CN109488004A CN201811324152.1A CN201811324152A CN109488004A CN 109488004 A CN109488004 A CN 109488004A CN 201811324152 A CN201811324152 A CN 201811324152A CN 109488004 A CN109488004 A CN 109488004A
Authority
CN
China
Prior art keywords
ceramic tile
brick
construction
bond
concrete surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811324152.1A
Other languages
Chinese (zh)
Inventor
陈守辉
邱秉达
黄木涛
李云锋
朱哲锋
林彦
张鑫江
林礼跃
韦林翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG NO 1 CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
GUANGDONG NO 1 CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG NO 1 CONSTRUCTION ENGINEERING Co Ltd filed Critical GUANGDONG NO 1 CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201811324152.1A priority Critical patent/CN109488004A/en
Publication of CN109488004A publication Critical patent/CN109488004A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a kind of smooth concrete surface ceramic tile ungauged regions sticking construction methods, include the following steps: that computer arranges brick, material and tool prepare, concrete wall surface base treatment, mark control line, walkthrough wall brick, rebasing ruler, metope brushing ceramic tile bond, ceramic tile back side brushing ceramic tile bond, tile paste, jointing, wiping seam, cleaning;Construction is simple of the present invention: smooth concrete surface ceramic tile ungauged regions sticking construction technology does not need dabbing or plucking on concrete walls, it does not need to carry out the construction of plaster leveling layer, concrete wall surface and the painting of brick face are pasted after brushing binder using cement mortar or polymer mortar;Shorten the construction period: smooth concrete surface ceramic tile ungauged regions sticking construction technology does not need dabbing or plucking and construction of leveling blanket, to accelerate construction progress and shorten the construction period;The direct patch block of structural plane, which reduces the screed-coats such as plastering, may insure that elevator hall's clear space reaches maximum, eliminate compression of the old patch block technology to the clear space size of building.

