CN209217728U - A kind of route of 750kV series compensation power distribution equipment draws binding structure - Google Patents

A kind of route of 750kV series compensation power distribution equipment draws binding structure Download PDF

Info

Publication number
CN209217728U
CN209217728U CN201822259798.8U CN201822259798U CN209217728U CN 209217728 U CN209217728 U CN 209217728U CN 201822259798 U CN201822259798 U CN 201822259798U CN 209217728 U CN209217728 U CN 209217728U
Authority
CN
China
Prior art keywords
string
gil
downlead
mends
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822259798.8U
Other languages
Chinese (zh)
Inventor
张虎
项力恒
康鹏
张益田
申卫华
宋晓宁
韩志萍
毛生海
贺瑞
曹鑫
刘然
张高飞
周天春
康旭伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
State Grid Qinghai Electric Power Co Ltd
Electric Power Planning and Engineering Institute Co Ltd
Original Assignee
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
State Grid Qinghai Electric Power Co Ltd
Electric Power Planning and Engineering Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Electric Power Design Institute of China Power Engineering Consulting Group, State Grid Qinghai Electric Power Co Ltd, Electric Power Planning and Engineering Institute Co Ltd filed Critical Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN201822259798.8U priority Critical patent/CN209217728U/en
Application granted granted Critical
Publication of CN209217728U publication Critical patent/CN209217728U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Organic Insulating Materials (AREA)

Abstract

The utility model discloses a kind of routes of 750kV series compensation power distribution equipment to draw binding structure, the first downlead and the second downlead including being separately positioned on a base angle tower two sides;First downlead and the second downlead cover thread casing with the line side GIL string respectively and the line side GIL string is mended outlet casing tube and connect;String recruit electric installation be separately connected GIL string mend side string cover thread casing and GIL string mend side string mend outlet casing tube;String recruits the side that a base angle tower transmission line of electricity is arranged in electric installation;The string of enlarging recruits electric installation and separates with existing angle tower, and occupied area is small, reduces land expropriation cost, economizes the land resource;Not by charging operation line influence when construction, can substantially compress since enlarging string recruits the line outage time caused by electric installation;Wiring is succinct, takes full advantage of the angle tower on former working line, and string recruits extraction no setting is required the special outlet structure of electric installation, greatly reduces engineering steel amount, has saved the investment of engineering.

