210000210

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230908

Granted publication date: 20181113

Pledgee: Tieling Branch of Shengjing Bank Co.,Ltd.

Pledgor: LIAONING BEIXIANG HEAVY MACHINERY MANUFACTURING Co.,Ltd.

Registration number: Y2022210000210

PC01 Cancellation of the registration of the contract for pledge of patent right