CN108320127A - A kind of power engineering term computer management system - Google Patents
A kind of power engineering term computer management system Download PDFInfo
- Publication number
- CN108320127A CN108320127A CN201711383677.8A CN201711383677A CN108320127A CN 108320127 A CN108320127 A CN 108320127A CN 201711383677 A CN201711383677 A CN 201711383677A CN 108320127 A CN108320127 A CN 108320127A
- Authority
- CN
- China
- Prior art keywords
- project
- module
- engineering
- management
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims abstract description 79
- 238000007689 inspection Methods 0.000 claims abstract description 11
- 238000009826 distribution Methods 0.000 claims abstract description 8
- 238000012544 monitoring process Methods 0.000 claims abstract description 6
- 238000012797 qualification Methods 0.000 claims abstract description 4
- 238000007726 management method Methods 0.000 claims description 61
- 238000000034 method Methods 0.000 claims description 13
- 230000008569 process Effects 0.000 claims description 12
- 238000013439 planning Methods 0.000 claims description 6
- 238000013461 design Methods 0.000 claims description 5
- 230000008676 import Effects 0.000 claims description 5
- 238000013475 authorization Methods 0.000 claims description 3
- 238000012937 correction Methods 0.000 claims description 3
- 238000012795 verification Methods 0.000 claims description 2
- 238000011156 evaluation Methods 0.000 abstract 1
- 238000009430 construction management Methods 0.000 description 11
- 238000005516 engineering process Methods 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 238000012986 modification Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 238000007619 statistical method Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000007639 printing Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/93—Document management systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Databases & Information Systems (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of power engineering term computers to manage system,It includes project management module,Construction team's management module,Project management and control module,Engineering project library module and fundamental functional modules,Construction team's management module is used for the essential information to construction team,Enterprise qualification and ability are managed,Inquiry and evaluation,The engineering project library module is used to file engineering project,Inquiry and download,The fundamental functional modules are used for system authority,User,Authority distribution is managed,The project management and control module includes project basic information module,Item base Profiling module and engineering project subpackage module,The project management and control module can help to carry out site inspection,Engineering management,Final acceptance of construction,The work such as safety management and monitoring,The present invention can help project manager to understand quickly positioning item location,Digital photograph filing is carried out in time,And coordinate the work of each department on engineering project chain,To improve project management efficiency.
Description
Technical field
The present invention relates to project management system fields more particularly to a kind of power engineering term computer to manage system.
Background technology
Higher level's capital construction management department requires increasingly strict, demonstration project, high grade project, mobile red banner, labor to construction management
Dynamic contest etc. all proposes requirements at the higher level to construction fine-grained management, but current power transmission and distribution project is limited by engineering project and goes into operation a little
Each professional is equipped with the factors such as few on more, construction management chain, and way to manage is still very extensive, and there are many weak spots needs
It further strengthens.
1, many engineering project positions are all kept away partially very much, and project progress, on-site actual situations only have a few peoples' understanding, look for every time
Engineered locations are required for special messenger to lead the way, and non-at-scene administrative staff can not be allowed to exercise supervision, clearly grasp in time;
2, digital photograph filing needs to shoot privileged site and content, and in one week in time according to state's net documentation requirements
Sorting and file is carried out, the digital photograph time of filing period of power transmission and distribution project and filing rate do not comply with requirement at present.
3, Project Operation management includes subpackage management, store keeping, capital management, is required on each management process chain
Sectors cooperation, there is flow in company the time requirement of restriction originally, but often card resistance influences whole in a certain flow now
A flow progress causes circulation time-out, serious engineering constraint progress;
In view of there are so more problems in engineering management, personnel lack, present situations can not change engineering duty again etc., consider to borrow
Reflect internet+thinking, comb construction management whole process, traditional construction management is optimized, it is powerful using PC and mobile phone
Storage capacity, statistical analysis ability and convenience, develop a kind of project management system, by the weak spot in construction management flow
Reinforced using current advanced IT technologies, allows whole process, each key node that can clearly be presented on each project pipe
In face of reason personnel, the transparency of engineering management can be increased, moreover it is possible to improve the running efficiency of company's construction management, realize that science and technology subtracts
It is negative.
Invention content
The purpose of the present invention is to provide a kind of power engineering term computers to manage system, complete by combing construction management
Flow optimizes traditional construction management, utilizes the powerful storage capacity of computer and mobile phone, statistical analysis ability and convenient
Property, the weak spot in construction management flow is reinforced using current advanced IT technologies, allows whole process, each key node
It can clearly be presented in face of each project manager, increase the transparency of engineering management, improve company's construction management
Running efficiency realizes science and technology Reduction of Students' Study Load.
For achieving the above object, the present invention adopts the following technical scheme that:
The present invention provides a kind of power engineering term computers to manage system comprising project management module, construction team
5 management modules, project management and control module, engineering project library module and fundamental functional modules, construction team's management module are used for
Record management is carried out to the essential information, enterprise qualification and ability of construction team, to the project query that construction team's history undertakes,
And the performance of construction team in the construction process is evaluated, the engineering project library module is used for according to the time to engineering
Project is filed, and to carrying out inquiry and being packaged project document to download in the project built and completed, the fundamental functional modules are used for
System authority, user, authority distribution are managed, and record login daily record and the operation log of each user, wherein:
The project management module includes project basic information management module, item base Profiling module and engineering project point
Packet module;
The project basic information management module is used to import or be marked on map the geographical location of project;The project
Basic data module is for importing, changing and the drawing of management project, material table, Planning of construction periods and engineering design plan;It is described
Engineering project subpackage module is used to record the subpackage information of engineering project, is counted to the drawing, material table, duration of sub-contracted project project
It draws and engineering design plan is adjusted;
The project management and control module includes site inspection module, subcontract module, engineering management module, project construction
Thread management module, checks and accepts module and project monitoring module at safety management module;
The site inspection module for subpackage troop to the subcontracted parts carry out site inspection when to project geographical location into
Row positioning and verification mark, correction drawing, material table and quantities;The subcontract module is closed for entry purpose subpackage
Together, and material table, project drawing and the Planning of construction periods of corresponding sub-contracted project;The engineering management module is used for work progress
Materials'use situation and project construction situation be managed;The safety management module is used for construction team's list and arrives
Position situation record and supervision;The examination module is used to carry out completion report of construction work, completion summary of materials and completed project drawing
Management;The project monitoring module is used to be monitored the construction situation of each project and to the reality of construction team everyone
Shi Dingwei.
Optimization as the present invention to above-mentioned technical proposal, the fundamental functional modules include system setting submodule, close
Key mandate submodule and collect statistics submodule.
Optimization as the present invention to above-mentioned technical proposal, construction team's management module include construction team's essential information
It manages submodule and project under construction inquires submodule.
The beneficial effects of the present invention are:
(1) allow all items personnel of taking part in building that can easily grasp engineering progress situation, construction location is found in preparation;Basic number
After maintenance, all permissions related personnel can see entire engineering progress situation by mobile phone APP terminal, pass through construction location
All affected members are allowed accurately to find construction location after navigation feature with the combination of cell phone map.
(2) it is reminded by the shooting of the digital piece of cell phone application and convenient engineering, realization digital photograph files promptness 100%,
By the realization of teletransmission engineering, filing rate 100% is realized.
(3) by engineering project library module, engineering data electronic document can be established, in favor of realize engineering data and
When sort out and quick-searching, the progress of engineering can be understood in real time, especially to complicated line project, project progress is in electricity
Very clear on sub- map, engineered locations can be easily found by map navigation function, allow all personnel that take part in building to shorten engineering ripe
The time is known, working efficiency is improved.
(4) each department's ditch has been connected with APP this " tie " on each sub-contracted project project construction and each engineering project chain, has
Conducive to resource-sharing, promote the communication and coordination of each department inside power transmission and distribution project, especially subpackage plan, material planning, fund
Plan it is transparent after, flow tempo is obviously accelerated, and a certain link is seldom stuck in, and has ensured the smooth development of engineering indirectly.
After specification, standard, circular document are uploaded onto the server, construction personnel at the scene can also download at any time to browse, and comparison is improved and applied
Work technique, improves Personnel Skill Levels, has ensured construction quality.All safety inspections, quality examination work " with no paper " into
Row is carried out, and bright spot, disadvantage can be watched by mobile phone, forms an exposure stage, and the competitive spirit of each engineering project is transferred
Get up, forms than learning the good construction atmosphere caught up with and surpassed.
(5) it by the collection to engineering foundation data, is established for the analysis of duration of a project in later stage, flow duration of runs big data
Fixed basis, allows project management is more standardized, sequencing.
Specific implementation mode
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, with reference to
Specific implementation mode, the present invention is further explained.
A kind of power engineering term computer management system comprising project management module, construction team's management module, item
Mesh management and control module, engineering project library module and fundamental functional modules, wherein:
One, project management module
1, project basic information management submodule
The essential information of project is managed, and can import or be marked on map the geographical location of project.Acquiescence system
The geographical location that system marks project according to the item address of input on map automatically (is searched for by geographical location and is marked, is not allowed
Really).
2, item base data management submodule
(1) drawing information of lead-in item automatically generates engineering line chart, and can change engineering drawing (line chart), beats
Print engineering drawing.
(2) the material table of engineering project is imported.The material table of online modification engineering project, and according to engineering project subpackage feelings
Condition, adjustment form the material table of the subcontracted parts.And to the automatic calculating ratio pair of material table, verify material that is remaining or lacking.
(3) upload or add security protocol net label.
(4) it imports or typing engineering project milestone plan (duration), the prompt of system automatic early-warning is arranged according to system,
Administrative staff, management and construction team are reminded in advance.
(5) it imports or typing project engineering design is planned.And it is managed.
3, engineering project subpackage submodule
The subpackage information for recording engineering project, to the material, project drawing, milestone plan etc. of sub-contracted project project
It is adjusted setting.
Two, construction team's management module
1, construction team's basic information management submodule
Record management is carried out to the essential information, enterprise qualification, ability of construction team;In the construction process to construction team
Performance and problem recorded, evaluate star.
2, project under construction inquires submodule
The project situation that construction team's history undertakes is inquired.
Three, project management and control module
1, site inspection submodule
Subpackage construction team carries out site inspection to the subcontracted parts, in survey processes to project by cell phone application system
Reason position carries out positioning and verifies mark;Correction project drawing;According to project standard configuration, calculates and generate material table and engineering
Amount.The cost budgeting of Perform Project Financial Aanalysis.
2, subcontract submodule is signed
Entry purpose subcontract, and the final material of corresponding sub-contracted project, project drawing, milestone plan etc.
Content.
3, engineering management submodule
(1) handling of goods and materials
The basic supplies material account of engineering project is formed according to material table;Project material arrival situation is recorded, and is distributed
To each subcontracted parts, is led and expected by notifications subpackage construction team;Recording materials use in the construction process for construction team
Situation;Construction team reports the material information that project lacks, and after the workflow examination and approval set in system, purchases or allot hair
It puts;The material information used in programming count work progress generates completion material table.
(2) project construction process management
When project kickoff, subpackage troop is according to template completion or uploads commencement report;In work progress, pass through cell phone application
Work on the spot photo and marking situation, feedback items progress are uploaded according to construction site code requirement.To the logging of completion
Construction personnel.Cell phone application is automatically reminded to construction personnel and reports project process according to system set-up time.
4, safety management submodule
(1) construction plan
Subpackage troop works out daily construction plan according to project milestone;Upload construction team's list.
(2) it supervises in place
Safety manager supervises (system automatically records the movement locus of safety manager) in place daily, records in real time
Construction site, and recorded video upload of taking pictures, system automatically record geographical location information when upload.
5, final acceptance of construction submodule
(1) after project is completed, subpackage troop reports completion report of construction work.
(2) system automatically generated completion summary of materials.
(3) administrative staff establishment officer carries out an acceptance inspection.When examination, inspector by cell phone application the checking item drawing with
Whether actual items situation is consistent, and according to actual conditions revisions on drawings content.System automatically generated checks and accepts summary of materials.
(4) construction team and other personnel carry out project material to improve modification.
(5) all material information of project is checked by system, and can be packaged download.
6, project monitoring submodule
(1) construction situation of each project is monitored, the distribution situation of project in construction, point is shown by map interface
Each project is hit, can check the specific construction situation of each subpackage troop, and the same Field Force of cluster intercommunication function can be passed through
Carry out communication exchange.
(2) real-time locating display is carried out to field personnel, and the movement locus of each personnel can be played back.
7, project data manages submodule
(1) retrieval is carried out to the data of each project to check.
(2) user's online modification data content with permission.
(3) project data is packaged and is downloaded.
Four, engineering project library module
Engineering project is filed according to the time, to being inquired in the project built and completed.And project document can be packaged
It downloads.
Five, fundamental functional modules
1, submodule is arranged in system
System authority, user, authority distribution are managed.And record login daily record and the operation log of each user.
2, key authorization manages submodule
To key user by the way of key authorization login system, by the module carry out key use empowerment management.
3, collect statistics submodule
It is main to realize the function of statistic analysis of Various types of data, and support printing and export function.Statistical report form support table,
The data of the forms of expression such as block diagram, line chart, cake chart, specific statistical analysis include:
(1) the engineering project situation of range statistics each construction period is pressed.
(2) subpackage troop statistical item construction situation is pressed.
(3) item types statistical engineering project construction situation is pressed.
Based on above-mentioned project management system, allow all items personnel of taking part in building that can easily grasp engineering progress situation, it is accurate
It is standby to find construction location;After basic data maintenance, all permissions related personnel can see entire engineering by mobile phone APP terminal
Progress after navigation feature, accurately found by be allowed all affected members and applied by the combination of construction location and cell phone map
Station is set;It is reminded by the digital piece shooting of cell phone application and convenient engineering, realization digital photograph is filed promptness 100%, passed through
Filing rate 100% is realized in the realization of teletransmission engineering;The Project Operation management subpackage flow used time drops to 1 half a month of corporate policy
Within, the material movement used time drops within 1 month of corporate policy, and the fund reply used time drops within 15 days of corporate policy.
Those of ordinary skill in the art it should be appreciated that more than embodiment be intended merely to illustrate the present invention,
And be not used as limitation of the invention, as long as in the spirit of the present invention, the change to embodiment described above
Change, modification will all be fallen in scope of the presently claimed invention.
Claims (3)
1. a kind of power engineering term computer manages system, which is characterized in that it includes project management module, construction team's pipe
Module, project management and control module, engineering project library module and fundamental functional modules are managed, construction team's management module is used for applying
Essential information, enterprise qualification and the ability of crew 5 carry out record management, to the project query that construction team's history undertakes, and
The performance of construction team in the construction process is evaluated, the engineering project library module is used for according to the time to engineering project
Filing, to carrying out inquiry and being packaged project document to download in the project built and completed, the fundamental functional modules are used for being
System mechanism, user, authority distribution are managed, and record login daily record and the operation log of each user, wherein:
The project management module includes project basic information management module, item base Profiling module and engineering project subpackage mould
Block;
The project basic information management module is used to import or be marked on map the geographical location of project;The item base
Profiling module is for importing, changing and the drawing of management project, material table, Planning of construction periods and engineering design plan;The engineering
Projects subcontract module is used to record the subpackage information of engineering project, to the drawing of sub-contracted project project, material table, Planning of construction periods and
Engineering design plan is adjusted;
The project management and control module includes site inspection module, subcontract module, engineering management module, project construction process pipe
It manages module, safety management module, check and accept module and project monitoring module;
The site inspection module determines project geographical location when carrying out site inspection to the subcontracted parts for subpackage troop
Position and verification mark, correction drawing, material table and quantities;The subcontract module is used for entry purpose subcontract,
And material table, project drawing and the Planning of construction periods of corresponding sub-contracted project;The engineering management module is used for work progress
Materials'use situation and project construction situation are managed;The safety management module is for construction team's list and in place
Situation records and supervision;The examination module to completion report of construction work, completion summary of materials and completed project drawing for carrying out pipe
Reason;The project monitoring module is for being monitored the construction situation of each project and to the real-time of construction team everyone
Positioning.
2. a kind of power engineering term computer according to claim 1 manages system, which is characterized in that the basis work(
Energy module includes system setting submodule, key authorization submodule and collect statistics submodule.
3. a kind of power engineering term computer according to claim 1 manages system, which is characterized in that the construction team
5 management modules include construction team's basic information management submodule and project under construction inquiry submodule.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711383677.8A CN108320127A (en) | 2017-12-20 | 2017-12-20 | A kind of power engineering term computer management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711383677.8A CN108320127A (en) | 2017-12-20 | 2017-12-20 | A kind of power engineering term computer management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108320127A true CN108320127A (en) | 2018-07-24 |
Family
ID=62891767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711383677.8A Pending CN108320127A (en) | 2017-12-20 | 2017-12-20 | A kind of power engineering term computer management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108320127A (en) |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106651653A (en) * | 2016-12-19 | 2017-05-10 | 国家电网公司 | Intelligent power distribution network project auxiliary management system |
CN109064142A (en) * | 2018-09-18 | 2018-12-21 | 电子科技大学 | Power engineering Project Management System based on J2EE platform |
CN109508950A (en) * | 2018-10-10 | 2019-03-22 | 国网新疆电力有限公司信息通信公司 | The application method and control early warning system of early warning are managed in information communications management system |
CN109559054A (en) * | 2018-12-04 | 2019-04-02 | 国网山东省电力公司无棣县供电公司 | A kind of Phase of Electric Power Projects information processing system |
CN109784852A (en) * | 2019-01-12 | 2019-05-21 | 重庆洪峰工业设备安装有限公司 | A kind of electronic system and working method of Engineering Oriented debit |
CN110223001A (en) * | 2019-06-18 | 2019-09-10 | 北京蓝尊科技有限公司 | A kind of ecological environment reparation overall process dynamic supervision method and system |
CN110322224A (en) * | 2019-07-03 | 2019-10-11 | 福建广电网络集团股份有限公司 | A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd |
CN110428236A (en) * | 2019-08-15 | 2019-11-08 | 宁夏信友监理咨询管理股份有限公司 | A kind of communication engineering construction whole process engineering consulting management system |
CN110580254A (en) * | 2019-07-30 | 2019-12-17 | 上海建工五建集团有限公司 | Engineering project data management system |
CN110689255A (en) * | 2019-09-23 | 2020-01-14 | 广州轨道交通建设监理有限公司 | Engineering supervision enterprise integrated service management system |
CN110852909A (en) * | 2019-09-01 | 2020-02-28 | 成都建工第五建筑工程有限公司 | Building engineering information management system |
CN111160852A (en) * | 2019-12-16 | 2020-05-15 | 温州电力建设有限公司 | Intelligent engineering data writing system and method based on big data |
CN111444141A (en) * | 2020-03-26 | 2020-07-24 | 长沙中交京纬工程技术有限公司 | Data archive storage method based on BIM |
CN111667224A (en) * | 2019-03-05 | 2020-09-15 | 王民峰 | APP for dynamically managing engineering construction based on project division at multiple terminals |
CN111950845A (en) * | 2020-07-02 | 2020-11-17 | 广东邦鑫数据科技股份有限公司 | Processing method, system, device and medium for surveying and measuring engineering data |
CN112200543A (en) * | 2020-10-28 | 2021-01-08 | 中国华电科工集团有限公司 | Management method and management system for new energy engineering construction |
CN112529544A (en) * | 2020-12-29 | 2021-03-19 | 上海都毅通信工程有限公司 | Project process management method and system |
CN112541748A (en) * | 2020-12-29 | 2021-03-23 | 大成数据科技(河南)有限公司 | Engineering project management system based on BIM technology |
CN112826103A (en) * | 2021-01-25 | 2021-05-25 | 范新广 | Peeling device for processing dried orange peel |
CN112967019A (en) * | 2021-03-03 | 2021-06-15 | 国网河南省电力公司郑州供电公司 | Management application system for major repair technique modification in power system |
CN113761608A (en) * | 2020-06-05 | 2021-12-07 | 株式会社缮 | Construction support cloud system and program |
CN114792226A (en) * | 2022-04-13 | 2022-07-26 | 刘博� | Electronic standing book management method and system for project material review |
CN115796814A (en) * | 2023-02-06 | 2023-03-14 | 一智科技有限公司 | Construction management method and system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120221379A1 (en) * | 2011-02-11 | 2012-08-30 | David Frederick Martinez | Facility control system (fcs) to manage assets and products |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
US20170053244A1 (en) * | 2015-08-22 | 2017-02-23 | Salim B. KHALIL | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods |
CN107480959A (en) * | 2017-09-06 | 2017-12-15 | 聊城市光明电力服务有限责任公司 | A kind of power engineering project management and control application system |
-
2017
- 2017-12-20 CN CN201711383677.8A patent/CN108320127A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120221379A1 (en) * | 2011-02-11 | 2012-08-30 | David Frederick Martinez | Facility control system (fcs) to manage assets and products |
US20170053244A1 (en) * | 2015-08-22 | 2017-02-23 | Salim B. KHALIL | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
CN107480959A (en) * | 2017-09-06 | 2017-12-15 | 聊城市光明电力服务有限责任公司 | A kind of power engineering project management and control application system |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106651653A (en) * | 2016-12-19 | 2017-05-10 | 国家电网公司 | Intelligent power distribution network project auxiliary management system |
CN106651653B (en) * | 2016-12-19 | 2021-05-04 | 国家电网公司 | Intelligent power distribution network engineering auxiliary management system |
CN109064142A (en) * | 2018-09-18 | 2018-12-21 | 电子科技大学 | Power engineering Project Management System based on J2EE platform |
CN109508950A (en) * | 2018-10-10 | 2019-03-22 | 国网新疆电力有限公司信息通信公司 | The application method and control early warning system of early warning are managed in information communications management system |
CN109559054A (en) * | 2018-12-04 | 2019-04-02 | 国网山东省电力公司无棣县供电公司 | A kind of Phase of Electric Power Projects information processing system |
CN109784852A (en) * | 2019-01-12 | 2019-05-21 | 重庆洪峰工业设备安装有限公司 | A kind of electronic system and working method of Engineering Oriented debit |
CN111667224A (en) * | 2019-03-05 | 2020-09-15 | 王民峰 | APP for dynamically managing engineering construction based on project division at multiple terminals |
CN110223001A (en) * | 2019-06-18 | 2019-09-10 | 北京蓝尊科技有限公司 | A kind of ecological environment reparation overall process dynamic supervision method and system |
CN110322224A (en) * | 2019-07-03 | 2019-10-11 | 福建广电网络集团股份有限公司 | A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd |
CN110580254A (en) * | 2019-07-30 | 2019-12-17 | 上海建工五建集团有限公司 | Engineering project data management system |
CN110428236A (en) * | 2019-08-15 | 2019-11-08 | 宁夏信友监理咨询管理股份有限公司 | A kind of communication engineering construction whole process engineering consulting management system |
CN110852909A (en) * | 2019-09-01 | 2020-02-28 | 成都建工第五建筑工程有限公司 | Building engineering information management system |
CN110689255A (en) * | 2019-09-23 | 2020-01-14 | 广州轨道交通建设监理有限公司 | Engineering supervision enterprise integrated service management system |
CN111160852A (en) * | 2019-12-16 | 2020-05-15 | 温州电力建设有限公司 | Intelligent engineering data writing system and method based on big data |
CN111444141A (en) * | 2020-03-26 | 2020-07-24 | 长沙中交京纬工程技术有限公司 | Data archive storage method based on BIM |
CN111444141B (en) * | 2020-03-26 | 2022-12-02 | 北京中交京纬公路造价技术有限公司 | Data archive storage method based on BIM |
CN113761608A (en) * | 2020-06-05 | 2021-12-07 | 株式会社缮 | Construction support cloud system and program |
CN111950845A (en) * | 2020-07-02 | 2020-11-17 | 广东邦鑫数据科技股份有限公司 | Processing method, system, device and medium for surveying and measuring engineering data |
CN112200543A (en) * | 2020-10-28 | 2021-01-08 | 中国华电科工集团有限公司 | Management method and management system for new energy engineering construction |
CN112541748A (en) * | 2020-12-29 | 2021-03-23 | 大成数据科技(河南)有限公司 | Engineering project management system based on BIM technology |
CN112529544A (en) * | 2020-12-29 | 2021-03-19 | 上海都毅通信工程有限公司 | Project process management method and system |
CN112826103A (en) * | 2021-01-25 | 2021-05-25 | 范新广 | Peeling device for processing dried orange peel |
CN112967019A (en) * | 2021-03-03 | 2021-06-15 | 国网河南省电力公司郑州供电公司 | Management application system for major repair technique modification in power system |
CN114792226A (en) * | 2022-04-13 | 2022-07-26 | 刘博� | Electronic standing book management method and system for project material review |
CN115796814A (en) * | 2023-02-06 | 2023-03-14 | 一智科技有限公司 | Construction management method and system |
CN115796814B (en) * | 2023-02-06 | 2023-06-20 | 一智科技有限公司 | Construction management method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108320127A (en) | A kind of power engineering term computer management system | |
CN204791127U (en) | Job site quality control information system | |
CN115375146B (en) | Digital construction integrated platform | |
CN105205682A (en) | Product design Internet platform and application method thereof | |
CN111506662A (en) | Data collection system for enterprise fixed asset arrangement based on block chain | |
CN109740622A (en) | Image labeling task crowdsourcing method and system based on the logical card award method of block chain | |
CN104361445A (en) | Real-time labor management system and management method | |
CN107480959A (en) | A kind of power engineering project management and control application system | |
CN106251061A (en) | A kind of intellectual capital management system | |
CN106600734A (en) | Processing method and system for card swiping for attendance, as well as mobile end and server | |
CN107274315A (en) | Classroom based on wechat public number is registered method and system | |
CN111126884A (en) | Engineering progress management system and method based on block chain | |
CN104899143A (en) | Software peer review system realizing device for providing DM (Data Mining) | |
CN105719122A (en) | Field operation distance-based performance accounting management method and system | |
CN111861799A (en) | Intelligent construction site management system and method | |
CN113870047A (en) | Power engineering management and control system | |
CN109377282A (en) | Real estate Land Appraisal production management method and system, computer equipment and storage medium | |
CN109241773A (en) | construction cost data management system | |
CN102610141A (en) | Software development process transition control system | |
CN115034740A (en) | Full life cycle project management cloud platform system | |
CN116342311A (en) | Reimbursement system and method of use thereof | |
CN114971820A (en) | Online trading platform based on block chain | |
CN111522882B (en) | Internal model management system and method based on block chain | |
CN113807706B (en) | College student innovation and creation academic score management system and method based on blockchain technology | |
CN111798081A (en) | Rural electrification project management system based on block chain technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180724 |
|
RJ01 | Rejection of invention patent application after publication |