CN109484951A CN201811642431.2A CN201811642431A CN109484951A CN 109484951 A CN109484951 A CN 109484951A CN 201811642431 A CN201811642431 A CN 201811642431A CN 109484951 A CN109484951 A CN 109484951A
Authority
CN
China
Prior art keywords
channel box
access platform
construction
construction elevator
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811642431.2A
Other languages
Chinese (zh)
Inventor
章鹏成
袁健
王焱
李明辉
杜俊坡
陈许刚
杨艳武
赵友奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Publication of CN109484951A publication Critical patent/CN109484951A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/006Applications of loading and unloading equipment for lifts associated with buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The embodiment of the invention discloses a kind of access platforms of construction elevator, including elevator body and the channel Box being mounted in elevator body, the channel Box is horizontally set on outside lift port, and one end of channel Box is hinged on the bottom plate of elevator body, and folding line is equipped with along the length direction of panel on the upper surface of channel Box, channel Box is set to form the upward arced configuration in protrusion, the two sides of the channel Box are equipped with protective fence, and the channel Box between two protective fences is made to form access platform.A kind of access platform of construction elevator of the invention utilizes channel Box and construction elevator integrated setting, without separately taking transport channel platform at the construction field (site), cost was both saved, has reduced labour, and also saved the step of mounting and dismounting again, convenient for construction, security risk is reduced.

Description

A kind of access platform of construction elevator
Technical field
The present embodiments relate to technical field of building construction, and in particular to a kind of access platform of construction elevator.
Background technique
Construction elevator will be generally set in high-building construction, but construction elevator is to have one between building Fixed spacing, it is therefore desirable to which transport channel platform is set between construction elevator and floor building, to solve construction material, apply The transportation problem of worker person.
The prior art is at the construction field (site) by setting up security protection scaffold, paving between construction elevator and floor building Template, I-steel etc. form shipping platform channel, but set up safety protection frame and need to expend a large amount of circulation material, and increase is applied Work cost, next is set up safety protection frame and personnel is needed to construct, and increases labor cost, and sets up safety protection frame and belong to High altitude operation needs to install and dismantle, difficulty of construction is big, speed is slow, construction when security risk it is larger.
Summary of the invention
For this purpose, the embodiment of the present invention provides a kind of access platform of construction elevator, to solve in the prior art due to building It builds construction site and sets up the problem of construction cost caused by safety protection frame is high, labor cost is high and difficulty of construction is big.
To achieve the goals above, embodiments of the present invention provide the following technical solutions:
In embodiments of the present invention, a kind of access platform of construction elevator is provided, comprising: elevator body and installation Channel Box in elevator body, the electricity that is on one side formed with from live ladder protective door of the elevator body with respect to architecture noumenon Ladder way, the channel Box are horizontally set on outside lift port, and one end of channel Box is hinged on the bottom plate of elevator body, is made Channel Box can be overturn to elevator body, and be equipped with folding line along the length direction of panel on the upper surface of channel Box, Channel Box is set to form the upward arced configuration in protrusion.
By using above-mentioned technical proposal, the channel Box being hinged on car-floor is set, elevator body it is parked into When discharge state, only channel Box need to gradually be overturn as horizontality, keep one end face of the channel Box far from lift port pre- It first rides upon the protection safety door on architecture noumenon and until ride upon on the outer of architecture noumenon, confession is formed by channel Box and is built The access platform for building material or construction personnel's transport, using channel Box and construction elevator integrated setting, without existing in construction Transport channel platform is separately taken in field, has both saved cost, has reduced labour, also saved the step of mounting and dismounting again, convenient for construction, has subtracted Few security risk, while in elevator body operating status, channel Box is gradually flipped up into vertical state, makes surface channel Plate can be overturn to elevator body, can be used at this time by channel Box as the sealing protective plate of lift port, and elevator is improved Safety when this running body makes channel Box form protrusion to arch wherein being equipped with folding line on the upper surface of channel Box Shape structure, to be horizontally disposed with as shipping platform in channel Box in use, one end based on channel Box is arranged in elevator A Zhi Lidian is formed on the bottom plate of ontology, the other end rides upon and forms another branch force on the outer of architecture noumenon, utilizes Domes can disperse bearing capacity convenient for channel Box, improve its bending resistance, increase the load-bearing property of channel Box.
Further, the two sides of the elevator body bottom plate are connected with link block, and make rotation axis equipped with rotation axis Both ends are rotatably connected on respectively on two pieces of link blocks, and the axial wall of the rotation axis is fixed in channel Box and is placed in construction elevator On end.
Further, the two sides of the channel Box are equipped with protective fence, make the channel Box shape between two protective fences At access platform.
Further, the protective fence is U-shaped structure of the opening towards channel Box, and the both ends of protective fence opening are equal It is fixed on the panel of channel Box.
Further, integrally formed with fixed block, the both ends of the fixed block on the both ends of the protective fence opening It is connect respectively with the panel bolts of channel Box.
Further, the middle part level of the protective fence, which is equipped with, blocks bar, and the both ends for blocking bar are integrally formed respectively anti- On two side levers of guardrail.
By using above-mentioned technical proposal, protective fence is set, makes the entirety of protective fence for construction of prevention work personnel or large size Material is transported, and handrail is formed by the top half of protective fence, railing is added in the middle part of protective fence, makes the column based on protective fence Bar avoids the gap between U-shaped two side lever of protective fence is excessive from causing to be easy when transport of materials for protecting middle-size and small-size transport material The case where falling, improves the safety of protective fence, and the width of protective fence, is highly set according to specific condition of construction It sets.
Further, the channel Box, which is placed on the end in elevator body, is equipped with middle part formation mistake proofing creasy Platform folded plate, hinge connection is on the upper surface of channel Box at the middle part folding line of the anti-faulting of slab ends folded plate.
By using above-mentioned technical proposal, in channel Box is placed on the end in elevator body and has been connected by hinge Portion forms anti-faulting of slab ends folded plate creasy, wherein the thickness with a thickness of 3 profiled sheets of anti-faulting of slab ends folded plate, and roll over anti-faulting of slab ends A wherein flanging for plate is placed on the edge of channel Box, and another flanging is placed in elevator body, when construction elevator and floor beam When stop position height is different, anti-faulting of slab ends folded plate can be adjusted by hinge with the gradient of elevator body contacts baseplate to adjust The horizontal positioned gradient of section channel Box makes construction elevator and knot so that channel Box can smoothly be set up to floor beam Structure flooring plays the role of buffering when stopping highly inconsistent, can reduce the stop error of elevator operator.
Further, it is stupefied that multiple reinforcements are connected on the bottom surface of the channel Box.
By using above-mentioned technical proposal, the reinforcement of multiple small-sized rhs-structures is connected on the bottom surface of channel Box It is stupefied, to increase the bearing capacity of channel Box, it is ensured that channel Box is durable.
Further, the thickness range of the channel Box is 2-4mm.
Further, the upper surface of the channel Box is equipped with anti-skid chequer.
Embodiment according to the present invention, a kind of access platform of construction elevator have the advantages that setting is hinged on electricity Channel Box is gradually flipped up into vertical state, at this time in elevator body operating status by the channel Box on terraced bottom plate Can be used by channel Box as the sealing protective plate of lift port, and in the parked input and output material state of elevator body, only need by It is horizontality that channel Box, which is gradually overturn, rides upon channel Box on architecture noumenon in advance far from one end face of lift port Protection safety door and until ride upon on the outer of architecture noumenon, is formed by channel Box and is transported for construction material or construction personnel Defeated access platform, using channel Box and construction elevator integrated setting, without separately taking transport channel platform at the construction field (site), Both it saved cost, reduced labour, and also saved the step of mounting and dismounting again, and convenient for construction, reduced security risk.
Detailed description of the invention
It, below will be to embodiment party in order to illustrate more clearly of embodiments of the present invention or technical solution in the prior art Formula or attached drawing needed to be used in the description of the prior art are briefly described.It should be evident that the accompanying drawings in the following description is only It is merely exemplary, it for those of ordinary skill in the art, without creative efforts, can also basis The attached drawing of offer, which is extended, obtains other implementation attached drawings.
Structure depicted in this specification, ratio, size etc., only to cooperate the revealed content of specification, for Those skilled in the art understands and reads, and is not intended to limit the invention enforceable qualifications, therefore does not have technical Essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the function of the invention that can be generated Under effect and the purpose that can reach, should all still it fall in the range of disclosed technology contents obtain and can cover.
Fig. 1 is a kind of overall structure diagram of the access platform of construction elevator provided in an embodiment of the present invention;
Fig. 2 is that a kind of channel Box overturning horizontality of access platform of construction elevator provided in an embodiment of the present invention is shown It is intended to;
Fig. 3 is that a kind of channel Box overturning vertical state of access platform of construction elevator provided in an embodiment of the present invention is shown It is intended to;
Fig. 4 is the enlarged diagram of A structure in Fig. 2.
In figure: 1, elevator body;11, lift port;12, link block;2, channel Box;3, rotation axis;4, protective fence;5, solid Determine block;6, bar is blocked;7, anti-faulting of slab ends folded plate;8, reinforce stupefied.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily, it is clear that described embodiment is the present invention one Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
The term of cited such as "upper", "lower", "left", "right", " centre ", is merely convenient to describe in this specification Be illustrated, rather than to limit the scope of the invention, relativeness is altered or modified, and is changing technology without essence It inside holds, when being also considered as the enforceable scope of the present invention.
Embodiment 1
As depicted in figs. 1 and 2, the embodiment of the invention provides a kind of access platforms of construction elevator, including elevator body 1 With the channel Box 2 being mounted in elevator body 1.Lift port 11 is formed with respect to the one side of architecture noumenon in construction elevator, it is described Lift port 11 is equipped with elevator protective door, and channel Box 2 uses thickness range for the checkered steel plate of 2-4mm, and channel Box 2 Size can be configured according to specific condition of construction.Channel Box 2 is horizontally set on outside lift port 11, and channel Box 2 one end is hinged on the bottom plate of construction elevator 1, specifically, the two sides of 1 bottom plate of construction elevator are connected with link block 12, and It is rotatably connected on the both ends of rotation axis 3 respectively on two pieces of link blocks 12 equipped with rotation axis 3, the axial wall of rotation axis 3 is fixed in logical Pavement slab 2 is placed on the end in construction elevator 1, and the axial wall of rotation axis 3 is placed in the inside of channel Box 2, thus in elevator When 1 parked input and output material state of ontology, the protective door of elevator body 1 is opened, it is horizontal for only need to gradually overturning channel Box 2 State makes channel Box 2 ride upon the protection safety door on architecture noumenon in advance far from one end face of lift port 11 and until takes It is located on the outer of architecture noumenon, the access platform for construction material or construction personnel's transport is formed by channel Box 2, using logical 1 integrated setting of pavement slab 2 and elevator body had both saved cost, has reduced labor without separately taking transport channel platform at the construction field (site) Power also saves the step of mounting and dismounting again, convenient for construction, reduces security risk, while in 1 operating status of elevator body When, channel Box 2 is gradually flipped up into vertical state (with reference to Fig. 3), it at this time can also be by channel Box as lift port 11 The sealing protective plate at place uses, and improves safety when elevator body operation.Wherein along panel on the upper surface of channel Box 2 Length direction be equipped with folding line, so that channel Box 2 is formed the upward arced configuration in protrusion, to make channel Box 2 is horizontally disposed For shipping platform in use, one Zhi Lidian of formation on the bottom plate of elevator body 1 is arranged in one end based on channel Box 2, separately One end, which rides upon, forms another branch force on the outer of architecture noumenon, can be dispersed using domes convenient for channel Box 2 Bearing capacity improves its bending resistance, increases the load-bearing property of channel Box 2, in order to improve the safety transported on channel Box 2 Property, anti-skid chequer is additionally provided on the upper surface of channel Box 2, and multiple small-sized square tubes are connected on the bottom surface of channel Box 2 The reinforcement of structure stupefied 8 (refers to Fig. 4), especially in the affixed reinforcement stupefied 8 in the bending place of channel Box 2, to increase channel Box 2 Bearing capacity, it is ensured that channel Box 2 is durable.Middle part is installed on the end that channel Box 2 is placed in elevator body 1 Anti- faulting of slab ends folded plate 7 creasy is formed, makes two flangings of anti-faulting of slab ends folded plate 7 that can carry out overturning adjusting along folding line, anti-faulting of slab ends is rolled over Hinge connection is placed in a wherein flanging for anti-faulting of slab ends folded plate 7 logical on the upper surface of channel Box 2 at the middle part folding line of plate 7 On the edge of pavement slab 2, another flanging is placed in elevator body 1, when construction elevator and floor beam stop position height are different When, the gradient that anti-faulting of slab ends folded plate 7 and 1 contacts baseplate of elevator body can be adjusted by hinge is horizontal to adjust channel Box 2 The gradient of placement makes construction elevator and structure flooring stop height so that channel Box 2 can smoothly be set up to floor beam Play the role of buffering when inconsistent, the stop error of elevator operator can be reduced.
As described above, being additionally provided with protective fence 4 in the two sides of channel Box 2, make the channel Box between two protective fences 4 2 form access platform, and protective fence 4 is U-shaped structure of the opening towards channel Box 2, and the both ends of 4 opening of protective fence are solid It connects on the panel of channel Box 2, specifically, integrally formed with fixed block 5 on the both ends of 4 opening of protective fence, and it is solid The both ends for determining block 5 are connect with the panel bolts of channel Box 2 respectively, and the entirety of protective fence 4 is made to be used for construction of prevention work personnel or big Type transports material, and forms handrail by the top half of protective fence 4, while when channel Box 2 to be gradually flipped up, channel The protective fence 4 of 2 two sides of panel is also overturn into elevator body 1, and the ground of elevator body 1 is resisted by the handrail position of protective fence 4 On plate, so that channel Box 2 be made, makes channel Box 2 at vertical state, channel Box 2 is avoided excessively to turn in elevator plate body 1 Turn.The both ends blocked bar 6, and block bar 6 are equipped in the middle part level of protective fence 4 to be integrally formed respectively on two side levers of protective fence 4, Make the railing 6 based on protective fence 4 for protecting middle-size and small-size transport material, avoids the gap between 4 liang of side levers of U-shaped protective fence is excessive from leading Cause to be easy the case where falling when transport of materials, improve the safety of protective fence 4, and the width of protective fence 4, highly can basis Specific condition of construction is configured.
A kind of access platform of construction elevator of the invention is cancelled elevator protective door on the basis of construction elevator, and is set The channel Box 2 being hinged on car-floor is set, in 1 operating status of elevator body, channel Box 2 is gradually flipped up into Vertical state can be used by channel Box 2 as the sealing protective plate of lift port 11 at this time, and elevator body 1 it is parked into When discharge state, only channel Box 2 need to gradually overturn as horizontality, keep channel Box 2 one far from lift port 11 proper To the protection safety door ridden upon on architecture noumenon in advance and until ride upon on the outer of architecture noumenon, by 2 shape of channel Box It is not necessarily at the access platform for construction material or construction personnel's transport using 1 integrated setting of channel Box 2 and elevator body Transport channel platform is separately taken at the construction field (site), has both been saved cost, has been reduced labour, has also saved the step of mounting and dismounting again, just In construction, security risk is reduced.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements without departing from theon the basis of the spirit of the present invention are fallen within the scope of the claimed invention.

Claims (10)

1. a kind of access platform of construction elevator, it is characterised in that: the access platform includes elevator body (1) and is mounted on electricity Channel Box (2) in terraced ontology (1), the elevator body (1) are protected with respect to being formed on one side from live ladder for architecture noumenon The lift port (11) of door, the channel Box (2) is horizontally set on lift port (11) outside, and one end of channel Box (2) is hinged On the bottom plate of elevator body (1), it overturn channel Box (2) can to elevator body (1), and in channel Box (2) It is equipped with folding line along the length direction of panel on upper surface, channel Box (2) is made to form the upward arced configuration in protrusion.
2. a kind of access platform of construction elevator according to claim 1, it is characterised in that: elevator body (1) bottom The two sides of plate are connected with link block (12), and being equipped with rotation axis (3) makes the both ends of rotation axis (3) be rotatably connected on two pieces respectively On link block (12), the axial wall of the rotation axis (3) is fixed in channel Box (2) and is placed on the end in elevator body (1).
3. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2) Two sides are equipped with protective fence (4), and the channel Box (2) between two protective fences (4) is made to form access platform.
4. a kind of access platform of construction elevator according to claim 3, it is characterised in that: the protective fence (4) is to open Mouthful towards channel Box (2) U-shaped structure, and the both ends of protective fence (4) opening are fixed in the panel of channel Box (2) On.
5. a kind of access platform of construction elevator according to claim 4, it is characterised in that: protective fence (4) opening Integrally formed with fixed block (5) on the both ends at place, the both ends of the fixed block (5) the panel spiral shell with channel Box (2) respectively It tethers and connects.
6. a kind of access platform of construction elevator according to claim 4, it is characterised in that: in the protective fence (4) Portion's level is equipped with and blocks bar (6), and the both ends for blocking bar (6) are integrally formed respectively on two side levers of protective fence (4).
7. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2) is set Anti- faulting of slab ends folded plate (7) creasy, the anti-faulting of slab ends folded plate (7) are formed in being equipped with middle part on the end in elevator body (1) Middle part folding line at hinge connection on the upper surface of channel Box (2).
8. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2) Multiple reinforcements stupefied (8) are connected on bottom surface.
9. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2) Thickness range is 2-4mm.
10. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2) Upper surface is equipped with anti-skid chequer.
CN201811642431.2A 2018-12-27 2018-12-29 A kind of access platform of construction elevator Pending CN109484951A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018116137977 2018-12-27
CN201811613797 2018-12-27

Publications (1)

Publication Number Publication Date
CN109484951A true CN109484951A (en) 2019-03-19

Family

ID=65713566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811642431.2A Pending CN109484951A (en) 2018-12-27 2018-12-29 A kind of access platform of construction elevator

Country Status (1)

Country Link
CN (1) CN109484951A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114873412A (en) * 2022-05-09 2022-08-09 中国一冶集团有限公司 Elevator floor connecting device and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202808143U (en) * 2012-07-31 2013-03-20 中天建设集团有限公司天津分公司 Passage structure among construction elevator and floors
CN203946757U (en) * 2014-07-02 2014-11-19 厦门康柏机械集团有限公司 A kind of construction elevator cage plate-turning door
KR20150010060A (en) * 2013-07-18 2015-01-28 윤혜진 Lift apparatus for construction
CN204675591U (en) * 2015-04-21 2015-09-30 广东新裕华重工科技有限公司 A kind of little reverse turning bed structure of elevator craning cage
CN207774569U (en) * 2017-12-21 2018-08-28 河北建设集团股份有限公司 Building hoist self-action safe pedal device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202808143U (en) * 2012-07-31 2013-03-20 中天建设集团有限公司天津分公司 Passage structure among construction elevator and floors
KR20150010060A (en) * 2013-07-18 2015-01-28 윤혜진 Lift apparatus for construction
CN203946757U (en) * 2014-07-02 2014-11-19 厦门康柏机械集团有限公司 A kind of construction elevator cage plate-turning door
CN204675591U (en) * 2015-04-21 2015-09-30 广东新裕华重工科技有限公司 A kind of little reverse turning bed structure of elevator craning cage
CN207774569U (en) * 2017-12-21 2018-08-28 河北建设集团股份有限公司 Building hoist self-action safe pedal device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114873412A (en) * 2022-05-09 2022-08-09 中国一冶集团有限公司 Elevator floor connecting device and using method thereof
CN114873412B (en) * 2022-05-09 2024-01-12 中国一冶集团有限公司 Floor connecting device of lifter and using method thereof

Similar Documents

Publication Publication Date Title
AU2016203815B2 (en) Hoisting Apparatus and System
US8511039B2 (en) Safety barrier for multi-storey buildings
US11345571B2 (en) Rack-and-pinion elevator system having a protective roof
RU63305U1 (en) FREIGHT WAGON BODY
CN109484951A (en) A kind of access platform of construction elevator
EP1918479A1 (en) Stair system
IT201800011085A1 (en) MOBILE COVERING ELEMENT FOR A COVERING APPARATUS, PREFERABLY AN ADJUSTABLE TYPE SUNSCREEN
DE3714053C2 (en) Elevator for passenger transportation
US3448554A (en) Vertical walls constructed of uprights and detachable panels and structures comprising them
CN206256702U (en) A kind of 3 D stereo operating platform installed for steel columns of steel structures
CN206969947U (en) Stagnant empty formula construction elevator
CN106013637B (en) Subway station L-type staircase structure
CN106395571B (en) A kind of elevator
KR102178186B1 (en) Expandable bucket safety handrail structure with foldable structure
KR102178504B1 (en) Elevator door safety apparatus for construction site
CN209307845U (en) A kind of modular Multidirectional displacement bridge expansion device
EP0579024A1 (en) Elevator shaft for prefabricated multi-storey buildings
CN207032835U (en) A kind of construction lifting platform
ITBG20100012A1 (en) MODULAR STRUCTURE FOR SCAFFOLDING AND THE LIKE
KR20200134999A (en) up-lift control and Anti-fall prevention steel box girder bridge
EP1619323B1 (en) Underground transformer substation with baffle-barrier device
JP7133444B2 (en) mesh sheet
KR102612484B1 (en) A prefabricated high-place workable
CN219859993U (en) Passageway platform between construction elevator and building
CN114873412B (en) Floor connecting device of lifter and using method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319