CN112200543A - Management method and management system for new energy engineering construction - Google Patents

Management method and management system for new energy engineering construction Download PDF

Info

Publication number
CN112200543A
CN112200543A CN202011173153.8A CN202011173153A CN112200543A CN 112200543 A CN112200543 A CN 112200543A CN 202011173153 A CN202011173153 A CN 202011173153A CN 112200543 A CN112200543 A CN 112200543A
Authority
CN
China
Prior art keywords
historical
current
engineering problem
processing scheme
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011173153.8A
Other languages
Chinese (zh)
Inventor
刘军红
李艳红
贾天翼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Zhongguang New Energy Technology Co ltd
China Huadian Engineering Group Co Ltd
Original Assignee
Huadian Zhongguang New Energy Technology Co ltd
China Huadian Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Zhongguang New Energy Technology Co ltd, China Huadian Engineering Group Co Ltd filed Critical Huadian Zhongguang New Energy Technology Co ltd
Priority to CN202011173153.8A priority Critical patent/CN112200543A/en
Publication of CN112200543A publication Critical patent/CN112200543A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/30Information retrieval; Database structures therefor; File system structures therefor of unstructured textual data
    • G06F16/35Clustering; Classification

Abstract

The invention discloses a management method and a management system for new energy engineering construction, wherein the management method comprises the following steps: acquiring a current engineering problem; acquiring and updating data of a database, wherein the data is a history processing scheme of a plurality of historical engineering problems; selecting the historical processing solution matched with the current engineering problem. By the arrangement, the current engineering problem can be solved in time through the historical processing scheme when some difficult engineering problems are faced on a construction site by acquiring the current engineering problem and matching the historical processing scheme in the database, so that experienced professional construction teams and site professional managers are not needed, the configuration of a construction site technical team is greatly filled, and the processing efficiency of the difficult problems is improved.

Description

Management method and management system for new energy engineering construction
Technical Field
The invention relates to the field of new energy engineering construction, in particular to a management method and a management system for new energy engineering construction.
Background
With the popularization and deepening of the national new energy encouraging policy, the construction of a large new energy base is subjected to a rapid and wild expansion stage, and the quality problem of engineering construction is gradually exposed while the pursuit amount is pursued. In the implementation process of large-scale new energy projects, due to knowledge and construction experience of different professional fields such as electric, communication, civil engineering and structure, higher requirements are provided for quantity configuration and professional ability of field management personnel.
However, due to the fact that new energy development time is short, some specifications and construction standards are relatively lagged, experienced professional construction teams and field professional managers are relatively short, and professional managers meeting field requirements are not configured, configuration of technical teams in a construction field is weak, and therefore processing efficiency of difficult problems in the construction field is low.
Disclosure of Invention
Therefore, the technical problem to be solved by the invention is to overcome the technical problem of low treatment efficiency of the difficult problem of the construction site in the prior art. Therefore, a management method and a management system for new energy engineering construction are provided.
The embodiment of the invention provides a management method for new energy engineering construction, which comprises the following steps: acquiring a current engineering problem; acquiring and updating data of a database, wherein the data is a history processing scheme of a plurality of historical engineering problems; selecting the historical processing solution matched with the current engineering problem.
Optionally, the selecting the historical processing solution matching the current engineering problem includes: acquiring keywords of the current engineering problem and the historical engineering problem; selecting the historical engineering problem matched with the current engineering problem according to the keyword; and matching the historical processing scheme according to the historical engineering problem.
Optionally, the keywords are classified according to engineering specialties or/and construction processes.
Optionally, the management method includes: judging whether to perform picture identification on the current engineering problem; if yes, shooting a current scene picture, and selecting a historical scene picture matched with the current scene picture; wherein the historical live pictures are from the data; and acquiring the historical processing scheme according to the historical scene picture.
Optionally, the historical processing scheme includes any one or more of a construction drawing, a construction flow, a construction specification, a construction standard, and a construction scheme.
Optionally, the management method includes: judging whether the historical processing scheme can solve the current engineering problem; and if not, uploading the current engineering problem to the database and updating the historical processing scheme in real time.
Optionally, if yes, modifying and saving the current processing scheme according to the historical processing scheme.
The embodiment of the invention also provides a management system for new energy engineering construction, which comprises: the first acquisition module is used for acquiring the current engineering problem; the second acquisition module is used for acquiring and updating data of the database, wherein the data is a history processing scheme of a plurality of historical engineering problems; and the matching module is used for selecting the historical processing scheme matched with the current engineering problem.
Optionally, the matching module comprises: the acquisition unit is used for acquiring keywords of the current engineering problem and the historical engineering problem; the selection unit is used for selecting the historical engineering problem matched with the current engineering problem according to the keyword; and the matching unit is used for matching the historical processing scheme according to the historical engineering problem.
Optionally, the management system comprises: and the classification unit is used for classifying the keywords according to engineering specialties or/and construction processes.
Optionally, the management system comprises: the first judgment module is used for judging whether to carry out picture identification on the current engineering problem; if yes, shooting a current scene picture, and selecting a historical scene picture matched with the current scene picture; wherein the historical live pictures are from the data; and the third acquisition module is used for acquiring the historical processing scheme according to the historical scene picture.
Optionally, the management system comprises: the second judgment module is used for judging whether the historical processing scheme can solve the current engineering problem or not; and if not, uploading the current engineering problem to the database and updating the historical processing scheme in real time.
Optionally, if yes, modifying and saving the current processing scheme according to the historical processing scheme.
An embodiment of the present invention further provides a computer-readable storage medium, where the computer-readable storage medium stores computer instructions, and the computer instructions are configured to cause the computer to execute any one of the management methods described above.
The embodiment of the invention has the following beneficial effects:
the invention provides a management method for new energy engineering construction, which comprises the following steps: acquiring a current engineering problem; acquiring and updating data of a database, wherein the data is a history processing scheme of a plurality of historical engineering problems; selecting the historical processing solution matched with the current engineering problem.
By the arrangement, the current engineering problem can be solved in time through the historical processing scheme when some difficult engineering problems are faced on a construction site by acquiring the current engineering problem and matching the historical processing scheme in the database, so that experienced professional construction teams and site professional managers are not needed, the configuration of a construction site technical team is greatly filled, and the processing efficiency of the difficult problems is improved.
2. According to the method and the system, the keyword of the current engineering problem and the keyword of the historical engineering problem are obtained, so that the requirement of the site on the professional skill of construction managers can be reduced, and the use convenience and the working efficiency of equipment are improved.
3. The method classifies the keywords according to engineering major or/and construction process, can further refine the category of the keywords, and can more accurately acquire correct keywords, thereby accurately acquiring a historical processing scheme and improving the processing efficiency of difficult problems.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a schematic diagram illustrating a management method for new energy engineering construction according to the embodiment;
fig. 2 is a schematic diagram showing a management system for new energy engineering construction according to the embodiment;
FIG. 3 is a schematic diagram of a computer device of an embodiment of the present invention.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
With the popularization and deepening of the national new energy encouraging policy, the construction of a large new energy base is subjected to a rapid and wild expansion stage, and the quality problem of engineering construction is gradually exposed while the pursuit amount is pursued. In the implementation process of large-scale new energy projects, due to knowledge and construction experience of different professional fields such as electric, communication, civil engineering and structure, higher requirements are provided for quantity configuration and professional ability of field management personnel. However, due to the fact that new energy development time is short, some specifications and construction standards are relatively lagged, experienced professional construction teams and field professional managers are relatively short, and professional managers meeting field requirements are not configured, configuration of technical teams in a construction field is weak, and therefore processing efficiency of difficult problems in the construction field is low.