Description

A kind of route of 750kV series compensation power distribution equipment draws binding structure
Technical field
The utility model belongs to substation, string mends station technical field, and in particular to a kind of 750kV series compensation power distribution equipment Route draw binding structure.
Background technique
Along with the fast development of Chinese national economy, the power industry in China is also rapidly developed, and domestic electrical rack is built If quickly.Ended for the end of the year 2013,75, the Northwest's the whole network 750kV route, total length is about 12731.235km, 750kV power transformation Institute 26, main transformer capacity 65000MVA.The first passage that current country's 750kV power grid is sent out in 750kV exchange super-pressure Xinjiang AC power transmission and transformation project (Jinchang~Jiuquan~Anxi transmission line of electricity) and the second channel sent out of exchange super-pressure Xinjiang AC power transmission and transformation project (Qaidam~Hai Xi~Sun-Moon Mountain transmission line of electricity) has 750kV series compensation with Denso in preconsolidation stress It sets.
In recent years, the wind-powered electricity generation, photovoltaic of the Northwest are quickly grown, and online demand increasingly increases, so that existing 750kV is electric The transmission capacity and level of stability of net receive serious test.To solve this problem, 750kV route in part need to install series connection Power distribution equipment is compensated, according to system situation, series compensation power distribution equipment can build or be separately provided series compensation station jointly with substation; The arrangement that traditional gate framework string of other domestic voltage class recruits electric installation is applied to enlarging series compensation with Denso Not only land requisition index is big on the route set, but also requires the power off time of former working line long in enlarging, is not able to satisfy existing The production run requirement of route.It is connect therefore, it is necessary to which the arrangement and route when extending to 750kV series compensation power distribution equipment are drawn Design scheme carries out improvement design, and the construction, investment and operation that achievement recruits electric installation extension project to 750kV string will tools It is of great importance.
Utility model content
To solve the above problems, the route that the utility model provides a kind of 750kV series compensation power distribution equipment draws binding structure, The effectively save occupied area of energy, construction investment also solve the problem that and need former fortune when recruiting electric installation scheme using traditional enlarging string The problem of row line has a power failure for a long time.
In order to achieve the above objectives, the technical solution adopted in the utility model is: a kind of 750kV series compensation power distribution equipment Route draws binding structure, the first downlead and the second downlead, the line side GIL string including being separately positioned on a base angle tower two sides Cover thread casing, GIL string benefit side string covers thread casing, GIL string mends side string benefit outlet casing tube, the line side GIL string mends outlet casing tube And string recruits electric installation,
First downlead covers thread casing with the line side GIL string and connect;Second downlead and the line side GIL string mend lead collar Pipe connection;The line side GIL string covers thread casing connection GIL string benefit side string and covers thread casing, and GIL string is mended side string benefit outlet casing tube and connected It connects the line side GIL string and mends outlet casing tube;String recruit electric installation be separately connected GIL string mend side string cover thread casing and GIL string mend side String mends outlet casing tube;String recruits the side that a base angle tower transmission line of electricity is arranged in electric installation.
The line side GIL string cover thread casing and GIL string mend side string cover between thread casing by GIL string mend side go here and there cover line Pipeline connection;
GIL string mends side string benefit access duct and is provided with more piece.
GIL string benefit side string mends outlet casing tube and the line side GIL goes here and there to mend and mends side string benefit outlet by GIL string between outlet casing tube Pipeline connection.
GIL string mends side string benefit outlet pipeline and is provided with more piece.
The distance between first downlead and the second downlead are not less than 50 meters.
The lower end of first downlead and the second downlead is not less than 13m at a distance from ground.
Compared with prior art, the utility model at least has the advantages that the utility model from angle tower two sides Line conductor make downlead to GIL casing and traditional gate framework arrangement respectively and compare and can substantially compression strings recruit Electric installation region occupied area reduces land expropriation cost, economizes the land resource;String is recruited electric installation to draw by GIL pipeline, is gone here and there Recruiting electric installation may be arranged on the outside of former route, therefore when enlarging string recruits electric installation construction, not interfere with former operation Route;After the completion of going here and there and recruiting electric installation construction, the route of angle tower two sides is drawn using the line maintenance time and is connected to GIL casing It can restore the normal production of route;More traditional string, which recruits electric installation arrangement, can substantially compress since enlarging string recruits electricity The line outage time caused by device;It, can be according to system position and site contour in Practical Project using GIL pipe arrangement It arranges that string recruits electric installation, can be built jointly with original substation, string can also be separately provided and mend station, flexible arrangement is high;Sufficiently Using the angle tower on former working line, string recruits extraction no setting is required the special outlet structure of electric installation, is significantly reduced Engineering steel amount, has saved the construction investment of engineering.
Detailed description of the invention
Fig. 1 is the utility model schematic top plan view.
Fig. 2 is angle tower wiring sectional schematic diagram.
In attached drawing, mono- base angle tower of 1-, 2- wire jumper, 3- string benefit station inlet wire, the first downlead of 4-, the line side 5-GIL string benefit Entrance bushing, 6-GIL string mend side string and mend access duct, and 7-GIL string mends side string and covers thread casing, and 8- string recruits electric installation, 9-GIL String mends side string and mends outlet casing tube, and 10-GIL string mends side string and mends outlet pipeline, and the line side 11-GIL string mends outlet casing tube, 12- second Downlead, 13- string mend station outlet.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all Embodiment, based on the embodiments of the present invention, those of ordinary skill in the art do not make creative work premise Under every other embodiment obtained, fall within the protection scope of the utility model.
Applicant recruits in an enlarging 750kV string and devises new route in electric installation engineering and draw binding structure, the scheme Using a base angle tower of original working line, generally the first Ji Ta of substation's outlet, 1 two sides of a base angle tower are unlocked Wire jumper 2 is connected to lower section string from the first downlead 4 of route of 1 two sides of a base angle tower and the second downlead 12 respectively and recruits On the GIL casing that electric installation 8 connects, realize that string recruits the connection of electric installation Yu original working line by GIL casing;It is described GIL casing includes that the line side GIL string covers thread casing 5, GIL string benefit side string covers thread casing 7, GIL string mends side string benefit lead collar Pipe 9 and the line side GIL string mend outlet casing tube 11.
The string of enlarging recruits electric installation 8 and arranges near angle tower nearby, can build jointly with former substation, string can also be separately provided Station is mended, the layout pattern that string recruits electric installation 8 is unrestricted;It includes string portion platform, bypass open circuit that the string of enlarging, which recruits electric installation, Device, ancillary equipment, series connection disconnecting switch, bypass isolating switch, arrester and voltage transformer.
It eliminates traditional string and recruits the gate framework that the outlet of electric installation 8 need to be arranged, string recruits the inlet-outlet line of electric installation 8 Directly draw the underface for being connected to former working line using GIL pipeline, line voltage mutual inductor and arrester are arranged in string nearby and mend Power distribution equipment region;The GIL pipeline include GIL string mend side string mend access duct 6 and GIL string mend side string mend outlet pipeline 10.
A kind of route of 750kV series compensation power distribution equipment draws binding structure, including is separately positioned on 1 two sides of a base angle tower The first downlead 4 and the second downlead 12, the line side GIL string cover thread casing 5, GIL string mend side string cover thread casing 7, GIL String benefit side string mends outlet casing tube 9, the line side GIL string is mended outlet casing tube 11 and gone here and there and recruits electric installation 8, the first downlead 4 and GIL Line side string covers the connection of thread casing 5;Second downlead 12 is mended outlet casing tube 11 with the line side GIL string and is connect;The line side GIL string It covers the connection GIL string benefit of thread casing 5 side string and covers thread casing 7, GIL string benefit side string benefit outlet casing tube 9 connects the line side GIL string benefit Outlet casing tube 11;String recruit electric installation 8 be separately connected GIL string mend side string cover thread casing 7 and GIL string mend side string mend outlet casing tube 9;String recruits the side that 1 transmission line of electricity of a base angle tower is arranged in electric installation 8;First downlead 4 connection string mends station inlet wire 3, the Two downleads 12 connection string mends station outlet 13.
The line side GIL string cover thread casing 5 and GIL string mend side string cover between thread casing 7 by GIL string mend side go here and there cover Spool road 6 connects;GIL string mends side string benefit access duct 6 and is provided with more piece.
GIL string benefit side string mends outlet casing tube 9 and the line side GIL goes here and there to mend and mends side string benefit by GIL string between outlet casing tube 11 Outlet pipeline 10 connects;GIL string mends side string benefit outlet pipeline 10 and is provided with more piece.
As shown in Fig. 2, the distance between the first downlead 4 and the second downlead 12 are not less than 50 meters;First downlead, 4 He The lower end of second downlead 12 is not less than 13m at a distance from ground;String recruits the level between electric installation and the first downlead 4 Distance can be adjusted flexibly according to concrete engineering demand.
String recruit series compensation platform in electric installation 8, bypass breaker, ancillary equipment, series connection disconnecting switch, bypass every Leave the side that pass, arrester and voltage transformer are arranged at angle tower.
As shown in Figure 1, the route that the string that the utility model gives enlarging 750kV recruits electric installation 8 draws the reality of binding structure Example is applied, it can be seen from the figure that embodiment is to have extended two and return back out line string to recruit electric installation, this enlarging, which is gone here and there, to be recruited electric installation 8 and exist Original has run to draw at a base angle tower 1 of substation's outlet and connect and substation builds jointly;The 750kV string of enlarging recruits electric installation cloth It sets in the side of outlet angle tower route, is close to original and has run substation, not with former outlet crossing elimination, go here and there and recruit electric installation 8 Inlet-outlet line draw the underface for being connected to 1 two sides of a base angle tower by 750kV GIL pipeline used for transmission line;The string of enlarging recruits Electric installation constructs Shi Yuyuan route distance farther out, does not influence the normal operation production of former route, including GIL pipeline immediately below route Outlet casing tube installation can also be charged after construction organization;After the installation is completed to all equipment, corner is unlocked in line outage Two sides difference lead can restore the operation of former route to GIL casing after the wire jumper of tower connection two sides route.
By above-mentioned analysis it can be concluded that, using at route angle tower GIL pipeline draw the string connect to recruit electric installation novel Structure occupied area is small, enlarging when do not influence former route operation, power off time is greatly decreased, more coordinates with route cooperation, runs Maintenance is more convenient and arranges more flexible, can apply in engineering;It and is the power distribution equipment design of enlarging series compensation power distribution equipment Arrangement provides a new optimal solution.
Finally, it should be noted that above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc. With replacement, and these are modified or replaceed, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution The spirit and scope of scheme.

Claims (7)

1. a kind of route of 750kV series compensation power distribution equipment draws binding structure, which is characterized in that turn including being separately positioned on a base First downlead (4) and the second downlead (12), the line side GIL string of turret (1) two sides cover thread casing (5), GIL string mends side String covers thread casing (7), GIL string mends side string benefit outlet casing tube (9), the line side GIL string mends outlet casing tube (11) and string recruits Electric installation (8),
First downlead (4) covers thread casing (5) with the line side GIL string and connect;Second downlead (12) and the line side GIL string are mended Outlet casing tube (11) connection;The line side GIL string covers thread casing (5) connection GIL string benefit side string and covers thread casing (7), and GIL string is mended Side string mends outlet casing tube (9) connection line side GIL string and mends outlet casing tube (11);String recruits electric installation (8) and is separately connected GIL string benefit Side string covers thread casing (7) and GIL string mends side string and mends outlet casing tube (9);String recruits electric installation (8) and is arranged in a base angle tower (1) side of transmission line of electricity.
2. the route of 750kV series compensation power distribution equipment according to claim 1 draws binding structure, which is characterized in that GIL line Trackside string covers thread casing (5) and GIL string benefit side string covers to go here and there between thread casing (7) by GIL and mends side string benefit access duct (6) Connection.
3. the route of 750kV series compensation power distribution equipment according to claim 2 draws binding structure, which is characterized in that GIL string It mends side string benefit access duct (6) and is provided with more piece.
4. the route of 750kV series compensation power distribution equipment according to claim 1 draws binding structure, which is characterized in that GIL string Benefit side string mends outlet casing tube (9) and the line side GIL goes here and there to mend and mends side string benefit outlet pipeline by GIL string between outlet casing tube (11) (10) it connects.
5. the route of 750kV series compensation power distribution equipment according to claim 4 draws binding structure, which is characterized in that GIL string It mends side string benefit outlet pipeline (10) and is provided with more piece.
6. the route of 750kV series compensation power distribution equipment according to claim 1 draws binding structure, which is characterized in that first The distance between downlead (4) and the second downlead (12) are not less than 50 meters.
7. the route of 750kV series compensation power distribution equipment according to claim 1 draws binding structure, which is characterized in that first The lower end of downlead (4) and the second downlead (12) is not less than 13m at a distance from ground.
CN201822259798.8U 2018-12-29 2018-12-29 A kind of route of 750kV series compensation power distribution equipment draws binding structure Active CN209217728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822259798.8U CN209217728U (en) 2018-12-29 2018-12-29 A kind of route of 750kV series compensation power distribution equipment draws binding structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822259798.8U CN209217728U (en) 2018-12-29 2018-12-29 A kind of route of 750kV series compensation power distribution equipment draws binding structure

Publications (1)

Publication Number Publication Date
CN209217728U true CN209217728U (en) 2019-08-06

Family

ID=67466628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822259798.8U Active CN209217728U (en) 2018-12-29 2018-12-29 A kind of route of 750kV series compensation power distribution equipment draws binding structure

Country Status (1)

Country Link
CN (1) CN209217728U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109494760A (en) * 2018-12-29 2019-03-19 中国电力工程顾问集团西北电力设计院有限公司 A kind of route of 750kV series compensation power distribution equipment draws binding structure
RU2813005C1 (en) * 2023-08-18 2024-02-06 федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский университет "МЭИ" (ФГБОУ ВО "НИУ "МЭИ") METHOD OF POWER SUPPLY TO CONSUMERS IN CASE OF DAMAGE TO PHASE OF 110 kV ELECTRICAL NETWORK

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109494760A (en) * 2018-12-29 2019-03-19 中国电力工程顾问集团西北电力设计院有限公司 A kind of route of 750kV series compensation power distribution equipment draws binding structure
CN109494760B (en) * 2018-12-29 2024-03-26 中国电力工程顾问集团西北电力设计院有限公司 Line guiding structure of 750kV series compensation power distribution device
RU2813005C1 (en) * 2023-08-18 2024-02-06 федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский университет "МЭИ" (ФГБОУ ВО "НИУ "МЭИ") METHOD OF POWER SUPPLY TO CONSUMERS IN CASE OF DAMAGE TO PHASE OF 110 kV ELECTRICAL NETWORK

Similar Documents

Publication Publication Date Title
CN103020761B (en) A kind of power distribution network repair method based on automatic division unit and evaluation
CN209217728U (en) A kind of route of 750kV series compensation power distribution equipment draws binding structure
CN104569686B (en) A kind of intelligent substation and its intelligent secondary device test system
CN205283114U (en) Stray current suppression device that power supply system revealed in return circuit among subway tunnel of city
CN108152779A (en) Electronic current mutual inductor check system and method
CN109494760A (en) A kind of route of 750kV series compensation power distribution equipment draws binding structure
CN205583475U (en) Integrated transformer substation of 110kV prepackage type
CN208782501U (en) A kind of double-fed wind power generator group
CN201985528U (en) Series compensation system adopting line iron towers
CN102664407A (en) Method and system for designing boosting transformer of new energy electric field
CN209375009U (en) A kind of 750kV GIS breaker double-row type arragement construction
CN202094698U (en) Intelligent transformer monitoring equipment
CN201946983U (en) Series compensating system adopting gantry framework
CN204258114U (en) A kind of 500kV substation equipment arrangement
CN207946512U (en) Electronic current mutual inductor check system
CN203103774U (en) Geographic information system (GIS) power distribution device of extra-high voltage transformer substation
CN105261986A (en) Optimization structure of 220kV substation
CN206575071U (en) A kind of tree-like door frame outlet structure of 330kV open airs GIS power distribution equipments
CN212773715U (en) 330kV overhead line co-tower crossing system for transformer substation inlet line section
CN204834243U (en) Adopt parallel reactor of glass steel insulator post
CN104143039A (en) System impedance calculating method
Bi et al. Study on lightning withstand level and induced voltage after insulation reconstruction of overhead ground wire
CN203310928U (en) Transformer bushing ct characteristic test device
CN212412440U (en) Outgoing line arrangement structure of 330kV HGIS power distribution device
CN202340084U (en) Novel intelligent civil engineering power distribution substation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant