CN109555218A - Dross auto-collection system - Google Patents

Dross auto-collection system Download PDF

Info

Publication number
CN109555218A
CN109555218A CN201910059066.0A CN201910059066A CN109555218A CN 109555218 A CN109555218 A CN 109555218A CN 201910059066 A CN201910059066 A CN 201910059066A CN 109555218 A CN109555218 A CN 109555218A
Authority
CN
China
Prior art keywords
dross
entrance
shunting
shunting well
water inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910059066.0A
Other languages
Chinese (zh)
Other versions
CN109555218B (en
Inventor
李习洪
段洪斌
周超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Drainage Systems Co Ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Publication of CN109555218A publication Critical patent/CN109555218A/en
Application granted granted Critical
Publication of CN109555218B publication Critical patent/CN109555218B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • E03F5/101Dedicated additional structures, interposed or parallel to the sewer system
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • E03F5/105Accessories, e.g. flow regulators or cleaning devices
    • E03F5/107Active flow control devices, i.e. moving during flow regulation
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Removal Of Floating Material (AREA)

Abstract

The invention discloses dross auto-collection systems, for collecting the dross in shunting well, shunting well includes shunting the borehole wall and shunting the borehole wall to surround the shunting well inner cavity formed, it shunts the borehole wall and is equipped with the water inlet being connected to shunting well inner cavity and discharge outlet, system includes that dross collects entrance and dross collection channel;Dross is collected entrance and is set on the shunting borehole wall, and dross is collected entrance and is connected to shunting well inner cavity, and dross collection channel includes inlet end and an outlet end.Present invention setting dross on shunting the borehole wall collects entrance and dross collection channel, when water level, which rises to dross, collects entrance, sewage and the dross for floating on the sewage water surface can be flowed out by dross collection channel, and it is washed away together with a section dirty pipe, whole process carries out automatically, structure is simple, greatly reduces cost and operating cost.

Description

Dross auto-collection system
Technical field
The present invention relates to technical field of sewage, are specifically related to a kind of dross auto-collection system.
Background technique
Sewage treatment is carried out using shunting well in the prior art.When fine day, dirt is entered by the shunting well sanitary sewage that shuts off Water treatment plant enters natural water after sewage treatment plant is handled, when the rainy day, since the pollutant load in initial rainwater compares It is more, sewage treatment plant's processing is entered by the shunting well initial rainwater that shuts off, and middle and later periods rainwater is relatively clean, passes through shunting After well shunts, natural water can be directly discharged into.It is converged in shunting well in sanitary sewage and initial rainwater containing a large amount of dross, Dross includes suspended matter and floating material pollutant.The setting fishing slag strainer generally in shunting well, is collected by fishing slag strainer and is shunted Dross in well will fish out slag strainer by artificial or hoisting mechanism and propose outside shunting well, more after fishing slag strainer is collected completely The fishing slag strainer renewed.There are the following problems for this fishing slag mode: 1, since water flow is rinsed, fishing slag strainer is easy damaged or is rushed It walks;2, whether fishing slag strainer is filled, and needs to inspect periodically, and clears up not in time if fishing slag strainer is filled, and is easy blocking water inlet pipe, Rainstorm weather influences flood passage;3, fishing slag strainer is installed in shunting well, and the small volume of shunting well is often fitted without control; 4, fishing slag strainer is deducted a percentage by artificial or hoisting mechanism to outside shunting well, and the rubbish cleaned up needs transport processing again, The waste of manpower and material resources is caused, operating cost is higher.
Summary of the invention
The purpose of the invention is to overcome the shortcomings of above-mentioned background technique, a kind of dross auto-collection system is provided.This Invention can collect the dross in sewage automatically, be not only simple in structure, and greatly reduce cost and operating cost.
The present invention provides a kind of dross auto-collection system, for collecting the dross in shunting well (1), shunting well (1) packet It includes and shunts the borehole wall (11) and shunt the borehole wall (11) around the shunting well inner cavity (12) formed, shunt the borehole wall (11) and be equipped with and shunting The water inlet and discharge outlet of well inner cavity (12) connection, it is characterised in that:
System includes that dross collects entrance and dross collection channel (8);
Dross is collected entrance and is set in the shunting borehole wall (11), and dross is collected entrance and is connected to shunting well inner cavity (12), floats The water inlet height that slag collects entrance is higher than the water inlet height of water inlet;
Dross collection channel (8) includes inlet end and an outlet end, and the level height of outlet end is lower than the level of input end Highly, input end connection dross collects entrance.
Dross auto-collection system provided by the invention, can also have the following features:
Dross in shunting well collects entrance from dross and enters the gravity outflow after dross collection channel;
Or, system further includes conveying device, conveying device is set in dross collection channel, and the entrance of conveying device and floating Slag collects entrance connection, and the dross in shunting well enters from dross collection entrance to be discharged through conveying device;
Or, system further includes attachment device (7), attachment device (7) is connected to dross and collects entrance and dross collection channel (8), and attachment device (7) is located at the outside for shunting the borehole wall (11),
Or, being equipped with highest warning line line in shunting well (1), highest warning line line is higher than the highest that dross collects entrance The level height of water inlet position.
Dross auto-collection system provided by the invention, can also have the following features:
Conveying device is screw conveyor;
And/or the system further includes bilge well, the channel in bilge well is dross collection channel, be arranged on bilge well into Mouth end and outlet end.
Dross auto-collection system provided by the invention, can also have the following features:
It shunts and is additionally provided with sewage draining exit on the borehole wall (11), sewage draining exit connects sewage pipe or sewage treatment plant or dirt by cutting dirty pipe Water processing establishment, wherein outlet end connection cuts dirty pipe or sewage pipe or sewage treatment plant or a sewage treatment facility, dross collect into The water inlet height of mouth is higher than the water inlet height of sewage draining exit.
Dross auto-collection system provided by the invention, can also have the following features:
When to cut dirty pipe be partly-filled pipe-flow, dross, which is collected the dross gravity that entrance enters and flowed into, cuts dirty pipe;
When to cut dirty pipe be full-section pipe-flow, it is equipped with conveying device in dross collection channel, it is logical that dross collects the dross that entrance enters It crosses conveying device and enters a section dirty pipe.
Dross auto-collection system provided by the invention, can also have the following features:
Discharge outlet is connected with natural water, and the pipeline being connected before discharge outlet or in discharge outlet or with discharge outlet is equipped with the One waterpower switch;
Or, discharge outlet is connected with natural water, and set on the pipeline being connected before discharge outlet or in discharge outlet or with discharge outlet There is the first waterpower switch, the pipeline being connected before sewage draining exit or on sewage draining exit or with sewage draining exit is equipped with the second waterpower switch.
Dross auto-collection system provided by the invention, can also have the following features:
First waterpower switch is one of gate, weir gate, gate valve, air bag or pneumatic house keeper's valve;
Second waterpower switch is one of gate, weir gate, gate valve, air bag or pneumatic house keeper's valve.
Dross auto-collection system provided by the invention, can also have the following features:
Dross collects entrance and is set to the first waterpower switch upstream, and dross collects the water inlet height of entrance lower than discharge outlet Water inlet height;
Or, the first waterpower switch is located at discharge outlet upstream, and the first waterpower switchs when crossing water for overflow, and dross collects entrance When being set to the first waterpower switch downstream, the water inlet height that dross collects entrance is higher than the water inlet height of discharge outlet.
Dross auto-collection system provided by the invention, can also have the following features:
System further includes monitoring device and control unit, and monitoring device is used to monitor the liquid level and/or water in shunting well (1) Matter, control unit are used to control the opening degree of waterpower switch according to the monitoring result of monitoring device.
Dross auto-collection system provided by the invention, can also have the following features:
System further includes for intercepting the baffle of dross (6), and baffle (6) is set in shunting well inner cavity (12) and perpendicular to water Direction setting is flowed, baffle (6) is located at the downstream that dross collects entrance.
Dross auto-collection system provided by the invention, can also have the following features:
Baffle (6) is fixed baffle, and the two sides of fixed baffle are fixed, and the level height on edge is received higher than dross on fixed baffle Collect the level height of the highest water inlet position of entrance, the level height of fixed baffle lower edge lower than dross collect entrance it is minimum into The level height of water position;
Or, baffle (6) is floating barrier, shunts the borehole wall (11) and be equipped with a pair of card slot perpendicular to shunting well (1) bottom, float The two sides of dynamic baffle are located in a pair of of card slot, and floating barrier can move up and down in a pair of of card slot.
The effect and beneficial effect of invention
Present invention setting dross on shunting the borehole wall collects entrance and dross collection channel, collects when water level rises to dross When entrance, sewage and the dross for floating on the sewage water surface can be flowed out by dross collection channel, and be washed away together with a section dirty pipe, whole A process carries out automatically, and structure is simple, greatly reduces cost and operating cost.
Detailed description of the invention
Fig. 1 is the front view structure signal of the dross auto-collection system automatically flowed into the embodiment of the present invention by gravity Figure;
Fig. 2 is the overlooking structure diagram of Fig. 1;
Fig. 3 is the structural representation of the dross auto-collection system automatically flowed into the embodiment of the present invention by conveying device Figure;
Fig. 4 is the structural schematic diagram of bilge well;
Fig. 5 is the structural schematic diagram of preferred pipe clamp valve arrangement one;And
Fig. 6 is the enlarged diagram in this Fig. 5 at A;
Appended drawing reference: 1- shunting well, 11- shunt the borehole wall, 12- shunting well inner cavity, 2- water inlet pipe, 3- sections of dirty pipes, 4- draining Pipe, 5- discharge outlet weir gate, 6- floating barrier, 7- attachment device, 8- dross collection channel, 9- blowdown port strobe, 10- bilge well, Wall J is isolated in 13- conveying device, 14- overflow port, resilient sleeve 210, shell 220, air inlet pipe G, pipeline D.
Specific embodiment
With reference to the accompanying drawing and specific embodiment the present invention is described in further detail.
A kind of dross auto-collection system, for collecting the dross in shunting well (1), shunting well (1) includes shunting the borehole wall (11) and the borehole wall (11) are shunted around the shunting well inner cavity (12) formed, shunts the borehole wall (11) and is equipped with and shunting well inner cavity (12) The water inlet and discharge outlet of connection, system include that dross collects entrance and dross collection channel (8);Dross, which is collected entrance and is set to, to be divided Flow the borehole wall (11) on, and dross collect entrance be connected to shunting well inner cavity (12), dross collection entrance water inlet highly be higher than into The water inlet height at the mouth of a river;Dross collection channel (8) includes inlet end and an outlet end, and the level height of outlet end is lower than input end Level height, input end be connected to dross collect entrance.The system is for two different shunting well forms:
The dirty pipe that cuts of form one, shunting well is partly-filled pipe-flow, that is, the liquid cut in dirty pipe is fewer, cannot be by entire pipeline Section when being full of, the dross above shunting well can be flowed by gravity, corresponding to rely on gravity using embodiment one The dross auto-collection system automatically flowed into;
The dirty pipe that cuts of form two, shunting well is full-section pipe-flow, that is, cuts liquid in dirty pipe mostly so that by entire pipeline When section is full of, dross above shunting well can not gravity flow into, corresponding dependence the conveying device using embodiment two oneself The dynamic dross auto-collection system flowed into.
Illustrate individually below.
Embodiment one
Referring to figure 1 and figure 2, the embodiment of the present invention provides a kind of collect automatically by the dross that gravity automatically flows into and is System, for collecting the dross in shunting well 1, shunting well 1 includes shunting the borehole wall 11 and shunting the borehole wall 11 around the shunting well formed Inner cavity 12 shunts the borehole wall 11 and is equipped with the water inlet that is connected to shunting well inner cavity 12 and discharge outlet, system include dross collect into Mouth and dross collection channel 8;Dross is collected entrance and is set on the shunting borehole wall 11, and dross collects entrance and shunting well inner cavity 12 connects Logical, the level height that dross collects the minimum water inlet position of entrance is higher than the level height of the highest water inlet position of water inlet;It is floating Slag collection channel 8 includes inlet end and an outlet end, and the level height of outlet end is lower than the level height of input end, and input end connects Logical dross collects entrance;Wherein, water inlet and discharge outlet have been respectively communicated with water inlet pipe 2 and drainpipe 4, water inlet pipe 2 and drainpipe 4 It is respectively positioned on the lower half for shunting the borehole wall 11.
In order to control the water level in shunting well 1, present system is additionally provided with waterpower switch, and waterpower switch is shunted by changing Water level in the water yield control shunting well 1 of well 1.
Present system further includes monitoring device, control unit and the baffle 6 for intercepting dross.Wherein, monitoring device For monitoring liquid level and/or water quality in shunting well 1, control unit is used to control waterpower according to the monitoring result of monitoring device and open The opening degree of pass.Baffle 6 be set to shunting well inner cavity 12 in and perpendicular to water (flow) direction be arranged, the two sides of baffle 6 respectively with shunting The borehole wall 11 connects, and baffle 6 is located at dross and collects between entrance and discharge outlet.
Specifically, waterpower switch includes the first waterpower switch for controlling the water yield of discharge outlet.
Embodiment 1
Referring to figure 1 and figure 2, based on the above technical solution, the first waterpower switch is telescopic discharge outlet Weir gate 5, when needing to collect the dross in shunting well 1, discharge outlet weir gate 5 is stretched out from 1 bottom of shunting well, and discharge outlet weir gate 5 is stretched Height out is higher than the highest drainage position of discharge outlet.
In practical applications, the first waterpower switch or gate or gate valve, gate or gate valve are set at discharge outlet.It is excellent It is first bottom-open type weir gate or bottom-open type gate, when the first waterpower switch is bottom-open type weir gate or bottom-open type gate, dross is received Collection entrance may be provided at the downstream of bottom-open type weir gate or bottom-open type gate.
Embodiment 2
It shunts and is additionally provided with sewage draining exit on the borehole wall 11, sewage draining exit is connected to shunting well inner cavity 12, and sewage draining exit is connected by cutting dirty pipe 3 Logical shunting well inner cavity 12 and sewage treatment plant or sewage treatment facility, and dross collects the level height of the minimum water inlet position of entrance Degree is higher than the level height of the highest water inlet position of sewage draining exit, and the outlet end of dross collection channel 8, which is connected to, cuts dirty pipe 3.This hair Bright system further includes the second waterpower switch of the water yield for control of sewage disposal mouth.Second waterpower switch is located at outlet end and cuts dirt The front of 3 junction of pipe.Specifically, the second waterpower switch is blowdown port strobe 9, and blowdown port strobe 9 is set at sewage draining exit.
In practical applications, the second waterpower switch can be appointing in gate, weir gate, gate valve, air bag or pneumatic house keeper's valve It anticipates a kind of at sewage draining exit.Preferably, the second waterpower switch is current limliting gate.
Embodiment 3
Baffle 6 is fixed baffle, and the two sides of fixed baffle are fixedly connected with the borehole wall 11 is shunted, the level on edge on fixed baffle Height is higher than the level height that dross collects the highest water inlet position of entrance, and the level height of fixed baffle lower edge is received lower than dross Collect the level height of the minimum water inlet position of entrance, the water level in waterpower switch control shunting well 1 is consistently higher than under fixed baffle The level height on edge.
Embodiment 4
Baffle 6 is floating barrier, shunts the borehole wall 11 and is equipped with a pair of card slot perpendicular to 1 bottom of shunting well, floating barrier Two sides are located in a pair of of card slot, and floating barrier can move up and down in a pair of of card slot, and water is exposed in the upper end of floating barrier Face, the lower end of floating barrier are located at below the water surface.In practical applications, floating barrier can be hollow structure, using stainless steel At.Preferably, floating barrier is made of 316 stainless steels.
Wherein, present system further includes attachment device 7, and attachment device 7 is connected to dross collection entrance and dross is collected and led to Road 8, and attachment device 7 is located at the outside for shunting the borehole wall 11.Specifically, attachment device 7 includes framework, and framework is close to the shunting borehole wall 11 side is equipped with the opening opposite with dross collection entrance, and framework bottom is equipped with the opening being connected with input end.In shunting well 1 Equipped with highest warning line line, highest warning line line is higher than the level height that dross collects the highest water inlet position of entrance, water Power switch realizes that the water level in shunting well 1 is no more than highest warning line line by control 1 water yield of shunting well.
Referring to figure 1 and figure 2, the monitoring result of monitoring device is transmitted to control unit, and control unit judgement needs to receive When collecting the dross of the sewage water surface, control unit controls discharge outlet weir gate 5 and opens, and the sewage water surface rises, and baffle 6 persistently intercepts floating Slag.When the sewage water surface, which rises to dross, collects entrance, the dross of sewage and the sewage water surface flows into attachment device 7, along dross Collection channel 8, which flows into, cuts dirty pipe 3, is discharged to sewage treatment plant.During sewage discharge, control unit controls discharge outlet weir gate 5 and/or blowdown port strobe 9 opening degree, keep the sewage water surface to be located at dross and collect inlet, convenient for persistent collection dross.Control Unit processed is according to the monitoring result of monitoring device, and when judging that the dross of the sewage water surface collects substantially clean, control unit control is arranged Mouth of a river weir gate 5 is closed, and discharge outlet weir gate 5 is retracted into 1 bottom of shunting well, and sewage is discharged from drainpipe 4.Baffle 6 continue collect from The dross flowed into water inlet pipe 2, monitoring device continue to monitor liquid level and/or water quality in shunting well 1, send result to control Unit, control unit control waterpower according to the monitoring result of monitoring device and switch, to realize that Cycle Automation collects dross.
The effect and beneficial effect of embodiment
(1) present embodiment setting dross on shunting the borehole wall collects entrance and dross collection channel, when water level rises to When dross collects entrance, sewage and the dross for floating on the sewage water surface flow into dross and collect entrance under the action of the gravity of water, from And realize the automatic dross collected in sewage, it is not only simple in structure, and greatly reduce cost and operating cost.
(2) present embodiment is switched equipped with waterpower, the water yield for changing shunting well is switched by waterpower, to control shunting Water level in well.When needing to collect dross, the water level of waterpower switch control shunting well rises to dross and collects entrance, with floating The sewage of slag is flowed out along dross collection channel.Present embodiment can collect the dross in sewage automatically, be not only simple in structure, And greatly reduce cost and operating cost.
(3) the waterpower switch of present embodiment includes that the first waterpower switchs, and can control draining by the first waterpower switch The water yield of mouth, to control the water level in shunting well.Meanwhile it further includes the second waterpower switch that waterpower switch, which includes, by the One waterpower switch and the second waterpower switch match, and can further accurately control the water level of shunting well, realize and are collecting dross When, water level control collects inlet in dross, so that the dross of the water surface continues through dross and collects entrance discharge.
(4) present embodiment is equipped with baffle, and baffle can continue to intercept dross, and dross is prevented to be discharged by discharge outlet.Its In, baffle can be fixed baffle or floating barrier.When baffle is fixed baffle, fixed baffle and the fixed company of the shunting borehole wall It connects, the water level guaranteed water level in waterpower switch control shunting well is higher than the level height of fixed baffle lower edge, and dross is not from draining Mouth discharge, fixed baffle can be with persistent collection dross.When baffle is floating barrier, floating barrier is floated with the variation of water level Dynamic, dross is not discharged from discharge outlet, and floating barrier can be with persistent collection dross.
Above embodiment one drives by gravity flows and then collects dross, when cutting dirty pipe is full-section pipe-flow, shunts It is that floating material is fallen into section dirty pipe without normal gravity that overflow port, which enters sundries, above well: being filled with water this is because cutting inside dirty pipe State, and floating material can only float on the surface, so floating material is oneself can not to flow into the sewage pipe for cutting in dirty pipe and flowing to downstream Road.
In order to solve problem above, what inventor was creative is arranged bilge well, the floating above shunting well on shunting well Object can enter in bilge well from overflow port, while be provided with screw conveyor in bilge well, so that:
After floating material enters bilge well, under the helical feed of screw conveyor, the floating material in water is pushed by force To bilge well bottom, finally under the flow action for cutting dirty pipe, enter along water flow and cut dirty pipe, so that it is full for solving above-mentioned section of dirty pipe The problem of can not carrying out dross collection by gravity flowing when pipe stream.The particular technique side of following form of implementation two is proposed thus Case.
Embodiment two
Embodiment 5
Referring to shown in Fig. 3,4, the embodiment of the present invention provides a kind of dross automatically flowed by conveying device and collects automatically System, for collecting the dross in shunting well 1, shunting well 1 includes shunting the borehole wall 11 and shunting the borehole wall 11 around the shunting formed Well inner cavity 12 shunts the borehole wall 11 and is equipped with the water inlet being connected to shunting well inner cavity 12 and discharge outlet, and system includes that dross is collected Entrance and dross collection channel 8;Dross is collected entrance and is set on the shunting borehole wall 11, and dross collects entrance and shunting well inner cavity 12 Connection, dross collection channel 8 include inlet end and an outlet end;Wherein, water inlet and discharge outlet have been respectively communicated with water inlet pipe 2 and row Water pipe 4, water inlet pipe 2 and drainpipe 4 are respectively positioned on the lower half for shunting the borehole wall 11.
As shown in figure 4, being connected with closing bilge well 10 in the overflow port 12 for shunting the borehole wall, it is internally provided with conveying device 13, about 10 bilge well of closing is arranged, upper part is connected to overflow port 14 and dross collection channel in dross collection entrance, that is, figure 8, dross enters the import of closing bilge well 10 from the overflow port 14 on shunting well, is transported under conveying device 13 and cuts dirty pipe 3 Bottom.
After floating material enters bilge well, under the conveying of conveying device, the floating material in water is delivered to sewage by force Shaft bottom enters along water flow finally under the flow action for cutting dirty pipe and cuts dirty pipe.
Embodiment 6
On the basis of embodiment 5, the water outlet of dross collection channel 8 is connected to closing bilge well 10.
As shown in figure 4, conveying device is screw conveyor, bucket conveyor, drag conveyor, as a preference, originally Embodiment using screw conveyor have stronger push effect and anti-feed blocking effect, so as to preferably by dross it is strong Row is pushed to the bottom of bilge well, and corresponding bilge well is cylindrical shape.
Push by material compression to the bottom of bilge well, and with cut the nozzle of dirty pipe to it is corresponding when from cutting dirty pipe outflow Sewage washes away dross entrainment, cuts dirty pipe as water flow enters.
Embodiment 7
As a kind of optimization, the discharge outlet weir gate 5 being arranged in the structure of 1-4 in conjunction with the embodiments, baffle 6, embodiment 5-6's The dross auto-collection system automatically flowed by conveying device corresponding can also set for the water level controlled in shunting well 1 It sets.Present system is additionally provided with waterpower switch, the water in water yield control shunting well 1 of the waterpower switch by changing shunting well 1 Position.
Present system further includes monitoring device, control unit and the baffle 6 for intercepting dross.Wherein, monitoring device For monitoring liquid level and/or water quality in shunting well 1, control unit is used to control waterpower according to the monitoring result of monitoring device and open The opening degree of pass.Baffle 6 be set to shunting well inner cavity 12 in and perpendicular to water (flow) direction be arranged, the two sides of baffle 6 respectively with shunting The borehole wall 11 connects, and baffle 6 is located at dross and collects between entrance and discharge outlet.
Specifically, waterpower switch includes the first waterpower switch for controlling the water yield of discharge outlet.
In practical applications, the first waterpower switch can be appointing in gate, weir gate, gate valve, air bag or pneumatic house keeper's valve It anticipates a kind of at discharge outlet.
Embodiment 8
It shunts and is additionally provided with sewage draining exit on the borehole wall 11, sewage draining exit is connected to shunting well inner cavity 12, and sewage draining exit is connected by cutting dirty pipe 3 Logical shunting well inner cavity 12 and sewage treatment plant, and dross collects the level height of the minimum water inlet position of entrance higher than sewage draining exit The level height of highest water inlet position, the outlet end of dross collection channel 8, which is connected to, cuts a dirty pipe 3.Present system further includes using In the second waterpower switch of the water yield of control of sewage disposal mouth.Before second waterpower switch is located at outlet end and cuts 3 junction of dirty pipe Side.Specifically, the second waterpower switch is blowdown port strobe 9, and blowdown port strobe 9 is set at sewage draining exit.
In practical applications, the second waterpower switch can be appointing in gate, weir gate, gate valve, air bag or pneumatic house keeper's valve It anticipates a kind of at sewage draining exit.
Embodiment 9
Baffle 6 is fixed baffle, and the two sides of fixed baffle are fixedly connected with the borehole wall 11 is shunted, the level on edge on fixed baffle Height is higher than the level height that dross collects the highest water inlet position of entrance, and the level height of fixed baffle lower edge is received lower than dross Collect the level height of the minimum water inlet position of entrance, the water level in waterpower switch control shunting well 1 is consistently higher than under fixed baffle The level height on edge.
Embodiment 10
Baffle 6 is floating barrier, shunts the borehole wall 11 and is equipped with a pair of card slot perpendicular to 1 bottom of shunting well, floating barrier Two sides are located in a pair of of card slot, and floating barrier can move up and down in a pair of of card slot, and water is exposed in the upper end of floating barrier Face, the lower end of floating barrier are located at below the water surface.In practical applications, floating barrier can be hollow structure, using stainless steel At.Preferably, floating barrier is made of 316 stainless steels.
Highest warning line line is equipped in shunting well 1, highest warning line line is higher than the highest water inlet that dross collects entrance The level height of position, waterpower switch realize that the water level in shunting well 1 is guarded against no more than highest by control 1 water yield of shunting well Water level line.
Referring to figure 1 and figure 2, the monitoring result of monitoring device is transmitted to control unit, and control unit judgement needs to receive When collecting the dross of the sewage water surface, control unit controls discharge outlet weir gate 5 and opens, and the sewage water surface rises, and baffle 6 persistently intercepts floating Slag.When the sewage water surface, which rises to dross, collects entrance, the dross of sewage and the sewage water surface flows into bilge well 10, receives along dross Collect channel 8 and flow into a section dirty pipe 3, is discharged to sewage treatment plant.During sewage discharge, control unit controls discharge outlet weir gate 5 And/or the opening degree of blowdown port strobe 9, it keeps the sewage water surface to be located at dross and collects inlet, be convenient for persistent collection dross.Control Unit is according to the monitoring result of monitoring device, and when judging that the dross of the sewage water surface collects substantially clean, control unit control is drained Mouth weir gate 5 is closed, and discharge outlet weir gate 5 is retracted into 1 bottom of shunting well, and sewage is discharged from drainpipe 4.Baffle 6 continue collect from into The dross flowed into water pipe 2, monitoring device continue to monitor liquid level and/or water quality in shunting well 1, and it is single to send result to control Member, control unit control waterpower according to the monitoring result of monitoring device and switch, to realize that Cycle Automation collects dross.
Embodiment 11
In above-described embodiment 1-10, air bag is the air bag of elastomeric material, is connect with compressed gas source by tracheae, when filling Air bag expands and corresponding channel is ended when gas, and while deflating shrinks so that corresponding channel conductive.
Further, above-mentioned air bag is replaced with into pneumatic tubing clip valve.Existing pipe clip valve can be used in pneumatic tubing clip valve.
As shown in Figure 5,6, the present embodiment provides a kind of preferred pneumatic tubing clip valve organization plans comprising resilient sleeve 210 and shell 220, resilient sleeve has circulation passage T corresponding with outlet pipe, and shell 220 covers on resilient sleeve, and bullet Property sleeve both ends and the both ends sealing of shell be detachably connected, the outer wall of resilient sleeve and outer casing inner wall form cavity, shell It is equipped with the air inlet being connected with air inlet pipe G, when cavity inflation, resilient sleeve expansion, the sectional area of circulation passage becomes smaller, when When cavity is deflated, resilient sleeve restores, and the sectional area of circulation passage becomes larger.
Further, in the present embodiment, pneumatic tubing clip valve is arranged in the channel, and the pipeline is fixedly installed on In water outlet or sewage draining exit.
The effect and beneficial effect of embodiment
(1) present embodiment setting dross on shunting the borehole wall collects entrance and dross collection channel, when water level rises to When dross collects entrance, sewage and under floating on the dross of the sewage water surface under the conveying of conveying device flows into dross and collects entrance, To realize the automatic dross collected in sewage, the case where can adapt to the full-section pipe-flow of overflow well or closed shunting well, fit Ying Xinggeng is wide.
Those skilled in the art can carry out various modifications to the embodiment of the present invention and modification, if these modifications and change For type within the scope of the claims in the present invention and its equivalent technologies, then these modifications and variations are also in protection scope of the present invention Within.
The prior art that the content being not described in detail in specification is known to the skilled person.

Claims (11)

1. a kind of dross auto-collection system, for collecting the dross in shunting well (1), the shunting well (1) includes shunting well Wall (11) and shunt the borehole wall (11) around formed shunting well inner cavity (12), the shuntings borehole wall (11) equipped with in shunting well The water inlet and discharge outlet of chamber (12) connection, it is characterised in that:
The system comprises drosses to collect entrance and dross collection channel (8);
The dross is collected entrance and is set in the shunting borehole wall (11), and dross is collected entrance and is connected to shunting well inner cavity (12), institute State water inlet height of the water inlet height higher than the water inlet that dross collects entrance;
The dross collection channel (8) includes inlet end and an outlet end, and the level height of the outlet end is lower than the import The level height at end, the input end are connected to the dross and collect entrance.
2. dross auto-collection system as described in claim 1, it is characterised in that: the dross in the shunting well is floated from described Slag collects entrance and enters the gravity outflow after the dross collection channel;
Or, the conveying device is set in the dross collection channel the system also includes conveying device, and the conveying fills The entrance and the dross set collect entrance connection, and the dross in the shunting well is collected entrance from the dross and entered through described Conveying device discharge;
Or, attachment device (7) the connection dross collects entrance and dross is collected and led to the system also includes attachment device (7) Road (8), and the attachment device (7) is located at the outside for shunting the borehole wall (11),
Or, the shunting well (1) in be equipped with highest warning line line, the highest warning line line be higher than the dross collect into The level height of the highest water inlet position of mouth.
3. dross auto-collection system as claimed in claim 2, it is characterised in that:
The conveying device is screw conveyor;
And/or the system further includes bilge well, the channel in the bilge well is the dross collection channel, the bilge well The upper setting inlet end and an outlet end.
4. dross auto-collection system as described in claim 1, it is characterised in that:
Sewage draining exit is additionally provided on the shunting borehole wall (11), the sewage draining exit connects sewage pipe or sewage treatment plant by cutting dirty pipe Or sewage treatment facility, wherein described section of dirty pipe of the outlet end connection or sewage pipe or sewage treatment plant or sewage treatment are set It applies, the water inlet height that the dross collects entrance is higher than the water inlet height of the sewage draining exit.
5. dross auto-collection system as claimed in claim 3, it is characterised in that:
When described section of dirt pipe is partly-filled pipe-flow, the dross gravity inflow that the dross collection entrance enters is described to cut dirt pipe;
When described section of dirty pipe is full-section pipe-flow, conveying device is equipped in the dross collection channel, the dross is collected entrance and entered Dross pass through the conveying device and enter and described cut dirty pipe.
6. dross auto-collection system as claimed in claim 3, it is characterised in that:
The discharge outlet is connected with natural water, and sets on the pipeline being connected before the discharge outlet or in discharge outlet or with discharge outlet There is the first waterpower switch;
Or, the discharge outlet is connected with natural water, and the pipeline being connected before the discharge outlet or in discharge outlet or with discharge outlet It is equipped with the first waterpower to switch, the pipeline being connected before the sewage draining exit or on sewage draining exit or with sewage draining exit is opened equipped with the second waterpower It closes.
7. dross auto-collection system as claimed in claim 5, it is characterised in that:
The first waterpower switch is one of gate, weir gate, gate valve, air bag or pneumatic house keeper's valve;
The second waterpower switch is one of gate, weir gate, gate valve, air bag or pneumatic house keeper's valve.
8. dross auto-collection system as claimed in claim 5, it is characterised in that: the dross collection entrance is set to described First waterpower switch upstream, the water inlet height that the dross collects entrance are lower than the water inlet height of the discharge outlet;
Or, the first waterpower switch is located at discharge outlet upstream, and the first waterpower switchs when crossing water for overflow, and the dross collects entrance When being set to the first waterpower switch downstream, the water inlet that the water inlet height that the dross collects entrance is higher than the discharge outlet is high Degree.
9. dross auto-collection system as claimed in claim 5, it is characterised in that:
The system also includes monitoring device and control unit, the monitoring device is used to monitor the liquid in the shunting well (1) Position and/or water quality, described control unit are used to control the opening degree of waterpower switch according to the monitoring result of the monitoring device.
10. the dross auto-collection system as described in claim 1, it is characterised in that:
The system also includes the baffle (6) for intercepting dross, the baffle (6) is set in shunting well inner cavity (12) and vertical It is arranged in water (flow) direction, the baffle (6) is located at the downstream that the dross collects entrance.
11. dross auto-collection system as claimed in claim 9, it is characterised in that:
The baffle (6) is fixed baffle, and the two sides of the fixed baffle are fixed, and the level height on edge is high on the fixed baffle The level height of the highest water inlet position of entrance is collected in the dross, the level height of the fixed baffle lower edge is lower than described Dross collects the level height of the minimum water inlet position of entrance;
Or, the baffle (6) is floating barrier, described the shunt borehole wall (11) are equipped with a pair of card perpendicular to shunting well (1) bottom Slot, the two sides of the floating barrier are located in a pair of of card slot, and floating barrier can move up and down in a pair of of card slot.
CN201910059066.0A 2018-01-23 2019-01-22 Automatic scum collecting system Active CN109555218B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018100648366 2018-01-23
CN201810064836.6A CN108301498A (en) 2018-01-23 2018-01-23 Dross auto-collection system

Publications (2)

Publication Number Publication Date
CN109555218A true CN109555218A (en) 2019-04-02
CN109555218B CN109555218B (en) 2024-03-26

Family

ID=62865983

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201810064836.6A Pending CN108301498A (en) 2018-01-23 2018-01-23 Dross auto-collection system
CN201920104335.6U Active CN210315933U (en) 2018-01-23 2019-01-22 Automatic scum collecting system
CN201910059066.0A Active CN109555218B (en) 2018-01-23 2019-01-22 Automatic scum collecting system

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201810064836.6A Pending CN108301498A (en) 2018-01-23 2018-01-23 Dross auto-collection system
CN201920104335.6U Active CN210315933U (en) 2018-01-23 2019-01-22 Automatic scum collecting system

Country Status (1)

Country Link
CN (3) CN108301498A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501690A (en) * 2020-04-02 2020-08-07 三峡大学 Flap gate with dredging function
CN114477368A (en) * 2020-11-12 2022-05-13 阿卡-艾尔洛比克系统公司 Scum collecting system and method in waste water treatment system

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301498A (en) * 2018-01-23 2018-07-20 武汉圣禹排水系统有限公司 Dross auto-collection system
CN111535423B (en) * 2020-05-08 2021-07-23 义乌市高洋建筑工程有限公司 Safe ecological ditch
CN113402109B (en) * 2021-05-27 2023-01-06 安徽保尔盈新材料科技有限公司 Method for treating and recycling wastewater for textile printing and dyeing
CN114105335A (en) * 2021-11-25 2022-03-01 张振华 Highway bridge floor drainage filtration system
CN114426318A (en) * 2022-01-14 2022-05-03 赖慎福 Sediment machine is scraped with being convenient for empty formula sewage treatment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008212899A (en) * 2007-03-07 2008-09-18 Toshiba Corp Scum skimmer
CN103182203A (en) * 2011-12-31 2013-07-03 上海市政工程设计研究总院(集团)有限公司 Slag discharge device and slag discharge method for sand basin
KR20140036701A (en) * 2012-09-18 2014-03-26 주식회사 대하엔텍 A circular scum skimmer apparatus for circle sedimentation basin
CN204022508U (en) * 2014-06-20 2014-12-17 广州市市政工程设计研究院 A kind of slag discharging device
CN105756183A (en) * 2016-04-19 2016-07-13 武汉圣禹排水系统有限公司 Inclined and floating slag blocking device of intercepting well
JP2016156128A (en) * 2015-02-23 2016-09-01 株式会社東芝 Gravity flow type sewer pipe
CN106512493A (en) * 2016-12-02 2017-03-22 北京恩菲环保股份有限公司 Scum cleaning tank
CN210315933U (en) * 2018-01-23 2020-04-14 武汉圣禹排水系统有限公司 Automatic scum collecting system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008212899A (en) * 2007-03-07 2008-09-18 Toshiba Corp Scum skimmer
CN103182203A (en) * 2011-12-31 2013-07-03 上海市政工程设计研究总院(集团)有限公司 Slag discharge device and slag discharge method for sand basin
KR20140036701A (en) * 2012-09-18 2014-03-26 주식회사 대하엔텍 A circular scum skimmer apparatus for circle sedimentation basin
CN204022508U (en) * 2014-06-20 2014-12-17 广州市市政工程设计研究院 A kind of slag discharging device
JP2016156128A (en) * 2015-02-23 2016-09-01 株式会社東芝 Gravity flow type sewer pipe
CN105756183A (en) * 2016-04-19 2016-07-13 武汉圣禹排水系统有限公司 Inclined and floating slag blocking device of intercepting well
CN106512493A (en) * 2016-12-02 2017-03-22 北京恩菲环保股份有限公司 Scum cleaning tank
CN210315933U (en) * 2018-01-23 2020-04-14 武汉圣禹排水系统有限公司 Automatic scum collecting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501690A (en) * 2020-04-02 2020-08-07 三峡大学 Flap gate with dredging function
CN114477368A (en) * 2020-11-12 2022-05-13 阿卡-艾尔洛比克系统公司 Scum collecting system and method in waste water treatment system

Also Published As

Publication number Publication date
CN108301498A (en) 2018-07-20
CN210315933U (en) 2020-04-14
CN109555218B (en) 2024-03-26

Similar Documents

Publication Publication Date Title
CN109555218A (en) Dross auto-collection system
CN107190842B (en) A kind of control method for shunting of accurately removing contamination for rainwater
CN107653958B (en) A kind of drainage system and water discharge control method with facility of regulating and storing
CN107587580A (en) A kind of band surge bottom-open type weir gate and pump row drainage system and water discharge control method
CN107842088A (en) A kind of drainage system and water discharge control method with regulate and store facility and online treatment facility
CN105056600A (en) Device and method for removing floating objects in sewage through spiral-flow type automatic cleaning and filtration
CN107605005A (en) A kind of drainage system and water discharge control method arranged with waterpower non-return weir gate and pump
CN108951831B (en) Propeller type mouth discharging and sewage intercepting device
CN207582618U (en) A kind of pump discharges into water system
CN107059989A (en) The rain collector and its method of work of automatic flow abandoning contaminative early-stage rainwater
CN209494027U (en) A kind of rain dirt separation structures
CN107606376B (en) A kind of aerating pipelines condensed water or water leakage self-draining arrangement
CN109356136A (en) It is a kind of for collect cleaning the micro- plastics of the water surface method and device
CN206616616U (en) The rain collector of automatic flow abandoning contaminative early-stage rainwater
CN206074582U (en) Sewage treatment plant inflow on-line detecting system
CN214693581U (en) Drainage filter equipment
CN205637027U (en) Reposition of redundant personnel of regional burst rainwater, regulation and processing system based on confluence tubulation net
CN107806154A (en) A kind of drainage system and water discharge control method with online treatment facility
CN208267068U (en) A kind of initial rainwater collection device
CN207469412U (en) A kind of control well device of combined system pollutant
CN209108682U (en) A kind of mudpan spoil disposal collection device
CN208748803U (en) A kind of shunting with preprocessing function is regulated and stored type gutter inlet device
CN103741785B (en) A kind of rain water drainage part flow arrangement
CN209900812U (en) Automatic intercepting filter tank, intercepting filter device and system
CN207436177U (en) A kind of drainage system with pump row

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant