CN109594992A CN201910041693.1A CN201910041693A CN109594992A CN 109594992 A CN109594992 A CN 109594992A CN 201910041693 A CN201910041693 A CN 201910041693A CN 109594992 A CN109594992 A CN 109594992A
Authority
CN
China
Prior art keywords
tunnel
line
threaded list
grouting
fitting groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910041693.1A
Other languages
Chinese (zh)
Inventor
游永锋
冯欢欢
董祥宽
唐纵雄
梁奎生
陈建立
崔伟
姜宗恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Stock Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG, China Railway Tunnel Stock Co Ltd filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201910041693.1A priority Critical patent/CN109594992A/en
Publication of CN109594992A publication Critical patent/CN109594992A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Abstract

The invention discloses a kind of juxtaposition tunneling methods, including following methods: completing the preparation built to constructing tunnel first, then determine No.1 line a and the position that the tunnel No.1 line b, No. two line a and No. two line b tunnelings excavate;Principle, which is built, according to the construction of " getting on, get off " carries out tunneling;First No. two threaded list roads are excavated, then excavate No.1 threaded list road;The four threaded list roads of No.1 line a, No.1 line b, No. two line a and No. two line b are dug through according to above-mentioned construction procedure, carry out building for juxtaposition tunnel.The present invention can use the sequence of construction of " getting on, get off ", build into the tunnel for being overlapped and intersecting up and down, tunnel is allowed to have the function of the station transfer of dual-layer Parallel overlapping, and utilize the reinforcing mode of slip casting in ground mixing pile and hole, the structural strength for improving tunnel entirety is conducive to the long-time service in tunnel.

Description

A kind of juxtaposition tunneling method
Technical field
The present invention relates to tunneling method field, specially a kind of juxtaposition tunneling method.
Background technique
Tunnel refers to the channel digged up in existing building or Tu Shi mechanism, is the engineering construction being embedded in stratum Object, tunnel can be divided into traffic tunnel, Hydraulic Tunnel, municipal tunnel and mining tunnel;The structure in tunnel include main building object and Auxiliary device two parts, main building object are made of barrel and portal, and auxiliary device includes refuge chamber, fire fighting device, meets an urgent need and lead to News and guarded drainage facility, also special ventilation and lighting apparatus in tunnel;Working environment in tunnel needs illumination of divulging information;It is high Emergency exit should be arranged in fast long Railway Tunnel and super long tunnel in conjunction with service gallery situation, should be set above emergency exit nameplate and Emergency Light facility.
With under the situation of High-speed Urbanization, to alleviate traffic pressure and rationally utilizing Underground Space Resource, city All for attracting attention, the following this kind of Tunnel Engineering can be continuously increased for the rapid transformation of road and the construction of city integrated piping lane, Tunnel construction can select most reasonable construction method early period according to the actual situation, have open cut for the common method of tunnel construction Method, shield method, push bench process and shallow burial hidden digging etc.;Tunnel is for building the facilities such as Crane Rail and railway.
Present tunnel overall structural strength is poor, and the service life in tunnel is lower, and is all single layer Parallel Tunnel, tunnel Relatively narrow of the carriage way station built has the function of that same track is ridden, and can not realize the function of same track area transfer Energy.
Summary of the invention
The purpose of the present invention is to provide a kind of juxtaposition tunneling methods, to solve to propose in above-mentioned background technique Tunnel overall structural strength it is poor, tunnel service life lower problem.
To achieve the above object, the invention provides the following technical scheme:
A kind of juxtaposition tunneling method, including following methods:
S1, the preparation built to constructing tunnel is completed first, then determine No.1 line a and the tunnel No.1 line b, No. two lines The position that a and No. two line b tunneling excavates;Wherein, No.1 threaded list road excavates position No. two line tunnel excavation positions Top;The position in the tunnel No.1 line b is in the top in No. two tunnels line b, and the position in No. two tunnels line a is in the upper of the tunnel No.1 line b Side, the position in the tunnel No.1 line a is in the top of No. two line a.
S2, principle progress tunneling is built according to the construction of " getting on, get off ";First No. two threaded list roads are excavated, then Excavate No.1 threaded list road;
(1), the excavation step in No. two threaded list roads are as follows: 1) the excavation position in No. two threaded list roads is excavated, in massif " ∏ " shape fitting groove is dug out at layer, fitting groove is excavated using incremental launching method, outward transport of being unearthed;2) precast concrete is transported It send in installation to fitting groove, component docking fastening is spliced into frame shape tunnel main structure, and tunnel main structure is mounted on fitting groove Lower part;3) cement mortar is injected toward the gap between fitting groove and tunnel main structure;4) the framework of tunnel main structure it Between excavate No. two threaded list roads the space soil body;5) two lining structures are applied in No. two line tunnel space soil bodys of excavation, built attached Belong to structure and electromechanical equipment is installed.
