CN209375009U - A kind of 750kV GIS breaker double-row type arragement construction - Google Patents

A kind of 750kV GIS breaker double-row type arragement construction Download PDF

Info

Publication number
CN209375009U
CN209375009U CN201920303239.4U CN201920303239U CN209375009U CN 209375009 U CN209375009 U CN 209375009U CN 201920303239 U CN201920303239 U CN 201920303239U CN 209375009 U CN209375009 U CN 209375009U
Authority
CN
China
Prior art keywords
gis
bus
outlet
column
breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920303239.4U
Other languages
Chinese (zh)
Inventor
韩志萍
王黎彦
康鹏
申卫华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN201920303239.4U priority Critical patent/CN209375009U/en
Application granted granted Critical
Publication of CN209375009U publication Critical patent/CN209375009U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gas-Insulated Switchgears (AREA)

Abstract

A kind of 750kV GIS breaker double-row type arragement construction, GIS breaker including two column arrangements, installation and maintenance access is arranged in two the intermediate of column GIS breaker, a component branch bus is respectively arranged on the outside of two column GIS breakers, one group of outlet structure is respectively arranged on the outside of two component branch bus, two column GIS breakers are connected from different buses by across road GIL pipeline bus on the ground.The outlet structure includes the outlet casing tube being successively connected outward with main bus-bar, voltage transformer and outlet arrester.Installation and maintenance access is arranged among two column GIS breakers in the utility model, is connect breaker with two column main bus-bars using across the road GIL pipeline bus in ground, reduces main bus-bar length, installation, maintenance are convenient, reduce project cost, reliable for operation.

Description

A kind of 750kV GIS breaker double-row type arragement construction
Technical field
The utility model belongs to ehv power transmission field, and in particular to a kind of 750kV GIS breaker double-row type arrangement Structure.
Background technique
With the fast development of power grid construction, the scale of Ultra-high Voltage Substations engineering is increasing, and the Northwest is due to solid The special natural environmental conditions such as some height above sea levels, the temperature difference are big, ultraviolet light is strong, using ordinary distribution device arrangement it is insufficient increasingly It is prominent.Land reserved resources wretched insufficiency, the Frequent Troubles influenced in substation operation by particular surroundings improve land resource benefit It is the project that power grid construction must face with rate, reduction project cost, guarantee substation operation safety etc..With regard to 750kV substation Power distribution equipment design for, 750kV GIS breaker is one of common equipment of 750kV power distribution equipment, conventional arrangement side Formula is "-" type, although as general one of design scheme, in extensive substation, because it takes up a large area, engineering Frequent Troubles affected by environment after cost is high, equipment investment is run, influence the safe and stable operation of power grid.
Utility model content
The purpose of this utility model is that being directed to above-mentioned the problems of the prior art, a kind of 750kV GIS breaker is provided Installation and maintenance access is arranged among two column GIS breakers, using across the road GIL pipeline bus in ground in double-row type arragement construction Breaker is connect with two column main bus-bars, reduces main bus-bar length, installation, maintenance are convenient, reduce project cost, operation can It leans on.
To achieve the goals above, the technical solution adopted in the utility model are as follows:
Installation and maintenance access is arranged in GIS breaker including two column arrangements, the intermediate of two column GIS breakers, and two column GIS are disconnected It is respectively arranged a component branch bus on the outside of the device of road, one group of outlet structure, two column GIS are respectively arranged on the outside of two component branch bus Breaker is connected from different buses by across road GIL pipeline bus on the ground.
The two component branch bus are I branch bar of 750kV outlet and II branch bar of 750kV outlet, ground overpass A column GIS breaker can be set again on the route of road GIL pipeline bus connection I branch bar of 750kV outlet.
The outlet structure includes that the outlet casing tube, voltage transformer and outlet being successively connected outward with main bus-bar are taken shelter from the thunder Device.
Outlet casing tube, voltage transformer and the outlet arrester is installed by electric power pylon.
The two column GIS breakers are separately connected 750kV three-phase bus, GIS breaker, two component branch bus, ground Across road GIL pipeline bus, outlet casing tube, voltage transformer and outlet arrester are all made of 750kV voltage class.
The installation and maintenance access arranges the lower section of across road GIL pipeline bus on the ground, and installation and maintenance access can lead to Cross crane.
Compared with prior art, the utility model has following the utility model has the advantages that reducing the lateral length of main bus-bar, 750kV GIS main bus-bar cost is higher, and about 20,000 yuan/single-phase rice, a complete string saves bus about 65m, saving construction cost 130 Wan Yuan.Long-distance pipe bus is overcome because of the failure problems such as frequent gas leakage caused by unevenness of expanding with heat and contract with cold, usually maintenance is primary main Interruption cost caused by bus is about 12,000,000 yuan.The lateral dimension of power distribution equipment is smaller, can be good at and main transformer pressure Device and other power distribution equipment cooperations, reduce lateral dimension 35%.Installation and maintenance access is arranged among two column breakers, Crane can drive directly into the channel, without turn, can directly lift by crane breaker, and crane tonnage is small, not need across bus, Lifting is convenient, has saved a large amount of installation and repairing times, after tested, can save installation, repair time 25%.The utility model is first It is secondary that reference is provided for successive projects using across the road scheme in GIL pipeline bus ground, it is reliable for operation, there is long-range popularization Meaning.
Detailed description of the invention
The complete string wiring schematic diagram of Fig. 1 the utility model;
The complete string floor map of Fig. 2 the utility model;
The complete string sectional schematic diagram of Fig. 3 the utility model;
In figure: 1-GIS breaker;2-750kV bus I;3-750kV bus II;Across the road GIL pipeline bus in the ground 4-; I branch bar of 5-750kV outlet;II branch bar of 6-750kV outlet;7- voltage transformer;8- outlet arrester;9- lead collar Pipe.
Specific embodiment
The following describes the utility model in further detail with reference to the accompanying drawings.
Referring to Fig. 1-3, the utility model passes through breaker apparatus arrangement side in optimization routine 750kV GIS power distribution equipment Formula reduces construction investment, reduces occupied area, eliminates the hidden trouble, ensure that the operation of electricity net safety stable.
The utility model includes the GIS breaker 1 of two column arrangements in structure, and two column GIS breakers 1 are separately connected Installation and maintenance access, two column GIS breakers 1 are arranged in 750kV bus I 2 and 750kV bus II 3, the intermediate of two column GIS breakers 1 Outside be respectively arranged I branch bar 5 of 750kV outlet and II branch bar 6 of 750kV outlet, the outside point of two component branch bus Do not arrange one group of outlet structure, outlet structure include the outlet casing tube 9 being successively connected outward with main bus-bar, voltage transformer 7 and Outlet arrester 8.GIS breaker 1, two component branch bus, on the ground across road GIL pipeline bus 4, outlet casing tube 9, mutual induction of voltage Device 7 and outlet arrester 8 are all made of 750kV voltage class.Two column GIS breakers 1 pass through from different buses on the ground across road GIL pipeline bus 4 connects.Installation and maintenance access arranges the lower section of across road GIL pipeline bus 4 on the ground, installation and maintenance access Crane can be passed through.Power distribution equipment lateral dimension is smaller, can be very good with main transformer and other power distribution equipment area cooperations, hang Vehicle can drive directly into the channel, without turning round, that is, be convenient to the GIS devices such as installation and repairing breaker.
The utility model installation and maintenance access is arranged among two column breakers, and small tonnage crane may be selected and can directly rise Two sides breaker is hung, the conventional medium-and-large-sized crane of "-" type scheme is avoided and repeatedly moves backward that turn to bring inconvenient, be more advantageous to peace Dress maintenance, reduces GIS breaker installation period, and reduce project cost;For the first time using across the road side in GIL pipeline bus ground Case, convenient for observation, maintenance, maintenance.The utility model reduces 750kV main bus-bar lateral length, solves Special environment The too long frequent principal fault problem caused by unevenness of expanding with heat and contract with cold of bus;It is more to can be avoided the conventional medium-and-large-sized crane of "-" type scheme Secondary reversing turns to bring inconvenience, is more advantageous to installation and repairing, reduces GIS breaker installation period, and reduce project cost.
The utility model can effectively solve the Northwest due to height above sea level, the special environment conditions such as the temperature difference is big, ultraviolet light is strong It causes long-distance pipe bus because of failure problems such as gas leakage frequent caused by expanding with heat and contract with cold, saves land occupation and investment, application prospect It is considerable.

Claims (6)

1. a kind of 750kV GIS breaker double-row type arragement construction, it is characterised in that:
Installation and maintenance access, two column GIS are arranged in GIS breaker (1) including two column arrangements, the intermediate of two column GIS breaker (1) It is respectively arranged a component branch bus on the outside of breaker (1), is respectively arranged one group of outlet structure on the outside of two component branch bus, two It arranges GIS breaker (1) and is connected from different buses by across road GIL pipeline bus (4) on the ground.
2. 750kV GIS breaker double-row type arragement construction according to claim 1, it is characterised in that: described two groups Branch bar is I branch bar of 750kV outlet (5) and II branch bar of 750kV outlet (6), on the ground across road GIL pipeline bus (4) a column GIS breaker (1) can be arranged on the route of I branch bar of 750kV outlet (5) again by connecting.
3. 750kV GIS breaker double-row type arragement construction according to claim 1, it is characterised in that: the outlet Framework includes the outlet casing tube (9), voltage transformer (7) and outlet arrester (8) being successively connected outward with main bus-bar.
4. 750kV GIS breaker double-row type arragement construction according to claim 3, it is characterised in that: the outlet Casing (9), voltage transformer (7) and outlet arrester (8) are installed by electric power pylon.
5. 750kV GIS breaker double-row type arragement construction according to claim 3, it is characterised in that: two column GIS breaker (1) is separately connected 750kV three-phase bus, GIS breaker (1), two component branch bus, on the ground across road GIL pipeline Bus (4), outlet casing tube (9), voltage transformer (7) and outlet arrester (8) are all made of 750kV voltage class.
6. 750kV GIS breaker double-row type arragement construction according to claim 1, it is characterised in that: the installation Access path arranges the lower section of across road GIL pipeline bus (4) on the ground, and installation and maintenance access can pass through crane.
CN201920303239.4U 2019-03-11 2019-03-11 A kind of 750kV GIS breaker double-row type arragement construction Active CN209375009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920303239.4U CN209375009U (en) 2019-03-11 2019-03-11 A kind of 750kV GIS breaker double-row type arragement construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920303239.4U CN209375009U (en) 2019-03-11 2019-03-11 A kind of 750kV GIS breaker double-row type arragement construction

Publications (1)

Publication Number Publication Date
CN209375009U true CN209375009U (en) 2019-09-10

Family

ID=67824028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920303239.4U Active CN209375009U (en) 2019-03-11 2019-03-11 A kind of 750kV GIS breaker double-row type arragement construction

Country Status (1)

Country Link
CN (1) CN209375009U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109728535A (en) * 2019-03-11 2019-05-07 中国电力工程顾问集团西北电力设计院有限公司 A kind of ehv power transmission GIS breaker double-row type arragement construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109728535A (en) * 2019-03-11 2019-05-07 中国电力工程顾问集团西北电力设计院有限公司 A kind of ehv power transmission GIS breaker double-row type arragement construction
CN109728535B (en) * 2019-03-11 2024-05-14 中国电力工程顾问集团西北电力设计院有限公司 Double-row arrangement structure of ultra-high voltage power transmission and transformation GIS circuit breaker

Similar Documents

Publication Publication Date Title
CN102938560A (en) Direct-current converter station based on bipolar structure
CN204386221U (en) A kind of three layers of association type outlet framework for the outdoor GIS transformer station of 220kV
CN105262069B (en) Hvdc transmission line longitudinal protection method based on failure DC component
CN202978006U (en) Ultrahigh voltage intelligent substation medium-voltage side HGIS power distribution device
CN104124916A (en) Power grid fault simulation test system movement detection device for high-altitude photovoltaic power station
CN204349309U (en) Photovoltaic inversion boosting integrated box type transformer station
CN209375009U (en) A kind of 750kV GIS breaker double-row type arragement construction
CN204835226U (en) Line arrangement structure of two complete clusters is joined in marriage into in wiring of one and half circuit breakers
CN104821490A (en) 500 kV HGIS power distribution device arrangement structure
CN205283114U (en) Stray current suppression device that power supply system revealed in return circuit among subway tunnel of city
CN209200948U (en) Valve hall and converter station
CN204706781U (en) A kind of 500 kilovolts of HGIS controller switching equipments, controller switching equipment group and power distribution equipments
CN106129991A (en) A kind of high-speed railway Special single-core cable grounding technical scheme
CN201985528U (en) Series compensation system adopting line iron towers
CN203367775U (en) Duplicate-busbar disconnecting switch segmented electric main connection wire
CN103066502A (en) Geographic information system (GIS) power distribution device of extra-high voltage transformer substation
Jian et al. Application of solar PV grid-connected power generation system in Shanghai Rail Transit
CN109728535A (en) A kind of ehv power transmission GIS breaker double-row type arragement construction
CN201946983U (en) Series compensating system adopting gantry framework
CN209544834U (en) 220kV double space modular HGIS electric wiring device
CN109586593B (en) Valve hall and converter station
CN209217728U (en) A kind of route of 750kV series compensation power distribution equipment draws binding structure
CN204011013U (en) The sealing syndeton of a kind of transformer, high-tension cable cable end and lightning arrester
CN203103774U (en) Geographic information system (GIS) power distribution device of extra-high voltage transformer substation
CN207518166U (en) Power plant 1000kV outlet grade transmitting system mounting structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant