The GIS power distribution equipment of a half breaker wiring of a kind of employing
Technical field:
The utility model belongs to the high voltage equipment field, relate to a kind of GIS power distribution equipment, the GIS power distribution equipment of a half breaker wiring of especially a kind of employing particularly relates to the design of the opposite both direction outlet of GIS (Cubicle Gas-Insulated Switchgear) power distribution equipment interior lines road direction.
Background technology:
Growth at full speed along with national economy, domestic a large amount of 330kV, 500kV, 750kV and 1000kV transformer station build successively and put into operation, it is also increasing that index is taken up an area of in transformer station, and the soil becomes valuable day by day as non-renewable resources, so a lot of transformer stations all design GIS (Cubicle Gas-Insulated Switchgear) power distribution equipment that has adopted a half breaker wiring, can save occupation of land with respect to unenclosed construction.Yet the conventional GIS power distribution equipment of this kind wiring is because the restriction of its bulk conditions, generally all be designed to a direction outlet, even there is local oppositely outlet in indivedual transformer stations, also just by with this time outlet equipment reversed arrangement, the power distribution equipment body is not made material alterations, applicability is not strong, and limitation is very big.The GIS power distribution equipment outlet method of a this conventional half breaker wiring is dumb, and main bus bar is very long, causes the great amount of investment waste of whole project of transmitting and converting electricity.Therefore, being necessary the GIS power distribution equipment that adopts a half breaker wiring in the transformer station is studied, mainly is to solve following problem: when circuit need be to the different directions outlet, it is smooth and easy that transformer station is cooperated with the line side, and invest in the saving line side; GIS involves great expense, and how by reducing the pipeline bus length, saves the GIS overall investment; How to pass through the compression interval width, save transformer station and totally take up an area of; How to reduce transformer station's steel using amount, save construction investment.
The utility model content:
The purpose of this utility model be to provide can satisfy actual requirement of engineering, half breaker wiring of a kind of employing, with the main bus bar centralized arrangement in the centre, circuit breaker respectively centralized arrangement in the GIS of main bus bar both sides power distribution equipment new design structure.
For achieving the above object, the utility model takes following technical pattern to be achieved:
Half breaker wiring of a kind of employing, with the main bus bar centralized arrangement in the centre, circuit breaker difference centralized arrangement is in the GIS of main bus bar both sides power distribution equipment new design structure, described GIS power distribution equipment adopts the main bus bar centralized arrangement in the centre, circuit breaker difference centralized arrangement is at the arrangement of main bus bar both sides, outlet structure is arranged between two groups of buses, and leader cable ditch and GIS convergence control cabinet can be arranged in main bus bar side or circuit breaker side by actual conditions.
The utility model advantage is:
1, makes the GIS power distribution equipment of a half breaker wiring to have increased the flexibility of outlet, can cooperate more swimmingly, significantly reduce the investment of circuit specialty with circuit easily to opposite both direction outlet;
2, this kind arrangement can reduce a large amount of GIS main bus bars, significantly saves equipment and infrastructure investment thereof;
3, because equipment such as near the no GIS outlet sleeve pipe of outlet structure, lightning arresters, make equipment grading ring in the conventional structure, wire jumper etc. require in this kind structure, not exist to the distance to the ground of framework, the different interval device just satisfies that charged required distance gets final product between different circuit, can significantly reduce interval width, save and take up an area of.
4, this kind mode has reduced half outlet structure quantities approximately, can save steel in a large number.And because frame underneath has been cancelled the string that dangles that conventional structure all need be arranged, make the framework height greatly to reduce, the framework root has institute and reduces, and further saves civilwork engineering quantity.
5, equipment hoisting such as GIS sleeve pipe, maintenance are more convenient, because sleeve pipe top naked substring does not exist insulator breakdown to fall and may damage expensive problems such as GIS sleeve pipe.
Description of drawings:
Fig. 1 is the utility model electrical principle wiring schematic diagram;
Fig. 2 is the utility model power distribution equipment floor map;
Fig. 3 is the utility model power distribution equipment sectional schematic diagram.
Among the figure: 1, a GIS main bus bar; 2, the 2nd GIS main bus bar; 3, isolating switch; 4, current transformer; 5, circuit breaker; 6, GIS outlet sleeve pipe; 7, main bus bar earthed switch; 8, main bus bar lightning arrester; 9, main bus bar voltage transformer; 10, outlet lightning arrester; 11, outlet voltage transformer; 12, post insulator; 13, outlet structure.
Embodiment:
Below in conjunction with accompanying drawing the utility model is done and to be described in further detail:
Referring to Fig. 1,2,3, half breaker wiring of a kind of employing, with the main bus bar centralized arrangement in the centre, circuit breaker respectively centralized arrangement at the GIS of main bus bar both sides power distribution equipment new design structure such as Fig. 1~shown in Figure 3.As can be seen from the figure, in the centre, circuit breaker difference centralized arrangement is in the main bus bar both sides with the main bus bar centralized arrangement for this kind design arrangement mode; Outlet structure is arranged between two groups of main bus bars, and leader cable ditch and GIS convergence control cabinet can be arranged in main bus bar side or circuit breaker side by actual conditions.Then outlet can be easily to opposite both direction outlet, and it is more convenient that equipment is installed maintenance, and more conventional GIS power distribution equipment has had very large optimization.
Can draw by above-mentioned analysis, with the main bus bar centralized arrangement in the centre, circuit breaker centralized arrangement respectively has characteristics such as the total floor space of power distribution equipment is little, saving is taken over the land for use, reduce the project of transmitting and converting electricity investment, operation is simple, safe and reliable in the GIS of main bus bar both sides power distribution equipment new design structure, can use in engineering; And, the GIS power distribution equipment that adopts a half breaker wiring solves structure for providing a new optimization.
Above content is to further describing that the present invention did in conjunction with concrete preferred implementation; can not assert that the specific embodiment of the present invention only limits to this; for the general technical staff of the technical field of the invention; without departing from the inventive concept of the premise; can also make some simple deduction or replace, all should be considered as belonging to the present invention and determine scope of patent protection by claims of being submitted to.