CN109559054B - Electric power engineering construction information processing system - Google Patents

Electric power engineering construction information processing system Download PDF

Info

Publication number
CN109559054B
CN109559054B CN201811476080.2A CN201811476080A CN109559054B CN 109559054 B CN109559054 B CN 109559054B CN 201811476080 A CN201811476080 A CN 201811476080A CN 109559054 B CN109559054 B CN 109559054B
Authority
CN
China
Prior art keywords
information
power engineering
engineering construction
electric power
data processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811476080.2A
Other languages
Chinese (zh)
Other versions
CN109559054A (en
Inventor
韩冰
张道金
于克林
张玉杰
刘长青
李爱丽
程晓晗
苏骞
颜景龙
刘丹烨
高伟
李德生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wudi Power Supply Co Of State Grid Shandong Electric Power Co
Original Assignee
Wudi Power Supply Co Of State Grid Shandong Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wudi Power Supply Co Of State Grid Shandong Electric Power Co filed Critical Wudi Power Supply Co Of State Grid Shandong Electric Power Co
Priority to CN201811476080.2A priority Critical patent/CN109559054B/en
Publication of CN109559054A publication Critical patent/CN109559054A/en
Application granted granted Critical
Publication of CN109559054B publication Critical patent/CN109559054B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention provides a power engineering construction information processing system, which is characterized in that a system foundation data processing process is configured, a distributed processing mode is configured for power engineering construction foundation information, and power engineering construction information foundation data input in the early stage of the power engineering construction information are processed; configuring a system process data processing process, configuring a distributed processing mode for the electric power engineering construction process information, acquiring, integrating and collecting the electric power engineering construction process information; and configuring a system completion data processing process, configuring a distributed processing mode for the electric power engineering construction completion information, acquiring, integrating and collecting the electric power engineering construction completion information. And multiple processes are executed in parallel, mutual conflict is avoided, and the processing and storage of the construction data of the power engineering are realized. The multi-stage data processing is synchronously performed at the same time, and multi-party sending, multi-party persistence and extraction and use are realized. The problems of long data storage time, long data extraction time, long data processing time and the like are solved, and the data processing efficiency is improved.