The management method and the management system for new energy engineering construction are used for overcoming the technical problem that the treatment efficiency of the difficult problems of the construction site is low in the prior art.
The embodiment of the invention provides a management method for new energy engineering construction, which comprises the following steps:
s1, acquiring the current engineering problem;
after the constructor encounters an unsolvable engineering problem, the current engineering problem which the constructor wants to query is acquired through the first acquisition module.
S2, acquiring and updating data of a database, wherein the data are history processing schemes of a plurality of historical engineering problems;
after acquiring the current engineering problem, the second acquisition module acquires a large amount of data about the engineering problem from the database, can download the data, and then updates the locally stored data. During the downloading process, the downloading can be performed in a wireless network, a Bluetooth mode, a local area network mode and the like.
And the database can be upgraded on line through a wireless network, the data synchronization with a remote technical service center of a construction unit is kept, and the remote technical service center can classify and add historical processing schemes collected in different regions and different projects into the database at any time to upgrade the database on line.
The data in the database is a processing scheme of a previously processed or previously originally recorded engineering problem, the previously processed or previously originally recorded engineering problem is called a historical engineering problem, and a processing scheme for solving the historical engineering problem is called a historical processing scheme.
The historical processing scheme may include any one or more of construction drawings, construction procedures, construction specifications, construction standards, and construction schemes. The embodiment is only to illustrate the category of the history scheme, and is not limited thereto, and a person skilled in the art can divide the category of the history processing anti-reversion according to the actual situation, so that the same technical effect can be achieved.
And S3, selecting the historical processing scheme matched with the current engineering problem.
After the locally stored data is updated, the constructor can manually select or automatically select the historical engineering problems which are the same as or similar to the current engineering problems, and then the corresponding historical processing schemes are matched according to the same or similar historical engineering problems.
By the arrangement, through the steps S1, S2 and S3, when some difficult engineering problems are faced on the construction site, the current engineering problems can be solved in time through a historical processing scheme, so that experienced professional construction teams and site professional managers are not needed, the configuration of a construction site technical team is greatly filled, and the processing efficiency of the difficult problems is improved.
To facilitate manual selection and automatic selection of the same or similar historical engineering questions, step S3 may further include the steps of:
s31, acquiring keywords of the current engineering problem and the historical engineering problem;
and after the current engineering problem and the historical engineering problem are obtained, keywords of the current engineering problem and the historical engineering problem are obtained. The keyword obtaining step may be: firstly, keywords are preset in the system, after the current engineering problem and the historical engineering problem appear, the system carries out sentence recognition on the current engineering problem and the historical engineering problem, and then the keywords are determined. When the specific keyword is not identified, the similar preset keyword containing one or more characters can be screened, and then the constructor determines according to the actual situation of the constructor.
For example, the keywords may be text or speech: the system automatically calls out relevant standard requirements and process cautions of transformer grounding construction, and presents a standard field manufacturing process and effect diagram.
To further improve the efficiency of manual and automatic selection, keywords may be classified. In the embodiment of the invention, the keywords can be classified according to engineering specialties or/and construction flows, the categories of the keywords can be further refined, and the correct keywords can be more accurately obtained, so that a historical processing scheme can be accurately obtained, and the processing efficiency of difficult problems is improved. Of course, other categories may be classified, and this embodiment is only an example, and those skilled in the art may change the classification standard according to the actual situation, and may perform the same function.
S32, selecting the historical engineering problem matched with the current engineering problem according to the keyword;
after the keywords are obtained, matching is carried out on the current engineering problem and the historical engineering problem according to the keywords, namely matching is carried out on the keywords containing the same or similar keywords.
And S33, matching the history processing scheme according to the history engineering problem.
After the step S32 matches the historical engineering problem, the corresponding historical processing solution is matched according to the historical engineering problem.
According to the method and the system, the keyword of the current engineering problem and the keyword of the historical engineering problem are obtained, so that the requirement of the site on the professional skill of construction managers can be reduced, and the use convenience and the working efficiency of equipment are improved.
In the embodiment of the present invention, if the corresponding historical treatment solution cannot be obtained through the above steps, or the obtained historical treatment solution is not satisfactory by the constructor, the following steps may be further adopted, and the management method further includes:
s4, judging whether to perform picture identification on the current engineering problem; if yes, shooting a current scene picture, and selecting a historical scene picture matched with the current scene picture; wherein the historical scene picture is from the database;
after the historical processing scheme is obtained after the steps are completed, the constructor can judge whether to perform picture identification according to the self condition. If the constructor can not obtain the corresponding historical processing scheme through the steps or the obtained historical processing scheme is not satisfied, picture recognition can be carried out.
The method comprises the steps of firstly shooting a current construction position of a construction site, then obtaining a shot current site picture, and matching the current site picture with a historical site picture, wherein the historical site picture is also from a database. The historical scene pictures are previously uploaded scene pictures or previously stored scene pictures in the database.
The picture matching process may be: firstly, marking and identifying the characteristic points in the current field picture, then screening the characteristic points of the historical field pictures in the database, and selecting the historical field picture with higher similarity to the current field picture. Higher similarity indicates a greater number of feature point coincidences, and lower similarity indicates a fewer number of feature point coincidences.
And S5, acquiring the historical processing scheme according to the historical scene pictures.
After the historical live pictures are acquired, a historical processing scheme corresponding to the historical live pictures is selected.
After any of the above steps, if the constructor finds that the historical processing scheme can not solve the current engineering problem, the constructor needs to ask for help from professional technicians of the construction unit. Can be carried out by the following steps:
s6, judging whether the historical processing scheme can solve the current engineering problem;
and S7, if not, uploading the current engineering problem to the database and updating the historical processing scheme in real time.
In step S7, if the current engineering problem cannot be solved, the current engineering problem may be uploaded to a database and a professional technician at the remote technical service center of the construction organization may be notified to view and solve the current engineering problem in time through the database. Of course, the process can realize data exchange and real-time online interaction with a remote technical service center through a wireless network (4G/5G/local area network).
And S8, if yes, modifying and saving the current processing scheme according to the historical processing scheme.
If the current engineering problem has been solved, the current processing solution is modified and saved according to the historical processing solution. Of course, after the current engineering problem is solved through step S7, the current processing solution previously used to solve the current engineering problem is also modified and saved.
Of course, the management method may further include: according to different project projects, data addition and screening can be completed automatically and manually.
In the construction process, the processing process and the data storage are automatically recorded according to the processing progress of the current engineering problem on site, and the processing process and the data storage are automatically classified and added into a difficult problem database.
The embodiment of the invention also provides a management system for new energy engineering construction, which comprises:
the first acquisition module 10 is used for acquiring a current engineering problem;
the second obtaining module 20 is configured to obtain and update data of a database, where the data is a history processing scheme of a plurality of historical engineering problems;
a matching module 30, configured to select the historical processing solution matched with the current engineering problem.
Wherein, the matching module 30 includes:
the acquisition unit is used for acquiring keywords of the current engineering problem and the historical engineering problem;
the selection unit is used for selecting the historical engineering problem matched with the current engineering problem according to the keyword;
and the matching unit is used for matching the historical processing scheme according to the historical engineering problem.
The management system further includes: and the classification unit is used for classifying the keywords according to engineering specialties or/and construction processes.
The management system further includes:
the first judgment module is used for judging whether to carry out picture identification on the current engineering problem; if yes, shooting a current scene picture, and selecting a historical scene picture matched with the current scene picture; wherein the historical live pictures are from the data;
and the third acquisition module is used for acquiring the historical processing scheme according to the historical scene picture.
The management system further includes:
the second judgment module is used for judging whether the historical processing scheme can solve the current engineering problem or not; and if not, uploading the current engineering problem to the database and updating the historical processing scheme in real time. And if so, modifying and storing the current processing scheme according to the historical processing scheme.
The embodiment of the invention also provides computer equipment, and the working process of the computer equipment is as follows:
1. before starting the project, inputting the drawing and the related electronic engineering data into the corresponding module according to the prompt of the computer equipment through the communication interface of the computer equipment;
2. in the construction process, the system can be switched to a corresponding page according to the requirements of an engineering site, or automatically jump to a page matched with a scene by shooting site images according to intelligent discrimination, and can check a standardized construction process and audio-visual explanation preset in the system;
3. if special problems occur in construction, namely the current engineering problems in the management method, the real-time online technical communication can be realized by starting a wireless network to connect a remote technical support center;
4. when the original design data is inconsistent with the site or changed on the site in the construction process, the data can be modified and stored through computer equipment and used as the basis of an electronic completion drawing;
in the whole engineering construction process, high-definition on-site audio and video data can be shot in real time through computer equipment, and the system automatically stores the data in corresponding modules according to dates and archives the data as engineering process data.
As shown in fig. 3, the computer device includes one or more processors 41 and a memory 42, one processor 41 being taken as an example in fig. 3.
The computer device may further include: an input device 43 and an output device 44.
The processor 41, the memory 42, the input device 43 and the output device 44 may be connected by a bus or other means, and fig. 3 illustrates the connection by a bus as an example.
The processor 41 may be a Central Processing Unit (CPU). The Processor 41 may also be other general purpose processors, Digital Signal Processors (DSPs), Application Specific Integrated Circuits (ASICs), Field Programmable Gate Arrays (FPGAs) or other Programmable logic devices, discrete Gate or transistor logic devices, discrete hardware components, or combinations thereof. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like.
The memory 42, which is a non-transitory computer readable storage medium, can be used for storing non-transitory software programs, non-transitory computer executable programs, and modules, such as program instructions/modules corresponding to the control methods in the embodiments of the present application. The processor 41 executes various functional applications and data processing of the server by running the non-transitory software programs, instructions and modules stored in the memory 42, so as to implement the management method for new energy engineering construction of the above method embodiment.
The memory 42 may include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program required for at least one function; the storage data area may store data created according to use of a processing device operated by the server, and the like. Further, the memory 42 may include high speed random access memory, and may also include non-transitory memory, such as at least one magnetic disk storage device, flash memory device, or other non-transitory solid state storage device. In some embodiments, memory 42 may optionally include memory located remotely from processor 41, which may be connected to a network connection device via a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
The input device 43 may receive input numeric or character information and generate key signal inputs related to user settings and function control of the processing device of the server. The output device 44 may include a display device such as a display screen.
One or more modules are stored in the memory 42, which when executed by the one or more processors 41, perform the method as shown in fig. 1.
The embodiment of the invention also provides a computer readable storage medium. Those skilled in the art will appreciate that all or part of the processes in the methods of the embodiments described above can be implemented by a computer program, which can be stored in a computer-readable storage medium, to instruct related hardware.
The program may include the procedures of the management method for new energy engineering construction according to the above embodiments when executed. The storage medium may be a magnetic Disk, an optical Disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a Flash Memory (Flash Memory), a Hard Disk (Hard Disk Drive, abbreviated as HDD), a Solid State Drive (SSD), or the like; the storage medium may also comprise a combination of memories of the kind described above.
Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the invention, and such modifications and variations fall within the scope defined by the appended claims.

Claims (15)

1. A management method for new energy engineering construction is characterized by comprising the following steps:
acquiring a current engineering problem;
acquiring and updating data of a database, wherein the data is a history processing scheme of a plurality of historical engineering problems;
selecting the historical processing solution matched with the current engineering problem.
2. The method of managing of claim 1, wherein said selecting said historical processing solution matching said current engineering problem comprises:
acquiring keywords of the current engineering problem and the historical engineering problem;
selecting the historical engineering problem matched with the current engineering problem according to the keyword;
and matching the historical processing scheme according to the historical engineering problem.
3. The management method according to claim 2, characterized in that said keywords are classified according to engineering expertise or/and construction flow.
4. The management method according to claim 1, characterized by comprising:
judging whether to perform picture identification on the current engineering problem;
if yes, shooting a current scene picture, and selecting a historical scene picture matched with the current scene picture; wherein the historical scene picture is from the database;
and acquiring the historical processing scheme according to the historical scene picture.
5. The management method according to any one of claims 1 to 4, wherein the history processing scheme includes any one or more of a construction drawing, a construction flow, a construction specification, a construction standard, and a construction scheme.
6. The management method according to any one of claims 1 to 4, characterized by comprising:
judging whether the historical processing scheme can solve the current engineering problem;
and if not, uploading the current engineering problem to the database and updating the historical processing scheme in real time.
7. The management method according to claim 6,
and if so, modifying and storing the current processing scheme of the current engineering problem according to the historical processing scheme.
8. A management system for new energy engineering construction is characterized by comprising:
the first acquisition module is used for acquiring the current engineering problem;
the second acquisition module is used for acquiring and updating data of the database, wherein the data is a history processing scheme of a plurality of historical engineering problems;
and the matching module is used for selecting the historical processing scheme matched with the current engineering problem.
9. The management system of claim 8, wherein the matching module comprises:
the acquisition unit is used for acquiring keywords of the current engineering problem and the historical engineering problem;
the selection unit is used for selecting the historical engineering problem matched with the current engineering problem according to the keyword;
and the matching unit is used for matching the historical processing scheme according to the historical engineering problem.
10. The management system according to claim 9, comprising:
and the classification unit is used for classifying the keywords according to engineering specialties or/and construction processes.
11. The management system according to claim 8, comprising:
the first judgment module is used for judging whether to carry out picture identification on the current engineering problem; if yes, shooting a current scene picture, and selecting a historical scene picture matched with the current scene picture; wherein the historical live pictures are from the data;
and the third acquisition module is used for acquiring the historical processing scheme according to the historical scene picture.
12. The management system according to claims 8-11, comprising:
the second judgment module is used for judging whether the historical processing scheme can solve the current engineering problem or not; and if not, uploading the current engineering problem to the database and updating the historical processing scheme in real time.
13. The management system of claim 12, wherein if so, modifying and saving a current processing scheme according to the historical processing scheme.
14. A computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory having stored therein computer instructions, the processor executing the computer instructions to perform the management method of any one of claims 1 to 7.
15. A computer-readable storage medium storing computer instructions for causing a computer to perform the management method of any one of claims 1 to 7.
CN202011173153.8A 2020-10-28 2020-10-28 Management method and management system for new energy engineering construction Pending CN112200543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011173153.8A CN112200543A (en) 2020-10-28 2020-10-28 Management method and management system for new energy engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011173153.8A CN112200543A (en) 2020-10-28 2020-10-28 Management method and management system for new energy engineering construction

Publications (1)

Publication Number Publication Date
CN112200543A true CN112200543A (en) 2021-01-08

Family

ID=74011979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011173153.8A Pending CN112200543A (en) 2020-10-28 2020-10-28 Management method and management system for new energy engineering construction

Country Status (1)

Country Link
CN (1) CN112200543A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113985226A (en) * 2021-10-25 2022-01-28 广东电网有限责任公司 Cable processing method and system
CN117114782A (en) * 2023-10-24 2023-11-24 佛山电力设计院有限公司 Construction engineering cost analysis method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109559007A (en) * 2018-09-19 2019-04-02 中建科技有限公司深圳分公司 A kind of construction quality management method and device
CN110175232A (en) * 2019-05-20 2019-08-27 泰康保险集团股份有限公司 Information processing method, device, electronic equipment and storage medium
CN110781381A (en) * 2019-09-11 2020-02-11 平安科技(深圳)有限公司 Data verification method, device and equipment based on neural network and storage medium
CN110990179A (en) * 2019-11-28 2020-04-10 中国银行股份有限公司 Task processing method, device and equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109559007A (en) * 2018-09-19 2019-04-02 中建科技有限公司深圳分公司 A kind of construction quality management method and device
CN110175232A (en) * 2019-05-20 2019-08-27 泰康保险集团股份有限公司 Information processing method, device, electronic equipment and storage medium
CN110781381A (en) * 2019-09-11 2020-02-11 平安科技(深圳)有限公司 Data verification method, device and equipment based on neural network and storage medium
CN110990179A (en) * 2019-11-28 2020-04-10 中国银行股份有限公司 Task processing method, device and equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113985226A (en) * 2021-10-25 2022-01-28 广东电网有限责任公司 Cable processing method and system
CN117114782A (en) * 2023-10-24 2023-11-24 佛山电力设计院有限公司 Construction engineering cost analysis method

Similar Documents

Publication Publication Date Title
CN112200543A (en) Management method and management system for new energy engineering construction
CN109409533B (en) Method, device, equipment and storage medium for generating machine learning model
CN110705231B (en) Webpage editing method and device
US11663722B2 (en) Interactive training of a machine learning model for tissue segmentation
CN110888582B (en) Tag information processing method, device, storage medium and terminal
KR101469087B1 (en) Error Checking System for Digital Map
US10902339B2 (en) System and method providing automatic completion of task structures in a project plan
CN105159718A (en) Firmware updating method and device
EP3330871A1 (en) Information retrieval
WO2020056978A1 (en) Key prediction method and device, and computer-readable storage medium
DE102019133749A1 (en) AUTOMATED NEW CREATION OF LIGHTING TECHNOLOGY FOR AN EVENT LOCATION
CN109388426B (en) Window parameter configuration method and system and computer readable medium
US20230376726A1 (en) Inference service deployment method, device, and storage medium
CN111443910A (en) Skin rendering method and device, electronic equipment and computer storage medium
CN113641719A (en) Data processing method, data processing device, computer and storage medium
CN110532448B (en) Document classification method, device, equipment and storage medium based on neural network
CN116578497A (en) Automatic interface testing method, system, computer equipment and storage medium
CN116483707A (en) Test method, test device, test apparatus, test program, and test program
CN113254189B (en) Task management method, system and equipment for defect detection
CN110895470A (en) Applet management apparatus and management method
CN114417980A (en) Business model establishing method and device, electronic equipment and storage medium
CN114418458A (en) Process parameter adjusting method based on digital twin DaaS platform
CN110989876A (en) Application program adaptation method, mobile terminal and storage medium
CN115495769B (en) Data desensitization method, system, readable storage medium and device
CN112596475B (en) System safety analysis system based on process control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination