CN109508950A - The application method and control early warning system of early warning are managed in information communications management system - Google Patents

The application method and control early warning system of early warning are managed in information communications management system Download PDF

Info

Publication number
CN109508950A
CN109508950A CN201811179418.8A CN201811179418A CN109508950A CN 109508950 A CN109508950 A CN 109508950A CN 201811179418 A CN201811179418 A CN 201811179418A CN 109508950 A CN109508950 A CN 109508950A
Authority
CN
China
Prior art keywords
data
project
management system
control unit
data center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811179418.8A
Other languages
Chinese (zh)
Inventor
李豫芹
刘权
刘信
何伟
摆小军
张镇东
马婉贞
马斌
王天军
冯磊
尹蕊
张烜
顾楠
杨淼
李德高
侯建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Network Xinjiang Electric Power Co Ltd Information And Communication Co
State Grid Corp of China SGCC
Original Assignee
National Network Xinjiang Electric Power Co Ltd Information And Communication Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Network Xinjiang Electric Power Co Ltd Information And Communication Co, State Grid Corp of China SGCC filed Critical National Network Xinjiang Electric Power Co Ltd Information And Communication Co
Priority to CN201811179418.8A priority Critical patent/CN109508950A/en
Publication of CN109508950A publication Critical patent/CN109508950A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/12Messaging; Mailboxes; Announcements
    • H04W4/14Short messaging services, e.g. short message services [SMS] or unstructured supplementary service data [USSD]

Abstract

The present invention relates to power informatization technical fields, it is the application method and control early warning system that early warning is managed in a kind of information communications management system, it includes telematic services management system, data center server, data acquisition module, control unit, SMS platform, control unit receives data acquisition unit from the project milestone node data in the telematic services management system that data center server acquires and compares with alarm threshold, if it was found that project milestone node data is more than preset alarm threshold, it then issues warning information and warning information is pushed to stakeholder using SMS platform.The present invention relies on existing telematic services management system and data center server SMS platform and integrates using SMS platform, realize that user requires customized alarm threshold according to project control and informs the working condition that project stakeholder should complete in the recent period by short message, " link up funnel " is effectively avoided, is improved work efficiency and resource utilization.