Description

Electric power engineering construction information processing system
Technical Field
The invention relates to the field of electric power engineering monitoring, in particular to an electric power engineering construction information processing system.
Background
With the high-speed increase of the economy of China, the electric power construction project is in a rapid growth trend, and therefore higher requirements are put forward on how to make good the management of the electric power construction project. The progress and quality management of a series of links from design to purchasing, manufacturing, installation and the like of the electric power construction project becomes the guarantee of the electric power construction project, the electric power equipment in the electric power construction project, each branch project in the electric power construction project and the scheduled completion of each branch project, and therefore the whole construction progress and quality can be guaranteed.
In practice, some systems or program software of the electric power engineering construction information can provide processing and storage based on the electric power engineering construction information, so that the construction information can be retained for subsequent use. However, the construction information of the power engineering is complex, and the data information is sent by multiple parties, is available for multiple parties and is extracted for use. Therefore, the data processing time of the system is too long, namely, the data storage time is long, the data extraction time is long, the data processing time is long, and the like, so that the data cannot be normally used, and the use of the construction information of the power engineering is influenced.
Disclosure of Invention
In order to overcome the defects in the prior art, the invention provides an electric power engineering construction information processing system, which comprises: a basic data processing progress module, a process data processing progress module and a completion data processing progress module;
the basic data processing progress module is used for configuring a system basic data processing progress, configuring a distributed processing mode for the electric power engineering construction basic information and processing the electric power engineering construction information basic data input in the early stage of the electric power engineering construction information;
the process data processing progress module is used for configuring a system process data processing progress, configuring a distributed processing mode for the electric power engineering construction process information, acquiring, integrating and collecting the electric power engineering construction process information;
and the completion data processing progress module is used for configuring a system completion data processing progress, configuring a distributed processing mode for the completion information of the electric power engineering, acquiring and integrating the completion information of the electric power engineering and collecting the completion information of the electric power engineering.
Preferably, the basic data processing progress module is further configured to obtain basic data of power engineering construction, equipment power line connection and section data of power engineering construction, power engineering line position, power engineering cloth rod position, power engineering stay wire position, power engineering ground position, power engineering household meter information, power engineering service wire information, power engineering wall load information, power engineering meter box information, cable channel, cable trench information, cable label information, and low-voltage transformer area arrangement information, form a power engineering construction design drawing, and provide modification, query, and newly added ports;
the design scheme is also used for acquiring the power construction information, the power equipment contract information corresponds to the power equipment construction information, a power equipment construction information design data management base is formed, and the power equipment construction information design data management base is stored in a design data storage area of the database;
the system is also used for providing an addition/deletion correction port of the construction contract of the electric power equipment, collecting each construction contract of the electric power equipment, enabling the construction information of the electric power equipment to correspond to the information of the electric power engineering project one by one to form a contract management library, and providing a contract input port, a contract edition port, a contract correction port and a contract query port of each construction contract of the electric power equipment;
the system is also used for acquiring construction project establishment information, bidding information and contract information of the power equipment and storing the information into a basic information storage area of a database;
the method is also used for acquiring basic information of the power equipment to be constructed, and the basic information comprises the following steps: the method comprises the following steps of (1) power equipment signals, power equipment application, power equipment functions, power equipment foundation requirements, power equipment construction process information, power equipment installation processes and power equipment debugging modes; storing basic information of the power equipment to be constructed in a basic information storage area of a database; the system is also used for acquiring material name information of the construction process of the power equipment and the consumption information of each material name, and storing the information into a basic information storage area of the database.
Preferably, the process data processing progress module is further configured to provide a reading process data processing progress and a writing process data processing progress for the power engineering construction information, and the reading process data processing progress and the writing process data processing progress are parallel processing progresses;
the system is also used for providing a process examination and approval item information processing process, a process detection item information processing process, a process image information processing process and a process file information processing process in the construction process based on keyword extraction, and storing the information in a process storage area of a database through a writing process data processing process;
the system is also used for extracting each electric power equipment construction project preset period information processing process based on the key words; and acquiring information processing processes of all progress preset monitoring points in a project preset period based on keyword extraction.
Preferably, the process data processing progress module is further configured to provide a multi-port write process data processing progress based on the electrical engineering construction information, write the electrical engineering construction information into the system, and store, analyze and process the electrical engineering construction information written into the system.
Preferably, the completion data processing progress module is further configured to provide a power engineering completion reading process data processing progress and a completion writing process data processing progress, and the completion reading process data processing progress and the completion writing process data processing progress are parallel processing progresses;
the system is also used for acquiring completion information of the electric power equipment, and storing the completion information of the electric power equipment to a completion storage area of the database in a completion process data processing process; the completion writing process data processing process is also used for collecting and organizing completed power equipment construction projects to generate a completion acceptance report;
and the system is also used for acquiring the settlement information of the electric power equipment, and storing the settlement information of the electric power equipment into a settlement storage area of the database by a data processing process in the completion writing process.
Preferably, the process data processing progress module is further configured to monitor operation data of the electric power engineering construction equipment, and compare the operation data with a threshold; monitoring environmental data of electric power engineering construction, and comparing the environmental data with a threshold value; monitoring data position data and human health data of related personnel of the power engineering construction, monitoring power engineering construction video data, monitoring operation data of a power engineering construction vehicle, and comparing the data with a threshold value;
the data state is also analyzed, and when a certain data or a plurality of data exceed a threshold value, an alarm prompt is sent out;
the method is also used for configuring an environmental data analysis curve, a construction progress curve and a construction progress network analysis chart.
Preferably, the process data processing progress module is further configured to obtain current data parameters of the management and evaluation of the plurality of power engineering construction projects and initial evaluation data of the management and evaluation of the power engineering construction projects, perform risk deviation analysis, and perform risk deviation analysis based on a same power engineering construction project management state that exists previously;
the method is also used for establishing a quality grade evaluation mechanism of the power engineering construction detection points, realizing management of a plurality of power engineering construction projects on equivalent parameters, and executing the quality grade evaluation mechanism of the detection points based on preset parameters and the same power engineering construction project parameters existing in advance;
each parameter of each power project construction project is analyzed by evaluation to determine that each power project construction project parameter meets a quality requirement and a current quality level of each power project construction project.
Preferably, the process data processing progress module is further configured to track and monitor the execution condition of the power engineering construction in the power engineering construction process, and perform summary statistics on the total contract payment and the subcontract payment of the power engineering construction and the power engineering construction cost;
counting the current construction cost expenditure information of the power engineering, and comparing and analyzing whether the construction target cost of the power engineering has deviation or not;
if the cost deviation does not exist, continuing tracking and monitoring the cost generated by the electric power engineering construction project;
if the cost generated by the power engineering construction project is deviated, calling the cost deviation generated by the power engineering construction project to perform deviation analysis;
and finding out key factors of the deviation of the electric power engineering construction project, and analyzing and displaying data through material quantity, labor quantity, equipment shift and engineering progress quantity for reference of users.
Acquiring deviation correcting data of a power engineering construction project, and adjusting a cost plan of the power engineering construction project according to the deviation correcting data of the power engineering construction project;
the system is also used for analyzing the cost trend of the power engineering construction project according to the power engineering construction project cost plan; and determining a working plan according to the cost budget adjustment result of the power engineering construction project and the cost budget adjustment of the power engineering construction project.
According to the technical scheme, the invention has the following advantages:
the invention provides a basic data processing progress module, a process data processing progress module and an as built data processing progress module. The system can coordinately complete large-scale information processing tasks in different working periods, different construction stages, on the basis of progress and quality requirements, different functions or by connecting a plurality of computers through a communication network during construction, under the unified management control of the system.
According to the invention, multiple processes are executed in parallel, mutual conflict is avoided, and the processing and storage of the construction data of the power engineering are realized.
The multi-stage data processing is synchronously performed at the same time, and multi-party sending, multi-party persistence and extraction and use are realized. The problems of long data storage time, long data extraction time, long data processing time and the like are avoided, and the data processing efficiency is improved.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings used in the description will be briefly introduced, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is an overall schematic diagram of an electric power engineering construction information processing system;
fig. 2 is a schematic diagram of an embodiment of the electric power engineering construction information processing system.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions of the present invention will be clearly and completely described below with reference to specific embodiments and drawings. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the scope of protection of this patent.
The present embodiment provides an electric power engineering construction information processing system, as shown in fig. 1 and fig. 2, including: a basic data processing progress module 1, a process data processing progress module 2 and a completion data processing progress module 3;
the basic data processing process module 1 is used for configuring a system basic data processing process, configuring a distributed processing mode for the electric power engineering construction basic information, and processing the electric power engineering construction information basic data input in the early stage of the electric power engineering construction information;
the process data processing progress module 2 is used for configuring a system process data processing progress, configuring a distributed processing mode for the electric power engineering construction process information, acquiring, integrating and collecting the electric power engineering construction process information;
the completion data processing progress module 3 is used for configuring a system completion data processing progress, configuring a distributed processing mode for the electric power engineering construction completion information, acquiring, integrating and collecting the electric power engineering construction completion information.
In the embodiment provided by the invention, the basic data processing progress module 1 is further used for acquiring basic data of power engineering construction, equipment power line connection and section data of power engineering construction, power engineering line position, power engineering cloth rod position, power engineering stay wire position, power engineering grounding position, power engineering user meter information, power engineering user wire receiving information, power engineering wall load information, power engineering meter box information, cable channel information, cable marking information and low-voltage transformer area arrangement information to form a power engineering construction design drawing, and providing modification, query and newly-added ports;
the design scheme is also used for acquiring the power construction information, the power equipment contract information corresponds to the power equipment construction information, a power equipment construction information design data management base is formed, and the power equipment construction information design data management base is stored in a design data storage area of the database;
the system is also used for providing an addition/deletion correction port of the construction contract of the electric power equipment, collecting each construction contract of the electric power equipment, enabling the construction information of the electric power equipment to correspond to the information of the electric power engineering project one by one to form a contract management library, and providing a contract input port, a contract edition port, a contract correction port and a contract query port of each construction contract of the electric power equipment;
the system is also used for acquiring construction project establishment information, bidding information and contract information of the power equipment and storing the information into a basic information storage area of a database;
the method is also used for acquiring basic information of the power equipment to be constructed, and the basic information comprises the following steps: the method comprises the following steps of (1) power equipment signals, power equipment application, power equipment functions, power equipment foundation requirements, power equipment construction process information, power equipment installation processes and power equipment debugging modes; storing basic information of the power equipment to be constructed in a basic information storage area of a database; the system is also used for acquiring material name information of the construction process of the power equipment and the consumption information of each material name, and storing the information into a basic information storage area of the database.
It should be further noted that the process data processing progress module is further configured to provide a reading process data processing progress and a writing process data processing progress for the electrical engineering construction information, and the reading process data processing progress and the writing process data processing progress are parallel processing progresses;
the system is also used for providing a process examination and approval item information processing process, a process detection item information processing process, a process image information processing process and a process file information processing process in the construction process based on keyword extraction, and storing the information in a process storage area of a database through a writing process data processing process;
the system is also used for extracting each electric power equipment construction project preset period information processing process based on the key words; and acquiring information processing processes of all progress preset monitoring points in a project preset period based on keyword extraction.
The process data processing progress module is also used for providing a multi-port writing process data processing progress based on the electric power engineering construction information, writing the electric power engineering construction information into the system, and storing, analyzing and processing the electric power engineering construction information written into the system.
In the embodiment provided by the invention, the completion data processing progress module is also used for providing a data processing progress in the electric power engineering completion reading process and a data processing progress in the completion writing process, and the data processing progress in the completion reading process and the data processing progress in the completion writing process are parallel processing progresses;
the system is also used for acquiring completion information of the electric power equipment, and storing the completion information of the electric power equipment to a completion storage area of the database in a completion process data processing process; the completion writing process data processing process is also used for collecting and organizing completed power equipment construction projects to generate completion acceptance reports;
and the system is also used for acquiring the settlement information of the electric power equipment, and storing the settlement information of the electric power equipment into a settlement storage area of the database by a data processing process in the completion writing process.
In the embodiment provided by the invention, the process data processing progress module is also used for monitoring the operation data of the electric power engineering construction equipment and comparing the operation data with the threshold value; monitoring environmental data of electric power engineering construction, and comparing the environmental data with a threshold value; monitoring data position data and human health data of related personnel of the power engineering construction, monitoring power engineering construction video data, monitoring operation data of a power engineering construction vehicle, and comparing the data with a threshold value;
the data state is also analyzed, and when a certain data or a plurality of data exceed a threshold value, an alarm prompt is sent out;
the method is also used for configuring an environmental data analysis curve, a construction progress curve and a construction progress network analysis chart.
In the embodiment provided by the invention, the process data processing progress module is also used for acquiring current data parameters of a plurality of electric power engineering construction project management evaluations and electric power engineering construction project management evaluation initial evaluation data, executing risk deviation analysis, and executing risk deviation analysis based on the same electric power engineering construction project management state existing in advance;
the method is also used for establishing a quality grade evaluation mechanism of the power engineering construction detection points, realizing management of a plurality of power engineering construction projects on equivalent parameters, and executing the quality grade evaluation mechanism of the detection points based on preset parameters and the same power engineering construction project parameters existing in advance;
each parameter of each power project construction project is analyzed by evaluation to determine that each power project construction project parameter meets a quality requirement and a current quality level of each power project construction project.
In the embodiment provided by the invention, the process data processing progress module is also used for tracking and monitoring the execution condition of the electric power engineering construction in the electric power engineering construction process, and summarizing and counting the total package and subcontract payment of the electric power engineering construction and the construction cost of the electric power engineering;
counting the current construction cost expenditure information of the power engineering, and comparing and analyzing whether the construction target cost of the power engineering has deviation or not;
if the cost deviation does not exist, continuing tracking and monitoring the cost generated by the electric power engineering construction project;
if the cost generated by the power engineering construction project is deviated, calling the cost deviation generated by the power engineering construction project to perform deviation analysis;
and finding out key factors of the deviation of the electric power engineering construction project, and analyzing and displaying data through material quantity, labor quantity, equipment shift and engineering progress quantity for reference of users.
Acquiring deviation correcting data of a power engineering construction project, and adjusting a cost plan of the power engineering construction project according to the deviation correcting data of the power engineering construction project;
the system is also used for analyzing the cost trend of the power engineering construction project according to the power engineering construction project cost plan; and determining a working plan according to the cost budget adjustment result of the power engineering construction project and the cost budget adjustment of the power engineering construction project.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (1)

1. An electric power engineering construction information processing system, characterized by comprising: a basic data processing progress module, a process data processing progress module and a completion data processing progress module;
the basic data processing progress module is used for configuring a system basic data processing progress, configuring a distributed processing mode for the electric power engineering construction basic information and processing the electric power engineering construction information basic data input in the early stage of the electric power engineering construction information;
the process data processing process module is used for configuring a system process data processing process, configuring a distributed processing mode for the electric power engineering construction process information, acquiring, integrating and collecting the electric power engineering construction process information;
the completion data processing progress module is used for configuring a system completion data processing progress, configuring a distributed processing mode for the electric power engineering construction completion information, acquiring, integrating and collecting the electric power engineering construction completion information;
the process data processing progress module is also used for providing a reading process data processing progress and a writing process data processing progress of the electric power engineering construction information, and the reading process data processing progress and the writing process data processing progress are parallel processing progresses;
the system is also used for providing a process examination and approval item information processing process, a process detection item information processing process, a process image information processing process and a process file information processing process in the construction process based on keyword extraction, and storing the information in a process storage area of a database through a writing process data processing process;
the system is also used for extracting each electric power equipment construction project preset period information processing process based on the key words; acquiring information processing processes of all progress preset monitoring points in a project preset period based on keyword extraction;
the process data processing progress module is also used for tracking and monitoring the execution condition of the electric power engineering construction in the electric power engineering construction process, and summarizing and counting the total package and subcontract payment of the electric power engineering construction and the construction cost of the electric power engineering;
counting the current construction cost expenditure information of the power engineering, and comparing and analyzing whether the construction target cost of the power engineering has deviation or not;
if the cost deviation does not exist, continuing tracking and monitoring the cost generated by the electric power engineering construction project;
if the cost generated by the electric power engineering construction project is deviated, the deviation analysis is carried out by calling the cost deviation generated by the electric power engineering construction project;
finding out key factors of deviation of the electric power engineering construction project, and analyzing and displaying data through material amount, labor amount, equipment shift and engineering progress amount for reference of users;
acquiring deviation correcting data of a power engineering construction project, and adjusting a cost plan of the power engineering construction project according to the deviation correcting data of the power engineering construction project;
the system is also used for analyzing the cost trend of the power engineering construction project according to the power engineering construction project cost plan; determining a working plan according to the cost budget adjustment result of the power engineering construction project and the cost budget adjustment of the power engineering construction project;
the process data processing progress module is also used for monitoring the operation data of the electric power engineering construction equipment and comparing the operation data with a threshold value; monitoring environmental data of electric power engineering construction, and comparing the environmental data with a threshold value; monitoring data position data and human health data of related personnel of the power engineering construction, monitoring power engineering construction video data, monitoring operation data of a power engineering construction vehicle, and comparing the data with a threshold value;
the data state is also analyzed, and when a certain data or a plurality of data exceed a threshold value, an alarm prompt is sent out;
the system is also used for configuring an environmental data analysis curve, a construction progress curve and a construction progress network analysis chart;
the process data processing progress module is also used for acquiring current data parameters of a plurality of electric power engineering construction project management evaluations and electric power engineering construction project management evaluation initial evaluation data, executing risk deviation analysis, and executing risk deviation analysis based on the same electric power engineering construction project management state existing in advance;
the method is also used for establishing a quality grade evaluation mechanism of the power engineering construction detection points, realizing management of a plurality of power engineering construction projects on equivalent parameters, and executing the quality grade evaluation mechanism of the detection points based on preset parameters and the same power engineering construction project parameters existing in advance;
evaluating and analyzing each parameter of each power engineering construction project to determine that each power engineering construction project parameter meets the quality requirement and the current quality level of each power engineering construction project;
the basic data processing progress module is also used for acquiring basic data of power engineering construction, equipment power line connection and section data of power engineering construction, power engineering line position, power engineering cloth rod position, power engineering stay wire position, power engineering grounding position, power engineering user meter information, power engineering service wire information, power engineering wall load information, power engineering meter box information, cable channel, cable trench information, cable marking information and low-voltage transformer area arrangement information to form a power engineering construction design drawing, and provide modification, query and newly-added ports;
the design scheme is also used for acquiring the power construction information, the power equipment contract information corresponds to the power equipment construction information, a power equipment construction information design data management base is formed, and the power equipment construction information design data management base is stored in a design data storage area of the database;
the system is also used for providing an addition/deletion correction port of the construction contract of the electric power equipment, collecting each construction contract of the electric power equipment, enabling the construction information of the electric power equipment to correspond to the information of the electric power engineering project one by one to form a contract management library, and providing a contract input port, a contract edition port, a contract correction port and a contract query port of each construction contract of the electric power equipment;
the system is also used for acquiring construction project establishment information, bidding information and contract information of the power equipment and storing the information into a basic information storage area of a database;
the method is also used for acquiring basic information of the power equipment to be constructed, and the basic information comprises the following steps: the method comprises the following steps of (1) power equipment signals, power equipment application, power equipment functions, power equipment foundation requirements, power equipment construction process information, power equipment installation processes and power equipment debugging modes; storing basic information of the power equipment to be constructed in a basic information storage area of a database; the system is also used for acquiring material name information of the construction process of the power equipment and the consumption information of each material name, and storing the information into a basic information storage area of a database;
the process data processing progress module is also used for providing a multi-port writing process data processing progress based on the electric power engineering construction information, writing the electric power engineering construction information into the system, and storing, analyzing and processing the electric power engineering construction information written into the system;
the completion data processing progress module is also used for providing a data processing progress in the electric power engineering completion reading process and a data processing progress in the completion writing process, and the data processing progress in the completion reading process and the data processing progress in the completion writing process are parallel processing progresses;
the system is also used for acquiring completion information of the electric power equipment, and storing the completion information of the electric power equipment to a completion storage area of the database in a completion process data processing process; the completion writing process data processing process is also used for collecting and organizing completed power equipment construction projects to generate a completion acceptance report;
and the system is also used for acquiring the settlement information of the electric power equipment, and storing the settlement information of the electric power equipment into a settlement storage area of the database by a data processing process in the completion writing process.
CN201811476080.2A 2018-12-04 2018-12-04 Electric power engineering construction information processing system Active CN109559054B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811476080.2A CN109559054B (en) 2018-12-04 2018-12-04 Electric power engineering construction information processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811476080.2A CN109559054B (en) 2018-12-04 2018-12-04 Electric power engineering construction information processing system

Publications (2)

Publication Number Publication Date
CN109559054A CN109559054A (en) 2019-04-02
CN109559054B true CN109559054B (en) 2022-05-27

Family

ID=65868898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811476080.2A Active CN109559054B (en) 2018-12-04 2018-12-04 Electric power engineering construction information processing system

Country Status (1)

Country Link
CN (1) CN109559054B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110196925B (en) * 2019-04-19 2020-03-20 北京戴纳实验科技有限公司 Information retrieval system for laboratory engineering design
CN110930025A (en) * 2019-11-21 2020-03-27 中国十九冶集团有限公司 Project management system for engineering construction
CN111260242A (en) * 2020-02-05 2020-06-09 国网北京市电力公司 Evaluation system and method
CN113159486A (en) * 2021-01-19 2021-07-23 深圳市都信建设监理有限公司 Electronic prevention and control project quality supervision method and system

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8306836B2 (en) * 2008-12-01 2012-11-06 Trimble Navigation Limited Management of materials on a construction site
CN203165006U (en) * 2013-01-23 2013-08-28 上海电信工程有限公司 Engineering project management system
CN104537452A (en) * 2014-11-04 2015-04-22 无锡鹰智科技有限公司 Electric power project computer management system
CN104850940B (en) * 2015-04-29 2018-08-31 国网辽宁省电力有限公司鞍山供电公司 Budget needed for the completion of projects preparation method and system based on engineering Whole Course Management
CN104809591A (en) * 2015-05-11 2015-07-29 东北电力大学 Electric power construction engineering supervision mechanism based on big data
CN105303332A (en) * 2015-11-30 2016-02-03 国家电网公司 Electric power engineering project management system
CN108320127A (en) * 2017-12-20 2018-07-24 国网山东省电力公司聊城供电公司 A kind of power engineering term computer management system
CN108898360A (en) * 2018-06-22 2018-11-27 中国能源建设集团安徽电力建设第工程有限公司 A kind of power engineering wisdom building site integrated control information system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
电网工程项目进度管理信息化模式研究;郭云鹏;《华东电力》;20081124;第36卷(第11期);第158-160页 *

Also Published As

Publication number Publication date
CN109559054A (en) 2019-04-02

Similar Documents

Publication Publication Date Title
CN109559054B (en) Electric power engineering construction information processing system
US8484549B2 (en) Visualizing data model sensitivity to variations in parameter values
CN106874483A (en) A kind of device and method of the patterned quality of data evaluation and test based on big data technology
CN105404967B (en) Automatic planning method and system for power distribution network
CA2845059A1 (en) Test script generation system
CN111611236A (en) Data analysis method and system
CN106874482A (en) A kind of device and method of the patterned data prediction based on big data technology
CN111680855A (en) Automatic risk detection and early warning method and system for whole process of project
CN102609501B (en) Data cleaning method based on real-time historical database
CN105405221A (en) Method and device for automated test
CN112016708A (en) Multi-dimensional data display method and device for intelligent cable
US20130110753A1 (en) Combining multivariate time-series prediction with motif discovery
CN110867956A (en) Topology automatic identification system and method based on intelligent platform area
CN115423429A (en) Multimode integrated distribution network operation system based on image and sound information
CN115271648B (en) Project visual supervision system, method, equipment and storage medium
CN111259212B (en) Telemetering data interpretation method, device, equipment and storage medium
CN114546365B (en) Flow visualization modeling method, server, computer system and medium
CN115657890A (en) PRA robot customizable method
CN113722564A (en) Visualization method and device for energy and material supply chain based on space map convolution
CN111160862A (en) Thinking-guidance-diagram-based process flow display method, electronic equipment and storage medium
CN115481826A (en) Electric power engineering construction information processing device and using method
CN111158827A (en) Method and device for graphic configuration tool correlation calculation value information
CN109359123A (en) A kind of inquiry of operation data and analysis system and method
CN110019172B (en) Data processing method and device, storage medium and electronic equipment
CN104598618A (en) Cloud platform incomplete large data filling method based on complete compatible classes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant