CN109551127A - A kind of full-automatic steel aluminium strip storage splicing equipment and method - Google Patents
A kind of full-automatic steel aluminium strip storage splicing equipment and method Download PDFInfo
- Publication number
- CN109551127A CN109551127A CN201710893474.7A CN201710893474A CN109551127A CN 109551127 A CN109551127 A CN 109551127A CN 201710893474 A CN201710893474 A CN 201710893474A CN 109551127 A CN109551127 A CN 109551127A
- Authority
- CN
- China
- Prior art keywords
- aluminium strip
- steel aluminium
- band
- steel
- automatic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 188
- 239000010959 steel Substances 0.000 title claims abstract description 188
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 title claims abstract description 181
- 229910052782 aluminium Inorganic materials 0.000 title claims abstract description 181
- 239000004411 aluminium Substances 0.000 title claims abstract description 179
- 238000003860 storage Methods 0.000 title claims abstract description 43
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000003466 welding Methods 0.000 claims abstract description 24
- 230000000087 stabilizing effect Effects 0.000 claims abstract description 8
- 239000000463 material Substances 0.000 claims description 25
- 230000003019 stabilising effect Effects 0.000 claims description 9
- 230000002146 bilateral effect Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 claims description 2
- 230000000295 complement effect Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 14
- 238000005520 cutting process Methods 0.000 abstract description 5
- 230000003287 optical effect Effects 0.000 abstract 2
- 239000000203 mixture Substances 0.000 abstract 1
- 230000001360 synchronised effect Effects 0.000 description 9
- 238000006073 displacement reaction Methods 0.000 description 6
- 238000001514 detection method Methods 0.000 description 4
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 206010044565 Tremor Diseases 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
Abstract
The present invention relates to the steel aluminum strip splicing work in the production field more particularly to optical cable of optical cable and steel aluminium-plastic pipe and the production of steel aluminium-plastic pipe.A kind of full-automatic steel aluminium strip storage splicing equipment and method include: rotatably to put tape holder 1, automatic seeking with head system 2, steel aluminium strip welding system 3, automatic storage band system 4 and control system 5 etc. part composition.Its main feature is that the automatic overlapping and welding for realizing two disk steel aluminium strips of front and back, whole process do not need manual intervention under control of the control system 5.The present invention takes the lead device 2 using automatic seeking, realizes automatic seeking and takes the lead, automatic cutting, clamps and automatically send band to bonding machine and mold automatically;The bonding machine that the present invention uses can weld steel band but also weld aluminium strip;Present invention employs steel aluminium strip tension stabilizing device 4-8 and 4-9 to ensure steel aluminium strip tension stability during tape splicing;The present invention additionally uses upper and lower guide wheels group 4-3 and 4-4 and carries out storage band, it is ensured that steel aluminium strip is not loose, does not overturn during entire storage band.
Description
Technical field
The present invention relates to the modeling of light, cable and steel, the production field of aluminium-plastic pipe more particularly to light, cable and steel modelings, aluminium-plastic pipe
Steel, aluminum strip splicing work in production.
Background technique
Light, cable and steel modeling, aluminium-plastic pipe production in, steel, aluminium strip tape splicing be still manually to be grasped with experienced operator
The problem of making, being primarily present the following aspects: 1) artificial tape splicing low efficiency, existing tape splicing are used for steel aluminium strip using different
Tape splicing mode, different welders is got out before tape splicing, along with manual tape splicing, belt is welded and compares expense
When expenses of labour;2) staff training is difficult, and general staff, which cannot be on duty just, can be carried out individually operated, skillfully to grasp and generally require 3-6
Month time, it is particularly problematic in today that labour is in short supply;3) often easily there is safety problem, if during tape splicing
Such issues that personnel operate the unskilled very easy accident for disconnected band or steel aluminium strip scratching fingers occur, occur, which often deals with, compares
Trouble, on the one hand may hurt sb.'s feelings, and on the other hand increase cost, influence the product friendship phase.4) existing storage uses still with device
It is loose storage band mode, this storage band mode needs manpower shield and puts band, on the one hand puts band tension shakiness, another party is due to being
Loose storage band mode, which can be easy to cause, turns over band.The present invention addresses the above problem.
Summary of the invention
The purpose of the present invention is: aim to solve the problem that present light, cable and steel modeling, aluminium-plastic pipe production in steel, aluminium strip tape splicing
The problem of there is still a need for manual operations realizes automatic storage tape splicing work by automatic control system and relevant device, thus will
Personnel free.
A kind of described full-automatic steel aluminium strip storage splicing equipment and method include: rotatably put tape holder, automatic storage band system,
Automatic seeking band head system, steel aluminium strip welding system etc. part forms, which can realize automatically under the control of central controller
The storage tape splicing of steel aluminium strip works.
The described tape holder of rotatably putting includes bilateral putting tape holder (complementing one another, be recycled), the inspection of steel aluminium strip coiled material outer diameter
Survey instrument, rotating device, put tape spool automatic tension device, steel aluminium strip puts coiling tape tension control device.Described rotatably puts tape holder
The course of work and principle are as follows: the steel aluminium strip coiled material outer diameter detecting instrument can detect the outer diameter of steel aluminium strip coiled material, system the moment
The outer diameter that can be detected accordingly calculates the residue length of steel aluminium strip coiled material.After system detection is finished to steel aluminium strip currently in use,
It rotatably puts tape holder and rotates the position that the steel aluminium strip that will be ready for rotates to energy normal use automatically, for producing and using.
The described automatic storage band system includes that steel aluminium strip clamping device, steel aluminium strip store up tape holder, steel aluminium strip tension stability automatically
Device etc..The described automatic storage band system work process and principle are as follows: when system detection to steel aluminium strip currently in use also
Start automatic storage band process when 150m long, system may require that the upper block of steel aluminium strip tension stabilizing device presses to down and lead at this time
Wheel, steel aluminium strip tension stabilizing device are started to work, and guarantee steel aluminium strip tension stability in the state of high-speed production.Simultaneity factor meeting
The automatic storage tape program of starting, lower both direction is mobile upwards respectively for the automatic upper and lower guide wheels group for storing up tape holder, completes storage band work, storage
System can control steel aluminium strip gripping means grips steel aluminium strip after the completion of band work, and steel aluminium strip cutting device is acted steel aluminium strip
45 ° of oblique angles, waiting carry out be overlapped with the steel aluminium strip cut that steel aluminium strip automatic seeking head device is sent.
The automatic storage is to change over loose storage with mode with the characteristics of system, effectively prevent turning over the hair of band
Raw, simultaneously because tensioned stabilising arrangement, no matter steel aluminium strip is especially able to maintain steel aluminium under tape splicing state in what state
The tension stability of band.
The automatic seeking is taken the lead device and is formed with head system by additional seek of synchronizing shaft of XY axis both direction.Described
Automatic seeking takes the lead system work process and principle is as follows: after rotatably putting tape holder steel aluminium strip rotated to normal use position,
Steel aluminium strip coiled material outer diameter detecting instrument detects the outer diameter of steel aluminium strip volume, and system confirms steel aluminium according to the steel aluminium strip coiled material outer diameter detected
Extreme higher position with volume, two synchronous motors of through hole XY axis, which will seek the sharp mouth for taking the lead device and move on to steel aluminium strip, puts tape holder
The top, and sharp mouth is supported into upper steel aluminium strip.Simultaneity factor can control steel aluminium strip coiled material and rotate clockwise, with steel aluminium strip coiled material
It rotating clockwise, steel aluminium strip, which takes the lead to enter, to be sought in band device, and steel aluminium strip coiled material continues to stop rotating after rotating clockwise half-turn, this
When seek and take the lead device and clamp cover board to push, push down steel aluminium strip, the starting of steel aluminium strip Scissoring device by steel aluminium strip crop it is at 45 ° tiltedly
Angle, then sought by the displacement of XY axis and to take the lead device and give this steel aluminium strip to bonding machine weld mold, with upper disk steel aluminium strip weight
Folded, steel aluminium strip bonding machine welds steel aluminium strip at this time.
The steel aluminium strip welding system includes steel aluminium strip special welding machine, steel aluminium strip Scissoring device and weld mold etc..
The characteristics of described steel aluminium strip bonding machine is the welding that can be carried out steel band and aluminium strip, do not need because the difference of band of material and more
Bonding machine is changed, while also not needing removal steel aluminium strip surface PE film and can guarantee that steel aluminium strip conduction property meets the requirement of standard.
The entire workflow and principle of the full-automatic steel aluminium strip storage tape splicing system:
When system detection to steel aluminium strip currently in use is there are also automatic storage band process is started when 150m long, steel aluminium strip is opened at this time
The upper block of power stabilising arrangement presses to lower tumbler, and steel aluminium strip tension stabilizing device is started to work, and guarantees the shape in high-speed production
Steel aluminium strip tension stability under state.Lower both direction is mobile upwards respectively for the upper and lower guide wheels group of the automatic storage tape holder of simultaneity factor control,
Storage is completed with work, steel aluminium strip gripping means grips steel aluminium strip after the completion of storage band work, steel aluminium strip cutting device is acted steel
45 ° of oblique angles of aluminium strip, waiting carry out be overlapped with the steel aluminium strip cut that steel aluminium strip automatic seeking head device is sent.
After rotatably putting tape holder steel aluminium strip is rotated to normal use position, steel aluminium strip coiled material outer diameter detecting instrument detects steel
The outer diameter of aluminium strip coiled material, system confirm the extreme higher position of steel aluminium strip coiled material according to the outer diameter of steel aluminium strip coiled material, through hole XY axis
Two synchronous motors will seek the sharp mouth for taking the lead device and move on to the top that steel aluminium strip puts tape holder, and sharp mouth is supported upper steel aluminium strip
Coiled material.Simultaneity factor allows steel aluminium strip coiled material to rotate clockwise, and as steel aluminium strip coiled material rotates clockwise, steel aluminium strip head, which enters, seeks band
In device, steel aluminium strip coiled material continues to stop rotating after rotating clockwise half-turn, seeks take the lead device clamping cover board pushing at this time, push down
Steel aluminium strip is cropped oblique angle at 45 ° by steel aluminium strip, the starting of steel aluminium strip Scissoring device, then is sought by the displacement of XY axis and taken the lead device general
New steel aluminium strip and upper disk steel aluminium strip overlap on bonding machine weld mold, and steel aluminium strip bonding machine is welded.
Rear steel aluminium strip clamping device is welded to unclamp, the upper and lower guide wheels group of steel aluminium strip belt machine starts return.Guide wheel group is returned
Steel aluminium strip tension stabilizing device stops working behind position, and upper block leaves lower tumbler, and production is normally carried out.
It repeats the above steps again after to this disk steel aluminium strip use, and so on, until order production finishes.
Detailed description of the invention
Fig. 1 is that a kind of full-automatic steel aluminium strip stores up splicing equipment and the tape splicing of method completes the normal production phase
1 rotatably puts tape holder;2 automatic seekings band head system;3 steel aluminium strip welding systems;4 automatic storage band systems;5 control systems
System.
Fig. 2 is the preparation tape splicing stage that a kind of full-automatic steel aluminium strip stores up splicing equipment and method
Fig. 3 is the tape splicing implementation phase that a kind of full-automatic steel aluminium strip stores up splicing equipment and method
Fig. 4 is rotatably to put tape holder
1 rotatably puts tape holder
1-1 steel aluminium strip rotates the rotating electric machine for putting tape holder;1-2 tension shaft and put tape holder;1-3 steel aluminium strip coiled material;1-4 steel aluminium
Band coiled material outer diameter detecting instrument.Fig. 5 .1 is that automatic seeking band head system is sought and takes the lead position;Fig. 5 .2 is that automatic seeking band head system send and takes the lead
Welding position.
2 automatic seekings band head system
2-1, which is sought, takes the lead device pressure zone plate;2-2, which is sought, takes the lead device;2-3, which is sought, takes the lead device compression cylinder;2-4 shears band
Platform;2-5 cuts out tape shearing device;2-6Y axis;2-7Y axis synchronous driving motor;2-8 seeks band appliance stand;2-9X axis;2-10X axis is synchronous
Driving motor.
Fig. 6 is steel aluminium strip welding system
3 steel aluminium strip welding systems
3-1 cuts out tape shearing device;3-2 welding machine and welding fixture;3-3 welds board;3-4 steel aluminium strip clamping device.
Fig. 7 .1 stores up band system automatically and is in normal production status;Fig. 7 .2 stores up band system automatically and is in storage carrier state.
4 automatic storage band systems
4-1 rotating tape guide;The left guide wheel group guide rail of 4-2;4-3 upper block group and bracket;4-4 lower tumbler group and bracket;4-5 guide wheel
Bracket moves synchronous motor;4-6 wheel bracket shifting axle;The right guide wheel group guide rail of 4-7;On 4-8 steel aluminium strip straining pulley stabilising arrangement
Guide wheel;4-9 steel aluminium strip straining pulley stabilising arrangement lower tumbler;4-10 steel aluminium strip straining pulley stabilising arrangement wheel support.
Fig. 8 control system schematic diagram
5-1 rotating electric machine;5-2 steel aluminium strip puts belt tension control device;5-3 automatic seeking takes the lead device plate press device;5-4 steel aluminium strip
Scissoring device controller;5-5X axis drive motor controller;5-6Y axis drive motor controller;5-7 central controller;5-8 steel
Aluminium strip Scissoring device controller;5-9 steel aluminium strip welds machine controller;5-10 steel aluminium strip clamping device controller;5-11 is stored up automatically
Band device guide wheel group displacement drive electric machine controller;5-12 steel aluminium strip tension stability controller.
Specific embodiment:
The data that steel aluminium strip coiled material external measuring instrument 1-4 will test are sent to central controller 5-7, as central controller 5-7
Being computed steel aluminium strip currently in use, there are also central controller 5-7 when 150m long to send a signal to the control of steel aluminium strip tension stability
The upper block 4-8 of device 5-12, control steel aluminium strip tension stabilizing device press to steel aluminium strip straining pulley stabilising arrangement lower tumbler 4-
9, steel aluminium strip tension stabilizing device is started to work, and guarantees steel aluminium strip tension stability in the state of high-speed production.Center control simultaneously
Device 5-7 processed provides signal to automatic storage band device guide wheel group displacement drive electric machine controller 5-11, and control wheel bracket is mobile
Synchronous motor 4-5, driving wheel bracket shifting axle 4-6 make the upper block group for storing up tape holder automatically and bracket 4-3 and lower tumbler
Group and bracket 4-4 are moved to upper and lower both direction respectively along left guide wheel group guide rail 4-2 and right guide wheel group guide rail 4-7, complete storage band
Work.
Central controller 5-7 sends a signal to steel aluminium strip clamping device controller 5-10 after the completion of storage band work, controls
Steel aluminium strip clamping device 3-4 clamps steel aluminium strip;Central controller 5-7 sends a signal to the cutting of steel aluminium strip after clamping steel aluminium strip
Setup Controller 5-8, control steel band cutting device 3-1 welding machine and welding fixture 3-2 by steel aluminium strip crop it is at 45 ° tiltedly
Angle waits and carries out be overlapped (overlapping 15mm) with the steel aluminium strip cut that steel aluminium strip automatic seeking head device 2 is sent.
At the same time after rotatably putting tape holder 1 steel aluminium strip is rotated to normal use position, steel aluminium strip coiled material outer diameter is surveyed
The outer diameter of instrument 1-4 detection steel aluminium strip volume is measured, central controller 5-7 confirms the highest order that steel aluminium strip is rolled up according to the outer diameter of steel aluminium strip
It sets, sends a signal to X-axis drive motor controller 5-5 and Y-axis drive motor controller 5-6, they respectively drive, and X-axis is synchronous to drive
Dynamic motor 2-10 and Y-axis synchronous driving motor 2-7 movement, promotes X-axis 2-9 and Y-axis 2-6 that will seek the sharp mouth for taking the lead device 2-2
The top that steel aluminium strip puts tape holder is moved on to, and sharp mouth is supported into upper steel aluminium strip coiled material 1-3.Central controller 5-7 signals simultaneously
To steel aluminium strip put belt tension control device 5-2 allow steel aluminium strip volume rotate clockwise, as steel aluminium strip rotates clockwise, steel aluminium strip head into
Enter to seek in band device, steel aluminium strip coiled material 1-3 continues to stop rotating after rotating clockwise half-turn, and central controller 5-7 is transmitted at this time
Number device pressing plate controller 5-3 is taken the lead to automatic seeking, control, which is sought, takes the lead device pressure zone plate 2-1 pushing, pushes down steel aluminium strip, simultaneously
Central controller 5-7 signals to steel aluminium strip Scissoring device controller 5-4, and control steel aluminium strip Scissoring device 2-5 starts steel
Aluminium strip cuts oblique angle at 45 °, then steel aluminium strip and upper disk steel aluminium strip are overlapped welding by the displacement of X-axis 2-9 and Y-axis 2-6
On machine and weld mold 3-2, and with the steel aluminium strip of previous disk in welding machine and the Chong Die 15mm of welding fixture 3-2, bonding machine and welding
Mold 3-2 is welded.
Steel aluminium strip is welded rear central controller 5-7 and signals to steel aluminium strip clamping device controller 5-10, steel aluminium strip
Clamping device 3-4 unclamps, while signaling to automatic storage band device guide wheel group displacement drive electric machine controller 5-11, and control is led
The mobile synchronous motor 4-5 movement of wheel support, promotes the upper block group for storing up tape holder automatically and bracket 4-3 and lower tumbler group and bracket 4-
4 start return.After guide wheel group return, central controller 5-7 signals to steel aluminium strip tension stability controller 5-12, steel aluminium strip
The upper block 4-8 and steel aluminium strip straining pulley stabilising arrangement lower tumbler 4-9 of power stabilising arrangement are separated, and production is normally carried out.
Above-described embodiment is merely exemplary to illustrate the principle of the present invention and its effect, and is not intended to limit the present invention.It is any ripe
The personage for knowing this technology all without departing from the spirit and scope of the present invention, carries out modifications and changes to above-described embodiment.Cause
This, all those of ordinary skill in the art are completed without departing from the spirit and technical ideas disclosed in the present invention
All equivalent modifications or change, should be covered by the claims of the present invention.
Claims (10)
1. a kind of full-automatic steel aluminium strip described in stores up splicing equipment and method includes: rotatably to put tape holder, store up automatically with system, certainly
The dynamic parts such as band head system, steel aluminium strip welding system and control system of seeking form, which under control of the control system can be certainly
The dynamic storage tape splicing work for realizing steel aluminium strip.
2. a kind of full-automatic steel aluminium strip storage splicing equipment according to claim 1 and method, it is characterised in that: the rotation
Rotatable tape holder of putting includes bilateral putting tape holder (complement one another, be recycled), rotating device, putting tape spool automatic tension device, steel aluminium
Band puts coiling tape tension control device.
3. a kind of full-automatic steel aluminium strip storage splicing equipment according to claim 1 and method, it is characterised in that: it is described from
Dynamic storage band system includes that steel aluminium strip clamping device, steel aluminium strip store up tape holder, steel aluminium strip tension stabilizing device etc. automatically.
4. a kind of full-automatic steel aluminium strip storage splicing equipment according to claim 1 and method, it is characterised in that: it is described from
Dynamic seek is taken the lead device and is formed with head system by additional seek of synchronizing shaft of XY axis both direction.
5. a kind of full-automatic steel aluminium strip storage splicing equipment according to claim 1 and method, it is characterised in that: the steel
Aluminium strip welding system includes steel aluminium strip special welding machine, steel aluminium strip Scissoring device and weld mold etc..
6. a kind of full-automatic steel aluminium strip storage splicing equipment according to claim 1 and method, it is characterised in that: the control
The overlapping and welding of two disk steel aluminium strips, whole process do not need before and after system processed is realized automatically under the control of central controller
Manual intervention.
7. rotatably putting tape holder according to claim 2, it is characterised in that: it is bilateral to put band, it complements one another, is recycled, together
When steel aluminium strip inner ring fixation be to carry out automatically, steel aluminium strip put band be active release band, it is ensured that tension stability.
8. automatic storage band system according to claim 3, it is characterised in that: storage band mode loose in the past can be changed, had
Effect prevents from turning over the generation of band, simultaneously because tensioned stabilising arrangement can guarantee the tension stability of the steel aluminium strip under tape splicing state.
9. automatic seeking band head system according to claim 4, it is characterised in that: can be in the case where unmanned intervene by steel aluminium strip
Take the lead accurately send to Chong Die with equal upper disk steel aluminium strip there above bonding machine mold.
10. steel aluminium strip welding system according to claim 5, it is characterised in that: can be carried out the welding of steel band and aluminium strip, no
It needs to replace bonding machine because of the difference of band of material, and the removal work of steel aluminium strip surface PE film can be carried out automatically, and
It can guarantee that steel aluminium strip conduction property meets the requirement of standard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710893474.7A CN109551127A (en) | 2017-09-26 | 2017-09-26 | A kind of full-automatic steel aluminium strip storage splicing equipment and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710893474.7A CN109551127A (en) | 2017-09-26 | 2017-09-26 | A kind of full-automatic steel aluminium strip storage splicing equipment and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109551127A true CN109551127A (en) | 2019-04-02 |
Family
ID=65864075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710893474.7A Pending CN109551127A (en) | 2017-09-26 | 2017-09-26 | A kind of full-automatic steel aluminium strip storage splicing equipment and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109551127A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0747407A (en) * | 1993-08-05 | 1995-02-21 | Mitsubishi Electric Corp | Welding section of continuous processing line |
JPH07124610A (en) * | 1993-10-29 | 1995-05-16 | Kawasaki Steel Corp | Joining method by spot welding for steel strip |
CN201366451Y (en) * | 2008-12-31 | 2009-12-23 | 中冶南方工程技术有限公司 | Automatic belt head loosening device |
CN102602749A (en) * | 2012-02-29 | 2012-07-25 | 湖北凯乐科技股份有限公司 | Steel strip and aluminium strip automatic storage machine |
CN102909476A (en) * | 2012-11-14 | 2013-02-06 | 中天日立光缆有限公司 | Automatic welding device for stainless steel band joints and production method thereof |
CN205038390U (en) * | 2015-10-12 | 2016-02-17 | 邵阳学院 | Full -automatic cable production facility of improvement |
CN205701874U (en) * | 2016-05-25 | 2016-11-23 | 武汉钢铁股份有限公司 | Coil of strip uncoiling guide |
CN106743834A (en) * | 2016-12-22 | 2017-05-31 | 无锡南方电工机械有限公司 | Swinging double plate steel aluminium strip puts band machine |
CN206339721U (en) * | 2016-12-26 | 2017-07-18 | 四川江虹线缆制造有限公司 | A kind of aluminium strip wraps up production line with optical cable |
-
2017
- 2017-09-26 CN CN201710893474.7A patent/CN109551127A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0747407A (en) * | 1993-08-05 | 1995-02-21 | Mitsubishi Electric Corp | Welding section of continuous processing line |
JPH07124610A (en) * | 1993-10-29 | 1995-05-16 | Kawasaki Steel Corp | Joining method by spot welding for steel strip |
CN201366451Y (en) * | 2008-12-31 | 2009-12-23 | 中冶南方工程技术有限公司 | Automatic belt head loosening device |
CN102602749A (en) * | 2012-02-29 | 2012-07-25 | 湖北凯乐科技股份有限公司 | Steel strip and aluminium strip automatic storage machine |
CN102909476A (en) * | 2012-11-14 | 2013-02-06 | 中天日立光缆有限公司 | Automatic welding device for stainless steel band joints and production method thereof |
CN205038390U (en) * | 2015-10-12 | 2016-02-17 | 邵阳学院 | Full -automatic cable production facility of improvement |
CN205701874U (en) * | 2016-05-25 | 2016-11-23 | 武汉钢铁股份有限公司 | Coil of strip uncoiling guide |
CN106743834A (en) * | 2016-12-22 | 2017-05-31 | 无锡南方电工机械有限公司 | Swinging double plate steel aluminium strip puts band machine |
CN206339721U (en) * | 2016-12-26 | 2017-07-18 | 四川江虹线缆制造有限公司 | A kind of aluminium strip wraps up production line with optical cable |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209503422U (en) | A kind of manual razor automatically assembles equipment | |
CN207358343U (en) | A kind of automatic welding production line | |
CN106112317A (en) | A kind of LED lamp tube automatic production line | |
CN204470749U (en) | A kind of Intelligent terminal automatic welding machine | |
CN106784982A (en) | A kind of battery production technology of production line for manufacturing battery and the above-mentioned production line for manufacturing battery of application | |
CN206040801U (en) | Automatic bending device of electricity core utmost point ear | |
CN105870755A (en) | LED light bar welder and LED light bar welding method | |
CN206216095U (en) | Automatic welding device | |
CN106276171A (en) | A kind of aluminium section bar goes up arranging device and control method thereof automatically | |
CN107600591A (en) | A kind of transformer automatic detection finished product production line flow process | |
CN107452979A (en) | A kind of soft package lithium battery cathode tab welds rubberizing paper equipment | |
CN106624583A (en) | Recovering machine for installing marine assembling pipes and recovering method | |
CN108747117A (en) | Strip welding machine structure | |
CN105537154A (en) | Single winding mechanism for defective pole pieces | |
CN105149958B (en) | Full-automatic coiling core wire piece machine | |
CN104409944B (en) | Automatic welding machine of DC head terminal | |
CN209491382U (en) | A kind of Full-automatic aluminum alloy cutter device | |
CN213441398U (en) | Semi-automatic binding means is used in carton shaping | |
CN109551127A (en) | A kind of full-automatic steel aluminium strip storage splicing equipment and method | |
CN110281011A (en) | A kind of automated production equipment | |
CN109514230A (en) | A kind of manual razor automatically assembles equipment and its control method | |
CN206781044U (en) | Charger auto-ultrasonic branding test device | |
CN104827656B (en) | Ultrasonic automatic splicing machine of polyester base cloth in membrane production line | |
CN207358405U (en) | A kind of full-automatic steel aluminium strip stores up splicing equipment | |
CN108717898A (en) | A kind of technology for assembling transformers of computer power adapter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190402 |
|
WD01 | Invention patent application deemed withdrawn after publication |