(2), the excavation step in No.1 threaded list road are as follows: 1) the excavation position in No.1 threaded list road is excavated, in massif " ∏ " shape fitting groove is dug out at layer, fitting groove is excavated using incremental launching method, outward transport of being unearthed;2) precast concrete is transported It send in installation to fitting groove, component docking fastening is spliced into frame shape tunnel main structure, and tunnel main structure is mounted on fitting groove Lower part;3) cement mortar is injected toward the gap between fitting groove and tunnel main structure;4) the framework of tunnel main structure it Between excavate No.1 threaded list road the space soil body;5) two lining structures are applied in the No.1 line tunnel space soil body of excavation, built attached Belong to structure and electromechanical equipment is installed.
S3, No.1 line a, No.1 line b, No. two line a and No. two line b four threaded list roads in driving, institute among four threaded list roads The folder soil body needs to carry out reinforcement processing;No.1 line a, No.1 line b, No. two line a and No. two line b four threaded list roads mutually overlap to be formed The position that overlaps of interchange tunnels, four threaded list roads is d1, d2 and d3;The depth of the rail level embedment in tunnel below the place of overlapping: d1 is 11.8m, d2 20.8m, d3 23.9m;In order to ensure the safety of constructing tunnel, clear distance is in 1-6m between interchange tunnels.
S4, No.1 line a, No.1 line b, No. two line a and No. two tunnels line b form the overlapping tunnel of c1 and c2 in driving, In c1 and the c2 tunnel construction sections of overlapping, using the sequence of construction to get on, get off, No.1 line and No. two two tunnel clear distances of line are less than 3m sections, Tunnel is reinforced using the reinforcing mode of ground mixing pile, 6m is less than greater than 3m using the reinforcing mode pair of slip casting in hole Tunnel is reinforced;For grouting and reinforcing section, slip casting is carried out to the folded soil body by lower part tunnel, in lower part tunnel excavating process In, synchronous grouting amount and grouting pressure should be first increased, to guarantee the density of tunnel surrounding soil, in the tunnel piercing of top, Increase synchronous grouting and secondary grouting amount;Carry out pre-pouring grout consolidation process simultaneously in lower part tunnel and top constructing tunnel.
S5, the four threaded list roads that No.1 line a, No.1 line b, No. two line a and No. two line b are dug through according to above-mentioned construction procedure, Carry out building for juxtaposition tunnel.
Preferably, it in the tunneling process in No. two threaded list roads, needs to increase cement mortar injection rate and grouting pressure, protects Demonstrate,prove the close property of reality of the soil body in tunnel;Synchronous grouting and secondary grouting amount are increased in No.1 line constructing tunnel, grouting mode is knot The form of rigid two fluid grouting.
Preferably, in step sl, the preparation that constructing tunnel is built are as follows: 1) collect the weather on tunneling ground in advance Climatic information, 2) the required safeguard procedures taken when constructing tunnel are determined according to the concrete condition of constructing tunnel engineering, 3) choosing The raw material such as purchasing and merging storage high-performance such as cement, metaling, steel, select suitable material match ratio.
Preferably, in step s3, (1) between interchange tunnels clear distance be less than 3m sections, using ground mixing pile to tunnel into Row is reinforced;Cement mixing method planar range surrounds region by the outer 3m of upper and lower interchange tunnels shield outer contour, and stake top is higher by Portion tunnel structure top 3m, stake bottom is than lower part tunnel structure bottom depth 1.5m, mixing pile stake diameter 600mm, occlusion amount 150mm, after reinforcing Soil body unconfined compressive strength be not less than 1.0Mpa;(2) at 3m-6m sections of interchange tunnels, using slip casting in Tunnel to tunnel It is reinforced, from leading construction lower part tunnel to Stabilizing Grout, and reserved secondary grouting hole, greater than 6m sections adjacent tunnels are applied Work, it is only necessary to reinforce tracking grouting, guarantee slip casting effect;The Grouting Pipe of certain length is set in secondary grouting hole, is passed through Grouting Pipe carries out slip casting to stratum, improves tunnel soil body intensity.
The beneficial effects of the present invention are:
1, the present invention can use the sequence of construction of " getting on, get off ", and the tunnel for being overlapped and intersecting up and down is built into construction, It allows tunnel to have the function of the station transfer of dual-layer Parallel overlapping, realizes the function of same track area transfer, and stirred using ground The reinforcing mode for mixing slip casting in stake and hole, improves the structural strength of tunnel entirety, is conducive to the long-time service in tunnel.
Detailed description of the invention
Fig. 1 is schematic diagram of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the present invention provides a kind of technical solution:
A kind of juxtaposition tunneling method, including following methods:
S1, the preparation built to constructing tunnel is completed first, then determine No.1 line a and the tunnel No.1 line b, No. two lines The position that a and No. two line b tunneling excavates;Wherein, No.1 threaded list road excavates position No. two line tunnel excavation positions Top;The position in the tunnel No.1 line b is in the top in No. two tunnels line b, and the position in No. two tunnels line a is in the upper of the tunnel No.1 line b Side, the position in the tunnel No.1 line a is in the top of No. two line a;
S2, principle progress tunneling is built according to the construction of " getting on, get off ";First No. two threaded list roads are excavated, then Excavate No.1 threaded list road;
(1), the excavation step in No. two threaded list roads are as follows: 1) the excavation position in No. two threaded list roads is excavated, in massif " ∏ " shape fitting groove is dug out at layer, fitting groove is excavated using incremental launching method, outward transport of being unearthed;2) precast concrete is transported It send in installation to fitting groove, component docking fastening is spliced into frame shape tunnel main structure, and tunnel main structure is mounted on fitting groove Lower part;3) cement mortar is injected toward the gap between fitting groove and tunnel main structure;4) the framework of tunnel main structure it Between excavate No. two threaded list roads the space soil body;5) two lining structures are applied in No. two line tunnel space soil bodys of excavation, built attached Belong to structure and electromechanical equipment is installed;
(2), the excavation step in No.1 threaded list road are as follows: 1) the excavation position in No.1 threaded list road is excavated, in massif " ∏ " shape fitting groove is dug out at layer, fitting groove is excavated using incremental launching method, outward transport of being unearthed;2) precast concrete is transported It send in installation to fitting groove, component docking fastening is spliced into frame shape tunnel main structure, and tunnel main structure is mounted on fitting groove Lower part;3) cement mortar is injected toward the gap between fitting groove and tunnel main structure;4) the framework of tunnel main structure it Between excavate No.1 threaded list road the space soil body;5) two lining structures are applied in the No.1 line tunnel space soil body of excavation, built attached Belong to structure and electromechanical equipment is installed;
S3, No.1 line a, No.1 line b, No. two line a and No. two line b four threaded list roads in driving, institute among four threaded list roads The folder soil body needs to carry out reinforcement processing;No.1 line a, No.1 line b, No. two line a and No. two line b four threaded list roads mutually overlap to be formed The position that overlaps of interchange tunnels, four threaded list roads is d1, d2 and d3;The depth of the rail level embedment in tunnel below the place of overlapping: d1 is 11.8m, d2 20.8m, d3 23.9m;In order to ensure the safety of constructing tunnel, clear distance is in 1-6m between interchange tunnels;
S4, No.1 line a, No.1 line b, No. two line a and No. two tunnels line b form the overlapping tunnel of c1 and c2 in driving, In c1 and the c2 tunnel construction sections of overlapping, using the sequence of construction to get on, get off, No.1 line and No. two two tunnel clear distances of line are less than 3m sections, Tunnel is reinforced using the reinforcing mode of ground mixing pile, 6m is less than greater than 3m using the reinforcing mode pair of slip casting in hole Tunnel is reinforced;For grouting and reinforcing section, slip casting is carried out to the folded soil body by lower part tunnel, in lower part tunnel excavating process In, synchronous grouting amount and grouting pressure should be first increased, to guarantee the density of tunnel surrounding soil, in the tunnel piercing of top, Increase synchronous grouting and secondary grouting amount;Carry out pre-pouring grout consolidation process simultaneously in lower part tunnel and top constructing tunnel.
