CN109577578A - A kind of cement base very-high performance artificial slabstone and its production and installation method - Google Patents

A kind of cement base very-high performance artificial slabstone and its production and installation method Download PDF

Info

Publication number
CN109577578A
CN109577578A CN201811491644.XA CN201811491644A CN109577578A CN 109577578 A CN109577578 A CN 109577578A CN 201811491644 A CN201811491644 A CN 201811491644A CN 109577578 A CN109577578 A CN 109577578A
Authority
CN
China
Prior art keywords
artificial slabstone
screw
connecting piece
high performance
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811491644.XA
Other languages
Chinese (zh)
Inventor
钟兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN201810096012.7A external-priority patent/CN108193858A/en
Priority claimed from CN201810546706.6A external-priority patent/CN108409261A/en
Application filed by Individual filed Critical Individual
Publication of CN109577578A publication Critical patent/CN109577578A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/04Apparatus or processes for treating or working the shaped or preshaped articles for coating or applying engobing layers
    • B28B11/048Apparatus or processes for treating or working the shaped or preshaped articles for coating or applying engobing layers by spraying or projecting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/22Apparatus or processes for treating or working the shaped or preshaped articles for cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B3/00Producing shaped articles from the material by using presses; Presses specially adapted therefor
    • B28B3/006Pressing by atmospheric pressure, as a result of vacuum generation or by gas or liquid pressure acting directly upon the material, e.g. jets of compressed air
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B3/00Producing shaped articles from the material by using presses; Presses specially adapted therefor
    • B28B3/02Producing shaped articles from the material by using presses; Presses specially adapted therefor wherein a ram exerts pressure on the material in a moulding space; Ram heads of special form
    • B28B3/04Producing shaped articles from the material by using presses; Presses specially adapted therefor wherein a ram exerts pressure on the material in a moulding space; Ram heads of special form with one ram per mould
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
    • E04F13/141Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass with an outer layer of concrete
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00008Obtaining or using nanotechnology related materials
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/54Substitutes for natural stone, artistic materials or the like
    • C04B2111/542Artificial natural stone
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

A kind of cement base very-high performance artificial slabstone and its production and installation method, including the board body using ultra-high performance concrete, stainless steel mesh sheet is embedded in board body, nut is provided in stainless steel mesh sheet, the nut port is flushed with the back of board body, the board body through Qiang Zhen, suppress, vacuumize and be made.The present invention requires based on using basic material necessary to ultra-high performance concrete and Recipe, and addition can increase the anti-stainless steel mesh sheet for tearing intensity open, and to shake by force, suppress, vacuumize for main plate-making method.The present invention makes full use of the advantage that is screwed together of nut-screw, it can be connect with the metal connecting piece of any moulding, achievable cladding humidification patch has or exoskeletal line plastic cladding, that any plate cutting combination is connected with metallic contact strips, the heat preservation board clamping of any material can be formed by integrated plate for heat insulation by nut and metal strip with screw rod is lengthened, and can fast and safely be installed.

Description

A kind of cement base very-high performance artificial slabstone and its production and installation method
Technical field
The present invention relates to building decoration area, especially a kind of cement base very-high performance artificial slabstone and production and installation Method.
Background technique
Existing building wall body decoration mainly has lithotome plate and ceramic-like to imitate slabstone two big at the plate of stone effect Class, lithotome plate are the dalle using the stone material naturally occurred by the methods of cutting, grinding, sandblasting production, ceramics Imitative slabstone is that clay is fired into the plate with lithotome effect by high temperature, and installation method mainly has wet combining and two kinds cladding Mode.1. wet combining: wet combining is that plate is pasted onto the wall that need to be decorated using sticking mortar, belongs to rigid connection, due to Outside wind pressure, rainwater and the temperature difference generate expand with heat and contract with cold, can accelerate mortar viscosity reduce, in addition the self weight of plate compared with Greatly, it is easy to cause plate to fall off, and the shock resistance that is rigidly connected is very poor, existing wet combining method only makes when building and decorating at low layer With building high level is forbidden to use substantially.2. cladding: dry hanging plate material need to be installed in the wall to be decorated first and be used for loading plate The metal joist frame of material, since the stone material itself naturally occurred has been solid state, inside can not be put for plug-in connection Embedded part, ceramics because high temperature fire it is internal can not equally put embedded part, two kinds of plates can only slot during installation in side face of plate material or Punching is punched at plate back, metal connecting piece could be used to connect installation with load-bearing keel shoe, due to lithotome and pottery Porcelain itself brittleness is larger, and the connector that card is placed in lateral groove or hole when installation need to carry the self weight of plate, thin if plate is relatively thin Wall easily causes chipping obscission;Back punching, relatively thin plate punching are easily broken, and shallow bore hole mounts intensity low-security Difference, therefore now regulation dry-hang stone thickness cannot be less than 25mm, time of the ceramics for cladding is shorter, and there are no provide its thickness Standard, but ceramic wafer needs certain thickness just to can guarantee its safety, show dry-hang stone weight per square meter be more than 65 kilograms with On, causing the keel shoe for carrying plate also needs to keep certain intensity could carry its weight, therefore causes metal joist frame Fabrication and installation cost it is big, heavier plate mounting cost is also very high, and since the weight of plate is big, make building structure also and need plus It could carry greatly, equally cause building construction increased costs, stone mining welding, ceramic high temperature is fired waste of energy and easily made At pollution.
It is found through retrieval, to solve the above problems, in a kind of system of artificial flat-plate stone of patent (CN2014100884568) Work and its installation method and patent (CN201410694568X) use the cladding cement based artificial plate combined with wet combining Although stone material installation method solves the above problem to a certain degree, plate there are intensity it is low, closely knit it is low, weatherability is poor, water suction The disadvantages of rate is high, freeze-thaw resistance is poor, it is lower to mount intensity due to being independently to put for pre-buried nut;Pre-buried hook is in plate Back is prominent, easily the assembly line processing of influence plate, and hook outstanding transport is not easy to pile up, and be easy to cause plate broken It splits.
Summary of the invention
The purpose of the present invention is to provide a kind of cement base very-high performance artificial slabstone and production and installation methods, with solution Certainly the problems mentioned above in the background art.
To achieve the above object, the invention provides the following technical scheme: a kind of cement base very-high performance artificial slabstone, packet The board body using ultra-high performance concrete (UHPC) is included, it is characterized in that stainless steel mesh sheet is embedded in board body, it is stainless Nut is provided in steel mesh piece, the nut port is flushed with the back of board body, the board body through Qiang Zhen, suppress, It vacuumizes and is made.
Preferably, the stainless steel mesh sheet and nut-welding, the nut is stainless steel nut.
Preferably, the ultra-high performance concrete (UHPC) include 525 and 525 or more high-mark cement, silicon ash and The ratio that suitable water is no more than 0.25 in water-cement ratio is added in slag powders, sandstone aggregate, high-efficiency water-reducing agent of poly-carboxylic acid, said components Coagulation forms.
Preferably, the following sandstone aggregate of 6mm partial size is 4~6 mesh rice stones, 10~20 mesh rice stones, 40~80 mesh rice One of stone, 80~120 mesh silica flours, 800~1200 mesh silica flours or multiple combinations.
Preferably, the ultra-high performance concrete includes the component of following mass fraction: 525 and 525 or more white 100 parts of portland cement, 8~15 parts of silicon ash, 10~30 parts of slag powders, 4~6 50~80 parts of mesh rice stones, 10~20 mesh rice stones 50 ~100 parts, 40~80 20~50 parts of mesh rice stones, 5~10 parts of 80~120 mesh silica flour, 5~10 parts of 800~1200 mesh silica flour, 0.5~2 part of high-efficiency water-reducing agent of poly-carboxylic acid, 0.2~1.0 part of hydrophobic powder, 0~5 part of iron oxide pigment, flyash 0~30 part, nanometer 0.1~15 part of material, said components are added suitable water and form in the ratio coagulation of water-cement ratio 0.18~0.22.
Preferably, the nano material is 0.1~5 part of nano silica, nano-titanium dioxide 0.1~5 part, nanometer One of 0.1~5 part of calcium carbonate or multiple combinations.
A kind of production method of cement base very-high performance artificial slabstone, comprising the following steps:
1. the preparation of making sheet equipment: making sheet equipment includes dither, not less than the hydraulic press of 10kg/cm2 pressure, is vacuumized To -0.08MPa pressure vacuum equipment below, material frame and pressing plate size are determined according to making sheet specification;
2. the slurry being stirred investment is applied in the material frame for wiping release agent, dither, vibration 10~15 are smoothed out and opened After second, the stainless steel mesh sheet of deposit belt nut in slurry finally puts spongy isolation cloth on slurry upper berth;
It is suppressed 15~30 seconds 3. opening hydraulic press and pressing not less than 10kg/cm2 pressure, and is evacuated to -0.08MPa or less simultaneously;
4. taking out isolation cloth, the plate pressed is transported to steam-curing chamber's maintenance with supporting plate;
5. the plate conserved is customized to standard thickness, according to different plate face effect requirements, with including sanding machine, sandblasting One of machine, baked wheaten cake face machine, water impulse face machine, bush-hammered face machine or multiple combinations equipment are processed into required surface effect, obtain this Artificial stone slab;
6. cleaning plate Tumblies Dry, protective agent is sprayed in artificial slabstone outer surface.
Artificial slabstone is mounted on wall or top of building in a manner of cladding humidification patch metal connecting piece, institute Stating metal connecting piece includes straight metal strip, and the straight metal strip both ends are respectively equipped with several screw through holes, straight metal strip wherein one Screw through hole has placed screw rod, which is screwed together with the nut on artificial slabstone;Heat preservation is put on a small amount of mortar point type Backboard portion;Another screw through hole that expansion bolt passes through straight metal strip is implanted into wall or top of building;It is hammered into shape and is tapped with skin Artificial slabstone surface is to requiring flatness;It tightens expansion bolt and straight metal strip is fixed on wall or top of building.
The artificial slabstone is mounted on wall in a manner of the cladding humidification patch of integrated plate for heat insulation by metal connecting piece, institute Stating metal connecting piece includes straight metal strip, and straight metal strip both ends are respectively equipped with several screw through holes, a straight metal strip wherein screw rod Through-hole has placed screw rod, which passes through insulation board and be screwed together with the nut on artificial slabstone;It is smeared with a small amount of mortar point type At insulation board back;Another screw through hole that expansion bolt passes through straight metal strip is implanted into wall;It is hammered into shape with skin and taps artificial stone Plate surface is to requiring flatness;It tightens expansion bolt and straight metal strip is fixed on wall.
The artificial slabstone is mounted on wall in a manner of keel-free direct hanging by metal connecting piece, the metal connection Part includes Z-type metal connecting piece, and Z-type metal connecting piece both ends are respectively equipped with several screw through holes, Z-type metal connecting piece its In a screw through hole placed screw rod, which is screwed together with the nut on artificial slabstone;Expansion bolt is passed through into Z-type gold Another screw through hole for belonging to connector is implanted into wall;It tightens expansion bolt and Z-type metal connecting piece is fixed on wall.
The artificial slabstone is mounted on wall in a manner of dry-hanging keel by metal connecting piece by having, the metal connection Part includes L-type metal connecting piece, and the keel include load-bearing keel, lateral keel, and the lateral keel is fixed on load-bearing keel On, the load-bearing keel are fixed on the wall, and the lateral keel is equipped with screw through hole, and the L-type metal connecting piece two connects It connects end and is respectively equipped with waist hole, a connecting pin waist hole of the L-type metal connecting piece has placed screw rod, the screw rod and artificial slabstone On nut be screwed together;Bolt has been placed in another connecting pin waist hole of L-type connector;The bolt pass through screw through hole after with Nut is screwed together.
The installation method of splice modeling lines is: shaped metal item is bent into multistage by the cross-sectional shape of preset shape Connection strap is equipped with screw through hole on the connection strap, and screw rod, the spiral shell on screw rod and artificial slabstone have been placed in screw through hole Mother is screwed together, and muti-piece artificial slabstone is connected by shaped metal item and is spliced into moulding lines;
Moulding lines are fixed on the wall by multiple metal connecting pieces, the metal connecting piece both ends are respectively equipped with several spiral shells Rod through-hole, wherein a screw through hole has placed screw rod to metal connecting piece, which is screwed together with the nut on artificial slabstone, Another screw through hole that expansion bolt is passed through to metal connecting piece, is implanted into wall and tightens expansion bolt and be fixed on wall.
The present invention requires based on using basic material necessary to ultra-high performance concrete (UHPC) and Recipe, adds The anti-stainless steel mesh sheet for tearing intensity open can be increased by adding, and to shake by force, suppress, vacuumize for main plate-making method.It suppresses, vacuumize It is the manufacturing conditions that the production ultra-high performance concrete such as existing building bridge is extremely difficult to;It suppresses and combines absorbent cloth that can squeeze out and inhale Walk the moisture content in plate;The gas and extra moisture content that can be extracted out in plate are vacuumized, the two can make moisture content reduce 20% or more, The compactness of plate can be made higher, thus can more reach the principle condition that ultra-high performance concrete glue is lower, intensity is higher, it is whole The stainless steel mesh sheet that plate the links together steel fibre more dispersed than necessary to ultra-high performance concrete has preferably connection The skeleton function of support makes the aggregate of plate combine together completely with mesh sheet, and the rigidity and toughness of stainless steel wire make plate very Will not occur the phenomenon that breaking releasing in the case where thin, plate thickness of the present invention is in 10mm or so, to keep panel weight big It is big to mitigate.The plate that the present invention makes has that the superelevation that has of ultra-high performance concrete is strong, significant spy of high tenacity, Gao Naijiu Point, more than several times more superior than the performance indexes of regular tenacity concrete, to overcome the original concrete substrate of inventor completely The gaps such as material intensity is low, density is low, anti-tearing open property is poor, weather-proof poor, freeze-thaw resistance difference.The present invention is on the basis of ultra-high performance concrete On be added to a variety of nano materials, wherein nanoscale silica, nanoscale calcium carbonate can make plate have it is higher close Solidity, intensity and it is anti-tear performance open, nano-titanium dioxide makes plate have the function of uvioresistant, sterilization, self-cleaning etc..The present invention is super High performance concrete is in the case that water absorption rate is minimum in all strength concretes, and concrete water absorption rate can be effectively reduced by being added to Hydrophobic powder, make the water absorption rate of plate that the ultralow requirement of building external decoration stone material be fully achieved, so that common cement-base be overcome to inhale The high gap of water rate.
Nut of the present invention for plug-in connection welds together with stainless steel mesh sheet, is laid on together with stainless steel mesh sheet In the slurry of plate back, an entirety is gone completely into after solidification, the mesh sheet of stainless steel material during installation, is cut into arbitrary size It will not corrode, overcome the mesh sheet of common metal material and the gap of steel fibre easy-to-rust;When the nut to link together mounts, Stress point is connect with entire plate, is mounted intensity with high, is overcome original cement-based artificial stone and independently put nut, What independent stressed mounted mounts the low gap of intensity.Nut of the invention have the advantages that it is corrosion protection, it is concordant with plate back Nut is processed and is transported convenient for assembly line.
The present invention makes full use of the advantage that is screwed together of nut-screw, can connect with the metal connecting piece of any moulding, can It completes cladding humidification patch, have or exoskeletal line plastic that is cladding, connecting any plate cutting combination with metallic contact strips, The heat preservation board clamping of any material can be formed by integrated plate for heat insulation by nut and metal strip with screw rod is lengthened, and can be fast and safely Installation.
The present invention is added modulated various using discarded assorted chicken girt and high grade white portland cement as primary raw material The iron oxide pigment of color, and on the basis of ultra-high performance concrete technique, being added to a variety of nano materials makes plate in room There is better weatherability and durability under external environment.Plate surface handles the stripping technology principle on surface using lithotome, Using the identical equipment and technique on stone material processing surface, nearly thousand kinds of colors and surface effect can be produced, natural stone is fully achieved Material decorative effect, and overcome the problems, such as the color difference that lithotome is generated by self-assembling formation.
The present invention fires, no chemical reaction without cutting into a mountain for quarrying without high temperature, reusable after dead meal dewatered drying Or the other building materials of production, no pollution, zero-emission is fully achieved.It overcomes lithotome to cut into a mountain for quarrying welding, ceramics are high Temperature fires waste of energy, and it is the technology benefited the nation and the people that clay, which exploits the drawbacks of welding generates pollution,.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of plate of the present invention.
Fig. 2 is the scheme of installation of dry hanging plate material of the present invention and wet combining;
Fig. 3 is the cladding scheme of installation with wet combining of integrated plate for heat insulation of the present invention;
Fig. 4 is the exoskeletal scheme of installation of the present invention;
Fig. 5 is the cladding schematic diagram of the present invention;
Fig. 6 is line plastic assembly schematic diagram of the present invention;
Fig. 7 is the enlarged drawing in Fig. 6 at A;
Fig. 8 is the structural schematic diagram that T-nut is applied in plate in the present invention;
Fig. 9 is the structural schematic diagram that metal connecting piece is installed in a manner of cladding humidification patch in the present invention;
Figure 10 is the structural schematic diagram that another metal connecting piece is installed in a manner of cladding humidification patch in the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description.
Plate of the present invention is made of following methods: by 525 and 525 or more 100 parts of white portland cement, silicon ash 8 ~15 parts, 10~30 parts of slag powders, sandstone aggregate (can be 4~6 60 parts of mesh yellow rice stones, 4~6 20 parts of mesh black rice stones, 10 ~20 50 parts of mesh yellow rice stones, 40~80 20 parts of mesh white rice stones, 5 parts of 80~120 mesh silica flour, 800~1200 mesh silica flours 5 Part one of component and its proportion or various ingredients and its proportion combination), 0.5~2 part of high-efficiency water-reducing agent of poly-carboxylic acid, oxidation 0~5 part of iron pigment, wherein sandstone aggregate is the following sandstone aggregate of 6mm partial size;Said components are added suitable water and press water-cement ratio not Ratio more than 0.25 is stirred;It is framed to prepare 600*900mm, and in framed interior spraying release agent.The slurry that will be stirred It puts into framed, it is levelling and open dither, it vibrates 10~15 seconds;The slurry that will have been vibrated, by determining position deposit belt The stainless steel mesh sheet 1 and isolation cloth of nut 2;Open hydraulic press the pressing plate alignment of same size is framed, 500 tons of pressure compactings 20 Second and open simultaneously vacuum machine and be evacuated to -0.08MPa, the two time synchronization;Isolation cloth is taken out, such as by the plate 3(suppressed Shown in Fig. 1), with supporting plate, send to steam-curing chamber and conserve;The plate conserved is customized to standard thickness with thicknessing machine;Use stone The polishing of material continuous polishing machine;Simultaneously sprayed surface protective agent is dried, and is sent to construction site.
In order to be further improved, multiple embodiments presented below, it is clear that described embodiment is only the present invention one Divide embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of creative work.
Embodiment one
Plate face color: yellow;Highlight surface;Specification: 600*900mm;Thickness 10mm.
1. raw material configures: 525 100 parts of white portland cements, 8 parts of silicon ash, 20 parts of slag powders, 4~6 mesh yellow rice stones 60 Part, 4~6 20 parts of mesh black rice stones, 10~20 50 parts of mesh yellow rice stones, 40~80 20 parts of mesh white rice stones, 80~120 mesh quartz 5 parts of powder, 5 parts of 800~1200 mesh silica flour, 0.8 part of high-efficiency water-reducing agent of poly-carboxylic acid, 0.6 part of hydrophobic powder, iron oxide yellow uitramarine 2 Part, 10 parts of flyash, 1 part of nano-titanium dioxide, 1.5 parts of nano silica, 2.5 parts of nanometer calcium carbonate.
2. above-mentioned dry mash is stirred evenly production dry powder, bag distribution packaging by dry powder device.
3. dry powder is proportionally added into high efficiency water reducing agent and water stirs 10 minutes, above-mentioned all components are added suitable water and press The ratio coagulation of water-cement ratio 0.2 forms.
4. preparation shakes by force, suppresses, vaccum-pumping equipment, it is framed to prepare 600*900mm, and in framed interior spraying release agent.
5. by the slurry being stirred investment it is framed in, it is levelling and open dither, vibrate 10~15 seconds.
6. the slurry that will have been vibrated, by determining position laying stainless steel mesh sheet 1, nut 2 and isolation cloth.
7. it is framed by the pressing plate alignment of same size to open hydraulic press, 500 tons of pressure are suppressed 20 seconds and open simultaneously vacuum Machine is evacuated to -0.08MPa, the two time synchronization.
8. isolation cloth is taken out, the plate 3(suppressed is as shown in Figure 1), with supporting plate, send to steam-curing chamber and conserve.
9. the plate conserved is customized to standard thickness with thicknessing machine.
10. being polished with stone material continuous polishing machine.
11. drying simultaneously sprayed surface protective agent, and send to construction site.
Embodiment two
Plate face color: red;Baked wheaten cake face;Specification: 600*600mm;Thickness 11mm.
1. raw material configures: 525 100 parts of white portland cements, 10 parts of silicon ash, 30 parts of slag powders, 4~6 mesh red meter Shi 80 parts, 4~6 20 parts of mesh black rice stones, 10~20 80 parts of mesh red rice stones, 40~80 40 parts of mesh white rice stones, 80~120 mesh stones 8 parts of English powder, 10 parts of 800~1200 mesh silica flour, 2 parts of high-efficiency water-reducing agent of poly-carboxylic acid, 1.0 parts of hydrophobic powder, iron oxide red pigment 5 Part, 20 parts of flyash, 1.5 parts of nano-titanium dioxide, 2 parts of nano silica, 1.5 parts of nanometer calcium carbonate, said components are added Suitable water is formed in the ratio coagulation of water-cement ratio 0.22.
2. pigment is red iron oxide pigment, meter Shi Wei is red, and other specifications are the same as embodiment one.
3. framed specification is 600*600mm.
4. 400 tons of pressure are suppressed 15 seconds.
5. surface treatment burns face machine burning face with stone material and forms baked wheaten cake face.
6. the slurry that will have been vibrated is welded with the stainless steel mesh sheet 1 and isolation cloth of nut 2, nut 2 by determining position laying It can be stainless steel nut.As shown in figure 8, stainless steel nut can also be T-type stainless steel nut 211, T-type stainless steel nut 211 The mesh that main body can pass through stainless steel mesh sheet 1 is arranged, and outer end is flushed with the back of board body 3.
7. its production method and step are the same as embodiment one.
Embodiment three
Plate face color: black;Water impulse face;Specification 500*700mm;Thickness 9mm.
1. raw material configures: 525 and 525 or more 100 parts of white portland cement, 15 parts of silicon ash, 10 parts of slag powders, 4~6 80 parts of black mesh rice stone, 10~20 100 parts of black mesh rice stones, 40~80 50 parts of mesh black rice stones, 80~120 mesh silica flours 10 Part, 8 parts of 800~1200 mesh silica flour, 0.5 part of high-efficiency water-reducing agent of poly-carboxylic acid, 0.2 part of hydrophobic powder, 1 part of iron oxide black pigment, 30 parts of flyash, 1.5 parts of nano-titanium dioxide, 1.5 parts of nano silica, 2 parts of nanometer calcium carbonate, said components are added appropriate Water formed in the ratio coagulation of water-cement ratio 0.18.
2. framed specification is 500*700mm.
3. 350 tons of pressure are suppressed 30 seconds.
4. plate table brushing retarder forms water impulse face with giant impulse face after initial set.
5. its production method and step are the same as embodiment one.
Cement based artificial stone material performance comparison:
Cement base very-high performance artificial slabstone obtained by Examples 1 to 3 is used for building decoration, including following several methods:
Installation method one:
As shown in Fig. 2, artificial slabstone is mounted on wall or building in a manner of cladding humidification patch metal connecting piece Top, the metal connecting piece include straight metal strip 4, and the straight metal strip both ends are respectively equipped with several screw through holes 5, straight metal Wherein a screw through hole has placed screw rod 21 to item 4, and 21 outer end of screw rod is screwed with fastening nut 6, and fastening nut 6 is by straight metal strip 4 It is compressed on the back of artificial slabstone 3.The screw rod 21 is screwed together with the stainless steel nut 2 on artificial slabstone;With a small amount of sand Slurry point type is put on insulation board back;Mortar plays the role of positioning thickness, and expansion bolt 9 is passed through to another screw rod of straight metal strip 4 Through-hole is implanted into wall or top of building;It is hammered into shape with skin and taps artificial slabstone surface to flatness is required, tighten expansion bolt 9 Straight metal strip 4 is fixed on wall or top of building, completes the installation of artificial slabstone.
Installation method two:
As shown in figure 3, artificial slabstone is mounted on wall in a manner of cladding humidification patch by metal connecting piece by keeping the temperature, the gold Belonging to connector includes straight metal strip 4, and straight 4 both ends of metal strip are respectively equipped with several screw through holes, a straight metal strip 4 wherein spiral shell Rod through-hole has placed long bolt 22, and 22 outer end of long bolt is screwed with fastening nut 6, and straight metal strip 4 is compressed on guarantor by fastening nut 6 The back of warm plate 10.The long bolt 22 passes through insulation board 10 and is screwed together with the stainless steel nut 2 on artificial slabstone;With a small amount of Mortar point type is put on 10 back of insulation board;Mortar plays the role of positioning thickness, and expansion bolt 9 is passed through the another of straight metal strip 4 Screw through hole is implanted into wall;It is hammered into shape with skin and taps artificial slabstone surface to flatness is required, tighten expansion bolt for straight metal Item is fixed on wall, completes artificial slabstone installation.
Installation method three:
As shown in figure 4, artificial slabstone is mounted on wall in a manner of keel-free direct hanging by metal connecting piece, the metal connects Fitting includes Z-type metal connecting piece 18, and 18 both ends of Z-type metal connecting piece are respectively equipped with several screw through holes, and Z-type metal connects Wherein a screw through hole has placed screw rod 24 to fitting 18, and 24 outer end of screw rod is screwed with fastening nut 15;Fastening nut 15 is golden by Z-type Belong to the back that connector 18 is compressed on artificial slabstone 3;The screw rod is screwed together with the stainless steel nut 2 on artificial slabstone, Another screw through hole that expansion bolt 9 passes through Z-type metal connecting piece 18 is implanted into wall;Expansion bolt 9 is tightened by straight metal Item is fixed on wall, completes artificial slabstone installation.
Installation method four:
As shown in figure 5, artificial slabstone is mounted on wall in a manner of dry-hanging keel by metal connecting piece by having, the metal connects Fitting includes L-type metal connecting piece 7, and the keel include load-bearing keel 17, lateral keel 8, and the lateral keel 8, which is fixed on, holds On weight keel 17, the load-bearing keel 17 are fixed on the wall, and the lateral keel 8 is equipped with screw through hole 14, the L-type gold Belong to 7 liang of connecting pins of connector and be respectively equipped with waist hole, a connecting pin waist hole of the L-type metal connecting piece 7 has placed screw rod, the spiral shell Bar is screwed together with the stainless steel nut on artificial slabstone, has placed bolt 16 in another connecting pin waist hole of L-type connector 7, The bolt 16 is screwed together after passing through screw through hole with nut, the upper-lower height and front and back flatness of plate is adjusted, after confirmation Two end nuts are tightened, artificial slabstone installation is completed.
Installation method five:
As shown in fig. 6-7, shaped metal item 19 is bent into multistage connection strap by the shape of moulding, is equipped on the connection strap Screw through hole has placed screw rod in screw through hole, and screw rod is screwed together with the stainless steel nut on artificial slabstone;Muti-piece is artificial Stone slab is connected by shaped metal item 19 and is spliced into moulding lines 20;
Moulding lines are fixed on the wall by multiple metal connecting pieces, 11 both ends of metal connecting piece are respectively equipped with several Screw through hole, wherein a screw through hole has placed screw rod 24 to metal connecting piece 11, which passes through the spiral shell of shaped metal item 19 Rod through-hole is screwed together with the stainless steel nut 2 on artificial slabstone, and expansion bolt 13 is passed through the another of metal connecting piece 11 Screw through hole is implanted into wall and tightens expansion bolt and be fixed on wall, completes the installation of artificial slabstone.
Mounting means six:
As shown in figure 9, artificial slabstone is mounted on top of building in a manner of cladding humidification patch metal connecting piece, it is described Metal connecting piece includes straight metal strip 31, and straight 31 both ends of metal strip are respectively equipped with several screw through holes, wherein straight metal strip One screw through hole has placed screw rod 21, which is screwed together with the nut on artificial slabstone, the screw rod outer end It is screwed with fastening nut 33, straight metal strip is compressed on artificial slabstone back by fastening nut;
Another screw through hole that expansion bolt passes through straight metal strip is implanted into top of building;It is hammered into shape with skin and taps artificial slabstone 3 surfaces are to requiring flatness;It tightens expansion bolt and straight metal strip is fixed on top of building, complete the peace of artificial slabstone Dress.
Mounting means seven:
As shown in Figure 10, artificial slabstone is mounted on top of building in a manner of cladding humidification patch metal connecting piece, institute Stating metal connecting piece includes straight metal strip 31, and the straight metal strip 31 is equipped with several screw through holes, wherein a screw through hole is worn It is equipped with screw rod 21, which is screwed together with the nut on artificial slabstone, and the screw rod outer end is screwed with fastening nut 33, straight metal strip 31 is compressed on artificial slabstone back by fastening nut 33;
Expansion bolt 33 is passed through another screw through hole of straight metal strip to be implanted into top of building;It is hammered into shape with skin and taps artificial slabstone 3 surfaces are to requiring flatness;It tightens expansion bolt and straight metal strip is fixed on top of building, complete the peace of artificial slabstone Dress.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (10)

1. a kind of cement base very-high performance artificial slabstone, including board body, it is characterised in that be embedded with not in board body Become rusty steel mesh piece, is provided with nut in stainless steel mesh sheet, the port of the nut is flushed with the back of board body, the plate sheet Body using ultra-high performance concrete through Qiang Zhen, suppress, vacuumize and be made.
2. a kind of cement base very-high performance artificial slabstone according to claim 1, it is characterised in that the very-high performance Concrete includes following components: 525 and 525 or more high-mark cement, silicon ash, sandstone aggregate, high-efficiency water-reducing agent of poly-carboxylic acid, on It states component suitable water is added and formed in water-cement ratio no more than 0.25 ratio coagulation.
3. a kind of cement base very-high performance artificial slabstone according to claim 2, it is characterised in that the very-high performance Concrete includes the component of following mass fraction: 525 and 525 or more 100 parts of white portland cement, 8~15 parts of silicon ash, mine 10~30 parts of ground-slag, 4~6 50~80 parts of mesh rice stones, 10~20 50~100 parts of mesh rice stones, 40~80 20~50 parts of mesh rice stones, 80 ~120 5~10 parts of mesh silica flours, 5~10 parts of 800~1200 mesh silica flour, 0.5~2 part of high-efficiency water-reducing agent of poly-carboxylic acid, hydrophobic powder 0.2~1.0 part, 0~5 part of iron oxide pigment, 0~30 part of flyash, 0.1~15 part of nano material, said components are added appropriate Water formed in the ratio coagulation of water-cement ratio 0.18~0.22.
4. a kind of cement base very-high performance artificial slabstone according to claim 3, it is characterised in that the nano material For one of 0.1~5 part of nano silica, 0.1~5 part of nano-titanium dioxide, 0.1~5 part of nanometer calcium carbonate or a variety of Combination.
5. a kind of production method of cement base very-high performance artificial slabstone as claimed in claim 2 or 3 or 4, feature exist In method includes the following steps:
The preparation of making sheet equipment: making sheet equipment includes dither, is not less than 10kg/cm2The hydraulic press of pressure, be evacuated to- 0.08MPa pressure vacuum equipment below determines material frame and pressing plate size according to making sheet specification;
The slurry being stirred investment is applied in the material frame for wiping release agent, dither is smoothed out and open, is vibrated 10~15 seconds Afterwards, in slurry deposit belt nut stainless steel mesh sheet, finally put spongy isolation cloth on slurry upper berth;
It opens hydraulic press and presses and be not less than 10kg/cm2Pressure is suppressed 15~30 seconds, and is evacuated to -0.08MPa or less simultaneously;
Isolation cloth is taken out, the plate pressed is transported to steam-curing chamber's maintenance with supporting plate;
The plate conserved is customized to standard thickness, according to different plate face effect requirements, with include sanding machine, sand-blasting machine, One of baked wheaten cake face machine, water impulse face machine, bush-hammered face machine or multiple combinations equipment are processed into required surface effect.
6. a kind of installation method of cement base very-high performance artificial slabstone as claimed in claim 1 or 2 or 3 or 4, feature It is that the artificial slabstone is mounted on wall or top of building in a manner of cladding humidification patch metal connecting piece, institute Stating metal connecting piece includes straight metal strip, and the straight metal strip is equipped with several screw through holes, wherein a screw through hole has placed Screw rod, the screw rod are screwed together with the nut on artificial slabstone;Insulation board back is put on a small amount of mortar point type;By expanding screw Another screw through hole that bolt passes through straight metal strip is implanted into wall or top of building;It is hammered into shape with skin and taps artificial slabstone surface extremely It is required that flatness, tightens expansion bolt for straight metal strip and is fixed on wall or top of building.
7. a kind of installation method of cement base very-high performance artificial slabstone as claimed in claim 1 or 2 or 3 or 4, feature It is that the artificial slabstone is mounted on wall in a manner of the cladding humidification patch of integrated plate for heat insulation by metal connecting piece, the gold Belonging to connector includes straight metal strip, and straight metal strip both ends are respectively equipped with several screw through holes, a straight metal strip wherein screw through hole Screw rod is placed, which passes through insulation board and be screwed together with the nut on artificial slabstone;Guarantor is put on a small amount of mortar point type Warm backboard portion;Another screw through hole that expansion bolt passes through straight metal strip is implanted into wall;It is hammered into shape with skin and taps artificial slabstone Surface is to requiring flatness;It tightens expansion bolt and straight metal strip is fixed on wall.
8. a kind of installation method of cement base very-high performance artificial slabstone as claimed in claim 1 or 2 or 3 or 4, feature It is that the artificial slabstone is mounted on wall in a manner of keel-free direct hanging by metal connecting piece, the metal connecting piece packet Include Z-type metal connecting piece, Z-type metal connecting piece both ends are respectively equipped with several screw through holes, Z-type metal connecting piece wherein one Screw through hole has placed screw rod, which is screwed together with the nut on artificial slabstone;Expansion bolt is connected across Z-type metal Another screw through hole of fitting is implanted into wall;It tightens expansion bolt and Z-type metal connecting piece is fixed on wall.
9. a kind of installation method of cement base very-high performance artificial slabstone as claimed in claim 1 or 2 or 3 or 4, feature It is that the artificial slabstone is mounted on wall in a manner of dry-hanging keel by metal connecting piece to have, the metal connecting piece packet L-type metal connecting piece is included, the keel include load-bearing keel, lateral keel, and the lateral keel is fixed on load-bearing keel, institute It states load-bearing keel to be fixed on the wall, the lateral keel is equipped with screw through hole, two connecting pin of L-type metal connecting piece point Not She You waist hole, a connecting pin waist hole of the L-type metal connecting piece placed screw rod, the spiral shell on the screw rod and artificial slabstone Mother is screwed together;Bolt has been placed in another connecting pin waist hole of L-type connector;The bolt pass through screw through hole after with nut spiral shell Close connection.
10. a kind of cement base very-high performance artificial slabstone installation method as claimed in claim 1 or 2 or 3 or 4, feature It is that the installation method is that shaped metal item is bent into multistage connection strap, the connection by the cross-sectional shape of preset shape It is equipped with screw through hole on item, screw rod has been placed in screw through hole, screw rod is screwed together with the nut on artificial slabstone, muti-piece Artificial slabstone is connected by shaped metal item and is spliced into moulding lines;
Moulding lines are fixed on the wall by multiple metal connecting pieces, the metal connecting piece both ends are respectively equipped with several spiral shells Rod through-hole, wherein a screw through hole has placed screw rod to metal connecting piece, which is screwed together with the nut on artificial slabstone; Another screw through hole that expansion bolt is passed through to metal connecting piece, is implanted into wall and tightens expansion bolt and be fixed on wall.
CN201811491644.XA 2018-01-31 2018-12-07 A kind of cement base very-high performance artificial slabstone and its production and installation method Pending CN109577578A (en)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
CN201810096012.7A CN108193858A (en) 2018-01-31 2018-01-31 A kind of production of European high-strength cement base artificial stone moulding of assembled and mounting means
CN2018100960127 2018-01-31
CN201810546706.6A CN108409261A (en) 2018-05-31 2018-05-31 A kind of production of nano cement base compound ultra-high strong artificial slabstone and installation method
CN2018105467066 2018-05-31
CN201810930182 2018-08-15
CN2018109301820 2018-08-15

Publications (1)

Publication Number Publication Date
CN109577578A true CN109577578A (en) 2019-04-05

Family

ID=65928956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811491644.XA Pending CN109577578A (en) 2018-01-31 2018-12-07 A kind of cement base very-high performance artificial slabstone and its production and installation method

Country Status (2)

Country Link
CN (1) CN109577578A (en)
WO (1) WO2019148964A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020114041A1 (en) * 2018-12-07 2020-06-11 钟兵 Artificial cement-based ultra-high-performance stone slab
WO2022166146A1 (en) * 2021-02-06 2022-08-11 钟兵 Composite plate convenient to mount
WO2024055622A1 (en) * 2022-09-13 2024-03-21 钟兵 Prefabricated component formed by reverse laying and production process therefor

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328530A (en) * 2002-05-09 2003-11-19 Ohki Corp Mounting device and installing method of plate-like reforming material to building outer wall
CN101302782A (en) * 2008-06-30 2008-11-12 深圳市明远氟涂料有限公司 Dried hanging thermal insulation decorative curtain wall and mounting process thereof
CN103498541A (en) * 2013-10-23 2014-01-08 陈贤进 Heat-preservation-decorating-integration plate and manufacturing method thereof
CN103924762A (en) * 2013-03-15 2014-07-16 钟兵 Manufacturing and mounting method of artificial tablet stone
CN104533046A (en) * 2014-11-27 2015-04-22 钟兵 Dry-hanging and wet-adhering combined mounting method of cement-based artificial flat stone
CN105019613A (en) * 2015-06-29 2015-11-04 陈廷雨 Assembly-type exterior wall decoration plate model and processing method thereof
CN205637406U (en) * 2015-11-06 2016-10-12 钟兵 Take heat retaining nanometer mud base artificial dull and stereotyped stone material that excels in
CN106284896A (en) * 2016-08-23 2017-01-04 洪斯衍 Stone composite board exterior wall and construction method
CN106626041A (en) * 2016-12-29 2017-05-10 中民筑友科技投资有限公司 Production process of thermal insulation decorative board
US9689162B2 (en) * 2014-11-10 2017-06-27 Quik-Therm Insulation Solutions Inc. Insulating wall assembly with framing member supports partially embedded within rigid insulation panels

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2664592B2 (en) * 1992-05-29 1997-10-15 株式会社竹中工務店 Dry tile panel mounting structure
CN103255892A (en) * 2013-05-09 2013-08-21 陈发城 Installing device of veneers or stone curtain walls and construction method for dry hanging veneers or stone curtain walls
CN105350736A (en) * 2015-11-06 2016-02-24 钟兵 Production and installation method of cement-based artificial stones for panels with heat preservation function
CN205421778U (en) * 2015-12-15 2016-08-03 深圳市深装总装饰股份有限公司 Hide arc stone material board of hanging futilely of lamp decoration and decorate square column
CN206829422U (en) * 2017-05-17 2018-01-02 苏州广林建设有限责任公司 A kind of two-sided dried hanging hang structure wall of indoor facing plate
CN108409261A (en) * 2018-05-31 2018-08-17 钟兵 A kind of production of nano cement base compound ultra-high strong artificial slabstone and installation method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328530A (en) * 2002-05-09 2003-11-19 Ohki Corp Mounting device and installing method of plate-like reforming material to building outer wall
CN101302782A (en) * 2008-06-30 2008-11-12 深圳市明远氟涂料有限公司 Dried hanging thermal insulation decorative curtain wall and mounting process thereof
CN103924762A (en) * 2013-03-15 2014-07-16 钟兵 Manufacturing and mounting method of artificial tablet stone
CN103498541A (en) * 2013-10-23 2014-01-08 陈贤进 Heat-preservation-decorating-integration plate and manufacturing method thereof
US9689162B2 (en) * 2014-11-10 2017-06-27 Quik-Therm Insulation Solutions Inc. Insulating wall assembly with framing member supports partially embedded within rigid insulation panels
CN104533046A (en) * 2014-11-27 2015-04-22 钟兵 Dry-hanging and wet-adhering combined mounting method of cement-based artificial flat stone
CN105019613A (en) * 2015-06-29 2015-11-04 陈廷雨 Assembly-type exterior wall decoration plate model and processing method thereof
CN205637406U (en) * 2015-11-06 2016-10-12 钟兵 Take heat retaining nanometer mud base artificial dull and stereotyped stone material that excels in
CN106284896A (en) * 2016-08-23 2017-01-04 洪斯衍 Stone composite board exterior wall and construction method
CN106626041A (en) * 2016-12-29 2017-05-10 中民筑友科技投资有限公司 Production process of thermal insulation decorative board

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姚燕主编: "《水泥与混凝土研究进展》", 31 October 2016, 中国建材工业出版社 *
河海大学编: "《水利大辞典》", 31 October 2015, 上海辞书出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020114041A1 (en) * 2018-12-07 2020-06-11 钟兵 Artificial cement-based ultra-high-performance stone slab
WO2022166146A1 (en) * 2021-02-06 2022-08-11 钟兵 Composite plate convenient to mount
WO2024055622A1 (en) * 2022-09-13 2024-03-21 钟兵 Prefabricated component formed by reverse laying and production process therefor

Also Published As

Publication number Publication date
WO2019148964A1 (en) 2019-08-08

Similar Documents

Publication Publication Date Title
CN108708516A (en) A kind of cladding humidification sticking structure of cement base very-high performance artificial slabstone
CN109356351A (en) A kind of cement base very-high performance artificial slabstone and its mounting structure
CN103664073B (en) A kind of autoclave aerated concrete building block utilizing Yellow River Sand to prepare and preparation method thereof
CN109577578A (en) A kind of cement base very-high performance artificial slabstone and its production and installation method
CN108409261A (en) A kind of production of nano cement base compound ultra-high strong artificial slabstone and installation method
CN104496361B (en) A kind of bamboo ribs-stalk composite wall body material composition and preparation method thereof
CN105669146A (en) Autoclaved aerated concrete block containing neutral sodium-salt alkali activated slag concrete and preparation method of autoclaved aerated concrete block
CN109339374A (en) A kind of cement base very-high performance artificial stone heat preservation and soundproof integrated board
JP2002292612A (en) Method for manufacturing inorganic cement composite plate
CN105753387A (en) Stone powder waste material regeneration easy plaster and preparation method thereof
CN107954665A (en) A kind of light-weighted autoclaved special healant of sand aerated concrete plate and preparation method thereof
CN108840643A (en) A kind of surface layer brushing gypsum mortar and preparation method thereof
CN108863236A (en) Exempt to stir the preparation method of Superlight ceramsites concrete cutting plate and exempts to stir Superlight ceramsites concrete cutting plate
CN109356314A (en) A kind of cement base very-high performance artificial slabstone ceiling structure
US7901615B2 (en) Moulding device and production process
CN110550902B (en) Cement-based ultrahigh-performance artificial stone slab
CN209413000U (en) A kind of air entrained concrete prefabricated panel and main structure connection structure
CN219365251U (en) Cement-based artificial stone slab capable of being connected on two sides
CN205476028U (en) Building block of pottery sand lightweight concrete self preservation temperature
CN218881315U (en) Multifunctional inverted-beating prefabricated member capable of being connected with back and assembly structure thereof
CN213143576U (en) Novel brick produced by using tailing sand
Ford New developments in high performance cementitious materials
CN1088158A (en) A kind of light thermal insulation board
Thomsen URUGUAY- BRICKS IN THE MERCOSUR
CN102050596A (en) Additive for heat-insulating and heat-preserving building blocks, preparation method thereof and application thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination