CN206956999U - A kind of steel construction curtain wall - Google Patents

A kind of steel construction curtain wall Download PDF

Info

Publication number
CN206956999U
CN206956999U CN201720584837.4U CN201720584837U CN206956999U CN 206956999 U CN206956999 U CN 206956999U CN 201720584837 U CN201720584837 U CN 201720584837U CN 206956999 U CN206956999 U CN 206956999U
Authority
CN
China
Prior art keywords
curtain wall
frame
gear frame
wall panel
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720584837.4U
Other languages
Chinese (zh)
Inventor
魏庆波
刘锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Zhuo Qiu Industrial Co Ltd
Original Assignee
Hebei Zhuo Qiu Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Zhuo Qiu Industrial Co Ltd filed Critical Hebei Zhuo Qiu Industrial Co Ltd
Priority to CN201720584837.4U priority Critical patent/CN206956999U/en
Application granted granted Critical
Publication of CN206956999U publication Critical patent/CN206956999U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

A kind of steel construction curtain wall, including curtain wall frame and curtain wall panel, one piece of positioning gear frame and decoration gear frame are installed with the top of curtain wall frame, and curtain wall panel is fixed between positioning gear frame and decoration gear frame by bolt;Curtain wall panel is further opened with a locating slot in the opening position contacted with positioning gear frame, and positioning gear frame is provided with a briquetting in position corresponding with locating slot, and one end of briquetting is stuck in the locating slot of curtain wall panel, and the other end is fixedly mounted on positioning gear frame.The utility model simplifies the operation of installation curtain wall panel, improves the installation effectiveness of curtain wall, ensure that the firm of curtain wall panel installation, improves security.Moreover, ensure that the smooth of the installation at the top of curtain wall panel, the appearance of whole curtain wall is improved.

Description

A kind of steel construction curtain wall
Technical field
Steel building technical field is the utility model is related to, more particularly to a kind of steel construction curtain wall.
Background technology
With the fast development of Building technology, increasing steel house starts to come into operation.Steel house is The support frame in house is interconnected to form using more steel constructions, can be formed during steel construction interconnection some rectangular Shape frame, after rectangle inframe installs curtain wall panel, steel house is built and finished, and can start to come into operation.But at present The curtain wall panel installation process used is complicated, it is necessary to use substantial amounts of aid during installation, and whole curtain wall The fastness of installation is poor, and installs rear surface irregularity, and the installed part that imprudence can be raised during use is damaged, therefore Safety in utilization is poor.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of steel construction curtain wall, and the curtain wall is quick and easy for installation, And the junction of curtain wall is smooth, the installed part for avoiding being raised is damaged.
To achieve the above object, the utility model provides following technical scheme:A kind of steel construction curtain wall, including steel construction The curtain wall frame that crossbeam is formed with vertical beam, and the curtain wall panel installed in curtain wall inframe, the curtain wall frame are rectangle, the curtain wall One piece of positioning gear frame and decoration gear frame are installed with the top of frame, the decoration gear frame is located at curtain wall frame close to the one of outside Side, positioning, which is kept off around frame, is uniformly provided with a circle bolt, and the decoration gear frame is in the corresponding position with bolt The positioning consistent with the quantity of positioning hole I also is provided with provided with the surrounding with bolt quantity identical positioning hole I, the curtain wall panel Hole II, curtain wall panel are fixed between positioning gear frame and decoration gear frame by bolt, and the end of the bolt passes through spiral shell Mother is fixed;The curtain wall panel is being further opened with a locating slot with the opening position that contact of positioning gear frame, the positioning keep off frame with The corresponding position of locating slot is provided with a briquetting, and one end of briquetting is stuck in the locating slot of curtain wall panel, and the other end is fixedly mounted on On positioning gear frame.
A kind of steel construction curtain wall described in the utility model, wherein, briquetting is located at the edge of positioning gear frame.
A kind of steel construction curtain wall described in the utility model, wherein, the section semicircular in shape of the locating slot, the briquetting Shape match with locating slot.
A kind of steel construction curtain wall described in the utility model, wherein, the edge of briquetting is provided with rubber sleeve.
Using above-mentioned technical proposal, the utility model, will by positioning gear frame and decoration gear frame when installing curtain wall panel The position of curtain wall panel installation therebetween, directly will by bolt because curtain wall panel is provided with mounting hole, therefore when mounted Curtain wall panel is arranged between decoration gear frame and positioning gear frame, is simplified the operation of installation curtain wall panel, is improved curtain wall Installation effectiveness, meanwhile, the briquetting that frame surrounding is kept off by positioning blocks curtain wall panel, ensure that the firm of curtain wall panel installation, improves Security.It is additionally, since decoration gear frame and is arranged on the outer side of curtain wall frame, and curtain wall panel is positioned simultaneously with decoration gear frame Bolt on gear frame is fixed, and therefore, the covering of frame is kept off by decorating, be ensure that the smooth of installation at the top of curtain wall panel, improve The appearance of whole curtain wall.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is Fig. 1 A-A sectional views.
Embodiment
Below in conjunction with the accompanying drawings, by the description to embodiment, the utility model is described further:
As shown in Figure 1, 2, a kind of steel construction curtain wall of the utility model, including the curtain wall frame that steel structure beam is formed with vertical beam 1, and the curtain wall panel 4 in curtain wall frame 1, curtain wall frame 1 be rectangle, the top of curtain wall frame 1 be installed with one piece it is fixed Position gear frame 2 and decoration gear frame 3, decoration gear frame 3 are located at curtain wall frame 1 and are uniformly provided with the side in outside, positioning gear frame 2 One row's bolt 5, decoration gear frame 3 are provided with and the positioning of the quantity identical of bolt 5 with the corresponding position of bolt 5 Hole I 61, the top of curtain wall panel 4 also are provided with the positioning hole II 62 consistent with the quantity of positioning hole I 61, and curtain wall panel 4 passes through bolt 5 It is fixed between positioning gear frame 2 and decoration gear frame 3, the end of bolt 5 is fixed by nut 7;Curtain wall panel 4 is kept off with positioning The opening position that frame 2 contacts is further opened with a locating slot 8, and positioning gear frame 2 is being provided with a briquetting with 8 corresponding position of locating slot 9, one end of briquetting 9 is stuck in the locating slot 8 of curtain wall panel 4, and the other end is fixedly mounted on positioning gear frame 2.
The utility model improves the security of curtain wall panel 4, by briquetting 9 located at positioning to increase the crushing strength of briquetting 9 Keep off the edge of frame 2.The section semicircular in shape of locating slot 8, shape and the locating slot 8 of briquetting 9 match, both matchings of increase Fastness.The surrounding of curtain wall panel 4 is stuck on briquetting 9, ensure that the uniform force of curtain wall panel 4, improve curtain wall panel 4 Security.In addition, a rubber sleeve on being covered on briquetting 9, can increase the frictional force between briquetting 9 and locating slot 8, improve Briquetting 9 and the compactness of the clamping of locating slot 8.
Curtain wall panel 4 is arranged on two by the utility model when installing curtain wall panel 4, by positioning gear frame 2 and decoration gear frame 3 Position between person, because curtain wall panel 4 is provided with mounting hole II 62, therefore when mounted, directly by bolt 5 by curtain wall Plate 4 is arranged between decoration gear frame 3 and positioning gear frame 2, is simplified the operation of installation curtain wall panel 4, is improved curtain wall Installation effectiveness, meanwhile, the briquetting 9 that the surrounding of frame 2 is kept off by positioning blocks curtain wall panel 4, ensure that curtain wall panel 4 is installed firm, carries High security.It is additionally, since decoration gear frame 3 and is arranged on the outer side of curtain wall frame 1, and curtain wall panel 4 and decoration gear frame 3 is same When the bolt 5 that is positioned on gear frame 2 fix, therefore, the covering of frame 3 is kept off by decorating, ensure that the peace at the top of curtain wall panel 4 What is filled is smooth, improves the appearance of whole curtain wall.
Above-described is only preferred embodiment of the present utility model, it is noted that for the ordinary skill of this area For personnel, on the premise of not departing from the utility model and creating design, various modifications and improvements can be made, these all belong to In the scope of protection of the utility model.

Claims (4)

1. a kind of steel construction curtain wall, including the curtain wall frame (1) that steel structure beam is formed with vertical beam, and installed in curtain wall frame (1) Interior curtain wall panel (4), the curtain wall frame (1) are rectangle, it is characterised in that:It is installed with the top of the curtain wall frame (1) One piece of positioning gear frame (2) and decoration gear frame (3), the decoration gear frame (3) is located at curtain wall frame (1) close to the side in outside, fixed One circle bolt (5) is uniformly installed, the decoration gear frame (3) is corresponding to bolt (5) around position gear frame (2) Opening position is provided with and also is provided with and positions with bolt (5) quantity identical positioning hole I (61), the surrounding of the curtain wall panel (4) The consistent positioning hole II (62) of hole I (61) quantity, curtain wall panel (4) are fixed on positioning gear frame (2) and decoration by bolt (5) Keep off between frame (3), the end of the bolt (5) is fixed by nut (7);The curtain wall panel (4) is keeping off frame (2) with positioning The opening position of contact is further opened with a locating slot (8), and the positioning gear frame (2) is provided with position corresponding with locating slot (8) One briquetting (9), one end of briquetting (9) are stuck in the locating slot (8) of curtain wall panel (4), and the other end is fixedly mounted on positioning gear frame (2) on.
A kind of 2. steel construction curtain wall according to claim 1, it is characterised in that:The briquetting (9) is located at positioning gear frame (2) Edge.
A kind of 3. steel construction curtain wall according to claim 2, it is characterised in that:The section of the locating slot (8) is in semicircle Shape, shape and the locating slot (8) of the briquetting (9) match.
A kind of 4. steel construction curtain wall according to claim 3, it is characterised in that:The edge of the briquetting (9) is provided with rubber Set.
CN201720584837.4U 2017-05-24 2017-05-24 A kind of steel construction curtain wall Active CN206956999U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720584837.4U CN206956999U (en) 2017-05-24 2017-05-24 A kind of steel construction curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720584837.4U CN206956999U (en) 2017-05-24 2017-05-24 A kind of steel construction curtain wall

Publications (1)

Publication Number Publication Date
CN206956999U true CN206956999U (en) 2018-02-02

Family

ID=61376106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720584837.4U Active CN206956999U (en) 2017-05-24 2017-05-24 A kind of steel construction curtain wall

Country Status (1)

Country Link
CN (1) CN206956999U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537778A (en) * 2018-10-26 2019-03-29 深圳市库博建筑设计事务所有限公司 Decorative curtain wall mounting structure and its construction method
CN111395600A (en) * 2020-03-24 2020-07-10 浙江世贸装饰股份有限公司 Unit type curtain wall system with double-layer protection structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537778A (en) * 2018-10-26 2019-03-29 深圳市库博建筑设计事务所有限公司 Decorative curtain wall mounting structure and its construction method
CN109537778B (en) * 2018-10-26 2020-06-26 深圳市库博建筑设计事务所有限公司 Decorative curtain wall mounting structure and construction method thereof
CN111395600A (en) * 2020-03-24 2020-07-10 浙江世贸装饰股份有限公司 Unit type curtain wall system with double-layer protection structure
CN111395600B (en) * 2020-03-24 2021-05-11 浙江世贸装饰股份有限公司 Unit type curtain wall system with double-layer protection structure

Similar Documents

Publication Publication Date Title
CN206956999U (en) A kind of steel construction curtain wall
CN204928684U (en) Fixed structure of solar photovoltaic board
CN206385765U (en) A kind of assembled wall board and mounting structure
CN206956995U (en) A kind of bright frame steel construction curtain wall
CN205755837U (en) A kind of wall body decoration green vegetation planting device
CN206956992U (en) A kind of steel construction curtain wall firmly installed
CN206739540U (en) A kind of screw cover for air-conditioning
CN207160478U (en) A kind of building decoration decorative panel
CN203114852U (en) Anti-disassembling structure of screw
CN206221962U (en) Aluminium trim lid
CN208598247U (en) A kind of fixed door glass connection structure
CN207332126U (en) Trapezoidal color steel tile photovoltaic aluminum frame
CN206829443U (en) A kind of novel curtain wall
CN205934988U (en) Ditch access cover plate structure is warmed up on ground
CN204190684U (en) Novel solar battery component aluminum frame
CN210053044U (en) Power box for electric power distribution
CN204001157U (en) Firm easily floor drain
CN203071428U (en) Installation cabinet for ray proof transformer
CN105140796B (en) A kind of distribution box connector and the distribution box mounting bracket using the connector
CN206957000U (en) A kind of new bright frame steel construction curtain wall
CN206091211U (en) Marble decorative lines
CN202248705U (en) Fixed part for installing thermal-insulating decoration board
CN203008921U (en) Rubber curtain mounting structure for shield launching
CN202669360U (en) Air purifying device
CN207275973U (en) A kind of elevator sightseeing glass fixing bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20190613

Granted publication date: 20180202

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20220613

Granted publication date: 20180202

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20220817

Granted publication date: 20180202