Description

The application method and control early warning system of early warning are managed in information communications management system
Technical field
It is the user that early warning is managed in a kind of information communications management system the present invention relates to power informatization technical field Method and control early warning system.
Background technique
At present during Information-based Item is managed, relies primarily on Party A personnel and looked into telematic services management system The important milestone node asking project milestone node data and executing according to the project plan calculates project alarm time and active It contacts Party B manufacturer and prepares evidence material;And the influence that managed project is various, project related personnel links up the factors such as inappropriate, The case where Party A is with the generally existing information asymmetry of Party B implement team, " linking up funnel ", causes project duration to be delayed, influences item Purpose is effectively managed.
Summary of the invention
The present invention provides the application method for managing early warning in a kind of information communications management system and early warning system is managed, gram The deficiency for having taken the above-mentioned prior art can effectively solve in existing information project " linking up funnel ", project control by people The work efficiency of management is low, both sides' information asymmetry, influences vulnerable to field conduct environment, links up inappropriate problem.
Technical solution of the present invention first is that being realized by following measures: managed in a kind of information communications management system The application method of early warning, includes the following steps:
Step 1: data acquisition module is logical by the information that the acquisition of IEC standard data-interface is stored in data center server The project milestone node data of communication service management system enters second step later;
It is required step 2: user manages according to project, project milestone node alarm threshold and project is set in a control unit Shareholder's contact method enters third step later;
Step 3: control unit is compared according to the alarm threshold of collected project milestone node data and user setting, if Project milestone node data is not up to alarm conditions, then repeatedly third step;If project milestone node data reaches alarm bar Part, control unit generate warning information, enter the 4th step later;
Step 4: the warning information that control unit generates is transferred to data center server, data center by data acquisition module Server calls SMS platform enters the 5th step later;
Step 5: SMS platform searches preset project stakeholder's contact method, warning information is sent with short message mode To project stakeholder, enter the 6th step later;
Step 6: project stakeholder prepares evidence material according to short message, and in typing telematic services management system, Enter the 7th step later;
Step 7: telematic services management system is according to evidence material renewal item milestone node data.
Technical solution of the present invention second is that being realized by following measures: a kind of control early warning system, feature exist In include telematic services management system, data center server, data acquisition module, control unit, SMS platform, it is described Telematic services management system, data center server, data acquisition module, control unit are sequentially connected electrically, the data Central server for storing telematic services Management System Data, adopted by IEC standard data-interface by data acquisition module Collect the project milestone node data for the telematic services management system being stored in data center server and is transferred to control Unit processed, control unit read and judge whether project milestone node data reaches alarm threshold and generate warning information, number Warning information is transferred to data center server according to acquisition module, data center server is called by webservice interface Warning information is sent to project stakeholder by SMS platform in the form of short message.
Here is the further optimization and/or improvements to invention technology described above scheme:
Above-mentioned project milestone node data includes project name, milestone name, milestone temporal information, procedure documents title With item base account data.
The present invention utilizes existing telematic services management system and SMS platform, and project is managed according to user Self-demand, by the customized alarm threshold of control unit, settable prompting item, pre-warning time are not limited to information communication The user-friendliness of the requirement that business management system manages project, system is higher;On the basis of original system functional application On, new function is developed in integration using SMS platform, is improved resource utilization;When control unit judgement reaches alarm conditions SMS platform is then called to push warning information to project stakeholder, project stakeholder proves material needed for capable of collecting in time, effectively Avoid " link up funnel ", improve work efficiency, short message is reminded in real time, be more in line with the developing direction of current informationization, Reduce management cost.
Detailed description of the invention
Attached drawing 1 is the method flow diagram of the embodiment of the present invention 1.
Attached drawing 2 is the electric control block diagram of the embodiment of the present invention 2.
Specific embodiment
The present invention is not limited by the following examples, can determine according to the technique and scheme of the present invention with actual conditions specific Embodiment.
Below with reference to examples and drawings, the invention will be further described:
Embodiment 1: as shown in Fig. 1, the application method of early warning is managed in a kind of information communications management system, including walked as follows It is rapid:
Step 1: data acquisition module is logical by the information that the acquisition of IEC standard data-interface is stored in data center server The project milestone node data of communication service management system enters second step later;
It is required step 2: user manages according to project, project milestone node alarm threshold and project is set in a control unit Shareholder's contact method enters third step later;
Step 3: control unit is compared according to the alarm threshold of collected project milestone node data and user setting, if Project milestone node data is not up to alarm conditions, then repeatedly third step;If project milestone node data reaches alarm bar Part, control unit generate warning information, enter the 4th step later;
Step 4: the warning information that control unit generates is transferred to data center server, data center by data acquisition module Server calls SMS platform enters the 5th step later;
Step 5: SMS platform searches preset project stakeholder's contact method, warning information is sent with short message mode To project stakeholder, enter the 6th step later;
Step 6: project stakeholder prepares evidence material according to short message, and in typing telematic services management system, Enter the 7th step later;
Step 7: telematic services management system is according to evidence material renewal item milestone node data.
Embodiment 2: as shown in Fig. 2, a kind of control early warning system, including in telematic services management system, data Central server, data acquisition module, control unit, SMS platform, the telematic services management system, data center services Device, data acquisition module, control unit are sequentially connected electrically, and the data center server is for storing telematic services management System data, the information communication that data acquisition module is stored in data center server by the acquisition of IEC standard data-interface The project milestone node data of business management system is simultaneously transferred to control unit, and control unit reads and judges project milestone Whether node data reaches alarm threshold and generates warning information, and warning information is transferred to data center and taken by data acquisition module Business device, data center server call SMS platform that warning information is sent to item in the form of short message by webservice interface Mesh shareholder.
Data center server is mentioned as core and basic platform in business data and Information Interchange System for enterprise For the hardware structure, software platform and technical support of high-performance, high availability, high scalability and high security, to meet enterprise The requirement of data sharing, it is ensured that interconnecting between constituent parts data center, enterprise, and meet and provide number towards all types of user According to the main technique requirements of service, telematic services management system passes through IEC standard data-interface and data center server Connection.In actual work, data center server can obtain the data information in telematic services management system, data acquisition Module is connect by IEC standard data-interface with data center server, can be obtained in telematic services management system Project milestone node data, the project milestone node data and alarm threshold pair that control unit obtains data acquisition module Than and issue warning information, pass through data center server webservice interface and call SMS platform, SMS platform receives control The warning information that unit processed issues, and warning information is pushed to stakeholder.
Above-mentioned control early warning system can be made further optimization and/or improvements according to actual needs:
As shown in Figure 1, project milestone node data includes project name, milestone name, milestone temporal information, process text Shelves title and item base account data.
Embodiment 3: by taking A project December 10 completes online trial operation day by day as an example, specific implementation procedure is as follows:
1, according to company's project construction uniform requirement, A project started January 15 in telematic services management system, need to be Online trial operation was completed before December 10;
2, data center server is by IEC standard data-interface, A project name in recalls information communication traffic management systems, Important milestone title, milestone temporal information, procedure documents title are stored in data center server tables of data;
3, data acquisition module acquires the A project being stored in data center server data packet by IEC standard data-interface Milestone node data is simultaneously transferred to control unit;
4. the rule that control unit sets project control demand according to user sends alarm letter to project stakeholder in 15 days in advance Breath, control unit subtracts 15 day (such as December 10 was calculated as November 25 by program) to milestone timing node, by November 25 Day is set as source data, and compares with calendar, and control unit will be collected from telematic services management system if matching One project name, milestone name, procedure documents title, stop time point editor text warning information, format are as follows: " A Mesh completes online trial operation on 10th in December, asks preparation process document information ";
5. data acquisition module sends warning information to data center server, data center server calls SMS platform system System resource sends short messages to all shareholders of the project, and short message content is the text information that early warning system has edited conversion;
6, after project stakeholder receives short message, prepare document information;It mentions and reports Party A project leader, Party A project leader audit After be uploaded to telematic services management system.
The present invention effectively reduces the delay of project duration caused by artificial origin, ensures by giving warning in advance and preparing The normalization of document information.
The above technical features constitute embodiments of the present invention, can basis with stronger adaptability and implementation result Actual needs increases and decreases non-essential technical characteristic, to meet the needs of different situations.

Claims (3)

1. managing the application method of early warning in a kind of information communications management system, include the following steps:
Step 1: data acquisition module is logical by the information that the acquisition of IEC standard data-interface is stored in data center server The project milestone node data of communication service management system enters second step later;
It is required step 2: user manages according to project, project milestone node alarm threshold and project is set in a control unit Shareholder's contact method enters third step later;
Step 3: control unit is compared according to the alarm threshold of collected project milestone node data and user setting, if Project milestone node data is not up to alarm conditions, then repeatedly third step;If project milestone node data reaches alarm bar Part, control unit generate warning information, enter the 4th step later;
Step 4: the warning information that control unit generates is transferred to data center server, data center by data acquisition module Server calls SMS platform enters the 5th step later;
Step 5: SMS platform searches preset project stakeholder's contact method, warning information is sent with short message mode To project stakeholder, enter the 6th step later;
Step 6: project stakeholder prepares evidence material according to short message, and in typing telematic services management system, Enter the 7th step later;
Step 7: telematic services management system is according to evidence material renewal item milestone node data.
2. a kind of control early warning system, it is characterised in that including telematic services management system, data center server, data Acquisition module, control unit, SMS platform, the telematic services management system, data center server, data acquisition module Block, control unit are sequentially connected electrically, and the data center server is for storing telematic services Management System Data, data The telematic services management system that acquisition module is stored in data center server by the acquisition of IEC standard data-interface Project milestone node data is simultaneously transferred to control unit, and control unit reads and judges whether project milestone node data reaches To alarm threshold and warning information is generated, warning information is transferred to data center server, data center by data acquisition module Server calls SMS platform that warning information is sent to project stakeholder in the form of short message by webservice interface.
3. control early warning system according to claim 2, it is characterised in that the project milestone node data includes item Mesh title, milestone name, milestone temporal information, procedure documents title and item base account data.
CN201811179418.8A 2018-10-10 2018-10-10 The application method and control early warning system of early warning are managed in information communications management system Pending CN109508950A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811179418.8A CN109508950A (en) 2018-10-10 2018-10-10 The application method and control early warning system of early warning are managed in information communications management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811179418.8A CN109508950A (en) 2018-10-10 2018-10-10 The application method and control early warning system of early warning are managed in information communications management system

Publications (1)

Publication Number Publication Date
CN109508950A true CN109508950A (en) 2019-03-22

Family

ID=65746415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811179418.8A Pending CN109508950A (en) 2018-10-10 2018-10-10 The application method and control early warning system of early warning are managed in information communications management system

Country Status (1)

Country Link
CN (1) CN109508950A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060173762A1 (en) * 2004-12-30 2006-08-03 Gene Clater System and method for an automated project office and automatic risk assessment and reporting
US20100036832A1 (en) * 2008-08-08 2010-02-11 Yahoo!, Inc. Searching by object category for online collaboration platform
US20100185474A1 (en) * 2009-01-21 2010-07-22 Microsoft Corporation Milestone Generation Techniques
CN103617521A (en) * 2013-11-29 2014-03-05 国家电网公司 Business supervising method for electricity marketing
CN105427091A (en) * 2015-12-03 2016-03-23 国网浙江杭州市萧山区供电公司 High-voltage business expansion overall process management and control system of power marketing
CN106503957A (en) * 2016-09-22 2017-03-15 国网江苏省电力公司泰州供电公司 A kind of nodal information acquisition method during power transmission and distribution
CN106897862A (en) * 2017-02-24 2017-06-27 国网山东省电力公司经济技术研究院 A kind of Electric Power Network Planning work in preliminary project stage progress and achievement managing and control system
CN108320127A (en) * 2017-12-20 2018-07-24 国网山东省电力公司聊城供电公司 A kind of power engineering term computer management system
CN110991985A (en) * 2019-11-11 2020-04-10 国网浙江武义县供电有限公司 Project progress data processing method
CN112036766A (en) * 2020-09-11 2020-12-04 上海国泉科技有限公司 Gridding distribution network service management method and device, computer equipment and storage medium
CN113256232A (en) * 2020-02-11 2021-08-13 厦门九嘉信息科技有限公司 Power engineering monitoring method and system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060173762A1 (en) * 2004-12-30 2006-08-03 Gene Clater System and method for an automated project office and automatic risk assessment and reporting
US20100036832A1 (en) * 2008-08-08 2010-02-11 Yahoo!, Inc. Searching by object category for online collaboration platform
US20100185474A1 (en) * 2009-01-21 2010-07-22 Microsoft Corporation Milestone Generation Techniques
CN103617521A (en) * 2013-11-29 2014-03-05 国家电网公司 Business supervising method for electricity marketing
CN105427091A (en) * 2015-12-03 2016-03-23 国网浙江杭州市萧山区供电公司 High-voltage business expansion overall process management and control system of power marketing
CN106503957A (en) * 2016-09-22 2017-03-15 国网江苏省电力公司泰州供电公司 A kind of nodal information acquisition method during power transmission and distribution
CN106897862A (en) * 2017-02-24 2017-06-27 国网山东省电力公司经济技术研究院 A kind of Electric Power Network Planning work in preliminary project stage progress and achievement managing and control system
CN108320127A (en) * 2017-12-20 2018-07-24 国网山东省电力公司聊城供电公司 A kind of power engineering term computer management system
CN110991985A (en) * 2019-11-11 2020-04-10 国网浙江武义县供电有限公司 Project progress data processing method
CN113256232A (en) * 2020-02-11 2021-08-13 厦门九嘉信息科技有限公司 Power engineering monitoring method and system
CN112036766A (en) * 2020-09-11 2020-12-04 上海国泉科技有限公司 Gridding distribution network service management method and device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN204204022U (en) A kind of live supervisory system based on operation of power networks state
CN101459925B (en) Complaint management system and method for telecommunication network
CN108256722B (en) Electric power information communication dispatching order hand-held terminal
EP2352093A1 (en) Method and system for clearing log files of service system
CN100589606C (en) A kind of SMS query analysis system and method
CN101373533A (en) Real time accurate marketing apparatus based on mobile communication signaling gateway and data processing method
CN114257636B (en) Unified message publishing method
CN103095829A (en) Network contact list system achieving version management and authority management
CN101296507B (en) Method and system and server for implementing list information synchronization
CN101471803B (en) Conference service system and method
CN101830240A (en) Track traffic centralized alarming management system and method thereof
CN110072251B (en) Method and device for analyzing user communication behavior and managing user
CN101854369A (en) Remote information notification system and method
CN102547607B (en) Message interaction control method and system, message interaction system and mobile terminal
CN109508950A (en) The application method and control early warning system of early warning are managed in information communications management system
CN109039776B (en) System for realizing unified account management of multiple systems by simulating HTTP (hyper text transport protocol) request
CN104657907A (en) Power system information processing method, device and system
CA2682951C (en) Message mechanism for workflow interfacing
CN111488997A (en) Automatic operation and maintenance method, device, equipment and storage medium
CN101860806B (en) Dynamic marshalling method, system and terminal
CN114386813A (en) Comprehensive customer service information service method and system
CN1322768C (en) Management method of honeycomb cluster client's data
CN112437146A (en) Equipment state synchronization method, device and system
CN101441743A (en) Information sharing system
CN201371835Y (en) Railway transportation centralized alarm management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190322