CN109505257A - A kind of pier shaft Temperature Controlling of Mass Concrete construction method - Google Patents

A kind of pier shaft Temperature Controlling of Mass Concrete construction method Download PDF

Info

Publication number
CN109505257A
CN109505257A CN201811580676.7A CN201811580676A CN109505257A CN 109505257 A CN109505257 A CN 109505257A CN 201811580676 A CN201811580676 A CN 201811580676A CN 109505257 A CN109505257 A CN 109505257A
Authority
CN
China
Prior art keywords
pier shaft
pier
construction method
water supply
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811580676.7A
Other languages
Chinese (zh)
Inventor
孙中华
李鹏翱
常玉骞
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201811580676.7A priority Critical patent/CN109505257A/en
Publication of CN109505257A publication Critical patent/CN109505257A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to the technical fields of the biggish high pier bridge construction of wall thickness, it is high in order to solve the thick-wall hollow pier mass concrete heat of hydration, cause cracks, the problems such as influencing bridge pier quality, provide a kind of pier shaft Temperature Controlling of Mass Concrete construction method, it is to be realized to the different height layer of pier shaft cooling in real time by the way that Concrete Temperature Control device is arranged in pier shaft.This method is to be equally spaced cooling tube in pier shaft reinforcing bar process of binding, later period uses water pump cooling water supply, reduce the heat that concrete hydrating generates, avoid concrete internal temperature is excessively high from causing the various diseases of concrete, the construction method overcomes the problems such as conventional construction method is difficult to ensure bridge pier construction quality, the quality that ensure that high pier heavy wall pier construction process ensure that construction safety, improve construction efficiency.

Description

A kind of pier shaft Temperature Controlling of Mass Concrete construction method
Technical field
The invention belongs to the technical fields of the biggish high pier bridge construction of wall thickness, and in particular to a kind of pier shaft large volume Concrete temperature-control construction method.
Background technique
With the rapid development of the capital construction facilities such as high-speed railway, highway, city intersection road, large span cross-line, across The structure types bridge such as river continuously emerges, and bridge pier height constantly increases, and hollow pier is widely used, and special construction beam continuously emerges, Thin-wall Hollow Pier wall thickness also constantly increases, and concreting maintenance just should be conserved and be controlled by mass concrete when thickness is greater than 1m System, but there are no mature control methods for this part for existing construction technology, often have the multinomial warm plastic forming disease such as bridge pier crack Evil, seriously affects bridge quality, to guarantee Bridge Pier Construction quality, therefore proposes a kind of pier shaft Temperature Controlling of Mass Concrete construction party Method reduces mass concrete aquation and generates heat, guarantees Bridge Pier Construction quality.
Summary of the invention
Present invention understands that certainly the thick-wall hollow pier mass concrete heat of hydration is high, the problems such as causing the diseases such as cracks, A kind of pier shaft Temperature Controlling of Mass Concrete construction method is studied, mass concrete aquation is reduced and generates heat, guarantee that bridge pier is applied Working medium amount.
The present invention adopts the following technical scheme:
A kind of pier shaft Temperature Controlling of Mass Concrete construction method, which is characterized in that be by the way that concrete is arranged in hollow pier shaft Temperature control device is realized the different height layer of pier shaft cooling in real time.
The Concrete Temperature Control device includes water supply pumping plant and cooling bay, vibration means for main pipe for supplying water road and several water supply and sewage branch pipes, pier Body bottom is equipped with preformed hole, and vibration means for main pipe for supplying water road passes through preformed hole, and vibration means for main pipe for supplying water road one end connects water supply pumping plant and cooling bay, supply and discharge Water branch pipe is uniformly arranged from the bottom to top and connect respectively with vibration means for main pipe for supplying water road, is equipped in the pier shaft of water supply and sewage branch pipe respective heights Water hole and inlet opening, water supply and sewage branch pipe are connected by circulation with apopore and inlet opening head and the tail.
Water supply and sewage branch pipe is set to pier shaft bottom 20cm or more, and the inlet opening and drainage hole aperture reserved on pier shaft are not less than 5cm。
Spacing between inlet opening and drainage hole is not less than 80cm.
The vibration means for main pipe for supplying water road is connected through a screw thread by several segments steel pipe, and between every section steel pipe and pier shaft at least There is a fixed point.
The present invention in pier shaft reinforcing bar process of binding by being equally spaced cooling tube, and the later period is using water pump supply cooling Water reduces the heat that concrete hydrating generates, avoids concrete internal temperature is excessively high from causing the various diseases of concrete, the construction party Method overcomes the problems such as conventional construction method is difficult to ensure bridge pier construction quality, ensure that high pier heavy wall pier construction process Quality, ensure that construction safety, improve construction efficiency.
Detailed description of the invention
Fig. 1 is pier construction flow chart;
Fig. 2 is cooling tube floor plan;
Fig. 3 is water service plan;
Fig. 4 is water supply, drainpipe side view;
In figure: 2- water supply and sewage branch pipe, 3- vibration means for main pipe for supplying water road, 4- preformed hole, 5- water supply pumping plant and cooling bay.
Specific embodiment
Pier shaft Temperature Controlling of Mass Concrete construction method of the present invention is filled by the way that Concrete Temperature Control is arranged in pier shaft It sets, the different height layer of pier shaft is realized cooling in real time.
The Specific construction process of the temperature control device is as follows:
1) when pier shaft over-form construction, mono- layer of setting cooling tube of 80cm is installed in reinforcing bar process of binding, cooling tube uses wall thickness 2mm, The steel pipe of diameter 35mm is made, and when pier shaft unilateral side thickness is greater than 1m, cooling tube need to be arranged;Cooling tube is apart from pier shaft coagulation Native appearance thickness control be not less than 40cm, cooling tube intake-outlet, after being installed using sealing film sealing, installation guarantee into Water outlet is held out against with pier shaft internal model;
2) more than the 20cm of hollow pier bottom, the supply and discharge water hole that aperture is 5cm is reserved, between water supplying pipe duct and drainage pipeline hole Away from being advisable with 1m;Reserved water supply and sewage preformed hole is managed using 5cmPVC, coxopodite supply and discharge water pipe and water pump are installed after demoulding, installation is vertical Coxopodite supply and discharge water pipe connects bottom two layers cooling tube using water supply and sewage branch pipe, supplies water and realizes to concrete cooling processing;
3) drainage pipeline uses diameter for the steel pipe of 5cm, and cooling tube water supply and sewage branch pipe is arranged in steel pipe interval 80cm, and main pipeline is every Section length is 1.5m, and using being threadedly coupled, pipeline adds in hollow pier inner sidewall using expansion bolt is fixed main pipeline every 1m Gu;According to concreting height, connecting branch after demoulding realizes each layer cooling tube real-time working, guarantees that concrete temperature obtains To control;
4) water supply pumping plant is arranged in bridge pier bottom outside, and drainage collection cooling bay guarantees pressure of supply water, meets each layer cooling tube circulation Water needs, and drainage collection cooling bay realizes return water collection and cooling.
The method of the present invention is for hollow pier, and hollow pier uses construction process when over-form construction as shown in Figure 1.

Claims (5)

1. a kind of pier shaft Temperature Controlling of Mass Concrete construction method, which is characterized in that be by the way that coagulation is arranged in hollow pier shaft Native temperature control device is realized the different height layer of pier shaft cooling in real time.
2. pier shaft Temperature Controlling of Mass Concrete construction method according to claim 1, which is characterized in that the coagulation soil temperature Control device includes water supply pumping plant and cooling bay, vibration means for main pipe for supplying water road and several water supply and sewage branch pipes, and pier shaft bottom is equipped with preformed hole, is supplied water Main pipeline passes through preformed hole, and vibration means for main pipe for supplying water road one end connection water supply pumping plant and cooling bay, water supply and sewage branch pipe are laid from the bottom to top It sets and is connect respectively with vibration means for main pipe for supplying water road, apopore and inlet opening, water supply and sewage are equipped in the pier shaft of water supply and sewage branch pipe respective heights Branch pipe is connected by circulation with apopore and inlet opening head and the tail.
3. pier shaft Temperature Controlling of Mass Concrete construction method according to claim 2, which is characterized in that water supply and sewage branch pipe is set In pier shaft bottom 20cm or more, the inlet opening and drainage hole aperture reserved on pier shaft are not less than 5cm.
4. pier shaft Temperature Controlling of Mass Concrete construction method according to claim 3, which is characterized in that inlet opening and draining Spacing between hole is not less than 80cm.
5. pier shaft Temperature Controlling of Mass Concrete construction method according to claim 4, which is characterized in that the vibration means for main pipe for supplying water Road is connected through a screw thread by several segments steel pipe, and at least one fixed point between every section steel pipe and pier shaft.
CN201811580676.7A 2018-12-24 2018-12-24 A kind of pier shaft Temperature Controlling of Mass Concrete construction method Pending CN109505257A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811580676.7A CN109505257A (en) 2018-12-24 2018-12-24 A kind of pier shaft Temperature Controlling of Mass Concrete construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811580676.7A CN109505257A (en) 2018-12-24 2018-12-24 A kind of pier shaft Temperature Controlling of Mass Concrete construction method

Publications (1)

Publication Number Publication Date
CN109505257A true CN109505257A (en) 2019-03-22

Family

ID=65754320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811580676.7A Pending CN109505257A (en) 2018-12-24 2018-12-24 A kind of pier shaft Temperature Controlling of Mass Concrete construction method

Country Status (1)

Country Link
CN (1) CN109505257A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684762A (en) * 2021-08-17 2021-11-23 中铁九局集团第六工程有限公司 Concrete temperature control device in high pier turnover formwork construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009030246A (en) * 2007-07-24 2009-02-12 Oriental Shiraishi Corp Concrete wet-curing method and curing facility
CN202689564U (en) * 2012-06-28 2013-01-23 中交第二航务工程局有限公司 Hydration heat temperature control device for mass concrete construction
CN103692543A (en) * 2013-12-11 2014-04-02 辽宁科技大学 Closed moisturizing, heating and curing device for realizing super-high early-strength of concrete
CN105803895A (en) * 2016-05-03 2016-07-27 中国京冶工程技术有限公司 System for cooling and thawing frozen airport pavement by utilizing ground source heat pump and construction method
JP6261995B2 (en) * 2014-01-30 2018-01-17 大成建設株式会社 Concrete temperature control method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009030246A (en) * 2007-07-24 2009-02-12 Oriental Shiraishi Corp Concrete wet-curing method and curing facility
CN202689564U (en) * 2012-06-28 2013-01-23 中交第二航务工程局有限公司 Hydration heat temperature control device for mass concrete construction
CN103692543A (en) * 2013-12-11 2014-04-02 辽宁科技大学 Closed moisturizing, heating and curing device for realizing super-high early-strength of concrete
JP6261995B2 (en) * 2014-01-30 2018-01-17 大成建設株式会社 Concrete temperature control method
CN105803895A (en) * 2016-05-03 2016-07-27 中国京冶工程技术有限公司 System for cooling and thawing frozen airport pavement by utilizing ground source heat pump and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈天地: "铁路空心桥墩温度场试验研究", 《中国学位论文全文数据库》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684762A (en) * 2021-08-17 2021-11-23 中铁九局集团第六工程有限公司 Concrete temperature control device in high pier turnover formwork construction

Similar Documents

Publication Publication Date Title
CN201221056Y (en) Concrete bridge pier spray curing means
CN108914965A (en) The continuous construction method of aluminum alloy mould plate for pipe gallery
CN206801065U (en) A kind of side wall concrete automatic maintenance device
CN205999782U (en) A kind of pre-buried closed bridge drainage system
CN105256998B (en) A kind of automatic maintenance method of on-site concrete vertical structure cycling use of water
CN108708264A (en) A kind of multi-stage construction method of Long-Span Concrete Filled Steel Tubular Arch Bridges filling concrete
CN109505257A (en) A kind of pier shaft Temperature Controlling of Mass Concrete construction method
CN103741597B (en) A kind of without transition section concrete bridge expansion joint installation and mounting method thereof
CN114736036A (en) Large-volume ultra-high-performance concrete thermal curing system and thermal curing process
CN209779452U (en) Pier shaft bulky concrete control by temperature change construction equipment
CN105178256B (en) One kind is used for the deep nonmetallic horizontal slip-form system of narrow gutter wall continuous placing
CN102619333B (en) Construction method of large-section steel pipe concrete column
CN205332627U (en) A cooling system for construction of bulky concrete structure
CN203210505U (en) Automatic circulating water spray maintaining device of precast concrete beam
CN102995613B (en) Connection method and structure for casting wall body and plate girder of powerhouse of hydropower station by stages
CN104453236A (en) Circulating water natural cooling system and method for controlling mass concrete cracks
CN104963294B (en) A kind of railway Thin-wall Hollow Pier circulation drip irrigation curing system
CN107245983A (en) Gutter wall continuous placing horizontal slip-form device
CN207974022U (en) Be conducive to the template of bridge pier concrete curing
CN204095109U (en) Large-scale PPR pipe continous way cooling structure
CN210229214U (en) Annular water tank for sewage treatment
CN106223286A (en) A kind of irrigation and drainage system in modern farmland
CN209741671U (en) Large-volume concrete temperature control system for continuous beam 0# block bottom web
CN1851165B (en) Pipeline crossing method for water supply and sewerage pipeline and its structure
CN204402049U (en) A kind of circulating water natural cooling system controlling Volume Concrete Cracks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190322