CN109577342B - 一种圆形井坑施工的快捷支护装置 - Google Patents
一种圆形井坑施工的快捷支护装置 Download PDFInfo
- Publication number
- CN109577342B CN109577342B CN201811361195.7A CN201811361195A CN109577342B CN 109577342 B CN109577342 B CN 109577342B CN 201811361195 A CN201811361195 A CN 201811361195A CN 109577342 B CN109577342 B CN 109577342B
- Authority
- CN
- China
- Prior art keywords
- rod
- supporting
- telescopic
- buckle
- central
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Supports For Pipes And Cables (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811361195.7A CN109577342B (zh) | 2018-11-15 | 2018-11-15 | 一种圆形井坑施工的快捷支护装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811361195.7A CN109577342B (zh) | 2018-11-15 | 2018-11-15 | 一种圆形井坑施工的快捷支护装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109577342A CN109577342A (zh) | 2019-04-05 |
CN109577342B true CN109577342B (zh) | 2021-04-06 |
Family
ID=65922707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811361195.7A Active CN109577342B (zh) | 2018-11-15 | 2018-11-15 | 一种圆形井坑施工的快捷支护装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109577342B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111549793B (zh) * | 2020-05-26 | 2021-07-09 | 中国十七冶集团有限公司 | 一种基坑侧壁有隧道的基坑支护结构 |
CN111664313A (zh) * | 2020-06-16 | 2020-09-15 | 康健青 | 一种用于水利输送的管道支护结构 |
CN111962531A (zh) * | 2020-08-18 | 2020-11-20 | 中建二局第三建筑工程有限公司 | 一种市政施工用土墙支撑器及其使用方法 |
CN113235630B (zh) * | 2021-05-11 | 2022-08-23 | 中交第三公路工程局有限公司 | 一种气动降水方法及其降水装置 |
CN113863325B (zh) * | 2021-11-18 | 2022-04-22 | 中煤浙江勘测设计有限公司 | 综合管廊基坑的支护结构及其施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104947682A (zh) * | 2015-05-06 | 2015-09-30 | 中国地质大学(武汉) | 一种基坑支护施工方法及其装置 |
CN105350548B (zh) * | 2015-11-27 | 2017-04-26 | 黄淮学院 | 一种建筑基坑的支护结构 |
CN105735322B (zh) * | 2016-02-04 | 2017-12-22 | 郑州安源工程技术有限公司 | 一种刚柔复合防渗可回收支护结构的设计施工方法 |
CN207646742U (zh) * | 2017-11-16 | 2018-07-24 | 水电十三局天津勘测设计研究院有限公司 | 一种便于快速拆装的基坑支护装置 |
CN108005084A (zh) * | 2017-11-29 | 2018-05-08 | 杭州江润科技有限公司 | 深基坑复合式支护及施工方法 |
-
2018
- 2018-11-15 CN CN201811361195.7A patent/CN109577342B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN109577342A (zh) | 2019-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109577342B (zh) | 一种圆形井坑施工的快捷支护装置 | |
CN111851468B (zh) | 地下水泥土钢墙连续插放垂直度控制施工方法 | |
CN106402490B (zh) | 基于钢套头工具管的粉砂土地层顶管顶进施工方法 | |
KR101640971B1 (ko) | 흙막이 벽체용 시트파일 연결 설치부재 | |
KR101372261B1 (ko) | 암거 시공용 박스 폼 구조 | |
CN111502682B (zh) | 一种非开挖式顶管施工装置及施工方法 | |
CN103306289A (zh) | 基坑桩锚护壁混凝土锚索冠梁结构及其施工方法 | |
CN210031842U (zh) | 基于排桩、连系梁和对拉锚索的相临深基坑联合支护体系 | |
CN108678751B (zh) | 先顶进后开挖的盾构刀盘检修井装配式施工方法 | |
CN106245529A (zh) | 铁路t形梁安全快速落梁方法 | |
EP3194663B1 (en) | Trench wall support | |
CN210286436U (zh) | 雨污水管滑移吊装体系 | |
KR20100001516A (ko) | 가설 흙막이 공법에 있어서의 사각강관으로 된 버팀보와경사버팀재의 연결구조 | |
CN108252324B (zh) | 一种河床底部混凝土挡土墙固定装置及施工方法 | |
KR100819379B1 (ko) | 유압시스템을 이용한 콘크리트구조체 및 이를 이용한구조물의 무소음 무진동 시공방법 | |
CN113483148A (zh) | 一种装配式顶管施工导轨装置 | |
CN219808387U (zh) | 一种便于现场安装拆卸的沟槽支护装置 | |
CN106567381B (zh) | 大型u型钢板桩施工工艺 | |
CN215669609U (zh) | 一种水利施工防倒塌拆卸式围堰 | |
CN205503156U (zh) | 一种隧道施工用拱部锚杆机支撑装置 | |
CN220433662U (zh) | 一种带有桩头超灌模具的操作装置 | |
CN103898927B (zh) | 地连墙接头、与其相配套的夹持装置以及地连墙施工方法 | |
CN215164543U (zh) | 一种装配式基坑跨越通道 | |
CN210049557U (zh) | 一种突变断面下的作业台架 | |
CN214301776U (zh) | 一种深基坑混凝土支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20190405 Assignee: Center for technology transfer Jiangsu University of Science and Technology Assignor: JIANGSU University OF SCIENCE AND TECHNOLOGY Contract record no.: X2021980006173 Denomination of invention: A fast support device for circular pit construction Granted publication date: 20210406 License type: Common License Record date: 20210714 |
|
EC01 | Cancellation of recordation of patent licensing contract | ||
EC01 | Cancellation of recordation of patent licensing contract |
Assignee: Center for technology transfer Jiangsu University of Science and Technology Assignor: JIANGSU University OF SCIENCE AND TECHNOLOGY Contract record no.: X2021980006173 Date of cancellation: 20210826 |