CN103541546A - Device for rapidly mounting and demounting building formworks - Google Patents
Device for rapidly mounting and demounting building formworks Download PDFInfo
- Publication number
- CN103541546A CN103541546A CN201310448153.8A CN201310448153A CN103541546A CN 103541546 A CN103541546 A CN 103541546A CN 201310448153 A CN201310448153 A CN 201310448153A CN 103541546 A CN103541546 A CN 103541546A
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- locking
- left frame
- frame
- slide block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses a device for rapidly mounting and demounting building formworks. The device comprises a right frame and a left frame, and both the right frame and the left frame are of a square frame structure. Corresponding locking holes are formed in a right frame left border and a right frame right border of the right frame and a left frame left border and a left frame right border of the left frame. The device is characterized in that a locking connecting rod is installed on the right frame and composed of a connecting rod sliding rod, a locking check block and a connecting rod handle, wherein the connecting rod sliding rod is vertically arranged, the locking check block is located on the sliding rod, and the sliding rod and the locking check block are combined into a U-shaped structure. The device mainly relates to the field of buildings.
Description
Technical field
The present invention relates generally to building field, relates in particular to a kind of fast assembling-disassembling device for construction formwork.
Background technology
Building aluminum alloy pattern plate is owing to can repeating recovery and use in architectural process, application in modern high-rise building is more and more extensive, replace gradually traditional wooden barrier structure, in use, first want main house body to overlap with aluminum alloy pattern plate, again toward filling concrete in the space in the middle of aluminum alloy pattern plate, after theing cement solidifies, remove again aluminum alloy pattern plate, and then continue to build the second layer, constantly repeat to build and the construction of dismantling aluminum alloy pattern plate and complete whole highrise building, and whole aluminum alloy pattern plate for building is to be formed by polylith template assembly, traditional aluminum alloy pattern plate surrounding all has pin-and-hole, between two aluminum alloy pattern plates, by pivot pin, pass between two templates, and in one end of pin, there is a square through hole draw-in groove, by a wedge is through in this draw-in groove, with hammer, be fixed, with this, fix and be connected a plurality of aluminum alloy pattern plates, when needs are dismantled, after also will wedge being pounded out with hammer, again pivot pin is transferred to, to reach the process of installation and removal, the problem existing in installation and removal in background technology is, due in multistory building, aluminum alloy pattern plate quantity used is all more, and in installation process, need repeatedly installation and removal, each aluminum modules installing hole all needs constantly to drive in and pound out with hammer, not only in installation process, noise is large, and in installation and removal process, efficiency is low, pivot pin and wedge are again parts separately, and small volume, in the building-site construction of being everlasting, very easily lose, after loss, must not no longer from producer, again buy accessory again, project duration and progress have been had a strong impact on, even cause larger economic loss, while installing and removing aloft, need stand in operation on step stool, there is potential safety hazard, operation inconvenience.Work as concrete vibrating, pivot pin and wedge be easy loose or dislocation under the power effect of vibrating, thereby occurs swollen mould and burst-mode phenomenon.
Summary of the invention
The invention discloses a kind of fast assembling-disassembling device for construction formwork, in order to solve the deficiencies in the prior art.
For addressing the above problem, technical solution of the present invention is:
A kind of fast assembling-disassembling device for construction formwork, comprise the correct frame and the left frame that are quadra structure, the correct frame left frame of its correct frame and correct frame left frame, with on the left frame left frame of left frame and left frame left frame, all have corresponding locking hole, locking connecting rod is installed on described correct frame, its locking connecting rod is the connecting rod slide bar vertically arranging by one, and being positioned at locking link stopper and the link rod handle composition on slide bar, slide bar, locking link stopper are combined into " U " type structure.
Described locking connecting rod top is provided with on connecting rod plate washer on link stopper and connecting rod, and locking connecting rod bottom is provided with connecting rod lower baffle and slide, and is arranged on the slide block on slide top, and its slide block can slidably reciprocate on slide.
On described slide block, be provided with slide block handle.
Described slide bar, locking link stopper are combined into " U " type structure and have two at least.
In described " U " type structure, the side opening degree of depth is less than " U " type inside bottom surface to the distance of locking hole upside, and the height length in " U " type structure outside is less than the perforate length of locking hole short transverse.
The vertical length of described slide bar is less than the height of correct frame inner side, and difference is between the two less than the height of plate washer and connecting rod lower baffle on link stopper on connecting rod, connecting rod.
Described handle is perpendicular to slide bar and locking link stopper.
Described locking connecting rod can move up and down along short transverse under external force by handle.
On described slide block, be provided with spacing preiection, have a holding unit on slide block, correct frame and left frame are when locking state, and the bottom of slide bar is positioned in the holding unit on slide block.
The invention has the beneficial effects as follows: by this fast assembling-disassembling device, two aluminum alloy pattern plates can be carried out to rapid-assembling and dismounting, and assembling and disassembling device is directly installed in template, both not be used in and in construction, produced noise, installation and removal are all very convenient, improved efficiency of construction, thereby thoroughly solved in installing and easily lost the problem that accessory affects project duration and progress, because assembling and disassembling device is provided with handle, during installation and removal, only need just energy rapid-assembling/disassembling of moving handle, reduce high-rise working chance, guaranteed constructor's safety.Assembling and disassembling device overall structure, makes to be intactly connected between gang form, has avoided the generation of swollen mould and burst-mode phenomenon.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is that the present invention removes the structural representation after locking connecting rod;
Fig. 3 is left frame of the present invention and the mounting structure schematic diagram of correct frame in released state;
Fig. 4 is left frame of the present invention and the mounting structure schematic diagram of correct frame in locking state;
Fig. 5 is slide block structure schematic diagram;
Fig. 6 is the structural representation of locking connecting rod;
In figure: 1-locks connecting rod, 11-slide bar, 12-locks link stopper, 13-link rod handle, 2-correct frame, 21-correct frame left frame, link stopper on 22-connecting rod, plate washer on 23-connecting rod, 24-connecting rod lower baffle, 25-correct frame left frame, 3-left frame, 31-left frame left frame, 32-left frame left frame, 4-slide block, 41-spacing preiection, 42-holding unit, 5-slide, 6-locking hole, 7-slide block handle.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in further detail.
Referring to accompanying drawing 1-6, the present invention includes the correct frame 2 and the left frame 3 that are quadra structure, the correct frame left frame 21 of its correct frame 2 and correct frame left frame 25, with on the left frame left frame 31 of left frame 3 and left frame left frame 32, all have corresponding locking hole 6, locking connecting rod 1 is installed on described correct frame 2, its locking connecting rod 1 is the connecting rod slide bar 11 vertically arranging by one, and be positioned at locking link stopper 12 and the link rod handle 13 on slide bar 11, institute forms, and slide bar 11, locking link stopper 12 are combined into " U " type structure.
Described locking connecting rod 1 top is provided with on connecting rod plate washer 23 on link stopper 22 and connecting rod, and locking connecting rod 1 bottom is provided with connecting rod lower baffle 24, slide 5, and be arranged on slide block 4 and the slide block handle 7 on slide 5 tops, its slide block 4 can slidably reciprocate on slide 5.
On described slide block 4, be provided with slide block handle 7.
Described slide bar 11, locking link stopper 12 are combined into " U " type structure and have two at least.
In described " U " type structure, the side opening degree of depth is less than " U " type inside bottom surface to the distance of locking hole 6 upsides, and the height length in " U " type structure outside is less than the perforate length of locking hole 6 short transverses.
The vertical length of described slide bar 11 is less than the height of correct frame 2 inner sides, and difference is between the two less than on connecting rod the height of plate washer 23 and connecting rod lower baffle 24 on link stopper 22, connecting rod.
Described link rod handle 13 is perpendicular to slide bar 11 and locking link stopper 12.
Described locking connecting rod 1 can move up and down along short transverse under external force by link rod handle 13.
On described slide block 4, be provided with spacing preiection 41, have a holding unit 42 on slide block 4, correct frame 2 and left frame 3 are when locking state, and the bottom of slide bar 11 is positioned in the holding unit 42 on slide block 4.
In actual applications, correct frame 2 and left frame 3 are square frame construction, correct frame 2 with left frame 3 when being connected, the correct frame left frame 21 of correct frame 2 and correct frame left frame 25, with on the left frame left frame 31 of left frame 3 and left frame left frame 32, all have corresponding locking hole 6, so-called corresponding, just refer to, height and the size of same locking hole 6 on each frame plate all equates, to being convenient to install locking connecting rod 1, and locking connecting rod 1 is the connecting rod slide bar 11 vertically arranging by one, and the locking link stopper 12 and the link rod handle 13 that are positioned on slide bar 11 form, slide bar 11, locking link stopper 12 is combined into " U " type structure, generally, " U " type structural openings is directed upwardly setting, " U " type structure direction can certainly be arranged down, two kinds of modes can be selected according to different applicable situations, locking connecting rod 1 top is provided with on connecting rod plate washer 23 on link stopper 22 and connecting rod, locking connecting rod 1 bottom is provided with connecting rod lower baffle 24, slide 5, and be arranged on the slide block 4 on slide 5 tops, slide block 4 is provided with slide block handle 7, its slide block 4 can slidably reciprocate on slide 5, because locking connecting rod 1 is by moving up and down to lock correct frame 2 and left frame 3, in order to prevent in movement or lock when the not-connected status reliability of connecting rod 1, first by correct frame 2 and left frame 3 laminatings, and by locking hole 6 alignment, then gently mention link rod handle 13, the locking link stopper 12 that makes to lock on connecting rod 1 passes after the locking hole 6 of correct frame 2 and left frame 3, locking connecting rod 1 is mentioned to position, correct frame 2 and left frame 3 are lockable.The side at slide bar 11 both ends of locking connecting rod 1 arranges link stopper 22 and slide 5 on a connecting rod, with limiting lock, be close to the position of bar 1, it can not be moved left and right as direction as shown in figure (3) and figure (4), in the upper and lower end parts position of locking the front end of connecting rod 1, plate washer 23 and connecting rod lower baffle 24 on connecting rod are set equally, so that locking connecting rod 1 can not move forward afterwards, moreover, the vertical length of slide bar 11 is less than the height of correct frame 2 inner sides, and difference is between the two less than link stopper 22 on connecting rod, the height of plate washer 23 and connecting rod lower baffle 24 on connecting rod, therefore, when locking connecting rod 1 is locked when mobile up and down, locking connecting rod 1 plate washer 23 and connecting rod lower baffle 24 on connecting rod, on connecting rod under link stopper 22 and slide 5 spacing, it can only be moved along short transverse, because the side opening degree of depth in " U " type structure is less than " U " type inside bottom surface to the distance of locking hole 6 upsides, the height length in " U " type structure outside is less than the perforate length of locking hole 6 short transverses.When making to lock link stopper 12 and guarantee through locking hole 6, when locking connecting rod 1 moves, can guarantee to lock link stopper 12 and can pin correct frame 2 and left frame 3.When correct frame 2 and left frame 3 are lockable, owing to now locking the self gravitation of connecting rod 1, easily make locking state loosening, therefore, on slide block 4, be provided with spacing preiection 41, on slide block 4, there is a holding unit 42, correct frame 2 and left frame 3 are when locking state, slide block 4 is slided promotion slide block handle 7, the bottom of slide bar 11 is positioned in the holding unit 42 on slide block 4, thereby guaranteed that correct frame 2 and left frame 3 are firmly in locking state, conventionally slide 5 arranges a projection or groove with being connected by slide 5 tops of slide block 4, at slide block 4, groove or a projection matching with slide 5 is set, making between the two can left and right to carry out limited position moves, or between slide 5 and slide block 4, also can carry out the kind of drive by screw rod moves left and right, generally, for firmly convenient, can a link rod handle 13 be set at locking connecting rod 1, link rod handle 13 is perpendicular to slide bar 11 and locking link stopper 12, operation while so conveniently installing.
Generally, the layout of locking connecting rod 1 also has certain being particular about, conventionally " U " type structure is arranged on the left edge 21 of correct frame of correct frame 2 of slide bar 11, or above the left edge 31 of the left frame that left frame 3 is set, because great majority are all to operate with the right hand, " U " type structure is arranged on the left side of slide bar 11, whether the state that facilitates people to be beneficial to eye-observation locking at operating grip puts in place, during dismounting, be also whether convenient observation locking is removed, and correct frame 2 and left frame 3 are all comprised of quadra, the left edge 21 of correct frame that 1 setting of whole locking connecting rod is framework or above the left edge 31 of left frame, the right edge 25 of correct frame and the right edge 32 of left frame reserve corresponding locking hole 6 and conveniently assemble with other framework, so just, can laterally assemble framework, and can exchange arbitrarily.
Therefore, when needs are assembled correct frame 2 and left frame 3, only need hand-held link rod handle 13, link rod handle 13 is up carried, make to lock link stopper 12 and fasten left frame 3, again the slide block 4 that is arranged on below is promoted toward locking connecting rod 1 direction, the bottom of slide bar 11 is positioned in the holding unit 42 on slide block 4, so just, completed assembling, otherwise when needs are dismantled correct frame 2 and left frame 3, the slide block of below 4 is released toward locking connecting rod 1 rightabout, people is as long as move down link rod handle 13 by less power, 12 of link stoppers of locking move down, can make correct frame 2 and left frame 3 in released state, completed the process of assembly and disassembly fast.
The above-mentioned specific embodiment is the preferred embodiments of the present invention, can not limit the present invention, and other any change or other equivalent substitute mode that does not deviate from technical scheme of the present invention and make, within being included in protection scope of the present invention.
Claims (9)
1. the fast assembling-disassembling device for construction formwork, comprise the correct frame and the left frame that are quadra structure, the correct frame left frame of its correct frame and correct frame left frame, with on the left frame left frame of left frame and left frame left frame, all have corresponding locking hole, it is characterized in that: locking connecting rod is installed on described correct frame, its locking connecting rod is the connecting rod slide bar vertically arranging by one, and being positioned at locking link stopper and the link rod handle composition on slide bar, slide bar, locking link stopper are combined into " U " type structure.
2. the fast assembling-disassembling device for construction formwork according to claim 1, it is characterized in that: described locking connecting rod top is provided with on connecting rod plate washer on link stopper and connecting rod, locking connecting rod bottom is provided with connecting rod lower baffle and slide, and being arranged on the slide block on slide top, its slide block can slidably reciprocate on slide.
3. the fast assembling-disassembling device for construction formwork according to claim 1 and 2, is characterized in that: on described slide block, be provided with slide block handle.
4. the fast assembling-disassembling device for construction formwork according to claim 1, is characterized in that: described slide bar, locking link stopper are combined into " U " type structure and have two at least.
5. the fast assembling-disassembling device for construction formwork according to claim 1, it is characterized in that: in described " U " type structure, the side opening degree of depth is less than " U " type inside bottom surface to the distance of locking hole upside, the height length in " U " type structure outside is less than the perforate length of locking hole short transverse.
6. the fast assembling-disassembling device for construction formwork according to claim 1 and 2, it is characterized in that: the vertical length of described slide bar is less than the height of correct frame inner side, and difference is between the two less than the height of plate washer and connecting rod lower baffle on link stopper on connecting rod, connecting rod.
7. the fast assembling-disassembling device for construction formwork according to claim 1, is characterized in that: described link rod handle is perpendicular to slide bar and locking link stopper.
8. the fast assembling-disassembling device for construction formwork according to claim 1, is characterized in that: described locking connecting rod can move up and down along short transverse under external force by link rod handle.
9. the fast assembling-disassembling device for construction formwork according to claim 1 and 2, it is characterized in that: on described slide block, be provided with spacing preiection, on slide block, have a holding unit, correct frame and left frame are when locking state, and the bottom of slide bar is positioned in the holding unit on slide block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310448153.8A CN103541546A (en) | 2013-09-27 | 2013-09-27 | Device for rapidly mounting and demounting building formworks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310448153.8A CN103541546A (en) | 2013-09-27 | 2013-09-27 | Device for rapidly mounting and demounting building formworks |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103541546A true CN103541546A (en) | 2014-01-29 |
Family
ID=49965365
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310448153.8A Pending CN103541546A (en) | 2013-09-27 | 2013-09-27 | Device for rapidly mounting and demounting building formworks |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103541546A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339433A (en) * | 2018-12-04 | 2019-02-15 | 新晃远大机械铸造有限公司 | Assembled tier building steel form with strong bearing capacity |
CN109706965A (en) * | 2019-01-21 | 2019-05-03 | 海门市帕源路桥建设有限公司 | A kind of accurate assembled master mold of standardization box module and construction technology |
CN112854807A (en) * | 2021-01-22 | 2021-05-28 | 安徽师范大学 | Worker's civil engineering roofing fracture maintenance system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2067304U (en) * | 1989-06-23 | 1990-12-12 | 李渊河 | Bonding means of face plate of steel mould for building |
CN2667079Y (en) * | 2003-12-19 | 2004-12-29 | 北京天元伟业模板有限公司 | Form assembly fastening device |
CN1914388A (en) * | 2003-11-13 | 2007-02-14 | 古斯塔沃·塞拉诺罗德里格斯 | Metal formwork with accessories for moulding concrete |
CN202187546U (en) * | 2011-07-04 | 2012-04-11 | 张北京 | Novel four-bend steel frame and special lock hole steel plate bolt wedge connecting group thereof |
CN202925898U (en) * | 2012-11-28 | 2013-05-08 | 中天建设集团有限公司天津分公司 | Template joint connecting structure |
CN203594231U (en) * | 2013-09-27 | 2014-05-14 | 广东一百建筑科技有限公司 | Device for rapidly mounting and demounting building formworks |
-
2013
- 2013-09-27 CN CN201310448153.8A patent/CN103541546A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2067304U (en) * | 1989-06-23 | 1990-12-12 | 李渊河 | Bonding means of face plate of steel mould for building |
CN1914388A (en) * | 2003-11-13 | 2007-02-14 | 古斯塔沃·塞拉诺罗德里格斯 | Metal formwork with accessories for moulding concrete |
CN2667079Y (en) * | 2003-12-19 | 2004-12-29 | 北京天元伟业模板有限公司 | Form assembly fastening device |
CN202187546U (en) * | 2011-07-04 | 2012-04-11 | 张北京 | Novel four-bend steel frame and special lock hole steel plate bolt wedge connecting group thereof |
CN202925898U (en) * | 2012-11-28 | 2013-05-08 | 中天建设集团有限公司天津分公司 | Template joint connecting structure |
CN203594231U (en) * | 2013-09-27 | 2014-05-14 | 广东一百建筑科技有限公司 | Device for rapidly mounting and demounting building formworks |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339433A (en) * | 2018-12-04 | 2019-02-15 | 新晃远大机械铸造有限公司 | Assembled tier building steel form with strong bearing capacity |
CN109339433B (en) * | 2018-12-04 | 2021-07-27 | 新晃远大机械铸造有限公司 | Assembled steel formwork with strong bearing capacity for multi-storey building |
CN109706965A (en) * | 2019-01-21 | 2019-05-03 | 海门市帕源路桥建设有限公司 | A kind of accurate assembled master mold of standardization box module and construction technology |
CN112854807A (en) * | 2021-01-22 | 2021-05-28 | 安徽师范大学 | Worker's civil engineering roofing fracture maintenance system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102071796A (en) | Template for construction | |
CN103541546A (en) | Device for rapidly mounting and demounting building formworks | |
CN203594231U (en) | Device for rapidly mounting and demounting building formworks | |
CN201730330U (en) | Beam formwork for building | |
CN202577960U (en) | Suspension outer bearing type combination steel formwork applied in roller compacted concrete (RCC) construction | |
CN206393801U (en) | A kind of embedded and locked type noise adjustable height mould | |
CN208009271U (en) | A kind of bridge steel template convenient for connecting and quickly assembling | |
CN102071802A (en) | Template for construction | |
CN108868130B (en) | Double-layer connecting beam opening formwork system and construction method thereof applied to double-layer connecting beam | |
CN107642232B (en) | Horizontal connecting structure and system for formwork support and construction method | |
CN102121308A (en) | Template for buildings | |
CN208844909U (en) | A kind of easy-to-dismount aluminum alloy mould plate | |
CN207092517U (en) | A kind of climbing frame protection net mounting structure | |
CN201649688U (en) | Rapid supporting joint | |
CN205822763U (en) | A kind of bowl fastening type steel pipe scaffold being easy to assemble | |
CN103541544A (en) | Double concrete wall plate scissor type keel supporting template system | |
CN207847078U (en) | Core Walls Structure shear wall converts boom device without wall without creeping formwork seat in the plane at beam | |
CN102268921A (en) | Beam template for construction | |
CN102116082B (en) | Moulding board for building purposes | |
CN102199946A (en) | Constructional shear wall template | |
CN220799001U (en) | A prefabricated slope protection structure for construction of high standard farmland | |
CN210482953U (en) | Construction platform convenient to dismouting is automatic | |
CN110821135A (en) | Attached lifting scaffold | |
CN220565560U (en) | Detachable assembled embedded grid blocking device for inclined roof | |
CN215520356U (en) | A energy-concerving and environment-protective type encloses fender structure for assembly type construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140129 |