Description

A kind of smooth concrete surface ceramic tile ungauged regions sticking construction method
Technical field
The invention belongs to tile paste technical fields, and in particular to a kind of smooth concrete surface ceramic tile ungauged regions sticking construction Method.
Background technique
For a long time, ceramic tile is as a kind of construction material being widely used in building decoration and fitment, because its is stable Quality and decorative effect beautiful and generous and favored by market, but the construction technology of traditional stickup ceramic tile is because of its limitation Cause many quality problems;It is also because the operation technique fluctuation of construction personnel is big and the slow drying shrinkage of later period concrete and porcelain Brick such as expands at the factors in case of wet, causes ceramic tile and binder course to be detached from or hollowing caused by binder course and concrete surface are detached from or falls off existing As due to happening part imprevision, unit in charge of construction, the country, China substantially takes this large-area construction complete and in binder course It checks after reaching age, does over again after finding hollowing comprehensively, but hollowing caused by dilatancy falls off in case of wet for structure both shrinks or ceramic tile It can not be found in the construction time, guarantee processing can only be carried out in building validity period.
And with development in science and technology, China also starts gradually to popularize the new materials such as glue for tile and ceramic tile bond, they are each There is advantage, but since glue for tile still belongs to rigid binder course, it is gradually micro- because of concrete structure in 1-3 after the completion of construction It is small shrink the stress generated or ceramic tile itself deform in case of wet the stress of generation be more than after the cohesive force of glue for tile binder course still It will appear hollowing even obscission.
In order to reduce using and reduce artificial investment etc. and developing the road of environment protecting and power-saving for plaster leveling floor mortar, it is This present invention provides a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method.
Summary of the invention
It is above-mentioned to solve the purpose of the present invention is to provide a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method The construction technology of the traditional stickup ceramic tile proposed in background technique is because of many quality problems caused by its limitation;And because applying The factors such as the operation technique fluctuation of worker person is big and the slow drying shrinkage of later period concrete and ceramic tile expand in case of wet, cause ceramic tile The problem of hollowing caused by being detached from binder course disengaging or binder course and concrete surface or obscission.
To achieve the above object, the invention provides the following technical scheme: a kind of smooth concrete surface ceramic tile ungauged regions are pasted Construction method includes the following steps:
Step 1: computer arranges brick: design and construction drawing, and using the brick face setting-out of computer row's brick and scene, accurately obtains The size and shape of non-full sized brick needed for scene, sorting-out in statistics, which quotes demand inventory together and gives producer, directly to be produced;
Step 2: material and tool prepare: material includes ceramic tile, ceramic tile bond, face brick;Construction tool includes but unlimited In horizontal ruler, ink fountain, round brush, plastic cushion, rubber hammer, grey knife, guiding ruler;
Step 3: concrete wall surface base treatment: it will clear away and reject in the extra mortar of concrete surface, clean out Dust cleans template interleaving agent using detergent, smears ceramic tile bond after metope is dry;
Step 4: according to building axis line and ground elevation, metope or cylinder construction elevation mark control line: are measured with level meter Line, and logical line is drawn, pop up horizontal control lines;At from 300 ㎜ of yin-yang angle, protrude metope column, pile center and door and window side and Detached column center look for straight, angle square set side, pop-up orthogonal control lines with plumb bob or theodolite;
Step 5: walkthrough wall brick: according to snap the line to wall brick walkthrough;
Step 6: rebasing ruler: according to the absolute altitude suitable for reading of the most next skin brick calculated, pad puts ruler plate well as the first skin brick Standard suitable for reading, bottom ruler level are placed, and it is steady to put real pendulum;
Step 7: metope brushing ceramic tile bond: ceramic tile bond is uniformly applied on concrete wall surface using round brush;
Step 8: ceramic tile back side brushing ceramic tile bond: ceramic tile bond is uniformly applied to the ceramic tile back side using round brush On;
Step 9: tile paste: the ceramic tile for wiping ceramic tile bond will be applied and smear full water cement mortar or polymer mortar, be attached to On wall, brick face is touched with rubber hammer, is firmly combined it with metope;
Step 10: jointing, wiping seam: being stitched with white ceramic tiles rubber erasers, takes out seam using the thick electric wire of plastic peel;
Step 11: cleaning: facing is cleared up with cotton yarn, tile surface and brickwork joint position are cleaned.
As a preferred technical solution of the invention, the ceramic tile surface is smooth, neat in edge, corner angle without damage, With work certificate.
As a preferred technical solution of the invention, the glazed tile, unglazed tile, any surface finish, quality is firm, Size, color are consistent, and without dark trace and crackle, performance indicator meets the regulation of existing national standards.
As a preferred technical solution of the invention, the ceramic tile bond is using high-quality water soluble acrylic acid, helps Transparence liquid made of the environment-friendly materials such as agent.
As a preferred technical solution of the invention, the waiting time is 3-24h after the ceramic tile bond brushing.
As a preferred technical solution of the invention, the cement mortar uses 1:2 cement mortar or polymer sand Slurry, initial set are no earlier than 45min, and final set is earlier than 12h.
As a preferred technical solution of the invention, it is described according to snap the line to wall brick walkthrough when, metope is no less than whole The 1/3 of brick.
It is described that ceramic tile bond is uniformly applied to coagulation using round brush as a preferred technical solution of the invention On cob wall face, every square of dosage control is in 75-85g.
Compared with prior art, the beneficial effects of the present invention are:
(1) construction is simple: smooth concrete surface ceramic tile ungauged regions sticking construction technology does not need the dabbing on concrete walls Or plucking, do not need to carry out the construction of plaster leveling layer, concrete wall surface and brick face apply brush binder after using cement mortar or Polymer mortar is pasted;
(2) shorten the construction period: smooth concrete surface ceramic tile ungauged regions sticking construction technology does not need dabbing or plucking and looks for Leveling construction, to accelerate construction progress and shorten the construction period;
(3) the direct patch block of structural plane, which reduces the screed-coats such as plastering, may insure that elevator hall's clear space reaches maximum, eliminate old Compression of the patch block technology to the clear space size of building;
(4) the live direct patch block of structural plane makes the metope row's brick of technical staff on computers practical closer to scene, essence Really prime direction is puted up in optimization brick face, optimizes brick face size, and non-full sized brick is directly produced by producer, reduces the artificial clip work in scene Sequence reduces tapestry brick damage;
(5) it eliminates in old tile paste technology because screed-coat hollowing generates the sky done over again and generated with binder course Mortar shrinkage Drum problem;
(6) it eliminates during building use, since concrete contracts last or ceramic tile dampness expansion generate caused by stress Hollowing;
(7) convenient to install professional crossed construction with electromechanical, old tile bonding technology encounters metope in the construction process to be needed When wanting aperture, due to using rigid binder course, in Tapping procedures under mechanical vibration often ceramic tile can monolith fall off or generate Hollowing, and this situation, convenient and electromechanical speciality crossed construction can then be eliminated using novel ceramic tile bond.
Detailed description of the invention
Fig. 1 is flow chart of the invention;
Fig. 2 is that ceramic tile of the invention and concrete wall ungauged regions paste figure;
Fig. 3 is that ceramic tile of the invention and concrete wall ungauged regions are pasted and eliminate binder course contraction distortion figure;
Fig. 4 is that ceramic tile of the invention and concrete wall ungauged regions are pasted and eliminate concrete shrinkage deformation figure;
Fig. 5 is that ceramic tile of the invention and concrete wall ungauged regions are pasted and eliminate ceramic tile deformation pattern;
Fig. 6 is the direct bonding applique surface ceramic tile construction way hierarchical diagram of elevator hall's concrete walls of the invention;
In figure: 1, ceramic tile;2, ceramic tile bond;3, cement mortar or polymer mortar binder course;4, flexible ceramic tile bonds Agent blind after concrete wall surface deformation avoids hollowing from being formed;5, Concrete In Structures body.
Specific embodiment
A kind of smooth concrete surface ceramic tile ungauged regions sticking construction method, includes the following steps:
Step 1: computer arranges brick: design and construction drawing, and using the brick face setting-out of computer row's brick and scene, accurately obtains The size and shape of non-full sized brick needed for scene, sorting-out in statistics, which quotes demand inventory together and gives producer, directly to be produced, without The artificial clip in scene, reduces cost of labor and material loss;
Step 2: material and tool prepare: material includes ceramic tile 1, ceramic tile bond 2, face brick;Construction tool includes but not It is limited to horizontal ruler, ink fountain, round brush, plastic cushion, rubber hammer, grey knife, guiding ruler;
Step 3: concrete wall surface base treatment: it will clear away and reject in the extra mortar of concrete surface, clean out Dust cleans template interleaving agent using detergent, ceramic tile bond 2 is smeared after metope is dry, and ceramic tile bond 2 is situated between as intermediate Matter belongs to flexible bonding material;
Step 4: according to building axis line and ground elevation, metope or cylinder construction elevation mark control line: are measured with level meter Line, and logical line is drawn, pop up horizontal control lines;At from 300 ㎜ of yin-yang angle, protrude metope column, pile center and door and window side and Detached column center look for straight, angle square set side, pop-up orthogonal control lines with plumb bob or theodolite;
Step 5: walkthrough wall brick: according to snap the line to wall brick walkthrough, such as find that error adjusts in time, metope is less than such as discovery 1/3 position of full sized brick will be adjusted, and according to 1 typesetting figure of ceramic tile and level, orthogonal control lines, divide ruler in metope and column pile face It is very little, it looks for skin number, pops up the both horizontally and vertically control line of every block of ceramic tile 1, the seam that when snap the line piecemeal is considered as ceramic tile 1 is wide Degree;
Step 6: rebasing ruler: according to the absolute altitude suitable for reading of the most next skin brick calculated, pad puts ruler plate well as the first skin brick Standard suitable for reading, bottom ruler level are placed, and it is steady to put real pendulum;
Step 7: ceramic tile bond 2 uniformly metope brushing ceramic tile bond 2: is applied to concrete wall surface using round brush On, should ensure that when smearing construction metope base it is clean, it is solid, without greasy dirt, dust and loose matter, and ensure that metope is dry, manually The flexible adhesion layer of one layer of 0.2-0.4mm is formed after smearing one time on the wall, every square of dosage 75-85g reaches product to it and says It just can be carried out tile paste construction after the bright time;
Step 8: ceramic tile back side brushing ceramic tile bond 2: ceramic tile bond 2 is uniformly applied to ceramic tile 1 using round brush and is carried on the back On face, ceramic tile bond 2 is uniformly applied on 1 back side of ceramic tile using round brush, should ensure that 1 back side of ceramic tile is dry when smearing construction Only, solid, without greasy dirt, dust and loose matter, and ensure that ceramic tile 1 is dry, ceramic tile 1 smeared piled up by specification after binder it is whole Together, separate to be bonded dose of solidification using plastic cushion on four angles between brick and brick to reach condition and can carry out sticking operation;
Step 9: ceramic tile 1 is pasted: when ceramic tile 1 is pasted, the direct-through line that hangs down on the corner is hung, it is horizontal to draw logical line levelling with linen thread, To control the flatness of entire furring tile 1, stickup a line a line should carry out from bottom to top, and painting is wiped ceramic tile bond 2 Ceramic tile 1 completely smears cement mortar or polymer mortar 3, is close on the flat ruler board of most next line, subject to the above saliva horizontal line, patch On the wall, with rubber hammer touch brick face, be firmly combined it with metope, after most downlink ceramic tile 1 posts, with guiding ruler cross levelling, It vertically looks for directly, then successively up pastes, it is vertically and horizontally arranged on same metope, there should not be the non-full sized brick of a line or more, it is non-whole Brick row should come at secondary position or inner corner trim, such as meet the bearing of pipeline, lamps and lanterns, sanitary equipment outstanding, and available dedicated is bored Cut equipment set cut it is identical, not handy non-full sized brick piece together edge patch, cement mortar use 1:2 cement mortar or polymer mortar, initial set It is no earlier than 45min, final set is earlier than 12h;
Step 10: jointing, wiping seam: being stitched with white ceramic tiles rubber erasers, takes out seam using the thick electric wire of plastic peel, it is desirable that straight, even It is continuous, closely knit;
Step 11: cleaning: facing is cleared up with cotton yarn, tile surface and brickwork joint position are cleaned.
In Figure of description 2, ceramic tile bond 2 is applied on concrete wall, subsequent brushing cement mortar or polymer Mortar binder course 3 smears ceramic tile bond 2 on ceramic tile 1, pastes ceramic tile 1 and concrete wall fix later.
It is consistent with the principle of description above attached drawing 2 in Figure of description 3, the difference is that flexible ceramic tile agglomerant Blind avoids hollowing from forming 4 close to the position of smearing ceramic tile bond 2 on ceramic tile 1 after concrete wall surface deformation.
It is consistent with the principle of description above attached drawing 2 in Figure of description 4, the difference is that flexible ceramic tile agglomerant Blind avoids hollowing from forming 4 close to concrete wall after concrete wall surface deformation, and smears porcelain away from concrete wall The position of tile adhesive 2.
It is consistent with the principle of description above attached drawing 2 in Figure of description 5, the difference is that flexible ceramic tile agglomerant Blind avoids hollowing from forming 4 between ceramic tile bond 2 and ceramic tile 1 after concrete wall surface deformation.
In Figure of description 6, ceramic tile bond 2 is brushed into and then brushing cement mortar or the polymerization on Concrete In Structures body 5 Object mortar binder course 3 smears ceramic tile bond 2 on ceramic tile 1, and the ceramic tile 1 for smearing ceramic tile bond 2 and Concrete In Structures body 5 are glued Conjunction.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method, which comprises the steps of:
Step 1: computer arranges brick: design and construction drawing, and using the brick face setting-out of computer row's brick and scene, accurately obtains scene The size and shape of required non-full sized brick, sorting-out in statistics, which quotes demand inventory together and gives producer, directly to be produced;
Step 2: material and tool prepare: material includes ceramic tile, ceramic tile bond, face brick;Construction tool includes but is not limited to water Leveling ruler, ink fountain, round brush, plastic cushion, rubber hammer, grey knife, guiding ruler;
Step 3: concrete wall surface base treatment: it will clear away and reject in the extra mortar of concrete surface, clean out ash Dirt cleans template interleaving agent using detergent, smears ceramic tile bond after metope is dry;
Step 4: mark control line: according to building axis line and ground elevation, measuring metope or cylinder construction elevation line with level meter, And logical line is drawn, pop up horizontal control lines;At from 300 ㎜ of yin-yang angle, column, pile center and door and window side and the independence of metope are protruded Column center look for straight, angle square set side, pop-up orthogonal control lines with plumb bob or theodolite;
Step 5: walkthrough wall brick: according to snap the line to wall brick walkthrough;
Step 6: rebasing ruler: according to the absolute altitude suitable for reading of the most next skin brick calculated, it is suitable for reading as the first skin brick that pad puts ruler plate well Standard, bottom ruler level is placed, and it is steady to put real pendulum;
Step 7: metope brushing ceramic tile bond: ceramic tile bond is uniformly applied on concrete wall surface using round brush;
Step 8: ceramic tile back side brushing ceramic tile bond: ceramic tile bond is uniformly applied on the ceramic tile back side using round brush;
Step 9: the ceramic tile for wiping ceramic tile bond will tile paste: be appliedIt smears fullCement mortar or polymer mortar, are attached to wall On, brick face is touched with rubber hammer, is firmly combined it with metope;
Step 10: jointing, wiping seam: being stitched with white ceramic tiles rubber erasers, takes out seam using the thick electric wire of plastic peel;
Step 11: cleaning: facing is cleared up with cotton yarn, tile surface and brickwork joint position are cleaned.
2. a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method according to claim 1, it is characterised in that: institute State that ceramic tile surface is smooth, neat in edge, corner angle have work certificate without damage.
3. a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method according to claim 1, it is characterised in that: institute Glazed tile, unglazed tile are stated, any surface finish, quality is firm, and size, color are consistent, and without dark trace and crackle, performance indicator meets existing The regulation of row national standard.
4. a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method according to claim 1, it is characterised in that: institute Ceramic tile bond is stated as using transparence liquid made of the environment-friendly materials such as high-quality water soluble acrylic acid, auxiliary agent.
5. a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method according to claim 1, it is characterised in that: institute The waiting time is 3-24h after stating ceramic tile bond brushing.
6. a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method according to claim 1, it is characterised in that: institute Cement mortar is stated using 1:2 cement mortar or polymer mortar, initial set is no earlier than 45min, and final set is earlier than 12h.
7. a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method according to claim 1, it is characterised in that: institute When stating according to snap the line to wall brick walkthrough, metope is no less than the 1/3 of full sized brick.
8. a kind of smooth concrete surface ceramic tile ungauged regions sticking construction method according to claim 1, it is characterised in that: institute It states and ceramic tile bond is uniformly applied on concrete wall surface using round brush, every square of dosage control is in 75-85g.
CN201811324152.1A 2018-11-08 2018-11-08 A kind of smooth concrete surface ceramic tile ungauged regions sticking construction method Pending CN109488004A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811324152.1A CN109488004A (en) 2018-11-08 2018-11-08 A kind of smooth concrete surface ceramic tile ungauged regions sticking construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811324152.1A CN109488004A (en) 2018-11-08 2018-11-08 A kind of smooth concrete surface ceramic tile ungauged regions sticking construction method

Publications (1)

Publication Number Publication Date
CN109488004A true CN109488004A (en) 2019-03-19

Family

ID=65695302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811324152.1A Pending CN109488004A (en) 2018-11-08 2018-11-08 A kind of smooth concrete surface ceramic tile ungauged regions sticking construction method

Country Status (1)

Country Link
CN (1) CN109488004A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821117A (en) * 2019-11-11 2020-02-21 湖南梅克雷薇新材料科技有限公司 Tile leveling structure and tile leveling structure construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009122332A1 (en) * 2008-04-01 2009-10-08 Jaume Parisi Sarobe Method of cladding with tiles for floors, walls, ceilings and the like
CN101565997A (en) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 Construction method for large-area irregular floor tile
CN103088996A (en) * 2011-11-03 2013-05-08 北京希凯世纪建材有限公司 Ceramic tile sticking method
CN107795077A (en) * 2017-10-26 2018-03-13 张娜 A kind of novel ceramic tile paving technology
CN108265946A (en) * 2017-12-15 2018-07-10 夹江县盛世东方陶瓷有限公司 A kind of ceramics painting and calligraphy brick patch block method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009122332A1 (en) * 2008-04-01 2009-10-08 Jaume Parisi Sarobe Method of cladding with tiles for floors, walls, ceilings and the like
CN101565997A (en) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 Construction method for large-area irregular floor tile
CN103088996A (en) * 2011-11-03 2013-05-08 北京希凯世纪建材有限公司 Ceramic tile sticking method
CN107795077A (en) * 2017-10-26 2018-03-13 张娜 A kind of novel ceramic tile paving technology
CN108265946A (en) * 2017-12-15 2018-07-10 夹江县盛世东方陶瓷有限公司 A kind of ceramics painting and calligraphy brick patch block method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
RUJIE1024: "瓷砖粘结剂的使用注意事项", 《百度文库》 *
李9148936: "公共区域及卫生间墙地砖铺贴方法", 《百度文库》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821117A (en) * 2019-11-11 2020-02-21 湖南梅克雷薇新材料科技有限公司 Tile leveling structure and tile leveling structure construction process

Similar Documents

Publication Publication Date Title
CN104047406A (en) Construction process for ultra-thin stone-facing heat-preserving decorative plate
CN107152145A (en) A kind of stone material flooring construction method
CN101314978A (en) Construction method for thermal insulation wall of exterior wall
CN108343203A (en) A kind of metope anticracking batch embedding technology
CN112922256A (en) Ceramic tile pasting process
CN109488004A (en) A kind of smooth concrete surface ceramic tile ungauged regions sticking construction method
CN105178547A (en) Large-unit ceramic thin sheet back-suspending and gluing structure and construction method thereof
CN104120860A (en) Construction method for cement mortar ground leveling
CN111305592B (en) Composition layer structure and application thereof in renovation of old ceramic tile wall surface
CN109057221A (en) A kind of cement insulation board outer heat preservation system construction method
CN210597982U (en) Composite copper plate structure with back bolt on floor
CN109555316A (en) Environment protection architecture construction method
CN110054449A (en) A kind of ceramic tile bond, preparation method and application method
CN205025042U (en) Big unit pottery sheet metal back of body kiss -coating bonds and constructs
CN204040341U (en) A kind of exterior wall old ceramic tile face putty refurbishment system
CN211949245U (en) Roof stone flashing structure
CN212507490U (en) Wall building device
CN101781921A (en) Process for constructing surface of wall body
CN106284917A (en) A kind of construction technology utilizing flowable mortar adhesively face brick
CN1570325A (en) Construction process for synthetic resin curtain wall series paste on wall surface
CN106150020A (en) A kind of construction technology utilizing flowing mortar adhesively face brick
CN214739520U (en) Large plate brick inlaying structure
CN211369445U (en) Compound ceramic tile spreads fast and pastes structure
CN205907857U (en) Two -sided partition wall that adorns firmly
CN110130643A (en) A kind of plastic cement, flax ground construction technique

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319