S5, the four threaded list roads that No.1 line a, No.1 line b, No. two line a and No. two line b are dug through according to above-mentioned construction procedure, Carry out building for juxtaposition tunnel.
Specifically, needing to increase cement mortar injection rate and grouting pressure in the tunneling process in No. two threaded list roads, protect Demonstrate,prove the close property of reality of the soil body in tunnel;Synchronous grouting and secondary grouting amount are increased in No.1 line constructing tunnel, grouting mode is knot The form of rigid two fluid grouting.
Specifically, in step sl, the preparation that constructing tunnel is built are as follows: 1) collect the weather on tunneling ground in advance Climatic information, 2) the required safeguard procedures taken when constructing tunnel are determined according to the concrete condition of constructing tunnel engineering, 3) choosing The raw material such as purchasing and merging storage high-performance such as cement, metaling, steel, select suitable material match ratio.
Specifically, in step s3, (1) clear distance between interchange tunnels is less than 3m sections, using ground mixing pile to tunnel into Row is reinforced;Cement mixing method planar range surrounds region by the outer 3m of upper and lower interchange tunnels shield outer contour, and stake top is higher by Portion tunnel structure top 3m, stake bottom is than lower part tunnel structure bottom depth 1.5m, mixing pile stake diameter 600mm, occlusion amount 150mm, after reinforcing Soil body unconfined compressive strength be not less than 1.0Mpa;(2) at 3m-6m sections of interchange tunnels, using slip casting in Tunnel to tunnel It is reinforced, from leading construction lower part tunnel to Stabilizing Grout, and reserved secondary grouting hole, greater than 6m sections adjacent tunnels are applied Work, it is only necessary to reinforce tracking grouting, guarantee slip casting effect;The Grouting Pipe of certain length is set in secondary grouting hole, is passed through Grouting Pipe carries out slip casting to stratum, improves tunnel soil body intensity.
Construction principle of the present invention according to " getting on, get off ", overall construction procedure are as follows: lower section tunneling shield driving, interlayer soil Secondary grouting is reinforced in body slip casting and hole, is reinforced on the inside of the tunnel of lower section, and top tunneling shield driving, top tunnel carries out slip casting and adds Gu.
Wherein, after the completion of lower section constructing tunnel within the scope of overlapping tunnel, the interlayer soil body is carried out in tunnel from below Slip casting, and above constructing tunnel when, also will to the interlayer soil body carry out slip casting.
The present invention can use the sequence of construction of " getting on, get off ", and construction is built into the tunnel for being overlapped and intersecting up and down, allowed Tunnel has the function of the station transfer of dual-layer Parallel overlapping, realizes the function of same track area transfer, and is stirred using ground The reinforcing mode of stake and slip casting in hole, improves the structural strength of tunnel entirety, is conducive to the long-time service in tunnel.
The intensity of the interlayer soil body when juxtaposition tunneling method is in order to guarantee top constructing tunnel, avoids top tunnel Occur unstability in road tunneling process, sink;Increase reserved injected hole on the inside of the tunnel in lower section tunnel, to increase the note of the interlayer soil body Slurry amount.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understand without departing from the principles and spirit of the present invention can to these embodiments carry out it is a variety of variation, modification, replacement and Modification, the scope of the present invention is defined by the appended.

Claims (4)

1. a kind of juxtaposition tunneling method, it is characterised in that: including following methods:
S1, complete the preparation built to constructing tunnel first, then determine No.1 line a and the tunnel No.1 line b, No. two line a with The position that No. two line b tunnelings excavate;Wherein, No.1 threaded list road excavates position in the upper of No. two line tunnel excavation positions Side;The position in the tunnel No.1 line b in the top in No. two tunnels line b, the position in No. two tunnels line a in the top in the tunnel No.1 line b, The position in the tunnel No.1 line a is in the top of No. two line a;
S2, principle progress tunneling is built according to the construction of " getting on, get off ";First No. two threaded list roads are excavated, then are excavated No.1 threaded list road;
(1), the excavation step in No. two threaded list roads are as follows: 1) the excavation position in No. two threaded list roads is excavated, at massif stratum " ∏ " shape fitting groove is dug out, fitting groove is excavated using incremental launching method, outward transport of being unearthed;2) precast concrete is transported and is pacified It is filled in fitting groove, component docking fastening is spliced into frame shape tunnel main structure, and tunnel main structure is mounted on fitting groove lower part; 3) cement mortar is injected toward the gap between fitting groove and tunnel main structure;4) it is excavated between the framework of tunnel main structure The space soil body in No. two threaded list roads;5) two lining structures are applied in No. two line tunnel space soil bodys of excavation, builds accessory structure And electromechanical equipment is installed;
(2), the excavation step in No.1 threaded list road are as follows: 1) the excavation position in No.1 threaded list road is excavated, at massif stratum " ∏ " shape fitting groove is dug out, fitting groove is excavated using incremental launching method, outward transport of being unearthed;2) precast concrete is transported and is pacified It is filled in fitting groove, component docking fastening is spliced into frame shape tunnel main structure, and tunnel main structure is mounted on fitting groove lower part; 3) cement mortar is injected toward the gap between fitting groove and tunnel main structure;4) it is excavated between the framework of tunnel main structure The space soil body in No.1 threaded list road;5) two lining structures are applied in the No.1 line tunnel space soil body of excavation, builds accessory structure And electromechanical equipment is installed;
S3, No.1 line a, No.1 line b, No. two line a and No. two line b four threaded list roads in driving, among four threaded list roads folded by soil Body needs to carry out reinforcement processing;No.1 line a, No.1 line b, No. two line a and No. two line b four threaded list roads mutually overlap to be formed and overlap The position that overlaps in tunnel, four threaded list roads is d1, d2 and d3;It overlaps and locates the depth that the rail level in lower section tunnel is embedded to: d1 11.8m, D2 is 20.8m, d3 23.9m;In order to ensure the safety of constructing tunnel, clear distance is in 1-6m between interchange tunnels;
S4, No.1 line a, No.1 line b, No. two line a and No. two tunnels line b form the overlapping tunnel of c1 and c2 in driving, in weight Folded c1 and c2 tunnel construction sections, using the sequence of construction to get on, get off, No.1 line and No. two two tunnel clear distances of line are less than 3m sections, use The reinforcing mode of ground mixing pile reinforces tunnel, and 6m is less than greater than 3m using the reinforcing mode of slip casting in hole to tunnel It is reinforced;For grouting and reinforcing section, slip casting is carried out to the folded soil body by lower part tunnel, in the tunnel excavating process of lower part, Synchronous grouting amount and grouting pressure should be first increased, to guarantee the density of tunnel surrounding soil, in the tunnel piercing of top, is increased Synchronous grouting and secondary grouting amount;Carry out pre-pouring grout consolidation process simultaneously in lower part tunnel and top constructing tunnel.
S5, the four threaded list roads that No.1 line a, No.1 line b, No. two line a and No. two line b are dug through according to above-mentioned construction procedure are carried out Juxtaposition tunnel is built.
2. a kind of juxtaposition tunneling method according to claim 1, it is characterised in that: the pick in No. two threaded list roads Into, needing to increase in the process cement mortar injection rate and grouting pressure, guarantee the close property of reality of the soil body in tunnel;In No.1 threaded list Synchronous grouting and secondary grouting amount are increased in road construction, grouting mode is the form for tying rigid two fluid grouting.
3. a kind of juxtaposition tunneling method according to claim 1, it is characterised in that: in step sl, tunnel The preparation that construction is built are as follows: 1) the preparatory synoptic climate information of collecting tunneling ground, 2) according to constructing tunnel engineering Concrete condition determines the required safeguard procedures taken when constructing tunnel, 3) it chooses and stores high-performance such as cement, metaling, steel The raw material such as material select suitable material match ratio.
4. a kind of juxtaposition tunneling method according to claim 1, it is characterised in that: in step s3, (1) exists Clear distance is less than 3m sections between interchange tunnels, is reinforced using ground mixing pile to tunnel;Cement mixing method planar range is upper and lower Outer the surrounded region 3m of interchange tunnels shield outer contour, stake top are higher by top tunnel structure top 3m, and stake bottom is than lower part tunnel knot Structure bottom depth 1.5m, mixing pile stake diameter 600mm, occlusion amount 150mm, the soil body unconfined compressive strength after reinforcing are not less than 1.0Mpa;(2) at 3m-6m sections of interchange tunnels, tunnel is reinforced using slip casting in Tunnel, from leading construction lower part tunnel To Stabilizing Grout, and reserved secondary grouting hole, it is greater than 6m sections of adjacent tunnel constructions, it is only necessary to reinforce tracking grouting, guarantee Slip casting effect;The Grouting Pipe of certain length is set in secondary grouting hole, slip casting is carried out to stratum by Grouting Pipe, improves tunnel Road soil strength.
CN201910041693.1A 2019-01-16 2019-01-16 A kind of juxtaposition tunneling method Pending CN109594992A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910041693.1A CN109594992A (en) 2019-01-16 2019-01-16 A kind of juxtaposition tunneling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910041693.1A CN109594992A (en) 2019-01-16 2019-01-16 A kind of juxtaposition tunneling method

Publications (1)

Publication Number Publication Date
CN109594992A true CN109594992A (en) 2019-04-09

Family

ID=65965310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910041693.1A Pending CN109594992A (en) 2019-01-16 2019-01-16 A kind of juxtaposition tunneling method

Country Status (1)

Country Link
CN (1) CN109594992A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306986A (en) * 2019-05-09 2019-10-08 深圳市综合交通设计研究院有限公司 A kind of anti-cut construction method of underground interchange fork node Tunneling by mining method
CN110645005A (en) * 2019-10-30 2020-01-03 中铁开发投资集团有限公司 High-water-rich round gravel stratum earth pressure balance shield rapid tunneling construction method
CN112459804A (en) * 2020-11-25 2021-03-09 中交二航局第二工程有限公司 Synchronous tunneling construction method for overlapped tunnels

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226398A (en) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method
CN103277110A (en) * 2013-05-13 2013-09-04 中铁十四局集团有限公司 Construction method of overlapped shield tunnel
CN106223969A (en) * 2016-08-30 2016-12-14 中铁隧道勘测设计院有限公司 One closely upper and lower overlap or shield tunnel construction method of closely intersecting
CN106958448A (en) * 2017-05-16 2017-07-18 宁波市交通建设工程试验检测中心有限公司 A kind of shallow tunnel construction method and system
CN108643934A (en) * 2018-04-28 2018-10-12 中铁二院重庆勘察设计研究院有限责任公司 A kind of interior engineering method based on combined type step inverted arch of levels overlapping tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226398A (en) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method
CN103277110A (en) * 2013-05-13 2013-09-04 中铁十四局集团有限公司 Construction method of overlapped shield tunnel
CN106223969A (en) * 2016-08-30 2016-12-14 中铁隧道勘测设计院有限公司 One closely upper and lower overlap or shield tunnel construction method of closely intersecting
CN106958448A (en) * 2017-05-16 2017-07-18 宁波市交通建设工程试验检测中心有限公司 A kind of shallow tunnel construction method and system
CN108643934A (en) * 2018-04-28 2018-10-12 中铁二院重庆勘察设计研究院有限责任公司 A kind of interior engineering method based on combined type step inverted arch of levels overlapping tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
廖景: "盾构近距离交叉重叠隧道研究", 《中华建设》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306986A (en) * 2019-05-09 2019-10-08 深圳市综合交通设计研究院有限公司 A kind of anti-cut construction method of underground interchange fork node Tunneling by mining method
CN110645005A (en) * 2019-10-30 2020-01-03 中铁开发投资集团有限公司 High-water-rich round gravel stratum earth pressure balance shield rapid tunneling construction method
CN112459804A (en) * 2020-11-25 2021-03-09 中交二航局第二工程有限公司 Synchronous tunneling construction method for overlapped tunnels

Similar Documents

Publication Publication Date Title
CN106703828B (en) The construction method of subway station is built using prefabricated assembled lining cutting combination PBA
CN106223967B (en) A kind of great burying rectangle or class rectangle tunneling shield constructing device and method
CN102748040B (en) Main structure for metro long-span station and pillar arching construction method thereof
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN202707075U (en) Long-span subway station main structure constructed based on column and arch method
CN1837506B (en) Construction method for excavating box-shape structure over an operating tunnel
CN108868778A (en) A kind of Large Underground Structure no-dig technique construction method
CN105626083A (en) Construction method for permeable ribbed multiple-arch tunnel
CN102031736A (en) Construction technology for under-passing existing line under complicated geological condition
CN108005660A (en) A kind of Optimization of Expressway Tunnel Construction method
CN104612696B (en) Overpass column hole method construction method is passed through in big cross section tunneling subway station in fine sand layer
CN105781573A (en) Railway down-traversing highway tunnel double-layer casing pipe reinforcement double-pipe shed follow-pipe drilling construction method
CN109594992A (en) A kind of juxtaposition tunneling method
CN105201516A (en) Subway station body structure and four-joint-arch PBA underground excavation construction method thereof
CN111411962A (en) Coal mine rock burst treatment method
CN106049195A (en) Method for strengthening subgrade basement of existing high speed railway line
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN103993885A (en) Construction method for underground excavation tunnel side-direction hole opening supporting system
CN104632245A (en) Method using multi-pilot-tunnel expanding excavation large-diameter shield tunnel for building subway station
CN104653188A (en) Method for arranging large-diameter shield receiving and originating well in underground-excavated air duct
CN111206944A (en) Construction method for differential settlement control of pre-supporting excavation of deformation joint of underpass subway station
CN106121659A (en) The narrow-bore tunnel excavation method of major urban arterial highway upper-soft lower-hard ground is worn under one
CN107938680A (en) A kind of excavation of foundation pit safe construction method
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN108374674B (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190409