CN109546373A - A kind of substation's earthing clamp mounting device and the installation method of earthing clamp - Google Patents

A kind of substation's earthing clamp mounting device and the installation method of earthing clamp Download PDF

Info

Publication number
CN109546373A
CN109546373A CN201811402331.2A CN201811402331A CN109546373A CN 109546373 A CN109546373 A CN 109546373A CN 201811402331 A CN201811402331 A CN 201811402331A CN 109546373 A CN109546373 A CN 109546373A
Authority
CN
China
Prior art keywords
earthing clamp
insulating
coaster
insulating bar
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811402331.2A
Other languages
Chinese (zh)
Other versions
CN109546373B (en
Inventor
胡学深
童冰
高源�
郭毅
杨旻昊
陈鑫
梁潭华
潘云鹏
唐云飞
韦方朗
何荣平
杨昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qujing Bureau of Extra High Voltage Power Transmission Co
Original Assignee
Qujing Bureau of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qujing Bureau of Extra High Voltage Power Transmission Co filed Critical Qujing Bureau of Extra High Voltage Power Transmission Co
Priority to CN201811402331.2A priority Critical patent/CN109546373B/en
Publication of CN109546373A publication Critical patent/CN109546373A/en
Application granted granted Critical
Publication of CN109546373B publication Critical patent/CN109546373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R11/00Individual connecting elements providing two or more spaced connecting locations for conductive members which are, or may be, thereby interconnected, e.g. end pieces for wires or cables supported by the wire or cable and having means for facilitating electrical connection to some other wire, terminal, or conductive member, blocks of binding posts
    • H01R11/11End pieces or tapping pieces for wires, supported by the wire and for facilitating electrical connection to some other wire, terminal or conductive member
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R43/00Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors
    • H01R43/027Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors for connecting conductors by clips

Abstract

The invention discloses a kind of substation earthing clamp mounting device and the installation methods of earthing clamp, are related to earthing clamp mounting technique field.The device includes insulating carriage, insulating bar and insulation hanging wire coaster.The end of insulating carriage is equipped with insulation lifting block;Insulating bar has the free end and operating side being oppositely arranged;Insulating bar is configured as after insulation hanging wire coaster is installed on operating side, and by the cooperation of insulate lifting block and insulating bar, insulation hanging wire coaster is sent to live wire;After the hanging wire coaster that insulate is installed on live wire, insulating bar is configured as earthing clamp being installed on operating side, and by the cooperation of insulation hanging wire coaster and insulating bar, earthing clamp is installed on live wire.The apparatus structure is simple, easy to assembly, flexible operation, can reduce service personnel's accident due to caused by fault when being grounded operation, the installation effectiveness and quality of earthing clamp can be improved, while improving safety.

Description

A kind of substation's earthing clamp mounting device and the installation method of earthing clamp
Technical field
The present invention relates to earthing clamp mounting technique fields, are installed in particular to a kind of substation with earthing clamp The installation method of device and earthing clamp.
Background technique
Live wire in substation is all overhead line, and generally liftoff to have 20 meters or so, the at this moment installation of earthing clamp is just It is extremely difficult.The installation of earthing clamp at present all be by bucket arm vehicle service personnel be sent to high-altitude using insulating bar into Row ground connection operation.But electrical body is closely spaced in substation, spaces compact, bucket arm vehicle is very careful in operation, It is careless slightly be possible to touch electrical body cause serious safety accident.
Summary of the invention
The purpose of the present invention is to provide a kind of substation earthing clamp mounting device, the apparatus structure is simple, assembles Convenient, flexible operation, due to using insulating materials, so as to avoid service personnel when being grounded operation due to caused by fault Accident generation, the installation effectiveness and quality of earthing clamp can be effectively improved, while improving the peace of the work of staff Quan Xing.
Another object of the present invention is to provide a kind of installation method of earthing clamp, this method utilizes above-mentioned substation It is installed with earthing clamp mounting device.Therefore, this method can quickly and efficiently install earthing clamp, while improve work people The safety of the work of member.
The embodiment of the present invention is achieved in that
A kind of substation's earthing clamp mounting device, comprising:
Insulating carriage, the end of insulating carriage are equipped with insulation lifting block;
Insulating bar, insulating bar have the free end and operating side being oppositely arranged;
Insulate hanging wire coaster, and insulating bar is configured as after insulation hanging wire coaster is installed on operating side, passes through insulation The cooperation of lifting block and insulating bar send insulation hanging wire coaster to live wire;When insulation hanging wire coaster is installed on After live wire, insulating bar is configured as earthing clamp being installed on operating side, and passes through insulation hanging wire coaster and insulation The cooperation of operating stick, earthing clamp is installed on live wire.
Further, in the preferred embodiment, insulating carriage includes multiple support legs in angle setting.
Further, in the preferred embodiment, insulating carriage is that there are three three feet of support leg to insulate for tool Support frame, the setting close to each other of the first end of three support legs, the second end of three support legs is located remotely from each other setting, and insulate Weight coaster is set to the first end of three support frames.
Further, in the preferred embodiment, insulation lifting block includes the first coaster ontology and plays the One lifting rope, the first coaster ontology are set to the end of insulating carriage, and the first end of the first lifting rope is used to hold for manpower, and first The second end of lifting rope passes through the first coaster ontology and connect with insulating bar, and the first lifting rope is configured as driving under external force Insulating bar rises to live wire position.
Further, in the preferred embodiment, insulation hanging wire coaster includes that the second coaster ontology and second is hung Rope, after the second coaster ontology is installed on live wire, the first end of the second lifting rope is used to hold for manpower, and the of the second lifting rope Two ends pass through the second coaster ontology and connect with insulating bar, and the second lifting rope, which is configured as driving under external force, to be set to absolutely The earthing clamp of the operating side of edge operating stick is installed to live wire.
Further, in the preferred embodiment, the height of insulating carriage is 8~15m, insulating bar Length is 15~25m.
Further, in the preferred embodiment, the height of insulating carriage is 10m, the length of insulating bar Degree is 20m.
A kind of installation method of earthing clamp, comprising:
It is installed using above-mentioned substation with earthing clamp mounting device.
Further, in the preferred embodiment, insulating carriage is placed in the lower section of live wire;
Insulating bar is sling by the lifting block that insulate, and the insulation that will be set to the operating side of insulating bar is hung Line coaster is installed on live wire;
Insulating bar is sling by the hanging wire coaster that insulate, and the ground line of the operating side of insulating bar will be set to Folder is installed on live wire.
Further, in the preferred embodiment, the lower section that insulating carriage is placed in live wire it Preceding multiple support legs to insulating carriage assemble, and the lifting block that insulate is installed on to the top of insulating carriage.
The embodiment of the present invention at least have following advantages or the utility model has the advantages that
The embodiment provides a kind of substation earthing clamp mounting device, which includes insulating supporting Frame, insulating bar and insulation hanging wire coaster.Wherein, the end of insulating carriage is equipped with insulation lifting block;Insulation operation Bar has the free end and operating side being oppositely arranged;Insulating bar is configured as being installed on operating side in insulation hanging wire coaster Afterwards, by the cooperation of insulate lifting block and insulating bar, insulation hanging wire coaster is sent to live wire;When insulation hanging wire After coaster is installed on live wire, insulating bar is configured as earthing clamp being installed on operating side, and passes through insulation hanging wire The cooperation of coaster and insulating bar, earthing clamp is installed on live wire.Substation earthing clamp mounting device Structure is simple, easy to assembly, flexible operation, passes through insulating carriage, insulation lifting block, insulating bar and insulation hanging wire Coaster is equipped with, so that earthing clamp can be rapidly, safely installed on live wire, due to using insulation material Material can effectively improve ground connection so as to avoid the generation of service personnel's accident due to caused by fault when being grounded operation The installation effectiveness and quality of wire clamp, while improving the safety of the work of staff.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the partial structural diagram one for substation's earthing clamp mounting device that the embodiment of the present invention provides;
Fig. 2 is the partial structural diagram two for substation's earthing clamp mounting device that the embodiment of the present invention provides;
Fig. 3 is the partial structural diagram three for substation's earthing clamp mounting device that the embodiment of the present invention provides;
Fig. 4 is the partial structural diagram four for substation's earthing clamp mounting device that the embodiment of the present invention provides;
Fig. 5 is the partial structural diagram five for substation's earthing clamp mounting device that the embodiment of the present invention provides;
Fig. 6 is the partial structural diagram six for substation's earthing clamp mounting device that the embodiment of the present invention provides;
Fig. 7 is the partial structural diagram seven for substation's earthing clamp mounting device that the embodiment of the present invention provides.
Icon: 100- insulating carriage;101- insulation lifting block;103- insulating bar;The free end 105-;107- behaviour Make end;109- insulation hanging wire coaster;111- earthing clamp;113- support leg;115- the first coaster ontology;The first lifting rope of 117-; 119- the second coaster ontology;The second lifting rope of 121-;123- live wire.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.Therefore, below to the reality of the invention provided in the accompanying drawings The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of selected implementation of the invention Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts Every other embodiment, shall fall within the protection scope of the present invention.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the embodiment of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", The orientation or positional relationship of the instructions such as "vertical", "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, Either the invention product using when the orientation or positional relationship usually put, be merely for convenience of the description present invention and simplification retouched It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, and It cannot be understood as indicating or implying relative importance.
In the description of the embodiment of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to detachably connect It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediate matchmaker can also be passed through Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition Understand the concrete meaning of above-mentioned term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature can be on or below second feature Directly contacted including the first and second features, also may include the first and second features be not direct contact but by them it Between other characterisation contact.Moreover, fisrt feature is on second feature, top and above include fisrt feature second spy Right above sign and oblique upper, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature it Under, lower section and fisrt feature included below be directly below and diagonally below the second feature, or be merely representative of first feature horizontal height Less than second feature.
Fig. 1 is the partial structural diagram for 111 mounting device of substation's earthing clamp that the embodiment of the present invention provides One;Fig. 2 is the partial structural diagram two for 111 mounting device of substation's earthing clamp that the embodiment of the present invention provides;Fig. 3 For the partial structural diagram three for 111 mounting device of substation's earthing clamp that the embodiment of the present invention provides;Fig. 4 is this hair The partial structural diagram four for substation's 111 mounting device of earthing clamp that bright embodiment provides;Fig. 5 is reality of the invention The partial structural diagram five of substation's 111 mounting device of earthing clamp of example offer is provided;Fig. 6 mentions for the embodiment of the present invention For 111 mounting device of substation's earthing clamp partial structural diagram six;Fig. 7 is the change that the embodiment of the present invention provides The partial structural diagram seven of power station 111 mounting device of earthing clamp.Fig. 1 to Fig. 7 is please referred to, one kind is present embodiments provided Substation's 111 mounting device of earthing clamp, comprising: insulating carriage 100, insulating bar 103 and insulation hanging wire coaster 109。
In detail, in the present embodiment, the end of insulating carriage 100 is equipped with insulation lifting block 101;Insulating bar 103 have the free end 105 and operating side 107 being oppositely arranged;Insulating bar 103 is configured as in insulation hanging wire coaster 109 After being installed on operating side 107, by the cooperation of insulate lifting block 101 and insulating bar 103, by the hanging wire coaster 109 that insulate It send to live wire 123;After the hanging wire coaster 109 that insulate is installed on live wire 123, insulating bar 103 is configured as Earthing clamp 111 is installed on operating side 107, and by the cooperation of insulation hanging wire coaster 109 and insulating bar 103, will be connect Ground clamp 111 is installed on live wire 123.The substation is simple, easy to assembly with 111 mounting device structure of earthing clamp, Flexible operation passes through insulating carriage 100, insulation lifting block 101, insulating bar 103 and insulation hanging wire coaster 109 It is equipped with, so that earthing clamp 111 can be rapidly, safely installed on live wire 123, due to using insulation material Material can effectively improve ground connection so as to avoid the generation of service personnel's accident due to caused by fault when being grounded operation The installation effectiveness and quality of wire clamp 111, while improving the safety of the work of staff.
Referring to Fig. 1 to Fig. 4, in the present embodiment, insulating carriage 100 includes multiple supports in angle setting Foot 113.By the setting of multiple support legs 113 so that insulating carriage 100 is when being placed in below conductive wire, stability can Effectively guaranteed.
As a preferred option, in the present embodiment, insulating carriage 100 is that there are three three feet of support leg 113 are exhausted for tool Edge support frame 100, the setting close to each other of the first end of three support legs 113, the second end of three support legs 113, which is located remotely from each other, to be set It sets, and the lifting block 101 that insulate is set to the first end of three support frames.The setting of three support legs 113 can control at On this basis, effectively guarantee the stability of insulating support rod.Certainly, in other embodiments of the invention, insulation branch The quantity of the support leg 113 of strut can also be selected according to demand, and the embodiment of the present invention is without limitation.
Referring to Fig. 1 to Fig. 4, in the present embodiment, insulation lifting block 101 include the first coaster ontology 115 with And the first lifting rope 117 is played, the first coaster ontology 115 is set to the end of insulating carriage 100, the first end of the first lifting rope 117 For holding for manpower, the second end of the first lifting rope 117 passes through the first coaster ontology 115 and connect with insulating bar 103, and first Lifting rope 117 is configured as that insulating bar 103 is driven to rise to 123 position of live wire under external force.It is sliding by first The effect of vehicle ontology 115 and the first lifting rope 117, so that when hanging wire coaster 109 is insulated in installation, it can be by the first lifting rope 117 Second end pass through the first coaster ontology 115 connect with insulating bar 103, the first lifting rope 117 is configured as in external force Lower drive insulating bar 103 rises, and the insulation hanging wire coaster 109 positioned at the operating side of insulating bar 103 107 is with insulation Operating stick 103 is moved to 123 position of live wire, to complete to install.
In detail, insulation hanging wire coaster 109 includes the second coaster ontology 119 and the second lifting rope 121, when the second coaster ontology After 119 are installed on live wire 123, the first end of the second lifting rope 121 is used to hold for manpower, the second end of the second lifting rope 121 It is connect across the second coaster ontology 119 with insulating bar 103, the second lifting rope 121, which is configured as driving under external force, to be set It is placed in the installation to live wire 123 of earthing clamp 111 of the operating side 107 of insulating bar 103.Pass through the second coaster ontology 119 and second lifting rope 121 effect so that the second end of the second lifting rope 121 can be worn when installing earthing clamp 111 It crosses the second coaster ontology 119 to connect with insulating bar 103, the second lifting rope 121 is configured as driving insulation under external force Operating stick 103 rises, and the earthing clamp 111 positioned at the operating side of insulating bar 103 107 is with the movement of insulating bar 103 To 123 position of live wire, to complete to install, service personnel can be effectively prevented from when being grounded operation due to caused by fault Accident generation, the installation effectiveness and quality of earthing clamp 111 can be effectively improved, while improving the work of staff Safety.
Referring to Fig. 1 to Fig. 7, in the present embodiment, the height of insulating carriage 100 is 8~15m, insulation operation The length of bar 103 is 15~25m.Preferably, the height of insulating carriage 100 is 10m, and the length of insulating bar 103 is 20m.Certainly, in the other embodiments of invention, the length of insulating support rod and insulating bar 103 can also be according to demand It is selected, the embodiment of the present invention is without limitation.
The embodiments of the present invention also provide a kind of installation methods of earthing clamp 111, comprising: utilizes above-mentioned substation It is installed with 111 mounting device of earthing clamp.Therefore, this method can quickly and efficiently install earthing clamp 111, improve simultaneously The safety of the work of staff.
In detail, this method comprises:
S1: assembling tripod, and insulation lifting block 101 is installed at the top of it;
S2: insulating carriage 100 is placed in the lower section of live wire 123;
S3: the behaviour that insulating bar 103 is sling by the lifting block 101 that insulate, and will be set to insulating bar 103 The insulation hanging wire coaster 109 for making end 107 is installed on live wire 123;
S4: the behaviour that insulating bar 103 is sling by the hanging wire coaster 109 that insulate, and will be set to insulating bar 103 The earthing clamp 111 for making end 107 is installed on live wire 123.
This method passes through insulating carriage 100, insulation lifting block 101, insulating bar 103 and insulation hanging wire coaster 109 are equipped with, so that earthing clamp 111 can rapidly, safely be installed on live wire 123, it is exhausted due to using Edge material can effectively improve so as to avoid the generation of service personnel's accident due to caused by fault when being grounded operation The installation effectiveness and quality of earthing clamp 111, while improving the safety of the work of staff.
In conclusion substation's 111 mounting device of earthing clamp that the embodiment of the present invention provides, apparatus structure letter Single, easy to assembly, flexible operation, due to using insulating materials, so as to avoid service personnel when being grounded operation due to losing The generation of accident caused by accidentally, can effectively improve the installation effectiveness and quality of earthing clamp 111, while improving staff Work safety.
The installation method for the earthing clamp 111 that the embodiment of the present invention provides, this method is using above-mentioned substation with connecing 111 mounting device of ground clamp is installed.Therefore, this method can quickly and efficiently install earthing clamp 111, while improve work The safety of the work of personnel.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of substation earthing clamp mounting device characterized by comprising
Insulating carriage, the end of the insulating carriage are equipped with insulation lifting block;
Insulating bar, the insulating bar have the free end and operating side being oppositely arranged;
Insulate hanging wire coaster, and the insulating bar is configured as after the insulation hanging wire coaster is installed on the operating side, By the cooperation of the insulation lifting block and the insulating bar, the insulation hanging wire coaster is sent to live wire; After the insulation hanging wire coaster is installed on the live wire, the insulating bar is configured as earthing clamp being installed on The operating side, and by the cooperation of insulation the hanging wire coaster and the insulating bar, the earthing clamp is installed on On the live wire.
2. substation according to claim 1 earthing clamp mounting device, it is characterised in that:
The insulating carriage includes multiple support legs in angle setting.
3. substation according to claim 2 earthing clamp mounting device, it is characterised in that:
The insulating carriage is that there are three three foot insulating carriages of the support leg, the first ends of three support legs for tool Setting close to each other, the second end of three support legs is located remotely from each other setting, and the insulation lifting block is set to three The first end of support frame as described above.
4. substation according to claim 1 earthing clamp mounting device, it is characterised in that:
The insulation lifting block includes the first coaster ontology and plays the first lifting rope, and the first coaster ontology is set to described The end of insulating carriage, the first end of first lifting rope are used to hold for manpower, and the second end of first lifting rope passes through The first coaster ontology is connect with the insulating bar, and first lifting rope is configured as driving under external force described Insulating bar rises to the live wire position.
5. substation according to claim 1 earthing clamp mounting device, it is characterised in that:
The insulation hanging wire coaster includes the second coaster ontology and the second lifting rope, when the second coaster ontology is installed on the band After electric lead, the first end of second lifting rope is used to hold for manpower, and the second end of second lifting rope passes through described second Coaster ontology is connect with the insulating bar, second lifting rope be configured as driving under external force be set to it is described absolutely The earthing clamp of the operating side of edge operating stick is installed to the live wire.
6. substation according to any one of claim 1 to 5 earthing clamp mounting device, it is characterised in that:
The height of the insulating carriage is 8~15m, and the length of the insulating bar is 15~25m.
7. substation according to claim 6 earthing clamp mounting device, it is characterised in that:
The height of the insulating carriage is 10m, and the length of the insulating bar is 20m.
8. a kind of installation method of earthing clamp characterized by comprising
It is installed using substation described in any one of any one of claims 1 to 77 with earthing clamp mounting device.
9. the installation method of earthing clamp according to claim 8 characterized by comprising
The insulating carriage is placed in the lower section of the live wire;
The behaviour that the insulating bar is sling by the insulation lifting block, and will be set to the insulating bar The insulation hanging wire coaster for making end is installed on the live wire;
The behaviour that the insulating bar is sling by the insulation hanging wire coaster, and will be set to the insulating bar The earthing clamp for making end is installed on the live wire.
10. the installation method of earthing clamp according to claim 9, which is characterized in that further include:
To multiple supports of the insulating carriage before the insulating carriage is placed in the lower section of the live wire Foot is assembled, and the wherein coaster that insulate is installed on to the top of the insulating carriage.
CN201811402331.2A 2018-11-22 2018-11-22 Grounding wire clamp installation device for transformer substation and installation method of grounding wire clamp Active CN109546373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811402331.2A CN109546373B (en) 2018-11-22 2018-11-22 Grounding wire clamp installation device for transformer substation and installation method of grounding wire clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811402331.2A CN109546373B (en) 2018-11-22 2018-11-22 Grounding wire clamp installation device for transformer substation and installation method of grounding wire clamp

Publications (2)

Publication Number Publication Date
CN109546373A true CN109546373A (en) 2019-03-29
CN109546373B CN109546373B (en) 2020-11-06

Family

ID=65849307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811402331.2A Active CN109546373B (en) 2018-11-22 2018-11-22 Grounding wire clamp installation device for transformer substation and installation method of grounding wire clamp

Country Status (1)

Country Link
CN (1) CN109546373B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112037599A (en) * 2020-08-27 2020-12-04 深圳供电局有限公司 Ground wire actual operation simulation training device
CN113823978A (en) * 2021-08-23 2021-12-21 广西电网有限责任公司贵港供电局 Telescopic high-altitude grounding assembly and disassembly device for 500KV transformer substation
CN114069351A (en) * 2021-11-27 2022-02-18 云南电网有限责任公司楚雄供电局 Automatic ground wire installing device and control method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10322826A (en) * 1997-05-20 1998-12-04 Nippon Denwa Shisetsu Kk Metal wheel device for stringing cable
CN201402940Y (en) * 2009-04-27 2010-02-10 张平安 Combined automatic UHV live cleaner
CN203398350U (en) * 2013-07-08 2014-01-15 国家电网公司 Ground wire free of climbing up pole
CN203966847U (en) * 2014-07-31 2014-11-26 国家电网公司 A kind of grounding switch bite handling implement
CN205985413U (en) * 2016-07-14 2017-02-22 国网山东省电力公司平原县供电公司 Earth connection retractable frame
CN206558713U (en) * 2017-03-20 2017-10-13 广东电网有限责任公司中山供电局 Electrical grounding line servicing unit
CN206976942U (en) * 2017-07-31 2018-02-06 齐寓乾 A kind of power construction wire-sending device
CN107706689A (en) * 2017-09-18 2018-02-16 国网山东省电力公司济南供电公司 It is a kind of to be used for the Special grounding device without stay rod

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10322826A (en) * 1997-05-20 1998-12-04 Nippon Denwa Shisetsu Kk Metal wheel device for stringing cable
CN201402940Y (en) * 2009-04-27 2010-02-10 张平安 Combined automatic UHV live cleaner
CN203398350U (en) * 2013-07-08 2014-01-15 国家电网公司 Ground wire free of climbing up pole
CN203966847U (en) * 2014-07-31 2014-11-26 国家电网公司 A kind of grounding switch bite handling implement
CN205985413U (en) * 2016-07-14 2017-02-22 国网山东省电力公司平原县供电公司 Earth connection retractable frame
CN206558713U (en) * 2017-03-20 2017-10-13 广东电网有限责任公司中山供电局 Electrical grounding line servicing unit
CN206976942U (en) * 2017-07-31 2018-02-06 齐寓乾 A kind of power construction wire-sending device
CN107706689A (en) * 2017-09-18 2018-02-16 国网山东省电力公司济南供电公司 It is a kind of to be used for the Special grounding device without stay rod

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112037599A (en) * 2020-08-27 2020-12-04 深圳供电局有限公司 Ground wire actual operation simulation training device
CN113823978A (en) * 2021-08-23 2021-12-21 广西电网有限责任公司贵港供电局 Telescopic high-altitude grounding assembly and disassembly device for 500KV transformer substation
CN114069351A (en) * 2021-11-27 2022-02-18 云南电网有限责任公司楚雄供电局 Automatic ground wire installing device and control method thereof

Also Published As

Publication number Publication date
CN109546373B (en) 2020-11-06

Similar Documents

Publication Publication Date Title
CN109546373A (en) A kind of substation's earthing clamp mounting device and the installation method of earthing clamp
CN203109949U (en) Intelligent detecting robot for connecting rod peristalsis insulator string
CN108806383A (en) Distribution training frame and distribution Training Methodology
CN203351105U (en) High voltage line repair training teaching aid
CN102664358B (en) Live replacement method for static contact of 220 kV flexible busbar
CN209056102U (en) Distribution training frame
CN202712459U (en) Angle adjustable ground wire device for electric power system
CN206558082U (en) Power transmission and transformation livewire work training apparatus
CN202352852U (en) Grounding device with support insulator
CN208954379U (en) A kind of transmission line malfunction analog training device
CN201449397U (en) Multipurpose connection operating lever based on field high pressure test
CN206117076U (en) Generating line jack box advancing mechanism
CN209293541U (en) A kind of DC power transmission line steel tower
CN209329622U (en) A kind of adjustable cable lattice fixator
CN205211610U (en) Static contact gold utensil
CN202978099U (en) Wire/cable fixing and supporting device
CN204376205U (en) Support for installation of lighning arrestor
CN205452910U (en) Electrified disappearing of GW7 type plug -in strip lacks specialized tool
CN104078849B (en) Support for installation of lighning arrestor
CN202405719U (en) Novel cable line pi connection system for transformer substation
CN208797461U (en) A kind of insulation shunt line support device suitable for bypass operation
CN208654276U (en) A kind of insulating rope voltage resistant test frame
CN209525776U (en) A kind of distribution line training frame
CN220341867U (en) Change platform insulation external member
CN212781075U (en) Insulator alternating current withstand voltage test isolated plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant