CN109494760A - A kind of route of 750kV series compensation power distribution equipment draws binding structure - Google Patents

A kind of route of 750kV series compensation power distribution equipment draws binding structure Download PDF

Info

Publication number
CN109494760A
CN109494760A CN201811646310.5A CN201811646310A CN109494760A CN 109494760 A CN109494760 A CN 109494760A CN 201811646310 A CN201811646310 A CN 201811646310A CN 109494760 A CN109494760 A CN 109494760A
Authority
CN
China
Prior art keywords
string
gil
downlead
mends
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811646310.5A
Other languages
Chinese (zh)
Other versions
CN109494760B (en
Inventor
张虎
项力恒
康鹏
张益田
申卫华
宋晓宁
韩志萍
毛生海
贺瑞
曹鑫
刘然
张高飞
周天春
康旭伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
State Grid Qinghai Electric Power Co Ltd
Electric Power Planning and Engineering Institute Co Ltd
Original Assignee
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
State Grid Qinghai Electric Power Co Ltd
Electric Power Planning and Engineering Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Electric Power Design Institute of China Power Engineering Consulting Group, State Grid Qinghai Electric Power Co Ltd, Electric Power Planning and Engineering Institute Co Ltd filed Critical Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN201811646310.5A priority Critical patent/CN109494760B/en
Publication of CN109494760A publication Critical patent/CN109494760A/en
Application granted granted Critical
Publication of CN109494760B publication Critical patent/CN109494760B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • H02J3/20Arrangements for adjusting, eliminating or compensating reactive power in networks in long overhead lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Abstract

The invention discloses a kind of routes of 750kV series compensation power distribution equipment to draw binding structure, the first downlead and the second downlead including being separately positioned on a base angle tower two sides;First downlead and the second downlead cover thread casing with the line side GIL string respectively and the line side GIL string is mended outlet casing tube and connect;String recruit electric installation be separately connected GIL string mend side string cover thread casing and GIL string mend side string mend outlet casing tube;String recruits the side that a base angle tower transmission line of electricity is arranged in electric installation;The string of enlarging recruits electric installation and separates with existing angle tower, and occupied area is small, reduces land expropriation cost, economizes the land resource;Not by charging operation line influence when construction, can substantially compress since enlarging string recruits the line outage time caused by electric installation;Wiring is succinct, takes full advantage of the angle tower on former working line, and string recruits extraction no setting is required the special outlet structure of electric installation, greatly reduces engineering steel amount, has saved the investment of engineering.

Description

A kind of route of 750kV series compensation power distribution equipment draws binding structure
Technical field
The invention belongs to substation, strings to mend station technical field, and in particular to a kind of line of 750kV series compensation power distribution equipment Pass binding structure.
Background technique
Along with the fast development of Chinese national economy, the power industry in China is also rapidly developed, and domestic electrical rack is built If quickly.Ended for the end of the year 2013,75, the Northwest's the whole network 750kV route, total length is about 12731.235km, 750kV power transformation Institute 26, main transformer capacity 65000MVA.The first passage that current country's 750kV power grid is sent out in 750kV exchange super-pressure Xinjiang AC power transmission and transformation project (Jinchang~Jiuquan~Anxi transmission line of electricity) and the second channel sent out of exchange super-pressure Xinjiang AC power transmission and transformation project (Qaidam~Hai Xi~Sun-Moon Mountain transmission line of electricity) has 750kV series compensation with Denso in preconsolidation stress It sets.
In recent years, the wind-powered electricity generation, photovoltaic of the Northwest are quickly grown, and online demand increasingly increases, so that existing 750kV is electric The transmission capacity and level of stability of net receive serious test.To solve this problem, 750kV route in part need to install series connection Power distribution equipment is compensated, according to system situation, series compensation power distribution equipment can build or be separately provided series compensation station jointly with substation; The arrangement that traditional gate framework string of other domestic voltage class recruits electric installation is applied to enlarging series compensation with Denso Not only land requisition index is big on the route set, but also requires the power off time of former working line long in enlarging, is not able to satisfy existing The production run requirement of route.It is connect therefore, it is necessary to which the arrangement and route when extending to 750kV series compensation power distribution equipment are drawn Design scheme carries out improvement design, and the construction, investment and operation that achievement recruits electric installation extension project to 750kV string will tools It is of great importance.
Summary of the invention
To solve the above problems, the route that the present invention provides a kind of 750kV series compensation power distribution equipment draws binding structure, can have Effect saves floor occupying area, construction investment, also solves the problem that and needs former operation line when recruiting electric installation scheme using traditional enlarging string The problem of road has a power failure for a long time.
In order to achieve the above objectives, the technical solution adopted by the present invention is that: a kind of route of 750kV series compensation power distribution equipment Draw binding structure, the first downlead and the second downlead, the line side GIL string including being separately positioned on a base angle tower two sides cover Thread casing, GIL string mend side string cover thread casing, GIL string mend side string mend outlet casing tube, the line side GIL string mend outlet casing tube and String recruits electric installation,
First downlead covers thread casing with the line side GIL string and connect;Second downlead and the line side GIL string mend lead collar Pipe connection;The line side GIL string covers thread casing connection GIL string benefit side string and covers thread casing, and GIL string is mended side string benefit outlet casing tube and connected It connects the line side GIL string and mends outlet casing tube;String recruit electric installation be separately connected GIL string mend side string cover thread casing and GIL string mend side String mends outlet casing tube;String recruits the side that a base angle tower transmission line of electricity is arranged in electric installation.
The line side GIL string cover thread casing and GIL string mend side string cover between thread casing by GIL string mend side go here and there cover line Pipeline connection;
GIL string mends side string benefit access duct and is provided with more piece.
GIL string benefit side string mends outlet casing tube and the line side GIL goes here and there to mend and mends side string benefit outlet by GIL string between outlet casing tube Pipeline connection.
GIL string mends side string benefit outlet pipeline and is provided with more piece.
The distance between first downlead and the second downlead are not less than 50 meters.
The lower end of first downlead and the second downlead is not less than 13m at a distance from ground.
Compared with prior art, the present invention at least has the advantages that the present invention is led from the route of angle tower two sides Line makees downlead to GIL casing and traditional gate framework arrangement respectively and compares and substantially compression strings can recruit electric installation area Domain occupied area reduces land expropriation cost, economizes the land resource;String is recruited electric installation to draw by GIL pipeline, string recruits Denso Setting may be arranged on the outside of former route, therefore when enlarging string recruits electric installation construction, not interfere with the route of former operation;Wait go here and there After the completion of recruiting electric installation construction, the route of angle tower two sides drawn using the line maintenance time and is connected to GIL casing and can restore The normal production of route;More traditional string recruits electric installation arrangement and can substantially compress to be drawn since enlarging string recruits electric installation The line outage time risen;Using GIL pipe arrangement, in Practical Project, string can be arranged according to system position and site contour Electric installation is recruited, can be built jointly with original substation, string can also be separately provided and mend station, flexible arrangement is high;Make full use of former fortune Angle tower in row line, string recruit extraction no setting is required the special outlet structure of electric installation, greatly reduce engineering use Steel amount has saved the construction investment of engineering.
Detailed description of the invention
Fig. 1 is schematic top plan view of the present invention.
Fig. 2 is angle tower wiring sectional schematic diagram.
In attached drawing, mono- base angle tower of 1-, 2- wire jumper, 3- string benefit station inlet wire, the first downlead of 4-, the line side 5-GIL string benefit Entrance bushing, 6-GIL string mend side string and mend access duct, and 7-GIL string mends side string and covers thread casing, and 8- string recruits electric installation, 9-GIL String mends side string and mends outlet casing tube, and 10-GIL string mends side string and mends outlet pipeline, and the line side 11-GIL string mends outlet casing tube, 12- second Downlead, 13- string mend station outlet.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, rather than whole embodiments, is based on Embodiment in the present invention, those of ordinary skill in the art just without making creative work it is obtained it is all its His embodiment, shall fall within the protection scope of the present invention.
Applicant recruits in an enlarging 750kV string and devises new route in electric installation engineering and draw binding structure, the scheme Using a base angle tower of original working line, generally the first Ji Ta of substation's outlet, 1 two sides of a base angle tower are unlocked Wire jumper 2 is connected to lower section string from the first downlead 4 of route of 1 two sides of a base angle tower and the second downlead 12 respectively and recruits On the GIL casing that electric installation 8 connects, realize that string recruits the connection of electric installation Yu original working line by GIL casing;It is described GIL casing includes that the line side GIL string covers thread casing 5, GIL string benefit side string covers thread casing 7, GIL string mends side string benefit lead collar Pipe 9 and the line side GIL string mend outlet casing tube 11.
The string of enlarging recruits electric installation 8 and arranges near angle tower nearby, can build jointly with former substation, string can also be separately provided Station is mended, the layout pattern that string recruits electric installation 8 is unrestricted;It includes string portion platform, bypass open circuit that the string of enlarging, which recruits electric installation, Device, ancillary equipment, series connection disconnecting switch, bypass isolating switch, arrester and voltage transformer.
It eliminates traditional string and recruits the gate framework that the outlet of electric installation 8 need to be arranged, string recruits the inlet-outlet line of electric installation 8 Directly draw the underface for being connected to former working line using GIL pipeline, line voltage mutual inductor and arrester are arranged in string nearby and mend Power distribution equipment region;The GIL pipeline include GIL string mend side string mend access duct 6 and GIL string mend side string mend outlet pipeline 10.
A kind of route of 750kV series compensation power distribution equipment draws binding structure, including is separately positioned on 1 two sides of a base angle tower The first downlead 4 and the second downlead 12, the line side GIL string cover thread casing 5, GIL string mend side string cover thread casing 7, GIL String benefit side string mends outlet casing tube 9, the line side GIL string is mended outlet casing tube 11 and gone here and there and recruits electric installation 8, the first downlead 4 and GIL Line side string covers the connection of thread casing 5;Second downlead 12 is mended outlet casing tube 11 with the line side GIL string and is connect;The line side GIL string It covers the connection GIL string benefit of thread casing 5 side string and covers thread casing 7, GIL string benefit side string benefit outlet casing tube 9 connects the line side GIL string benefit Outlet casing tube 11;String recruit electric installation 8 be separately connected GIL string mend side string cover thread casing 7 and GIL string mend side string mend outlet casing tube 9;String recruits the side that 1 transmission line of electricity of a base angle tower is arranged in electric installation 8;First downlead 4 connection string mends station inlet wire 3, the Two downleads 12 connection string mends station outlet 13.
The line side GIL string cover thread casing 5 and GIL string mend side string cover between thread casing 7 by GIL string mend side go here and there cover Spool road 6 connects;GIL string mends side string benefit access duct 6 and is provided with more piece.
GIL string benefit side string mends outlet casing tube 9 and the line side GIL goes here and there to mend and mends side string benefit by GIL string between outlet casing tube 11 Outlet pipeline 10 connects;GIL string mends side string benefit outlet pipeline 10 and is provided with more piece.
As shown in Fig. 2, the distance between the first downlead 4 and the second downlead 12 are not less than 50 meters;First downlead, 4 He The lower end of second downlead 12 is not less than 13m at a distance from ground;String recruits the level between electric installation and the first downlead 4 Distance can be adjusted flexibly according to concrete engineering demand.
String recruit series compensation platform in electric installation 8, bypass breaker, ancillary equipment, series connection disconnecting switch, bypass every Leave the side that pass, arrester and voltage transformer are arranged at angle tower.
As shown in Figure 1, The present invention gives the embodiment that the route that the string of enlarging 750kV recruits electric installation draws binding structure, It can be seen from the figure that embodiment is to have extended two and return back out line string to recruit electric installation, this enlarging string recruits electric installation 8 and has transported former Draw at one base angle tower 1 of row substation outlet and connects and substation builds jointly;The 750kV string of enlarging recruits electric installation and is arranged in out The side of line angle tower route, be close to it is former run substation, not with former outlet crossing elimination, string recruits the disengaging of electric installation 8 Line draws the underface for being connected to 1 two sides of a base angle tower by 750kV GIL pipeline used for transmission line;The string of enlarging recruits electric installation Shi Yuyuan route distance construct farther out, does not influence the normal operation production of former route, the outlet including GIL pipeline immediately below route Casing can also charge installation after construction organization;After the installation is completed to all equipment, angle tower connection is unlocked in line outage Lead is distinguished to GIL casing in two sides after the wire jumper of two sides route, can restore the operation of former route.
By above-mentioned analysis it can be concluded that, using at route angle tower GIL pipeline draw the string connect to recruit electric installation novel Structure occupied area is small, enlarging when do not influence former route operation, power off time is greatly decreased, more coordinates with route cooperation, runs Maintenance is more convenient and arranges more flexible, can apply in engineering;It and is the power distribution equipment design of enlarging series compensation power distribution equipment Arrangement provides a new optimal solution.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (7)

1. a kind of route of 750kV series compensation power distribution equipment draws binding structure, which is characterized in that turn including being separately positioned on a base First downlead (4) and the second downlead (12), the line side GIL string of turret (1) two sides cover thread casing (5), GIL string mends side String covers thread casing (7), GIL string mends side string benefit outlet casing tube (9), the line side GIL string mends outlet casing tube (11) and string recruits Electric installation (8),
First downlead (4) covers thread casing (5) with the line side GIL string and connect;Second downlead (12) and the line side GIL string are mended Outlet casing tube (11) connection;The line side GIL string covers thread casing (5) connection GIL string benefit side string and covers thread casing (7), and GIL string is mended Side string mends outlet casing tube (9) connection line side GIL string and mends outlet casing tube (11);String recruits electric installation (8) and is separately connected GIL string benefit Side string covers thread casing (7) and GIL string mends side string and mends outlet casing tube (9);String recruits electric installation (8) and is arranged in a base angle tower (1) side of transmission line of electricity.
2. the route of 750kV series compensation power distribution equipment according to claim 1 draws binding structure, which is characterized in that GIL line Trackside string covers thread casing (5) and GIL string benefit side string covers to go here and there between thread casing (7) by GIL and mends side string benefit access duct (6) Connection.
3. the route of 750kV series compensation power distribution equipment according to claim 2 draws binding structure, which is characterized in that GIL string It mends side string benefit access duct (6) and is provided with more piece.
4. the route of 750kV series compensation power distribution equipment according to claim 1 draws binding structure, which is characterized in that GIL string Benefit side string mends outlet casing tube (9) and the line side GIL goes here and there to mend and mends side string benefit outlet pipeline by GIL string between outlet casing tube (11) (10) it connects.
5. the route of 750kV series compensation power distribution equipment according to claim 4 draws binding structure, which is characterized in that GIL string It mends side string benefit outlet pipeline (10) and is provided with more piece.
6. the route of 750kV series compensation power distribution equipment according to claim 1 draws binding structure, which is characterized in that first The distance between downlead (4) and the second downlead (12) are not less than 50 meters.
7. the route of 750kV series compensation power distribution equipment according to claim 1 draws binding structure, which is characterized in that first The lower end of downlead (4) and the second downlead (12) is not less than 13m at a distance from ground.
CN201811646310.5A 2018-12-29 2018-12-29 Line guiding structure of 750kV series compensation power distribution device Active CN109494760B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811646310.5A CN109494760B (en) 2018-12-29 2018-12-29 Line guiding structure of 750kV series compensation power distribution device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811646310.5A CN109494760B (en) 2018-12-29 2018-12-29 Line guiding structure of 750kV series compensation power distribution device

Publications (2)

Publication Number Publication Date
CN109494760A true CN109494760A (en) 2019-03-19
CN109494760B CN109494760B (en) 2024-03-26

Family

ID=65712164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811646310.5A Active CN109494760B (en) 2018-12-29 2018-12-29 Line guiding structure of 750kV series compensation power distribution device

Country Status (1)

Country Link
CN (1) CN109494760B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201985528U (en) * 2010-11-16 2011-09-21 中国电力工程顾问集团西北电力设计院 Series compensation system adopting line iron towers
CN203339628U (en) * 2013-04-25 2013-12-11 中国水电顾问集团华东勘测设计研究院 500kV wire outlet structure suitable for hydropower stations
CN103887799A (en) * 2014-02-25 2014-06-25 国家电网公司 Series compensation system
CN204067880U (en) * 2014-08-01 2014-12-31 国家电网公司 A kind of power distribution equipment arrangement back-to-back
CN104882881A (en) * 2015-05-27 2015-09-02 中国能源建设集团浙江省电力设计院有限公司 Extra-high voltage series compensation system
CN207518166U (en) * 2017-12-07 2018-06-19 中国电力工程顾问集团东北电力设计院有限公司 Power plant 1000kV outlet grade transmitting system mounting structures
CN209217728U (en) * 2018-12-29 2019-08-06 中国电力工程顾问集团西北电力设计院有限公司 A kind of route of 750kV series compensation power distribution equipment draws binding structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201985528U (en) * 2010-11-16 2011-09-21 中国电力工程顾问集团西北电力设计院 Series compensation system adopting line iron towers
CN203339628U (en) * 2013-04-25 2013-12-11 中国水电顾问集团华东勘测设计研究院 500kV wire outlet structure suitable for hydropower stations
CN103887799A (en) * 2014-02-25 2014-06-25 国家电网公司 Series compensation system
CN204067880U (en) * 2014-08-01 2014-12-31 国家电网公司 A kind of power distribution equipment arrangement back-to-back
CN104882881A (en) * 2015-05-27 2015-09-02 中国能源建设集团浙江省电力设计院有限公司 Extra-high voltage series compensation system
CN207518166U (en) * 2017-12-07 2018-06-19 中国电力工程顾问集团东北电力设计院有限公司 Power plant 1000kV outlet grade transmitting system mounting structures
CN209217728U (en) * 2018-12-29 2019-08-06 中国电力工程顾问集团西北电力设计院有限公司 A kind of route of 750kV series compensation power distribution equipment draws binding structure

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
张健毅;刘涛;郭果;裴东良;程朝磊;: "超(特)高压串联补偿控制保护系统与线路保护接口方案", 中国电力, no. 07 *
张理;俞斌;吴晓鸣;李孝尊;袁亚东;: "变压器"同向分层立体化"进线布置优化", 电气应用, no. 01 *
张迎高;谢洁;: "价值工程在500kV串补站方案优化中的应用", 电力建设, no. 03 *
石铃林;: "串联补偿装置在500kV输电线路上的应用分析", 职业圈, no. 08 *
赵伟杰;夏洋;: "220 kV串联补偿装置在盈余电力送出中的应用", 云南电力技术, no. 05 *

Also Published As

Publication number Publication date
CN109494760B (en) 2024-03-26

Similar Documents

Publication Publication Date Title
CN103020761B (en) A kind of power distribution network repair method based on automatic division unit and evaluation
CN101769980A (en) Testing method simulating power transmission debugging
CN209217728U (en) A kind of route of 750kV series compensation power distribution equipment draws binding structure
CN104569686B (en) A kind of intelligent substation and its intelligent secondary device test system
CN109494760A (en) A kind of route of 750kV series compensation power distribution equipment draws binding structure
CN206272192U (en) A kind of new 330kV power distribution equipments in high altitude localities
CN205283114U (en) Stray current suppression device that power supply system revealed in return circuit among subway tunnel of city
CN108152779A (en) Electronic current mutual inductor check system and method
CN208753817U (en) A kind of 750kV power distribution equipment arragement construction
CN201985528U (en) Series compensation system adopting line iron towers
CN103066502A (en) Geographic information system (GIS) power distribution device of extra-high voltage transformer substation
CN106129991A (en) A kind of high-speed railway Special single-core cable grounding technical scheme
CN101546889B (en) Method for replacing main transformer of power system
CN102664407A (en) Method and system for designing boosting transformer of new energy electric field
CN203103774U (en) Geographic information system (GIS) power distribution device of extra-high voltage transformer substation
CN204258114U (en) A kind of 500kV substation equipment arrangement
CN210074318U (en) Alternating voltage transition terminal device
CN207946512U (en) Electronic current mutual inductor check system
CN105261986A (en) Optimization structure of 220kV substation
CN104251062B (en) The optimum organization structure of thermal power plant's steam turbine building, cooling tower and power distribution equipment
CN209375009U (en) A kind of 750kV GIS breaker double-row type arragement construction
CN201846015U (en) GIS (global information system) power distribution unit adopting one and half breaker connection
CN203310928U (en) Transformer bushing ct characteristic test device
CN204112791U (en) The optimum organization structure of thermal power plant's steam turbine building, cooling tower and power distribution equipment
CN204834243U (en) Adopt parallel reactor of glass steel insulator post

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant