CN109540727A - A kind of experimental provision and experimental method of the crystallization of simulation Karst Tunnel drainpipe - Google Patents

A kind of experimental provision and experimental method of the crystallization of simulation Karst Tunnel drainpipe Download PDF

Info

Publication number
CN109540727A
CN109540727A CN201811638827.XA CN201811638827A CN109540727A CN 109540727 A CN109540727 A CN 109540727A CN 201811638827 A CN201811638827 A CN 201811638827A CN 109540727 A CN109540727 A CN 109540727A
Authority
CN
China
Prior art keywords
drainpipe
water tank
main water
water box
auxiliary water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811638827.XA
Other languages
Chinese (zh)
Other versions
CN109540727B (en
Inventor
王永东
黄骤屹
周天跃
柴伦磊
蒋海涛
漆楚繁
汪涛
徐海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenshan Guangna Expressway Investment Development Co Ltd
Changan University
Original Assignee
Wenshan Guangna Expressway Investment Development Co Ltd
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenshan Guangna Expressway Investment Development Co Ltd, Changan University filed Critical Wenshan Guangna Expressway Investment Development Co Ltd
Priority to CN201811638827.XA priority Critical patent/CN109540727B/en
Publication of CN109540727A publication Critical patent/CN109540727A/en
Application granted granted Critical
Publication of CN109540727B publication Critical patent/CN109540727B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N5/00Analysing materials by weighing, e.g. weighing small particles separated from a gas or liquid
    • G01N5/02Analysing materials by weighing, e.g. weighing small particles separated from a gas or liquid by absorbing or adsorbing components of a material and determining change of weight of the adsorbent, e.g. determining moisture content

Abstract

A kind of experimental provision of simulation Karst Tunnel drainpipe crystallization, main water box is provided on bracket, main water box length direction side is provided with the first auxiliary water tank, the other side is provided with the second auxiliary water tank, first auxiliary water tank is connected by the first drainage cell with main water box, second auxiliary water tank is connected by the second drainage cell with main water box, first drainage cell and the second drainage cell are set on the adjusting bracket of installation on the ground, main water box width side is connected by the water pump being mounted on water supplying pipe with the second auxiliary water tank, water pump is electrically connected with control unit, main water box width side is connected by return pipe with the first auxiliary water tank and the second auxiliary water tank;Experimental provision influence factor of the present invention is comprehensive, it is small in size, convenient for operation, Karst Tunnel drainage pipeline Study on Crystallization technical field can be promoted the use of.

Description

A kind of experimental provision and experimental method of the crystallization of simulation Karst Tunnel drainpipe
Technical field
The invention belongs to drainage pipeline Study on Crystallization technical fields, and in particular to arrive a kind of simulation Karst Tunnel drainpipe knot Brilliant experimental provision and experimental method.
Background technique
Karst (also known as karst) area is very extensive in China's distribution, can lava layer spreads account for about national soil face Long-pending one third is especially developed with the karst of some areas such as Yunnan, Guizhou, Guangxi and Guangdong the most.Tunnel Engineering is being worn More karst region band when, various difficulties can be faced, wherein karstic ground water seepage flow crystallizes and blocking tunnel in drainpipe Drainage system has become one of problem urgently to be resolved.
To solve above-mentioned problem, just must the rule that is crystallized in drainpipe of Study of The Underground water, analysis crystallization condition ties The influence factor of the crystal such as brilliant speed accumulation, model experiment are to realize one of the important means of this target, and be directed to this at present One problem and the experimental provision invented is less, and often there are some problems in the experimental provision and experimental method created, example Such as: the influence factor that experimental provision considers is single, does not probe into drainpipe crystallization rule comprehensively as far as possible;Experimental provision compared with It is small, the crystallization situation of water in true Karst Tunnel drainpipe cannot be restored as far as possible.
Summary of the invention
Technical problem to be solved by the present invention lies in overcome the deficiencies in the prior art, provide a kind of design rationally, structure Simply, experimental provision influence factor is comprehensive, small in size, efficient explores the simulation Karst Tunnel drainpipe knot for reducing drainpipe crystallization Brilliant experimental provision and experimental method.
Solve above-mentioned technical problem the technical solution adopted is that: main water box, main water box length direction are provided on bracket Side is provided with the first auxiliary water tank, the other side is provided with the second auxiliary water tank, and the first auxiliary water tank passes through the first drainage cell It is connected with main water box, the second auxiliary water tank is connected by the second drainage cell with main water box, the first drainage cell and second Drainage cell is set on installation adjusting bracket on the ground, main water box width side by the water pump that is mounted on water supplying pipe with Second auxiliary water tank is connected, and water pump is electrically connected with control unit, and the main water box width other side passes through return pipe and the first auxiliary Water tank and the second auxiliary water tank are connected.
First drainage cell of the invention are as follows: 5 group of I type drainpipe is all set on the adjusting bracket of installation on the ground.
I type drainpipe of the invention are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose It is connected with transverse wave pipe, is provided with valve on hard straight tube.
Second drainage cell of the invention are as follows: II type drainpipe, III type drainpipe, IV type drainpipe, V type drainpipe, VI Type drainpipe is all set on the adjusting bracket being mounted on bottom surface.
II type drainpipe of the invention are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose It is connected with transverse wave pipe, transverse wave tube end is horizontally disposed the longitudinal corrugated pipe perpendicular with transverse wave pipe, firmly Valve is provided on straight tube;
III type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and lateral wave Line pipe is connected, and transverse wave pipe internal surface is laid with cloth waste material, is provided with valve on hard straight tube;
IV type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and lateral wave Line pipe is connected, and transverse wave pipe internal surface is laid with concrete disintegrating slag, is provided with valve on hard straight tube;
V type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and lateral wave Line pipe is connected, and is provided with valve on hard straight tube;The caliber of V type drainpipe is less than the caliber of remaining each drainpipe;
VI type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and lateral wave Line pipe is connected, and transverse wave tube outer surface is successively laid with heating layer and insulating layer, is provided with valve on hard straight tube.
Main water box of the invention, the first auxiliary water tank, the second auxiliary water tank are closed structure, are arranged on the second auxiliary water tank There is solute to add window.
Control unit of the invention are as follows: air switch and frequency converter electrical connection, frequency converter are electrically connected with water pump.
Adjusting bracket of the invention is to adjustably adjust frame.
The experimental method of the experimental provision of a kind of simulation Karst Tunnel drainpipe crystallization of the invention, by following steps group At:
Before the first above-mentioned drainage cell of S1, splicing, the second drainage cell, every group of bellows is weighed up with accurate electronic scale Quality w0And record respectively, it, will be corresponding after splicing and setting the first drainage cell, the second drainage cell by requirement of experiment Valve is closed;
S2, configured Karst Tunnel aqueous solution is placed in the second auxiliary water tank, and adjusts frequency converter and air switch, It is evacuated to the aqueous solution in the second auxiliary water tank in main water box, after liquid level reaches desired height in main water box, closes frequency converter And air switch, and main water box, the first auxiliary water tank, the second auxiliary water tank are covered into closing;
S3, valve is opened to necessary requirement, adjusts frequency converter and air switch again, the aqueous solution in main water box passes through First drainage cell flow to the first auxiliary water tank, flow to the second auxiliary water tank by the second drainage cell, and water pump is auxiliary by second again The water of water tank is helped to draw back in main water box, to guarantee that whole system water circulation can be normally carried out for a long time;
S4, lower transverse wave pipe and longitudinal corrugated pipe were dismantled every 2 weeks, and addition is appropriate molten into the second auxiliary water tank Matter;The quality w of every group of bellows is weighed with accurate electronic scale1And record respectively, subtract the net weight w of initial bellows0, obtain To crystalline quality w, i.e. w=w1-w0, time t is recorded, every group of drainpipe crystalline rate can be obtainedAnd it records respectively;
S5, experimental period are 1 year, and the w of record and v are depicted as statistical chart, analyze the influence factor of drainpipe crystallization, always Tie crystallization rule.
The present invention has the advantage that compared with the prior art
1, three water tanks that the present invention is arranged all have closing cap, and when guaranteeing that experiment carries out, whole system is in opposite envelope Closed state is bonded with the practical embedding state of Karst Tunnel area drain pipe, meanwhile, closing cap has effectively completely cut off other in air Substance, such as carbon dioxide infecting for solution, strict control experimental factors.
2, air switch and frequency converter, energy is arranged in present invention setting return pipe, water supplying pipe, water pump and console, console The power for controlling to efficient, flexible water pump, the state for circulating water constantly can simulate practical Karst Tunnel drainpipe The continuous generation of middle water crystallization.
3, the present invention is directed to probe into the influence factor and rule of the crystallization of Karst Tunnel drainpipe, drainpipe is not only allowed for The influence of the gradient, flow for crystallization, also by pasting cloth waste material and concrete disintegrating slag, it is contemplated that drain inside pipe wall friction and apply Influence of the work situation lack of standardization for crystallization;By adding longitudinal corrugated pipe, for crystallization when simulation transverse and longitudinal drainpipe joins It influences;By the way that heating layer and insulating layer, the influence that analog temperature crystallizes drainpipe are arranged outside bellows;By setting compared with The draining pipe unit of minor diameter simulates influence of the different-diameter drainpipe for crystallization.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of one embodiment of the invention.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the structural schematic diagram of I type drainpipe 2 in Fig. 1.
Fig. 4 is the structural schematic diagram of II type drainpipe 12 in Fig. 1.
Fig. 5 is the structural schematic diagram of III type drainpipe 11 in Fig. 1.
Fig. 6 is the structural schematic diagram of IV type drainpipe 10 in Fig. 1.
Fig. 7 is the structural schematic diagram of V type drainpipe 9 in Fig. 1.
Fig. 8 is the structural schematic diagram of VI type drainpipe 8 in Fig. 1.
In figure: 1, main water box;2, I type drainpipe;3, the first auxiliary water tank;4, return pipe;5, bracket;6, adjusting bracket;7, Second auxiliary water tank;8, VI type drainpipe;9, V type drainpipe;10, IV type drainpipe;11, III type drainpipe;12, II type is arranged Water pipe;13, control unit;14, water pump;15, water supplying pipe;16, hard straight tube;17, valve;18, hose;19, transverse wave pipe; 20, longitudinal corrugated pipe;21, cloth waste material, 22, concrete disintegrating slag;23, heating layer;24, insulating layer.
Specific embodiment
The present invention is described in further details with reference to the accompanying drawings and examples, but the present invention is not restricted to these implement Example.
Embodiment 1
In Fig. 1,2, a kind of experimental provision of simulation Karst Tunnel drainpipe crystallization of the present invention is equipped on bracket 5 Main water box 1,1 width side of main water box are connected by return pipe 4 with the first auxiliary water tank 3 and the second auxiliary water tank 7, guarantee master Liquid level is no more than certain altitude in water tank 1, ensure that the stability of device, the 1 width other side of main water box is by being mounted on water supply Water pump 14 on pipe 15 is connected with the second auxiliary water tank 7, and the solution in the second auxiliary water tank 7 is evacuated to main water box 1 by water pump Interior, the control unit 13 that water pump 13 is electrically connected with control unit 12 is made of air switch and frequency converter, air switch and frequency conversion Device electrical connection, frequency converter are electrically connected with water pump 14, can be adjusted the power of water pump 14 by adjusting frequency converter and air switch, be guaranteed The normal steady progress of whole system water circulation.Length direction two sides are machined with 5 groups of water outlets respectively on the main water box 1 of the present embodiment Hole, 1 length direction side of main water box is provided with the first auxiliary water tank 3, the other side is provided with the second auxiliary water tank 7, the first auxiliary Water tank 3 is connected by the first drainage cell with main water box 1, and the second auxiliary water tank 7 passes through the second drainage cell and 1 phase of main water box Connection, main water box 1 of the invention, the first auxiliary water tank 3, the second auxiliary water tank 7 are closed structure, avoid air plankton to solution Infect, improve the confidence level of experimental result, solute addition window, every 2 weeks, past second be provided on the second auxiliary water tank 7 Appropriate solute is added in auxiliary water tank 7.
First drainage cell and the second drainage cell are set on the adjusting bracket 6 of installation on the ground, and adjusting bracket 6 is that can stretch Contracting adjusting bracket, as shown in figure 3, first drainage cell of the present embodiment is made of 5 group of I type drainpipe, I type drainpipe 2 are as follows: hard straight 16 one end of pipe is connected with main water box 1, the other end is connected with hose 18, and hose 18 is connected with transverse wave pipe 19, hard straight Valve 17 is installed on pipe 16;The height that wherein 3 group of I type drainpipe 2 adjusts adjusting bracket 6 keeps its gradient different, probes into the gradient pair The influence of drainpipe crystallization, in addition 2 group of I 2 control valve 17 of type drainpipe control water flow is different, for probing into flow velocity for row The influence of water pipe crystallization.
Second drainage cell of the present embodiment is arranged by II type drainpipe 12, III type drainpipe 11, IV type drainpipe 10, V type Water pipe 9, VI type drainpipe 8 form, and the gradient of each group drainpipe is identical in the second drainage cell, as shown in Fig. 4~8, II type row Water pipe 12 are as follows: hard 16 one end of straight tube is connected with main water box 1, the other end is connected with hose 18, hose 18 and transverse wave pipe 19 are connected, and 19 end horizontal of transverse wave pipe is provided with the longitudinal corrugated pipe 20 perpendicular with transverse wave pipe 19, hard straight tube Valve is provided on 16, influence when for probing into the handover of drainpipe transverse and longitudinal to drainpipe crystallization;
III type drainpipe 11 are as follows: hard 16 one end of straight tube is connected with main water box 1, the other end is connected with hose 18, hose 18 are connected with transverse wave pipe 19, and 19 inner surface of transverse wave pipe is laid with cloth waste material 21, are provided with valve on hard straight tube 16 17, for probing into the difference of drainpipe inner-wall material, i.e. the coefficient of friction not influence to drainpipe crystallization simultaneously;
IV type drainpipe 10 are as follows: hard 16 one end of straight tube is connected with main water box 1, the other end is connected with hose 18, hose 18 are connected with transverse wave pipe 19, and 19 inner surface of transverse wave pipe is laid with concrete disintegrating slag 22, are provided on hard straight tube 16 Valve 17, influence when constructing lack of standardization for probing into, to drainpipe crystallization;
V type drainpipe 9 are as follows: hard 16 one end of straight tube is connected with main water box 1, the other end is connected with hose 18, hose 18 It is connected with transverse wave pipe 19, is provided with valve 17 on hard straight tube 16;The caliber of V type drainpipe 9 is less than remaining each drainpipe Caliber, for probing into the influence that crystallizes to drainpipe of draining pipe diameter difference.
VI type drainpipe 8 are as follows: hard 16 one end of straight tube is connected with main water box 1, the other end is connected with hose 18, hose 18 It is connected with transverse wave pipe 19,19 outer surface of transverse wave pipe is successively laid with heating layer 23 and insulating layer 24, hard straight tube 16 On be provided with valve 17, for probing into the influence that temperature difference crystallizes drainpipe locating for drainpipe.
According to a kind of above-mentioned experimental method of the experimental provision of simulation Karst Tunnel drainpipe crystallization, by following steps group At:
Before the first above-mentioned drainage cell of S1, splicing, the second drainage cell, every group of bellows is weighed up with accurate electronic scale Quality w0, and record respectively, after splicing and setting the first drainage cell, the second drainage cell by requirement of experiment, it will correspond to Valve close;
S2, configured Karst Tunnel aqueous solution is placed in the second auxiliary water tank 7, and adjusts frequency converter and air is opened It closes, is evacuated to the aqueous solution in the second auxiliary water tank 7 in main water box 1, after liquid level reaches desired height in main water box 1, close Frequency converter and air switch, and main water box 1, the first auxiliary water tank 3, the second auxiliary water tank 7 are covered into closing;
S3, valve is opened to necessary requirement, adjusts frequency converter and air switch again, the aqueous solution in main water box 1 is logical It crosses the first drainage cell to flow to the first auxiliary water tank 3, flow to the second auxiliary water tank 7 by the second drainage cell, water pump 14 again will The water of second auxiliary water tank 7 is drawn back in main water box 1, to guarantee that whole system water circulation can be normally carried out for a long time;
S4, lower transverse wave pipe 19 and longitudinal corrugated pipe 20 were dismantled every 2 weeks, and add and fit into the second auxiliary water tank 7 Measure solute;The quality w of every group of bellows is weighed with accurate electronic scale1, and record respectively, subtract the net weight of initial bellows w0, obtain crystalline quality w, i.e. w=w1-w0, time t is recorded, every group of drainpipe crystalline rate can be obtainedAnd remember respectively Record;
S5, experimental period are 1 year, and the w of record and v are depicted as statistical chart, analyze the influence factor of drainpipe crystallization, always Tie crystallization rule.
Carry out crystallization experiment is adopted the device and the method, main water box 1 is having a size of 0.8m*2.5m*1m in this experiment, and first The size of auxiliary water tank 1 and the second auxiliary water tank 7 is 0.4m*2.2m*0.6m, in the first auxiliary water tank 3, the second auxiliary water tank 7 Liquor capacity is 352L, and solution PH 8.66, calcium carbonate density is 2.93g/cm3, calcium chloride quality is 57.2g, sodium bicarbonate For 83.6g, sodium hydroxide 80.5g, each time of measuring is 2 weeks, carries out 6 measurements altogether and records every group when record experiment starts The initial mass of screwed pipe, after experiment starts, the quality of every group of screwed pipe after recording every two weeks, the matter of crystallization front and back screwed pipe Amount comparison such as following table.
1 drainage cell of table crystallization front and back quality controls table
As seen from the above table,
(1) within limits, with the increase of flow velocity, crystalline rate is gradually increased flow velocity, with the reduction of flow velocity, Crystalline rate is gradually reduced.(2) in a certain range, with the increase of the gradient, crystalline rate increases the drainpipe gradient.
(3) when draining pipe diameter is smaller, crystalline rate is general also smaller.
(4) in a certain range, when temperature is higher, crystalline rate is higher for temperature.
(5) in a certain range, more more coarse easier crystallization, more smooth for drainpipe inner wall coarse degree, is more not easy to crystallize.

Claims (9)

1. a kind of experimental provision of simulation Karst Tunnel drainpipe crystallization, it is characterised in that: main water box is provided on bracket, it is main Water tank length direction side is provided with the first auxiliary water tank, the other side is provided with the second auxiliary water tank, and the first auxiliary water tank passes through First drainage cell is connected with main water box, and the second auxiliary water tank is connected by the second drainage cell with main water box, first row Water unit and the second drainage cell are set on the adjusting bracket of installation on the ground, and main water box width side is by being mounted on water supply Water pump on pipe is connected with the second auxiliary water tank, and water pump is electrically connected with control unit, and the main water box width other side passes through return water Pipe is connected with the first auxiliary water tank and the second auxiliary water tank.
2. a kind of experimental provision of simulation Karst Tunnel drainpipe crystallization according to claim 1, it is characterised in that described The first drainage cell are as follows: 5 group of I type drainpipe is all set on installation adjusting bracket on the ground.
3. a kind of experimental provision of simulation Karst Tunnel drainpipe crystallization according to claim 2, it is characterised in that described I type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and transverse wave pipe phase It is connected to, is provided with valve on hard straight tube.
4. a kind of experimental provision of simulation Karst Tunnel drainpipe crystallization according to claim 3, it is characterised in that described The second drainage cell are as follows: II type drainpipe, III type drainpipe, IV type drainpipe, V type drainpipe, VI type drainpipe are respectively provided with In on the adjusting bracket being mounted on bottom surface.
5. a kind of experimental provision of simulation Karst Tunnel drainpipe crystallization according to claim 4, it is characterised in that described II type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and transverse wave pipe phase Connection, transverse wave tube end is horizontally disposed the longitudinal corrugated pipe perpendicular with transverse wave pipe, is provided with valve on hard straight tube Door;
III type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and transverse wave pipe It is connected, transverse wave pipe internal surface is laid with cloth waste material, is provided with valve on hard straight tube;
IV type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and transverse wave pipe It is connected, transverse wave pipe internal surface is laid with concrete disintegrating slag, is provided with valve on hard straight tube;
V type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and transverse wave pipe It is connected, is provided with valve on hard straight tube;The caliber of V type drainpipe is less than the caliber of remaining each drainpipe;
VI type drainpipe are as follows: hard straight tube one end is connected with main water box, the other end is connected with hose, hose and transverse wave pipe It is connected, transverse wave tube outer surface is successively laid with heating layer and insulating layer, is provided with valve on hard straight tube.
6. a kind of experimental provision of simulation Karst Tunnel drainpipe crystallization according to claim 1, it is characterised in that: described Main water box, the first auxiliary water tank, the second auxiliary water tank be closed structure, solute addition window is provided on the second auxiliary water tank Mouthful.
7. a kind of experimental provision of simulation Karst Tunnel drainpipe crystallization according to claim 1, it is characterised in that described Control unit are as follows: air switch and frequency converter electrical connection, frequency converter is electrically connected with water pump.
8. a kind of experimental provision of simulation Karst Tunnel drainpipe crystallization according to claim 1, it is characterised in that: described Adjusting bracket be adjustably adjust frame.
9. a kind of experiment side of the experimental provision of simulation Karst Tunnel drainpipe crystallization according to the claims 1~8 Method, it is characterised in that comprise the steps of:
Before the first above-mentioned drainage cell of S1, splicing, the second drainage cell, the matter of every group of bellows is weighed up with accurate electronic scale Measure w0And record respectively, after splicing and setting the first drainage cell, the second drainage cell by requirement of experiment, by corresponding valve It closes;
S2, configured Karst Tunnel aqueous solution is placed in the second auxiliary water tank, and adjusts frequency converter and air switch, make Aqueous solution in two auxiliary water tanks is evacuated in main water box, after liquid level reaches desired height in main water box, closes frequency converter and sky Air cock, and main water box, the first auxiliary water tank, the second auxiliary water tank are covered into closing;
S3, valve is opened to necessary requirement, adjusts frequency converter and air switch again, the aqueous solution in main water box passes through first Drainage cell flow to the first auxiliary water tank, flow to the second auxiliary water tank by the second drainage cell, and water pump is again by the second auxiliary water The water of case is drawn back in main water box, to guarantee that whole system water circulation can be normally carried out for a long time;
S4, lower transverse wave pipe and longitudinal corrugated pipe were dismantled every 2 weeks, and appropriate solute is added into the second auxiliary water tank;With Accurate electronic scale weighs the quality w of every group of bellows1And record respectively, subtract the net weight w of initial bellows0, crystallized Quality w, i.e. w=w1-w0, time t is recorded, every group of drainpipe crystalline rate can be obtainedAnd it records respectively;
S5, experimental period are 1 year, and the w of record and v are depicted as statistical chart, the influence factor of analysis drainpipe crystallization, total junction Brilliant rule.
CN201811638827.XA 2018-12-29 2018-12-29 Experimental device and experimental method for simulating karst tunnel drain pipe crystallization Active CN109540727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811638827.XA CN109540727B (en) 2018-12-29 2018-12-29 Experimental device and experimental method for simulating karst tunnel drain pipe crystallization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811638827.XA CN109540727B (en) 2018-12-29 2018-12-29 Experimental device and experimental method for simulating karst tunnel drain pipe crystallization

Publications (2)

Publication Number Publication Date
CN109540727A true CN109540727A (en) 2019-03-29
CN109540727B CN109540727B (en) 2024-03-08

Family

ID=65831259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811638827.XA Active CN109540727B (en) 2018-12-29 2018-12-29 Experimental device and experimental method for simulating karst tunnel drain pipe crystallization

Country Status (1)

Country Link
CN (1) CN109540727B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2994309A1 (en) * 2012-08-06 2014-02-07 Total Sa SIMULATION OF INSULAR KARSTIFICATION
US20160363691A1 (en) * 2015-06-15 2016-12-15 Petrochina Company Limited Physical simulation method and experiment device of fracture-cavity carbonate reservoir hydrocarbon charge
CN207473928U (en) * 2017-09-29 2018-06-08 重庆市勘察设计有限公司 Simulate the physical model experiment device that tunnel construction induces karst collapse
CN108645998A (en) * 2018-05-13 2018-10-12 桂林理工大学 A kind of test method causing karst collapse for simulated groundwater
CN209432643U (en) * 2018-12-29 2019-09-24 长安大学 A kind of experimental provision of simulation Karst Tunnel drainpipe crystallization

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2994309A1 (en) * 2012-08-06 2014-02-07 Total Sa SIMULATION OF INSULAR KARSTIFICATION
US20160363691A1 (en) * 2015-06-15 2016-12-15 Petrochina Company Limited Physical simulation method and experiment device of fracture-cavity carbonate reservoir hydrocarbon charge
CN207473928U (en) * 2017-09-29 2018-06-08 重庆市勘察设计有限公司 Simulate the physical model experiment device that tunnel construction induces karst collapse
CN108645998A (en) * 2018-05-13 2018-10-12 桂林理工大学 A kind of test method causing karst collapse for simulated groundwater
CN209432643U (en) * 2018-12-29 2019-09-24 长安大学 A kind of experimental provision of simulation Karst Tunnel drainpipe crystallization

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵小二;常勇;彭伏;吴吉春;: "水箱-管道系统溶质运移实验研究及其岩溶水文地质意义", 吉林大学学报(地球科学版), no. 04 *

Also Published As

Publication number Publication date
CN109540727B (en) 2024-03-08

Similar Documents

Publication Publication Date Title
CN106770418B (en) The device and method that Rock And Soil internal moisture migrates in monitoring frozen-thaw process in real time
CN103472205B (en) Slope water-soil loss experiment device and method under combined extreme meteorological conditions
CN102890147B (en) Test system for simulating pore-fissure double-medium seepage hydraulic characteristics
CN106932556B (en) Permafrost active layer water sport and ground ice frozen-thaw process tracer and method
CN102721800B (en) Artificial rainfall runoff and soil water motion simulation experimental system
CN203840863U (en) Water circulation and heat collecting and accumulating type temperature regulating device of solar greenhouse
CN104215566A (en) Visual soil freeze-thawing process test apparatus
CN103493715A (en) Irrigation control method and system based on crop root zone soil moisture and root distribution
CN102359146B (en) Selective inlet water temperature stabilizing device and water temperature value simulating and forecasting method
CN104792945A (en) Rockfill scouring simulation experiment device and experimental data acquisition method
CN105092578B (en) Moisture transition process follow-up mechanism and its experimental method in a kind of frozen soil
CN104819920A (en) Varying-head permeability experiment apparatus for indoor freezing and thawing equipment
CN209432643U (en) A kind of experimental provision of simulation Karst Tunnel drainpipe crystallization
CN202854601U (en) Water-through intelligent temperature control testing system
CN206573506U (en) The device that Rock And Soil internal moisture is migrated in monitoring frozen-thaw process in real time
CN109540727A (en) A kind of experimental provision and experimental method of the crystallization of simulation Karst Tunnel drainpipe
CN107584644A (en) Warm and humid wind coupling complex environment concrete moisture retention spray maintenance automatic mode
CN112257286B (en) Variable-source runoff yield mode simulation method for permafrost region temperature dominance
CN113029894A (en) Test bed for simulating three-dimensional heat seepage coupling transfer of soil body in karst area
CN102830730A (en) System and method for intelligent water supply temperature control test
CN102590060B (en) Different-gradient soil stable infiltration instrument
CN102288741A (en) Method for rapidly measuring rill erodibility of soil
CN203768857U (en) Model device for utilizing temperature field to acquire dam foundation permeating flow velocity
CN206573436U (en) A kind of device for monitoring undercurrent Flux
CN104594283B (en) A kind of long distance water diversion project Multi-functional analog system and analogy method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 169, middle Kaihua Road, Wenshan City, Wenshan Zhuang and Miao Autonomous Prefecture, Yunnan Province

Applicant after: WENSHAN PREFECTURE GUANGNA EXPRESSWAY INVESTMENT CONSTRUCTION DEVELOPMENT Co.,Ltd.

Applicant after: CHANG'AN University

Address before: 710064 No. 33 middle Changan Road, Shaanxi, Xi'an

Applicant before: CHANG'AN University

Applicant before: WENSHAN PREFECTURE GUANGNA EXPRESSWAY INVESTMENT CONSTRUCTION DEVELOPMENT Co.,Ltd.

CB02 Change of applicant information
CB03 Change of inventor or designer information

Inventor after: Huang Zhouyi

Inventor after: Wang Yongdong

Inventor after: Zhou Tianyue

Inventor after: Chai Lunlei

Inventor after: Jiang Haitao

Inventor after: Lacquer Chufan

Inventor after: Wang Tao

Inventor after: Xu Hai

Inventor before: Wang Yongdong

Inventor before: Huang Zhouyi

Inventor before: Zhou Tianyue

Inventor before: Chai Lunlei

Inventor before: Jiang Haitao

Inventor before: Lacquer Chufan

Inventor before: Wang Tao

Inventor before: Xu Hai

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant