CN106223969A - One closely upper and lower overlap or shield tunnel construction method of closely intersecting - Google Patents
One closely upper and lower overlap or shield tunnel construction method of closely intersecting Download PDFInfo
- Publication number
- CN106223969A CN106223969A CN201610761609.XA CN201610761609A CN106223969A CN 106223969 A CN106223969 A CN 106223969A CN 201610761609 A CN201610761609 A CN 201610761609A CN 106223969 A CN106223969 A CN 106223969A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- segment
- grouting
- closely
- parallel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 230000017105 transposition Effects 0.000 claims abstract description 42
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 19
- 238000013461 design Methods 0.000 claims abstract description 17
- 230000008520 organization Effects 0.000 claims abstract description 17
- 230000005641 tunneling Effects 0.000 claims abstract description 9
- 238000007569 slipcasting Methods 0.000 claims description 10
- 238000002347 injection Methods 0.000 claims description 8
- 239000007924 injection Substances 0.000 claims description 8
- 238000012856 packing Methods 0.000 claims description 6
- 230000001360 synchronised effect Effects 0.000 claims description 6
- 238000009434 installation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention belongs to underground engineering construction field, particularly relate to one closely upper and lower overlap or shield tunnel construction method of closely intersecting, it is characterized in that, comprise the following steps: (1) requires according to design and construction organization plan carries out the shield driving of tunnel, bottom or a wherein cross tunnel;(2) by injected hole grouting and reinforcing bottom tunnel parallel-segment or transposition section stratum;(3) after tunnel grouting solidifies and reaches requirement of strength, bottom support of tunnel system is installed, and guarantees that close contact installed by support;(4) carry out tunneling tunnel, top parallel-segment or transposition section;(5) parallel-segment or transposition section Full-face pouring to tunnel, top are reinforced;(6) after grouting and reinforcing section solidifies and reaches requirement of strength, support means is dismantled.The present invention utilizes the underground space, and subway line is overlapping up and down or intersects, and can carry out platform layout simultaneously;Reduce risk, save construction investment, reduce traffic above-ground, the interference of building.
Description
Technical field
The invention belongs to underground engineering construction field, particularly relate to one closely upper and lower overlap or shield of closely intersecting
Method for tunnel construction.
Background technology
Along with the high speed development of national economy, some developed regions of China have come into and have large-scale developed and utilized underground sky
Between epoch, and the construction of subway will be the emphasis of China's 21 century Urban Underground Space Excavation, and urban skyscraper uses stake
Base is more universal, and the situation of subway sectional tunnel cross-over pile base plinth happens occasionally, for reducing the engineering risk of cutting piles as far as possible
And engineering cost, it may be necessary in some cases to when Tunnel Crossing Piles of Building by the most overlapping for running tunnel or arranged in a crossed manner;Carry out
During the exploitation of plot, for avoiding too much affecting the use in plot because reserved subway passes through condition, the most also press running tunnel upper and lower
Overlapping or intersection is its reserved passageway;In the design process of subway station, move because being changed by traffic data process, pipeline, existing build
(structure) builds the impact of thing, for reducing engineering risk, saving construction investment and reduce the impact on traffic above-ground, car sometimes as far as possible
Stand and use side platform scheme that is left and right line platform is overlapping up and down or that intersect;For realizing the transfer on the same stage of 2 lines, change to two cars
Stand and the most all use the scheme of the left and right line platform side platform of overlap or intersection up and down.When station uses the most overlapping or intersects
Side platform scheme time, the running tunnel at two ends, station also needs local up and down overlapping or intersects.Existing subway construction has been enter into height
Speed developmental stage, is partially or fully used the most overlapping or cross tunnel because limiting by above-mentioned various conditions at Subway Tunnel
Situation will be more and more.
Summary of the invention
In order to solve above-mentioned technical problem, the invention provides one closely overlap or closely intersection shield tunnel up and down
Pipeline construction method, this method can effectively utilize space, reduces engineering risk and the engineering cost of cutting piles as far as possible.
The technical solution adopted in the present invention is:
One closely upper and lower overlap or shield tunnel construction method of closely intersecting, it is characterised in that comprise the following steps:
(1) require according to design and construction organization plan carries out the shield driving of tunnel, bottom or a wherein cross tunnel;
(2) by injected hole grouting and reinforcing bottom tunnel parallel-segment or transposition section stratum, within 270 ° of scopes of tunnel cross-section, length
Both sides, direction respectively beyond parallel-segment or each 5-8m of transposition section, strictly to control pressure and injection rate, it is ensured that shield tunnel during slip casting
Do not deform;
(3) after tunnel grouting solidifies and reaches requirement of strength, tunnel, bottom or transposition section support system are installed, and guarantee support
Install and be in close contact;
(4) require according to design and construction organization plan carries out tunneling tunnel, top parallel-segment or transposition section;Shield duct piece is spelled
Packing quality strictly controls, synchronous grouting harmonious, grouting amount full weight;
(5) parallel-segment or transposition section Full-face pouring to tunnel, top are reinforced;
(6) after grouting and reinforcing section solidifies and reaches requirement of strength, support means is dismantled.
In described step (2), it is 5m that length direction both sides respectively exceed the more excellent distance of parallel-segment or transposition section.
The invention have the benefit that
1, solving the underground space crowded, can make full use of the underground space, subway line is overlapping up and down or intersects, and can enter simultaneously
Row platform is arranged;
2, avoid and relocate, cut some engineering measures such as stake, reduce risk, save construction investment;
3, grouting and propping works all complete in tunnel, reduce traffic above-ground, the interference of building.
Accompanying drawing explanation
Fig. 1 is the structural representation in the present invention under two upper and lower overlap conditions in tunnel;
Fig. 2 is the structural representation in the present invention under two tunnel cross states;
Fig. 3 is overlay segment construction technology schematic diagram in the present invention;
Fig. 4 is the structural representation of support of tunnel system in the present invention;
Fig. 5-Fig. 6 is overlay segment grouting and reinforcing scope schematic diagram in the present invention.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings:
In figure, the descending shield tunnel of 1-, the up shield tunnel of 2-, 3-supports chassis effective length, and 4-area section anterior support is long
Degree (5-10 ring), 5-shield captain, 6-posterior bracket length (5 ring), 7-tunnel spacing, 8-face, 9-cutterhead, 10-anterior shield,
Shield in 11-, 12-shield tail, 13-section of jurisdiction, 14-rail, 15-hydraulic tank, 16-rubber steel core wheel, 17-chassis, 18-hydraulic pressure support
Cylinder, 19-rail level, 20-tunnel one, 21-tunnel two.
Embodiment 1
As shown in Fig. 1,3-6, one closely upper and lower overlapping shield tunnel construction method, comprise the following steps:
(1) shield driving in tunnel, bottom is carried out according to design requirement and construction organization plan;
(2) by injected hole grouting and reinforcing bottom tunnel parallel-segment or transposition section stratum, tunnel cross-section is 180 °, length direction two
Side respectively beyond parallel-segment or each 8m of transposition section, strictly to control pressure and injection rate, it is ensured that shield tunnel does not becomes during slip casting
Shape;
(3) after tunnel grouting solidifies and reaches requirement of strength, bottom support of tunnel system is installed, and guarantees that support is installed closely
Contact;
(4) require according to design and construction organization plan carries out tunneling tunnel, top parallel-segment or transposition section;Shield duct piece is spelled
Packing quality strictly controls, synchronous grouting harmonious, grouting amount full weight;
(5) parallel-segment or transposition section Full-face pouring to tunnel, top are reinforced;
(6) after top grouting and reinforcing section solidifies and reaches requirement of strength, support means is dismantled.
Embodiment 2
As shown in Fig. 1,3-6, one closely upper and lower overlapping shield tunnel construction method, comprise the following steps:
(1) shield driving in tunnel, bottom is carried out according to design requirement and construction organization plan;
(2) by injected hole grouting and reinforcing bottom tunnel parallel-segment or transposition section stratum, tunnel cross-section is 225 °, length direction two
Side respectively beyond parallel-segment or each 5m of transposition section, strictly to control pressure and injection rate, it is ensured that shield tunnel does not becomes during slip casting
Shape;
(3) after tunnel grouting solidifies and reaches requirement of strength, bottom support of tunnel system is installed, and guarantees that support is installed closely
Contact;
(4) require according to design and construction organization plan carries out tunneling tunnel, top parallel-segment or transposition section;Shield duct piece is spelled
Packing quality strictly controls, synchronous grouting harmonious, grouting amount full weight;
(5) parallel-segment or transposition section Full-face pouring to tunnel, top are reinforced;
(6) after top grouting and reinforcing section solidifies and reaches requirement of strength, support means is dismantled.
Embodiment 3
As shown in Fig. 1,3-6, one closely upper and lower overlapping shield tunnel construction method, comprise the following steps:
(1) shield driving in tunnel, bottom is carried out according to design requirement and construction organization plan;
(2) by injected hole grouting and reinforcing bottom tunnel parallel-segment or transposition section stratum, tunnel cross-section is 270 °, length direction two
Side respectively beyond parallel-segment or each 6m of transposition section, strictly to control pressure and injection rate, it is ensured that shield tunnel does not becomes during slip casting
Shape;
(3) after tunnel grouting solidifies and reaches requirement of strength, bottom support of tunnel system is installed, and guarantees that support is installed closely
Contact;
(4) require according to design and construction organization plan carries out tunneling tunnel, top parallel-segment or transposition section;Shield duct piece is spelled
Packing quality strictly controls, synchronous grouting harmonious, grouting amount full weight;
(5) parallel-segment or transposition section Full-face pouring to tunnel, top are reinforced;
(6) after top grouting and reinforcing section solidifies and reaches requirement of strength, support means is dismantled.
Embodiment 4
As shown in figures 2-6, one closely intersects shield tunnel construction method, comprises the following steps:
(1) shield driving of a wherein cross tunnel is carried out according to design requirement and construction organization plan;
(2) by injected hole grouting and reinforcing transposition section stratum, tunnel cross-section is 180 °, and length direction both sides are respectively each beyond transposition section
7m, strictly to control pressure and injection rate, it is ensured that shield tunnel does not deforms during slip casting;
(3) after tunnel grouting solidifies and reaches requirement of strength, transposition section support system is installed, and guarantees that support installation closely connects
Touch;
(4) require according to design and construction organization plan carries out tunneling tunnel, top parallel-segment or transposition section;Shield duct piece is spelled
Packing quality strictly controls, synchronous grouting harmonious, grouting amount full weight;
(5) parallel-segment or transposition section Full-face pouring to tunnel, top are reinforced;
(6) after top grouting and reinforcing section solidifies and reaches requirement of strength, support means is dismantled.
Embodiment 5
As shown in figures 2-6, one closely intersects shield tunnel construction method, comprises the following steps:
(1) shield driving of a wherein cross tunnel is carried out according to design requirement and construction organization plan;
(2) by injected hole grouting and reinforcing transposition section stratum, tunnel cross-section is 225 °, length direction both sides respectively beyond parallel-segment or
The each 5m of transposition section, strictly to control pressure and injection rate, it is ensured that shield tunnel does not deforms during slip casting;
(3) after tunnel grouting solidifies and reaches requirement of strength, transposition section support system is installed, and guarantees that support installation closely connects
Touch;
(4) require according to design and construction organization plan carries out tunneling transposition section;Shield segment assembling quality strictly controls, synchronizes
Slip casting is harmonious, grouting amount full weight;
(5) transposition section Full-face pouring is reinforced;
(6) after grouting and reinforcing section solidifies and reaches requirement of strength, support means is dismantled.
Embodiment 6
As shown in figures 2-6, one closely intersects shield tunnel construction method, comprises the following steps:
(1) shield driving of a wherein cross tunnel is carried out according to design requirement and construction organization plan;
(2) by injected hole grouting and reinforcing transposition section stratum, tunnel cross-section is 270 °, length direction both sides respectively beyond parallel-segment or
The each 8m of transposition section, strictly to control pressure and injection rate, it is ensured that shield tunnel does not deforms during slip casting;
(3) after tunnel grouting solidifies and reaches requirement of strength, transposition section support system is installed, and guarantees that support installation closely connects
Touch;
(4) require according to design and construction organization plan carries out tunneling transposition section;Shield segment assembling quality strictly controls, synchronizes
Slip casting is harmonious, grouting amount full weight;
(5) transposition section Full-face pouring is reinforced;
(6) after grouting and reinforcing section solidifies and reaches requirement of strength, support means is dismantled.
Above 6 embodiments of the present invention are described in detail, but described content has been only the preferable enforcement of the present invention
Example, it is impossible to be considered the practical range for limiting the present invention.All impartial changes made according to the present patent application scope and improvement
Deng, within all should still belonging to the patent covering scope of the present invention.
Claims (2)
1. one kind closely up and down overlapping or closely intersect shield tunnel construction method, it is characterised in that comprise the following steps:
(1) require according to design and construction organization plan carries out the shield driving of tunnel, bottom or a wherein cross tunnel;
(2) by injected hole grouting and reinforcing bottom tunnel parallel-segment or transposition section stratum, within 270 ° of scopes of tunnel cross-section, length
Both sides, direction respectively beyond parallel-segment or each 5-8m of transposition section, strictly to control pressure and injection rate, it is ensured that shield tunnel during slip casting
Do not deform;
(3) after tunnel grouting solidifies and reaches requirement of strength, tunnel, bottom or transposition section support system are installed, and guarantee support
Install and be in close contact;
(4) require according to design and construction organization plan carries out tunneling tunnel, top parallel-segment or transposition section;Shield duct piece is spelled
Packing quality strictly controls, synchronous grouting harmonious, grouting amount full weight;
(5) parallel-segment or transposition section Full-face pouring to tunnel, top are reinforced;
(6) after grouting and reinforcing section solidifies and reaches requirement of strength, support means is dismantled.
One the most according to claim 1 closely upper and lower overlap or shield tunnel construction method of closely intersecting, it is special
Levying and be, in described step (2), it is 5m that length direction both sides respectively exceed the more excellent distance of parallel-segment or transposition section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610761609.XA CN106223969A (en) | 2016-08-30 | 2016-08-30 | One closely upper and lower overlap or shield tunnel construction method of closely intersecting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610761609.XA CN106223969A (en) | 2016-08-30 | 2016-08-30 | One closely upper and lower overlap or shield tunnel construction method of closely intersecting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106223969A true CN106223969A (en) | 2016-12-14 |
Family
ID=58072581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610761609.XA Pending CN106223969A (en) | 2016-08-30 | 2016-08-30 | One closely upper and lower overlap or shield tunnel construction method of closely intersecting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106223969A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106812134A (en) * | 2017-03-23 | 2017-06-09 | 中铁第勘察设计院集团有限公司 | Reserved long term line passes through the plain stake reinforcement system and its construction method of existing lines part |
CN108240226A (en) * | 2018-02-11 | 2018-07-03 | 济南轨道交通集团有限公司 | Closely overlapping subway tunnel synchronized construction reserves shield sky and pushes away condition construction method |
CN108590679A (en) * | 2018-04-18 | 2018-09-28 | 重庆建工第七建筑工程有限责任公司 | Utilize the construction method for walking support truck jumbo overlapping tunnel |
CN109458185A (en) * | 2018-11-22 | 2019-03-12 | 重庆大学 | Overlapping crossing parallel tunneling shield construction method up and down |
CN109594992A (en) * | 2019-01-16 | 2019-04-09 | 中铁隧道股份有限公司 | A kind of juxtaposition tunneling method |
CN110578525A (en) * | 2019-10-08 | 2019-12-17 | 中铁开发投资集团有限公司 | micro-disturbance construction method for crossing operation subway tunnel by overlapping shield tunnel |
CN110645005A (en) * | 2019-10-30 | 2020-01-03 | 中铁开发投资集团有限公司 | High-water-rich round gravel stratum earth pressure balance shield rapid tunneling construction method |
CN111236990A (en) * | 2020-03-18 | 2020-06-05 | 武汉大学 | Shield tunnel internal supporting trolley system under condition of small space, shallow earthing and small radius |
CN111878109A (en) * | 2020-07-08 | 2020-11-03 | 深圳市综合交通设计研究院有限公司 | Conversion structure between double-layer shield tunnel and single-layer shield tunnel and construction method thereof |
CN112196544A (en) * | 2020-10-15 | 2021-01-08 | 中铁二局第二工程有限公司 | Construction method for crossing existing tunnel on contact discharge flue of high-ground-stress soft rock stratum |
CN113374496A (en) * | 2021-06-23 | 2021-09-10 | 上海隧道工程有限公司 | Upper-crossing tunnel structure and construction method |
CN113373901A (en) * | 2021-05-27 | 2021-09-10 | 中建一局集团建设发展有限公司 | Overlapping shield tunnel house foundation reinforcing structure next to house and construction method |
CN114542090A (en) * | 2022-03-11 | 2022-05-27 | 中国消防救援学院 | Construction method and structure system of short-distance overlapping line crossing tunnel overpass type support |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03103597A (en) * | 1989-09-18 | 1991-04-30 | Railway Technical Res Inst | Shield tunnel with multi-circle cross section |
JP2000213276A (en) * | 1999-01-20 | 2000-08-02 | Kumagai Gumi Co Ltd | Reinforcement structure of ground for twin tunnel, and structure of twin tunnel |
CN102116157A (en) * | 2009-12-30 | 2011-07-06 | 上海市机械施工有限公司 | Construction method for changing tunneling manner of adjacent shields from horizontal parallel to up-down parallel |
CN103277110A (en) * | 2013-05-13 | 2013-09-04 | 中铁十四局集团有限公司 | Construction method of overlapped shield tunnel |
CN203321532U (en) * | 2013-06-19 | 2013-12-04 | 天津市市政工程设计研究院 | Large angle and short distance intersection support structure for overlapping tunnels |
CN104500077A (en) * | 2014-12-10 | 2015-04-08 | 中铁二十局集团有限公司 | Construction method for enabling shallowly buried and darkly excavated tunnel to pass through cottage area |
JP2016008425A (en) * | 2014-06-24 | 2016-01-18 | 株式会社大林組 | Construction method for large section tunnel |
CN105332710A (en) * | 2015-12-09 | 2016-02-17 | 中铁十八局集团第五工程有限公司 | Construction method suitable for up-down overlapped tunnel with small clear space and long distance under weak geological condition |
CN105673036A (en) * | 2016-01-25 | 2016-06-15 | 济南轨道交通集团有限公司 | Prefabricated shield node tunnel during longitudinal shield crossing and construction method |
-
2016
- 2016-08-30 CN CN201610761609.XA patent/CN106223969A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03103597A (en) * | 1989-09-18 | 1991-04-30 | Railway Technical Res Inst | Shield tunnel with multi-circle cross section |
JP2000213276A (en) * | 1999-01-20 | 2000-08-02 | Kumagai Gumi Co Ltd | Reinforcement structure of ground for twin tunnel, and structure of twin tunnel |
CN102116157A (en) * | 2009-12-30 | 2011-07-06 | 上海市机械施工有限公司 | Construction method for changing tunneling manner of adjacent shields from horizontal parallel to up-down parallel |
CN103277110A (en) * | 2013-05-13 | 2013-09-04 | 中铁十四局集团有限公司 | Construction method of overlapped shield tunnel |
CN203321532U (en) * | 2013-06-19 | 2013-12-04 | 天津市市政工程设计研究院 | Large angle and short distance intersection support structure for overlapping tunnels |
JP2016008425A (en) * | 2014-06-24 | 2016-01-18 | 株式会社大林組 | Construction method for large section tunnel |
CN104500077A (en) * | 2014-12-10 | 2015-04-08 | 中铁二十局集团有限公司 | Construction method for enabling shallowly buried and darkly excavated tunnel to pass through cottage area |
CN105332710A (en) * | 2015-12-09 | 2016-02-17 | 中铁十八局集团第五工程有限公司 | Construction method suitable for up-down overlapped tunnel with small clear space and long distance under weak geological condition |
CN105673036A (en) * | 2016-01-25 | 2016-06-15 | 济南轨道交通集团有限公司 | Prefabricated shield node tunnel during longitudinal shield crossing and construction method |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106812134A (en) * | 2017-03-23 | 2017-06-09 | 中铁第勘察设计院集团有限公司 | Reserved long term line passes through the plain stake reinforcement system and its construction method of existing lines part |
CN108240226A (en) * | 2018-02-11 | 2018-07-03 | 济南轨道交通集团有限公司 | Closely overlapping subway tunnel synchronized construction reserves shield sky and pushes away condition construction method |
CN108240226B (en) * | 2018-02-11 | 2019-08-13 | 济南轨道交通集团有限公司 | It closely overlaps the reserved shield sky of subway tunnel synchronized construction and pushes away condition construction method |
CN108590679A (en) * | 2018-04-18 | 2018-09-28 | 重庆建工第七建筑工程有限责任公司 | Utilize the construction method for walking support truck jumbo overlapping tunnel |
CN109458185A (en) * | 2018-11-22 | 2019-03-12 | 重庆大学 | Overlapping crossing parallel tunneling shield construction method up and down |
CN109594992A (en) * | 2019-01-16 | 2019-04-09 | 中铁隧道股份有限公司 | A kind of juxtaposition tunneling method |
CN110578525A (en) * | 2019-10-08 | 2019-12-17 | 中铁开发投资集团有限公司 | micro-disturbance construction method for crossing operation subway tunnel by overlapping shield tunnel |
CN110645005A (en) * | 2019-10-30 | 2020-01-03 | 中铁开发投资集团有限公司 | High-water-rich round gravel stratum earth pressure balance shield rapid tunneling construction method |
CN111236990A (en) * | 2020-03-18 | 2020-06-05 | 武汉大学 | Shield tunnel internal supporting trolley system under condition of small space, shallow earthing and small radius |
CN111878109A (en) * | 2020-07-08 | 2020-11-03 | 深圳市综合交通设计研究院有限公司 | Conversion structure between double-layer shield tunnel and single-layer shield tunnel and construction method thereof |
CN112196544A (en) * | 2020-10-15 | 2021-01-08 | 中铁二局第二工程有限公司 | Construction method for crossing existing tunnel on contact discharge flue of high-ground-stress soft rock stratum |
CN112196544B (en) * | 2020-10-15 | 2022-10-18 | 中铁二局第二工程有限公司 | Construction method for crossing existing tunnel on contact discharge flue of high-ground-stress soft rock stratum |
CN113373901A (en) * | 2021-05-27 | 2021-09-10 | 中建一局集团建设发展有限公司 | Overlapping shield tunnel house foundation reinforcing structure next to house and construction method |
CN113374496A (en) * | 2021-06-23 | 2021-09-10 | 上海隧道工程有限公司 | Upper-crossing tunnel structure and construction method |
CN114542090A (en) * | 2022-03-11 | 2022-05-27 | 中国消防救援学院 | Construction method and structure system of short-distance overlapping line crossing tunnel overpass type support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106223969A (en) | One closely upper and lower overlap or shield tunnel construction method of closely intersecting | |
CN101749018B (en) | Coal mining method with direct coal pillar recovery | |
CN103046933B (en) | Shield station-crossing tunneling and station parallel construction method | |
CN103032081B (en) | Cross-river large-diameter slurry shield excavation and double-lining parallel construction method | |
CN101349159A (en) | Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face | |
CN105003272A (en) | Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways | |
CN203977309U (en) | A kind of shuttle type culvert linear steel form carrier | |
CN109458185B (en) | Construction method for vertically overlapped crossed parallel tunnel shield | |
CN106968691A (en) | Improve CD method construction methods in a kind of extremely frigid zones silty clay tunnel | |
CN107130968A (en) | A kind of tunnel construction mid-board | |
CN102966016A (en) | Internal double-layer prefabricated traffic lane structure of shield tunnel | |
CN102587933A (en) | Gob-side entry retaining method using prefabricated walls | |
CN106050241A (en) | Construction method for single-construction-channel dual-line same direction and same platform subway stations | |
CN108590679A (en) | Utilize the construction method for walking support truck jumbo overlapping tunnel | |
CN109235291A (en) | Railroad bridge changes girder system system, packaging technology and changes beam process | |
CN206860179U (en) | A kind of tunnel construction mid-board | |
CN207176713U (en) | A kind of piling strtucture for reducing side friction | |
CN111608086A (en) | Lateral flat top construction structure and method for steel-concrete composite beam | |
CN106677076B (en) | The simple and fast method and device of adjacent cover back box beam is installed with across a pier gantry crane | |
CN203531924U (en) | Lifting type moving trolley provided with tracks, wheels and templates | |
CN108868789B (en) | A kind of stratum active support and change method suitable for shield construction tunnel | |
CN204716248U (en) | Tunnel Heng Dong enters main hole and to caunch structure | |
CN203035204U (en) | Large-section tunnel second lining grouping formwork trolley | |
CN103032072B (en) | Method for disassembling, lifting and transferring closed type station shield to transferring line to be hoisted out | |
CN204920961U (en) | Adopt underground station of prefabricated component construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190202 Address after: 300000 Tianjin Free Trade Test Zone (Airport Economic Zone) No. 36 West Central Road Applicant after: CHINA RAILWAY LIUYUAN GROUP CO., LTD. Address before: 300000 Hongqiao District, Tianjin City, Bridge South East Road Applicant before: Zhongtie Tunnel Survey and Design Inst., Ltd. |
|
TA01 | Transfer of patent application right | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161214 |
|
WD01 | Invention patent application deemed withdrawn after publication |