CN109537778A - Decorative curtain wall mounting structure and its construction method - Google Patents

Decorative curtain wall mounting structure and its construction method Download PDF

Info

Publication number
CN109537778A
CN109537778A CN201811261214.9A CN201811261214A CN109537778A CN 109537778 A CN109537778 A CN 109537778A CN 201811261214 A CN201811261214 A CN 201811261214A CN 109537778 A CN109537778 A CN 109537778A
Authority
CN
China
Prior art keywords
hole
connecting hole
connecting rod
limited post
limited
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811261214.9A
Other languages
Chinese (zh)
Other versions
CN109537778B (en
Inventor
苏灿
贺鹏
蔡志辉
郑雄贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen City Architectural Design Co Cooper
Original Assignee
Shenzhen City Architectural Design Co Cooper
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen City Architectural Design Co Cooper filed Critical Shenzhen City Architectural Design Co Cooper
Priority to CN201811261214.9A priority Critical patent/CN109537778B/en
Publication of CN109537778A publication Critical patent/CN109537778A/en
Application granted granted Critical
Publication of CN109537778B publication Critical patent/CN109537778B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Curtains And Furnishings For Windows Or Doors (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention relates to decorating outer wall of building structures, problem troublesome in poeration is installed for decoration panel, provide a kind of decorative curtain wall mounting structure and its construction method, the mounting structure of decorative curtain wall includes fixed skeleton and several decoration panels for being fixed on fixed skeleton, decoration panel is equipped with connecting rod, fixed skeleton is equipped with several connecting holes being inserted into for connecting rod, the limited part of limitation connecting rod movement is equipped in connecting hole, the actuator of block piece and driving block piece backstop restraint member equipped with backstop restraint member limitation connecting rod movement in connecting hole, push end of the block piece far from decoration panel to drive block piece to release the blocking to limited part when connecting rod is inserted into connecting hole.The construction method of decorative curtain wall includes fixed skeleton installation, the installation of decoration panel.Decoration panel is fixed while being inserted into connecting hole by connecting rod, then is finally fixed by slip casting, it is easy to operate.

Description

Decorative curtain wall mounting structure and its construction method
Technical field
The present invention relates to a kind of decorating outer wall of building structures, more specifically, it relates to a kind of decorative curtain wall mounting structure And its construction method.
Background technique
Decorative curtain wall is the exterior wall enclosure of building, and not load-bearing is hung up as curtain, therefore also known as " curtain wall ", it is Modern large-scale and skyscraper commonly has the lightweight wall of decorative effect.
Existing decorative curtain wall generally includes fixed skeleton and decoration panel, is equipped between fixed skeleton and decoration panel Part is pre-fixed, when installing decorative curtain wall, is usually first pre-fixed by pre-fixing part for decoration panel on fixed skeleton, then lead to Crossing glue will be sticky between adjacent decoration panel with fixation, to complete the installation of decorative curtain wall.
But it needs to operate several decoration panels one by one with glue bonding.Since glue is liquid colloidal object, glue Water can generate fixed function to decoration panel after needing dry solidification, therefore, in order to guarantee relative position between adjacent panels Stability, reduce the glue between adjacent decoration panel and be easy because of the shaking of decoration panel to lead to the case where there are cracks, It is generally necessary to wait the glue solidifies to dry up after drying or using air duct by glue so that having adhered to the decoration panel position of glue After being fixed, next decoration panel can be fixed, it is troublesome in poeration, still there is improved space.
Summary of the invention
In view of the deficienciess of the prior art, one of the objects of the present invention is to provide a kind of installation knots of decorative curtain wall Structure has the advantages that installation is easy to operate.
To achieve the above object, the present invention provides the following technical scheme that
A kind of mounting structure of decorative curtain wall, including fixed skeleton and several decoration panels being fixed on fixed skeleton, institute Decoration panel is stated equipped with connecting rod, the fixed skeleton is equipped with several connecting holes being inserted into for connecting rod, the connecting hole The interior limited part for being equipped with limitation connecting rod movement, the interior block piece equipped with backstop restraint member limitation connecting rod movement of the connecting hole And the actuator of driving block piece backstop restraint member, the connecting rod push block piece far from decoration panel when being inserted into connecting hole End to drive block piece to release blocking to limited part.
By adopting the above technical scheme, when installing decoration panel, first by the connecting rod alignment and fixation skeleton in decoration panel On connecting hole, then by connecting rod be inserted into connecting hole in, when connecting rod moves to one end with limited part far from decoration panel It abutting and continues towards when the bottom wall movement of connecting hole, connecting rod drives block piece to release the barrier effect to limited part, so that Limited part limits the movement of connecting rod, so that connecting rod is fixed in connecting hole simultaneously when being inserted into connecting hole, grasps Make simplicity, it is time saving and energy saving, be conducive to improve working efficiency.
Preferably, the connecting rod is equipped with the blocked hole being inserted into for limited part, and the inner wall depression of the connecting hole is useful In the holding tank for accommodating limited part, the limited part is placed in holding tank, and the holding tank is equipped with driving limited part and stretches out receiving First elastic component of slot, when in limited part insertion blocked hole, the limited part is partially disposed in holding tank.
By adopting the above technical scheme, when the blocking that connecting rod is inserted into connecting hole and block piece is driven to release to limited part is made Used time, limited part is stretched out under the driving of the first elastic component in holding tank and partial insertion blocked hole, so that connecting rod exists It is fixed in connecting hole while in insertion connecting hole;By the setting of the first elastic component, so that limited part loses block piece Blocking after auto-extending holding tank, it is easy to operate, be conducive to improve working efficiency.
Preferably, the limited part is limited post, and the block piece is the gear frame being inserted into for connecting rod, the gear frame sliding It is connected to the inner wall of connecting hole, the actuator is the second elastic component that driving gear frame stops limited post stretching holding tank, described The locating part being equipped with outside limitation gear frame pop-up connecting hole in connecting hole, the gear frame are equipped with for the perforative through-hole of limited post, institute State center and limited post that the distance between one end and connecting hole bottom wall far from decoration panel of gear frame is not less than through-hole Vertical range between axis.
By adopting the above technical scheme, it is abutted when in connecting rod insertion connecting hole and with gear frame far from one end of decoration panel When, connecting rod is overcome the elastic force of the second elastic component and is slided with the bottom wall for driving gear frame towards connecting hole, while to keep off on frame Through-hole is moved towards limited post, and when keeping off the position for the opening face that frame slides into through-hole and holding tank, limited post is in the first bullet Property part driving under stretch out holding tank, through through-hole and be inserted into blocked hole, so that connecting rod is fixed in connecting hole, operate It is easy;The setting outside gear frame pop-up connecting hole is limited by locating part, so that gear frame is not easy to stretch out in outside connecting hole, to make It must keep off that other objects that frame is not easy to be connected outside hole touch and sliding, which occurs, causes limited post to stretch out holding tank and through logical The case where hole, is conducive to the stability for improving gear frame, to be conducive to improve gear frame to the stability of the barrier effect of limited post; Meanwhile locating part is limited in the scope of activities for keeping off frame in connecting hole, so that gear frame is in the installation process of decoration panel It is not easy to be pounded to by decoration panel and lead to keep off the impaired situation of frame, is conducive to protect gear frame.
Preferably, equipped with several limited posts and several holding tanks for accommodating limited post, Ruo Gansuo in the connecting hole It states holding tank and several limited posts to correspond, the gear frame is equipped with several for the perforative through-hole of limited post, when one of them institute When stating limited post and one of being inserted in through-hole, all limited posts and all through-holes face one by one are set in the connecting rod There are several blocked holes for limited post insertion, when one of them limited post one of is inserted in blocked hole, all limits Position column and all blocked holes face one by one.
By adopting the above technical scheme, several setting is equipped with by limited post, so that contact of the limited post with connecting rod Area increases, to be conducive to enhance the stability connected between connecting rod and connecting hole, and then is conducive to improve decoration panel Stability so that the stability of decorative curtain wall improves.
Preferably, the cross-sectional area of several limited posts is successively reduced along the depth direction of connecting hole towards bottom wall.
By adopting the above technical scheme, by the cross-sectional area of several limited posts along connecting hole towards bottom wall depth direction according to The setting of secondary diminution so that through-hole simultaneously along connecting hole towards the depth direction of bottom wall so that close to connecting hole opening one The limited post at end is not easy to be pierced by from the through-hole close to connecting hole bottom wall, so that driving lower edge of the gear frame in the second elastic component Horizontal direction towards connecting hole open at one end sliding when, limited post be not easy to stretch out from its not corresponding through-hole and can not The case where retraction, is conducive to improve gear frame to the stability of the barrier effect of limited post, convenient for improving resistance of the gear frame to limited post The switching accuracy of gear effect.
Preferably, the inner wall depression of the connecting hole has the groove for the insertion of the second elastic component, when second elastic component When being fully compressed, second elastic component is placed in groove.
By adopting the above technical scheme, pass through the setting of groove, when so that the second elastic component being fully compressed, the second elastic component Be placed in groove so that the second elastic component be not easy to resist gear frame and to keep off the one end of frame far from decoration panel can not be with The case where connecting hole bottom wall abuts is conducive to increase gear contact area of the frame far from decoration panel one end Yu connecting hole bottom wall, make The connective stability obtained between connecting rod and connecting hole improves.
Preferably, the limited post is equipped with flexible piece close to one end of the first elastic component, is provided with confession on the fixed skeleton Flexible piece stretches out the through hole outside fixed skeleton.
By adopting the above technical scheme, by pulling flexible piece to retract with the elastic force for driving limited post to overcome the first elastic component In holding tank, so that limited post is released to the fixed function of connecting rod, so that decoration panel is removably connected on fixed skeleton, So that the installation direction of decoration panel accidentally setup error when, decoration panel can be disassembled to reinstall, behaviour Make easy;Meanwhile when so that gear frame accidentally being pushed and limited post is caused to stretch out holding tank and run through through-hole, pulling can be passed through Flexible piece retracts limited post in holding tank again, reduces limited post and stretches out holding tank and lead to nothing between connecting hole and connecting rod Method connection, needs the case where re-replacing, advantageously reduces production cost, so that economic benefit improves.
Preferably, the flexible piece is connected to fixed skeleton close to the side of decoration panel, institute far from the end of limited post The fixation position for stating end of the flexible piece far from limited post is higher than the level height on decoration panel top.
By adopting the above technical scheme, the fixation position of the end by flexible piece far from limited post is higher than decoration panel top Level height setting, the operation of holding tank is retracted convenient for pulling flexible piece with the limited post that links, so that pulling flexible piece Operation has enough operating spaces.
Preferably, slip casting slot is provided on the fixed skeleton, the slip casting slot is connected to several connecting holes.
By adopting the above technical scheme, by the setting of slip casting slot, when several connecting rods are fixed in connecting hole, lead to It crosses slip casting slot and injects concrete slurry in connecting hole, be conducive to improve the stability connected between connecting rod and connecting hole, subtract Few first elastic component causes connecting rod to be easy to happen shaking there is a situation where aging, and then is conducive to improve the steady of decoration panel It is qualitative, so that decoration panel is less likely to occur to shake.
In view of the deficienciess of the prior art, another object of the present invention is to provide a kind of construction parties of decorative curtain wall Method has the advantages that installation is easy to operate.
A kind of decorative curtain wall construction method using above-mentioned decorative curtain wall mounting structure, includes the following steps:
S1, fixed skeleton is installed;
The installation of S2, decoration panel, specific as follows:
Connecting rod in decoration panel is pushed into drive block piece to release the limitation to limited part in connecting hole, so that limited part Under the driving of the first elastic component stretch out holding tank and be inserted into connecting rod blocked hole in.
By adopting the above technical scheme, it is fixed in connecting hole while being inserted into connecting hole by connecting rod, thus The fixed operation of decoration panel is completed, decorative curtain wall is formed, the gap without a pair of of an adjacent decoration panel carries out adhesion, operation Simplicity is conducive to improve installation effectiveness;Simultaneously advantageously reduce glue accidentally fall to the surface of decoration panel and to decoration The appearance of panel impacts.
In conclusion the invention has the following advantages:
1. it is fixed in connecting hole while being inserted into connecting hole by connecting rod, it is easy to operate, it is time saving and energy saving, be conducive to Improve working efficiency;
2. the setting outside gear frame pop-up connecting hole is limited by locating part, so that gear frame is not easy to stretch out in connecting hole, to make It must keep off that other objects that frame is not easy to be connected outside hole touch and sliding, which occurs, causes limited post to stretch out holding tank and through logical The case where hole, is conducive to improve gear frame to the stability of the barrier effect of limited post;
3. the setting successively reduced by the cross-sectional area of several limited posts along the depth direction of connecting hole towards bottom wall, so that gear When towards the movement of connecting hole open at one end, limited post is not easy to stretch out from its not corresponding through-hole and can not retract frame Situation is conducive to improve gear frame to the stability of the barrier effect of limited post, convenient for improving gear frame to the barrier effect of limited post Switching accuracy;
4. by the setting of flexible piece so that the installation direction of decoration panel accidentally setup error when, decoration panel can be torn open It unloads down to reinstall, it is easy to operate, meanwhile, it advantageously reduces limited post and stretches out holding tank and lead to connecting hole and connecting rod Between can not connect, need the case where re-replacing, advantageously reduce production cost so that economic benefit improve.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the decorative curtain wall in the present invention;
Fig. 2 is the schematic diagram of internal structure that connecting rod is in the fully inserted the state in connecting hole in the present invention;
Fig. 3 is the enlarged diagram in the portion A in Fig. 2;
Fig. 4 is that connecting rod is in the schematic diagram of internal structure that state is abutted with gear frame bottom wall in the present invention;
Fig. 5 is the enlarged diagram in the portion B in Fig. 4.
In figure: 1, fixed skeleton;11, top slat iron;12, skeleton is erected;13, slip casting slot;2, decoration panel;21, connecting rod;3, Connecting hole;31, limited part;311, blocked hole;312, limited post;3121, connectivity slot;313, through-hole;32, block piece;321, it keeps off Frame;33, actuator;331, the second elastic component;34, stopper;341, raised line;342, limit plate;35, locating part;351, it limits Frame;36, groove;37, holding tank;38, the first elastic component;4, intercommunicating pore;41, through hole;42, flexible piece.
Specific embodiment
With reference to the accompanying drawings and embodiments, invention is further described in detail.
Embodiment 1
A kind of mounting structure of decorative curtain wall referring to fig. 2 and Fig. 3, including fixed skeleton 1 and is fixed on fixed skeleton 1 Several decoration panels 2, decoration panel 2 is equipped with connecting rod 21, if being provided with the involvement being inserted into for connecting rod 21 on fixed skeleton 1 Connect hole 3.It is equipped with the limited part 31 that limitation connecting rod 21 moves in connecting hole 3, the limitation of backstop restraint member 31 is additionally provided in connecting hole 3 The actuator 33 of block piece 32 and driving 32 backstop restraint member 31 of block piece that connecting rod 21 moves, is inserted into when connecting rod 21 and connects Push end of the block piece 32 far from decoration panel 2 to drive block piece 32 to release the blocking to limited part 31 when connecing hole 3.
Referring to Fig. 1, fixed skeleton 1 includes several top slat irons 11 and several perpendicular skeletons 12, top slat iron 11 and perpendicular skeleton 12 It is intersecting each other to form fixed skeleton 1.
Referring to fig. 2 and Fig. 3, connecting hole 3 are located at the intersection of top slat iron 11 Yu perpendicular skeleton 12.The depth side of connecting hole 3 To vertical with top slat iron 11 and perpendicular skeleton 12.
Referring to fig. 2 and Fig. 3, for decoration panel 2 in cube-shaped, connecting rod 21 protrudes from decoration panel 2 close to fixed bone The side of frame 1, connecting rod 21 are located at the center of decoration panel 2.The length of connecting rod 21 is longer than the depth of connecting hole 3, dress There are gaps between decoration panel 2 and fixed skeleton 1.
Referring to fig. 4 and Fig. 5, limited part 31 include the limited post 312 in connecting hole 3, and limited post 312 can freely live It is dynamic.Limited post 312 is equipped with two rows, and two rows of limited posts 312 are respectively placed in connecting hole 3 along the two sides of short transverse.Every row's limit Column 312 is equipped with several, and two rows of limited posts 312 correspond, and several limited posts 312 are uniform along the depth direction of connecting hole 3 Distribution.Limited post 312 is cylindrical, the diameter of the limited post 312 of same row along connecting hole 3 towards bottom wall depth direction successively It reduces.
Referring to fig. 4 and Fig. 5, connecting rod 21 have several for the insertion of limited post 312 along the corresponding recess in the two sides of short transverse Blocked hole 311, in the present embodiment, blocked hole 311 is blind hole, the diameter one in the aperture of blocked hole 311 and limited post 312 It causes.
Referring to fig. 4 and Fig. 5, the inner wall of connecting hole 3 have several receiving limited posts 312 along the two sides of short transverse recess The depth direction of holding tank 37, holding tank 37 is vertical with the depth direction of connecting hole 3.Limited post 312 is free in holding tank 37 Activity.
Referring to fig. 2 and Fig. 3, holding tank 37 are interior equipped with the first elastic component 38 for driving limited post 312 to stretch out holding tank 37 And the stopper 34 of limitation limited post 312 pop-up holding tank 37 completely.In the present embodiment, the first elastic component 38 is spring, The length direction of first elastic component 38 extends along the depth direction of holding tank 37, and holding tank is fixed in one end of the first elastic component 38 37 bottom wall, the other end of the first elastic component 38 are fixed on the one end of limited post 312 far from connecting hole 3.Stopper 34 includes convex Limit plate 342 for 37 open at one end of holding tank and raised line 341 of the limited post 312 far from 3 one end of connecting hole is protruded from, it is convex Item 341 surround excircle one week of limited post 312.When raised line 341 is abutted with limit plate 342, the first elastic component 38 is in pressure Contracting state.
Referring to fig. 4 and Fig. 5, in the present embodiment, block piece 32 is gear frame 321, and gear frame 321 in a rectangular parallelepiped shape, keeps off frame 321 it is open at one end, keep off frame 321 opening direction it is consistent with the opening direction of connecting hole 3, keep off frame 321 boring, gear frame 321 length direction is consistent with the length direction of connecting hole 3, and the length for keeping off frame 321 is shorter than the depth of connecting hole 3, gear frame 321 Short transverse is consistent with the short transverse of connecting hole 3, and the height for keeping off frame 321 is consistent with the height of connecting hole 3.Keep off the outer of frame 321 Side wall is abutted with the inner sidewall of connecting hole 3.
Referring to fig. 4 and Fig. 5, the driving of actuator 33 gear frame 321 are open along the depth direction of connecting hole 3 towards connecting hole 3 One end is slided, the locating part 35 being additionally provided with outside the limitation gear pop-up connecting hole 3 of frame 321 in connecting hole 3.
Referring to fig. 4 and Fig. 5, in the present embodiment, actuator 33 is the second elastic component 331, and the second elastic component 331 is bullet Spring.The bottom wall recess of connecting hole 3 has the groove 36 for accommodating the second elastic component 331, the depth direction of groove 36 and the depth of connecting hole 3 Degree direction is consistent, and groove 36 is located at the center of 3 bottom wall of connecting hole, and 36 open at one end of groove is flushed with the bottom wall of connecting hole 3. The length direction of second elastic component 331 extends along the depth direction of connecting hole 3, and gear frame is fixed in one end of the second elastic component 331 321 near 3 bottom wall side of connecting hole outer wall, the other end of the second elastic component 331 is fixed on the bottom wall of groove 36.
Referring to fig. 4 and Fig. 5, in the present embodiment, locating part 35 is the limitting casing for being raised in 3 open at one end of connecting hole 351, limitting casing 351 and fixed 1 integrally connected of skeleton.When gear frame 321, which slides into, to abut with limitting casing 351, the second elastic component 331 are in compressive state.
Referring to fig. 2 and Fig. 3, gear frame 321 are provided with several for the perforative through-hole of limited post 312 along the two sides of short transverse 313.When gear frame 321, which slides into outer wall of the gear frame 321 near 3 bottom wall side of connecting hole, to abut with the bottom wall of connecting hole 3, gear The equal face of opening of several through-holes 313 on frame 321 and several holding tanks 37, the second elastic component 331 are in compressive state and complete It is placed in groove 36 entirely.
Referring to fig. 2 and Fig. 3, several limited posts 312 are fixedly connected to flexible piece 42 far from one end of connecting hole 3, In the present embodiment, flexible piece 42 is drawstring, and the bottom end of several holding tanks 37 is provided with for the perforative intercommunicating pore 4 of flexible piece 42, even The depth direction of through-hole 4 is consistent with the length direction of limited post 312.Flexible piece 42 on several limited posts 312 of same row is equal Integrally connected is fixed on skeleton 1 and is provided with for the perforative through hole 41 of flexible piece 42, the depth direction and connecting hole 3 of through hole 41 Depth direction it is consistent, through hole 41 is connected to each intercommunicating pore 4.The one end of flexible piece 42 far from limited post 312 is by running through Hole 41 is stretched out outside fixed skeleton 1 and is fixed on perpendicular skeleton 12, and the fixation position of the one end of flexible piece 42 far from limited post 312 is high In the level height of 2 top of decoration panel.Perpendicular skeleton 12 is fixed on by glue in the one end of flexible piece 42 far from limited post 312 On.When limited post 312, which slides into raised line 341, to abut with limit plate 342, flexible piece 42 is in tight state.
Referring to Fig. 1, Fig. 2 and Fig. 3, it is also provided with slip casting slot 13 on fixed skeleton 1, the length of slip casting slot 13 is along top slat iron 11 Length direction extend, slip casting slot 13 it is closed at one end, another end opening of slip casting slot 13 is to be connected to the external world.Slip casting slot 13 and same Several connecting holes 3 on one top slat iron 11 are connected to.Connectivity slot 3121 is provided on several limited posts 312.Connectivity slot 3121 Length direction is axial consistent with limited post 312, and the length of connectivity slot 3121 is consistent with the axial height of limited post 312.Connection Slot 3121 runs through the center of limited post 312.
The operating condition and principle of the present embodiment are as follows:
The setting that gear frame 321 pops up connecting hole 3 is limited by limitting casing 351, so that gear frame 321 is not easy to stretch out in connecting hole 3 Outside, so that other objects that gear frame 321 is not easy to be connected outside hole 3 touch and limited post 312 is caused to stretch out holding tank 37 and be difficult to the case where retracting, be conducive to improve gear frame 321 to the barrier effect of limited post 312, be conducive to improve limited post 312 Stability;Meanwhile the scope of activities for keeping off frame 321 is limited in connecting hole 3 by limitting casing 351, so that gear frame 321 is in decorative cover It is not easy to cause to keep off the case where frame 321 damages because accidentally being collided by decoration panel 2 in the installation process of plate 2, subtracts simultaneously The case where few decoration panel 2 collides with gear frame 321 and decoration panel 2 is caused to be damaged is conducive to protect gear frame 321.
By the setting of groove 36, so that the second elastic component 331 is not easy to resist gear frame 321 and cause gear frame 321 can not The case where being abutted with 3 bottom wall of connecting hole, so that being not easy to be conducive to there are gap between gear frame 321 and 3 bottom wall of connecting hole Increase gear contact area of the frame 321 far from 2 one end of decoration panel Yu 3 bottom wall of connecting hole, so that between connecting rod 21 and connecting hole 3 Connective stability improve.
It is limited outside the fully extended holding tank 37 of limited post 312 by the cooperation of limit plate 342 and raised line 341, is conducive to mention The stability of high limited post 312 reduces the fully extended holding tank of limited post 312 so that the scope of activities of limited post 312 is limited It is difficult to situation about being retracted in holding tank 37 outside 37, is retracted in holding tank 37 convenient for limited post 312 to release to connecting rod 21 Fixed function;Meanwhile so that limited post 312 in being inserted into blocked hole 311 with the position of fixed connecting rod 21 when, limited post 312 are partially disposed in holding tank 37, so that limited post 312 is stuck in blocked hole 311 and through-hole 313 and is less likely to occur It shakes, is conducive to the stability for improving limited post 312, and then be conducive to improve limited post 312 to the fixed function of connecting rod 21, So that the stability of decoration panel 2 improves.
The setting successively reduced by the diameter of several limited posts 312 along the depth direction of connecting hole 3 towards bottom wall, so that Through-hole 313 is successively reduced along the depth direction of connecting hole 3 towards bottom wall, so that close to the limited post 312 of 3 open at one end of connecting hole It is not easy to be pierced by from the through-hole 313 close to 3 bottom wall of connecting hole, so that the gear court under the driving of the second elastic component 331 of frame 321 To connecting hole 3 opening end motion during, limited post 312 is difficult to be pierced by from its not corresponding through-hole 313, is conducive to Improve the accuracy of barrier effect switching of the gear frame 321 to limited post 312.
It is easy to operate by pulling the flexible piece 42 of integrally connected to retract several limited posts 312 in holding tank 37, Be conducive to improve working efficiency;Meanwhile so that decoration panel 2 is detachable, reduces when install decoration panel 2 and wrong and nothing occur The case where method is reinstalled, while advantageously reducing limited post 312 and being difficult to contract after stretching out holding tank 37 because being accidentally actuated to It returns, causes fixed skeleton 1 not to be available, need the case where re-replacing, be conducive to save production cost, so that economic benefit mentions It is high.
The fixation position of one end by flexible piece 42 far from limited post 312 is higher than the level height on 2 top of decoration panel Setting pull flexible piece 42 to complete to operate convenient for operator so that flexible piece 42 is placed on the operable position of manpower The disassembling section of panel, it is easy to operate.
It is consistent with the length direction of limited post 312 by the depth direction of intercommunicating pore 4, be conducive to flexible piece 42 and limited in linkage Position column 312 retract holding tank 37 in when in on the consistent direction of 312 length direction of limited post, to be conducive to flexible piece 42 Linkage to limited post 312 reduces the situation that limited post 312 is stuck and is difficult to activity, grasps convenient for the disassembly of decoration panel 2 Make.
By the setting of slip casting slot 13, through hole 41 and connectivity slot 3121, so that the concrete in injection slip casting slot 13 Slurries can penetrate into holding tank 37 and the connection gap of connecting rod 21 and connecting hole 3 at so that limited post 312 and connection The position of bar 21 is synchronized to fix, and reduces by the first elastic component 38 and aging occurs and limited post 312 is caused to loosen to influence decorative cover The case where stability of plate 2;Meanwhile connecting hole 3 can substantially be judged by the leakage situation that through hole 41 observes concrete slurry Interior slip casting situation is convenient for grouting operation;In addition, passing through the setting of connectivity slot 3121, so that concrete slurry is easier to flow To in the gap of connecting rod 21 and connecting hole 3, be conducive to improve the connective stability between connecting rod 21 and connecting hole 3.
Embodiment 2
A kind of decorative curtain wall construction method of the decorative curtain wall mounting structure based on embodiment 1, includes the following steps:
S1, fixed skeleton 1 are installed, specific as follows: fixed skeleton 1 is installed on wall;It can be by the way of welding, by transversum Frame 11 and perpendicular skeleton 12 carry out welding installation.
S2, decoration panel 2 are tentatively installed, specific as follows: will be on the 21 alignment and fixation skeleton 1 of connecting rod in decoration panel 2 Connecting hole 3, by connecting rod 21 be inserted into connecting hole 3 in so that connecting rod 21 with keep off frame 321 inner wall abut.
When connecting rod 21, which moves to the one end of connecting rod 21 far from decoration panel 2, to abut with the bottom interior wall for keeping off frame 321, 313 face of through-hole of blocked hole 311 and gear frame 321 in connecting rod 21, connecting rod 21 continue towards the movement of 3 bottom wall of connecting hole simultaneously Overcome the elastic force of the second elastic component 331 and is moved with the bottom wall for driving gear frame 321 towards connecting hole 3.
When the bottom outer wall that gear frame 321 moves to gear frame 321 is abutted with the bottom wall of connecting hole 3, blocked hole 311, through-hole 313 and holding tank 37 the equal face of opening, gear frame 321 releases to the barrier effects of several limited posts 312, and limited post 312 exists The elastic force driving of first elastic component 38 is lower to stretch out holding tank 37, through through-hole 313 and is inserted into blocked hole 311, so that dress Decoration panel 2 is fixedly installed on fixed skeleton 1.
When the installation direction of decoration panel 2 is because of accidentally setup error, by pulling flexible piece 42 to drive several limits Position column 312 overcomes the elastic force of the first elastic component 38, so that limited post 312 is retracted in holding tank 37, to release limited post 312 To the fixed function of connecting rod 21.
When limited post 312 is separated and is retracted in holding tank 37 with blocked hole 311 and through-hole 313, gear frame 321 is the The horizontally toward opening end motion of connecting hole 3 under the elastic force effect of two elastic components 331, and push connecting rod 21 synchronous towards connection The opening end motion in hole 3, while to keep off the opening that frame 321 closes holding tank 37, so that limited post 312 is restricted to holding tank In 37 so that restore separable state between connecting rod 21 and connecting hole 3 so that decoration panel 2 can be removed with It reinstalls.
And the above installation operation is repeated so that decoration panel 2 is tentatively fixedly mounted.
By injecting concrete slurry to the open end of slip casting slot 13, concrete slurry is passed through holding tank by slip casting slot 13 In 37, and injected in connecting hole 3 by intercommunicating pore 4, through hole 41 and connectivity slot 3121 so that connecting hole 3 and connecting rod 21 Bonding, so that decoration panel 2 is fixed on fixed skeleton 1.
The operating condition and principle of the present embodiment are as follows:
Connecting rod 21 is limited column 312 while being inserted into connecting hole 3 and is fixed in connecting hole 3, to complete decoration panel 2 Fixed operation, it is easy to operate, it is time saving and energy saving, be conducive to improve working efficiency.
By injecting concrete slurry into slip casting slot 13 all decoration panels 2 on same top slat iron 11 are consolidated Due on fixed skeleton 1, so that several decoration panels 2 can be synchronized to fix, it is easy to operate without operating one by one, be conducive to mention The installation effectiveness of high decoration panel 2;Meanwhile being conducive to improve the connective stability between connecting rod 21 and connecting hole 3, reduce the One elastic component 38 occurs aging and limited post 312 is caused to be detached from blocked hole 311, and then connecting rod 21 is caused to be easy to happen shaking Situation is conducive to the stability for improving decoration panel 2, so that decoration panel 2 is less likely to occur to shake.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (10)

1. a kind of mounting structure of decorative curtain wall, it is characterized in that: including fixing skeleton (1) and being fixed on fixed skeleton (1) Several decoration panels (2), the decoration panel (2) be equipped with connecting rod (21), the fixed skeleton (1) be equipped with for connection Several connecting holes (3) of bar (21) insertion, the interior limited part (31) for being equipped with limitation connecting rod (21) movement of the connecting hole (3), Block piece (32) and driving block piece equipped with backstop restraint member (31) limitation connecting rod (21) movement in the connecting hole (3) (32) actuator (33) of backstop restraint member (31), the connecting rod (21) push block piece (32) remote when being inserted into connecting hole (3) End from decoration panel (2) is to drive block piece (32) to release the blocking to limited part (31).
2. the mounting structure of decorative curtain wall according to claim 1, it is characterized in that: the connecting rod (21) is equipped with for limit The blocked hole (311) of product (31) insertion, the inner wall depression of the connecting hole (3) have the holding tank for accommodating limited part (31) (37), the limited part (31) is placed in holding tank (37), and the holding tank (37) is equipped with driving limited part (31) and stretches out receiving The first elastic component (38) of slot (37), when in the limited part (31) insertion blocked hole (311), limited part (31) part It is placed in holding tank (37).
3. the mounting structure of decorative curtain wall according to claim 2, it is characterized in that: the limited part (31) is limited post (312), the block piece (32) is the gear frame (321) being inserted into for connecting rod (21), and the gear frame (321) is slidably connected to connection The inner wall in hole (3), the actuator (33) are that driving gear frame (321) stops the second of limited post (312) stretching holding tank (37) Elastic component (331), interior limitation gear frame (321) that is equipped with of the connecting hole (3) pops up the locating part (35) of connecting hole (3) outside, described Frame (321) are kept off to be equipped with for limited post (312) perforative through-hole (313), gear frame (321) far from decoration panel (2) one The distance between end and connecting hole (3) bottom wall are not less than between the center of through-hole (313) and the axis of limited post (312) Vertical range.
4. the mounting structure of decorative curtain wall according to claim 3, it is characterized in that: being equipped in the connecting hole (3) several A limited post (312) and several holding tanks (37) for accommodating limited post (312), several holding tanks (37) and several limits Column (312) corresponds, and the gear frame (321) is equipped with several for limited post (312) perforative through-hole (313), when one of them When the limited post (312) one of is inserted in through-hole (313), all limited posts (312) and all through-holes (313) one One face, the connecting rod (21) are equipped with several blocked holes (311) for limited post (312) insertion, when one of them limit When column (312) one of is inserted in blocked hole (311), all limited posts (312) and all blocked holes (311) are one by one just It is right.
5. the mounting structure of decorative curtain wall according to claim 4, it is characterized in that: the limited part (31) is limited post (312), the cross-sectional area of several limited posts (312) is successively reduced along the depth direction of connecting hole (3) towards bottom wall.
6. according to the mounting structure of decorative curtain wall as claimed in claim 3 to 5, it is characterized in that: the connecting hole (3) is interior Wall recess has the groove (36) for the second elastic component (331) insertion, when second elastic component (331) is fully compressed, institute The second elastic component (331) is stated to be placed in groove (36).
7. according to the mounting structure of decorative curtain wall as claimed in claim 3 to 5, it is characterized in that: the limited post (312) leans on One end of nearly first elastic component (38) is equipped with flexible piece (42), is provided on the fixed skeleton (1) and stretches out admittedly for flexible piece (42) Determine the through hole (41) of skeleton (1) outside.
8. the mounting structure of decorative curtain wall according to claim 7, it is characterized in that: the flexible piece (42) is far from limited post (312) end is connected to the side of fixed skeleton (1) close to decoration panel (2), and the flexible piece (42) is far from limited post (312) the fixation position of end is higher than the level height on decoration panel (2) top.
9. the mounting structure of -5 any decorative curtain walls according to claim 1, it is characterized in that: on the fixed skeleton (1) It is provided with slip casting slot (13), the slip casting slot (13) is connected to several connecting holes (3).
10. a kind of decorative curtain wall construction method using any decorative curtain wall mounting structure of claim 1-9, feature It is: includes the following steps:
S1, fixed skeleton (1) is installed;
The installation of S2, decoration panel (2), specific as follows:
Connecting rod (21) on decoration panel (2) is pushed into connecting hole (3) to drive block piece (32) to release to limited part (31) limitation, so that limited part (31) stretches out holding tank (37) under the driving of the first elastic component (38) and is inserted into connecting rod (21) in blocked hole (311).
CN201811261214.9A 2018-10-26 2018-10-26 Decorative curtain wall mounting structure and construction method thereof Active CN109537778B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811261214.9A CN109537778B (en) 2018-10-26 2018-10-26 Decorative curtain wall mounting structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811261214.9A CN109537778B (en) 2018-10-26 2018-10-26 Decorative curtain wall mounting structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN109537778A true CN109537778A (en) 2019-03-29
CN109537778B CN109537778B (en) 2020-06-26

Family

ID=65845775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811261214.9A Active CN109537778B (en) 2018-10-26 2018-10-26 Decorative curtain wall mounting structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN109537778B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779167A (en) * 2020-08-11 2020-10-16 江苏晶天建设工程有限公司 Decorative curtain wall and construction method thereof
CN115749073A (en) * 2022-12-07 2023-03-07 杭州新润幕墙工程有限公司 Unit curtain wall with protective structure

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4428171A (en) * 1982-03-12 1984-01-31 Atlantic Richfield Company Thermal storefront system
US4756132A (en) * 1987-04-16 1988-07-12 Systems Q/C, Inc. External veneer cap for an existing wall framing system and method of installation
US20120233944A1 (en) * 2009-11-30 2012-09-20 Frener & Reifer Metallbau Gmbh/Srl Facade system with less visible supports
CN107119833A (en) * 2017-07-13 2017-09-01 谊美吉斯光电科技(福建)有限公司 A kind of frame system of LED photovoltaic glass
CN107237431A (en) * 2017-07-28 2017-10-10 深圳市中辉装饰设计工程有限公司 Curtain wall installing structure
CN206956999U (en) * 2017-05-24 2018-02-02 河北卓秋实业有限公司 A kind of steel construction curtain wall
CN207079772U (en) * 2017-05-31 2018-03-09 上海茂利幕墙装饰工程有限公司 A kind of marble curtain wall of fluid communication
CN108301540A (en) * 2017-12-14 2018-07-20 金马日晖幕墙装饰有限公司 A kind of frame-type is without crossbeam glass curtain wall
CN207829250U (en) * 2018-02-01 2018-09-07 深圳市库博建筑设计事务所有限公司 A kind of installing structure of stone curtain wall
CN108560785A (en) * 2018-05-24 2018-09-21 东南大学 Antiknock curtain wall support system and its construction method
CN108589998A (en) * 2018-04-11 2018-09-28 中国建筑第八工程局有限公司 Resistance to deformation curtain wall jointing apparatus and its construction method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4428171A (en) * 1982-03-12 1984-01-31 Atlantic Richfield Company Thermal storefront system
US4756132A (en) * 1987-04-16 1988-07-12 Systems Q/C, Inc. External veneer cap for an existing wall framing system and method of installation
US20120233944A1 (en) * 2009-11-30 2012-09-20 Frener & Reifer Metallbau Gmbh/Srl Facade system with less visible supports
CN206956999U (en) * 2017-05-24 2018-02-02 河北卓秋实业有限公司 A kind of steel construction curtain wall
CN207079772U (en) * 2017-05-31 2018-03-09 上海茂利幕墙装饰工程有限公司 A kind of marble curtain wall of fluid communication
CN107119833A (en) * 2017-07-13 2017-09-01 谊美吉斯光电科技(福建)有限公司 A kind of frame system of LED photovoltaic glass
CN107237431A (en) * 2017-07-28 2017-10-10 深圳市中辉装饰设计工程有限公司 Curtain wall installing structure
CN108301540A (en) * 2017-12-14 2018-07-20 金马日晖幕墙装饰有限公司 A kind of frame-type is without crossbeam glass curtain wall
CN207829250U (en) * 2018-02-01 2018-09-07 深圳市库博建筑设计事务所有限公司 A kind of installing structure of stone curtain wall
CN108589998A (en) * 2018-04-11 2018-09-28 中国建筑第八工程局有限公司 Resistance to deformation curtain wall jointing apparatus and its construction method
CN108560785A (en) * 2018-05-24 2018-09-21 东南大学 Antiknock curtain wall support system and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779167A (en) * 2020-08-11 2020-10-16 江苏晶天建设工程有限公司 Decorative curtain wall and construction method thereof
CN115749073A (en) * 2022-12-07 2023-03-07 杭州新润幕墙工程有限公司 Unit curtain wall with protective structure
CN115749073B (en) * 2022-12-07 2023-05-23 杭州新润幕墙工程有限公司 Unit curtain wall with protective structure

Also Published As

Publication number Publication date
CN109537778B (en) 2020-06-26

Similar Documents

Publication Publication Date Title
CN109537778A (en) Decorative curtain wall mounting structure and its construction method
CN205712903U (en) A kind of indoor facing wall mounting decoration panel and decoration panel hanging device
CN109072618A (en) Seal board fixer
CN208792600U (en) A kind of assembled steel joist suspended ceiling
KR101080980B1 (en) Transparent sound proofing walls using horizontal supporting bar attached to front side of poster
CN202595963U (en) Transverse beam and vertical post installing structure for exposed frame curtain wall
CN109853797A (en) A kind of dry hanging curtain wall back bolting type connection part
CN104251028A (en) Combined stone curtain wall
CN207794397U (en) A kind of concealed frame glass curtain wall and special dismantling device
CN110331804A (en) A kind of dry hanging curtain wall back bolting type connection part
CN110924844A (en) Combined convenient magnetic soft screen door mounting frame
JPS595751B2 (en) Construction method for replacement sash
CN218028353U (en) Curtain wall construction for outdoor architectural decoration
CN202936909U (en) High compartment frame structure used for office space
CN206957007U (en) A kind of steel construction curtain wall for being easy to Fast Installation
CN214614609U (en) Prefabricated assembly type foundation's assembled building
CN214423757U (en) Assembly type building external wall panel structure
CN205742854U (en) A kind of prefabricated concrete board mounting structure
KR102094495B1 (en) Installation structure of exterior ornament for curtain wall
CN211776442U (en) Building construction partition wall
CN103541546A (en) Device for rapidly mounting and demounting building formworks
CN106223784A (en) The installation method of a kind of assembled door and window auxiliary frame and section bar component thereof
CN207892096U (en) A kind of vertical and horizontal frame attachment device of spring steel pin type
KR20090025485A (en) Construction structure of wall decorating- panel
KR101581958B1 (en) Window

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant