CN109484951A - A kind of access platform of construction elevator - Google Patents
A kind of access platform of construction elevator Download PDFInfo
- Publication number
- CN109484951A CN109484951A CN201811642431.2A CN201811642431A CN109484951A CN 109484951 A CN109484951 A CN 109484951A CN 201811642431 A CN201811642431 A CN 201811642431A CN 109484951 A CN109484951 A CN 109484951A
- Authority
- CN
- China
- Prior art keywords
- channel box
- access platform
- construction
- construction elevator
- elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/006—Applications of loading and unloading equipment for lifts associated with buildings
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
The embodiment of the invention discloses a kind of access platforms of construction elevator, including elevator body and the channel Box being mounted in elevator body, the channel Box is horizontally set on outside lift port, and one end of channel Box is hinged on the bottom plate of elevator body, and folding line is equipped with along the length direction of panel on the upper surface of channel Box, channel Box is set to form the upward arced configuration in protrusion, the two sides of the channel Box are equipped with protective fence, and the channel Box between two protective fences is made to form access platform.A kind of access platform of construction elevator of the invention utilizes channel Box and construction elevator integrated setting, without separately taking transport channel platform at the construction field (site), cost was both saved, has reduced labour, and also saved the step of mounting and dismounting again, convenient for construction, security risk is reduced.
Description
Technical field
The present embodiments relate to technical field of building construction, and in particular to a kind of access platform of construction elevator.
Background technique
Construction elevator will be generally set in high-building construction, but construction elevator is to have one between building
Fixed spacing, it is therefore desirable to which transport channel platform is set between construction elevator and floor building, to solve construction material, apply
The transportation problem of worker person.
The prior art is at the construction field (site) by setting up security protection scaffold, paving between construction elevator and floor building
Template, I-steel etc. form shipping platform channel, but set up safety protection frame and need to expend a large amount of circulation material, and increase is applied
Work cost, next is set up safety protection frame and personnel is needed to construct, and increases labor cost, and sets up safety protection frame and belong to
High altitude operation needs to install and dismantle, difficulty of construction is big, speed is slow, construction when security risk it is larger.
Summary of the invention
For this purpose, the embodiment of the present invention provides a kind of access platform of construction elevator, to solve in the prior art due to building
It builds construction site and sets up the problem of construction cost caused by safety protection frame is high, labor cost is high and difficulty of construction is big.
To achieve the goals above, embodiments of the present invention provide the following technical solutions:
In embodiments of the present invention, a kind of access platform of construction elevator is provided, comprising: elevator body and installation
Channel Box in elevator body, the electricity that is on one side formed with from live ladder protective door of the elevator body with respect to architecture noumenon
Ladder way, the channel Box are horizontally set on outside lift port, and one end of channel Box is hinged on the bottom plate of elevator body, is made
Channel Box can be overturn to elevator body, and be equipped with folding line along the length direction of panel on the upper surface of channel Box,
Channel Box is set to form the upward arced configuration in protrusion.
By using above-mentioned technical proposal, the channel Box being hinged on car-floor is set, elevator body it is parked into
When discharge state, only channel Box need to gradually be overturn as horizontality, keep one end face of the channel Box far from lift port pre-
It first rides upon the protection safety door on architecture noumenon and until ride upon on the outer of architecture noumenon, confession is formed by channel Box and is built
The access platform for building material or construction personnel's transport, using channel Box and construction elevator integrated setting, without existing in construction
Transport channel platform is separately taken in field, has both saved cost, has reduced labour, also saved the step of mounting and dismounting again, convenient for construction, has subtracted
Few security risk, while in elevator body operating status, channel Box is gradually flipped up into vertical state, makes surface channel
Plate can be overturn to elevator body, can be used at this time by channel Box as the sealing protective plate of lift port, and elevator is improved
Safety when this running body makes channel Box form protrusion to arch wherein being equipped with folding line on the upper surface of channel Box
Shape structure, to be horizontally disposed with as shipping platform in channel Box in use, one end based on channel Box is arranged in elevator
A Zhi Lidian is formed on the bottom plate of ontology, the other end rides upon and forms another branch force on the outer of architecture noumenon, utilizes
Domes can disperse bearing capacity convenient for channel Box, improve its bending resistance, increase the load-bearing property of channel Box.
Further, the two sides of the elevator body bottom plate are connected with link block, and make rotation axis equipped with rotation axis
Both ends are rotatably connected on respectively on two pieces of link blocks, and the axial wall of the rotation axis is fixed in channel Box and is placed in construction elevator
On end.
Further, the two sides of the channel Box are equipped with protective fence, make the channel Box shape between two protective fences
At access platform.
Further, the protective fence is U-shaped structure of the opening towards channel Box, and the both ends of protective fence opening are equal
It is fixed on the panel of channel Box.
Further, integrally formed with fixed block, the both ends of the fixed block on the both ends of the protective fence opening
It is connect respectively with the panel bolts of channel Box.
Further, the middle part level of the protective fence, which is equipped with, blocks bar, and the both ends for blocking bar are integrally formed respectively anti-
On two side levers of guardrail.
By using above-mentioned technical proposal, protective fence is set, makes the entirety of protective fence for construction of prevention work personnel or large size
Material is transported, and handrail is formed by the top half of protective fence, railing is added in the middle part of protective fence, makes the column based on protective fence
Bar avoids the gap between U-shaped two side lever of protective fence is excessive from causing to be easy when transport of materials for protecting middle-size and small-size transport material
The case where falling, improves the safety of protective fence, and the width of protective fence, is highly set according to specific condition of construction
It sets.
Further, the channel Box, which is placed on the end in elevator body, is equipped with middle part formation mistake proofing creasy
Platform folded plate, hinge connection is on the upper surface of channel Box at the middle part folding line of the anti-faulting of slab ends folded plate.
By using above-mentioned technical proposal, in channel Box is placed on the end in elevator body and has been connected by hinge
Portion forms anti-faulting of slab ends folded plate creasy, wherein the thickness with a thickness of 3 profiled sheets of anti-faulting of slab ends folded plate, and roll over anti-faulting of slab ends
A wherein flanging for plate is placed on the edge of channel Box, and another flanging is placed in elevator body, when construction elevator and floor beam
When stop position height is different, anti-faulting of slab ends folded plate can be adjusted by hinge with the gradient of elevator body contacts baseplate to adjust
The horizontal positioned gradient of section channel Box makes construction elevator and knot so that channel Box can smoothly be set up to floor beam
Structure flooring plays the role of buffering when stopping highly inconsistent, can reduce the stop error of elevator operator.
Further, it is stupefied that multiple reinforcements are connected on the bottom surface of the channel Box.
By using above-mentioned technical proposal, the reinforcement of multiple small-sized rhs-structures is connected on the bottom surface of channel Box
It is stupefied, to increase the bearing capacity of channel Box, it is ensured that channel Box is durable.
Further, the thickness range of the channel Box is 2-4mm.
Further, the upper surface of the channel Box is equipped with anti-skid chequer.
Embodiment according to the present invention, a kind of access platform of construction elevator have the advantages that setting is hinged on electricity
Channel Box is gradually flipped up into vertical state, at this time in elevator body operating status by the channel Box on terraced bottom plate
Can be used by channel Box as the sealing protective plate of lift port, and in the parked input and output material state of elevator body, only need by
It is horizontality that channel Box, which is gradually overturn, rides upon channel Box on architecture noumenon in advance far from one end face of lift port
Protection safety door and until ride upon on the outer of architecture noumenon, is formed by channel Box and is transported for construction material or construction personnel
Defeated access platform, using channel Box and construction elevator integrated setting, without separately taking transport channel platform at the construction field (site),
Both it saved cost, reduced labour, and also saved the step of mounting and dismounting again, and convenient for construction, reduced security risk.
Detailed description of the invention
It, below will be to embodiment party in order to illustrate more clearly of embodiments of the present invention or technical solution in the prior art
Formula or attached drawing needed to be used in the description of the prior art are briefly described.It should be evident that the accompanying drawings in the following description is only
It is merely exemplary, it for those of ordinary skill in the art, without creative efforts, can also basis
The attached drawing of offer, which is extended, obtains other implementation attached drawings.
Structure depicted in this specification, ratio, size etc., only to cooperate the revealed content of specification, for
Those skilled in the art understands and reads, and is not intended to limit the invention enforceable qualifications, therefore does not have technical
Essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the function of the invention that can be generated
Under effect and the purpose that can reach, should all still it fall in the range of disclosed technology contents obtain and can cover.
Fig. 1 is a kind of overall structure diagram of the access platform of construction elevator provided in an embodiment of the present invention;
Fig. 2 is that a kind of channel Box overturning horizontality of access platform of construction elevator provided in an embodiment of the present invention is shown
It is intended to;
Fig. 3 is that a kind of channel Box overturning vertical state of access platform of construction elevator provided in an embodiment of the present invention is shown
It is intended to;
Fig. 4 is the enlarged diagram of A structure in Fig. 2.
In figure: 1, elevator body;11, lift port;12, link block;2, channel Box;3, rotation axis;4, protective fence;5, solid
Determine block;6, bar is blocked;7, anti-faulting of slab ends folded plate;8, reinforce stupefied.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation
Content disclosed by book is understood other advantages and efficacy of the present invention easily, it is clear that described embodiment is the present invention one
Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing
Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
The term of cited such as "upper", "lower", "left", "right", " centre ", is merely convenient to describe in this specification
Be illustrated, rather than to limit the scope of the invention, relativeness is altered or modified, and is changing technology without essence
It inside holds, when being also considered as the enforceable scope of the present invention.
Embodiment 1
As depicted in figs. 1 and 2, the embodiment of the invention provides a kind of access platforms of construction elevator, including elevator body 1
With the channel Box 2 being mounted in elevator body 1.Lift port 11 is formed with respect to the one side of architecture noumenon in construction elevator, it is described
Lift port 11 is equipped with elevator protective door, and channel Box 2 uses thickness range for the checkered steel plate of 2-4mm, and channel Box 2
Size can be configured according to specific condition of construction.Channel Box 2 is horizontally set on outside lift port 11, and channel Box
2 one end is hinged on the bottom plate of construction elevator 1, specifically, the two sides of 1 bottom plate of construction elevator are connected with link block 12, and
It is rotatably connected on the both ends of rotation axis 3 respectively on two pieces of link blocks 12 equipped with rotation axis 3, the axial wall of rotation axis 3 is fixed in logical
Pavement slab 2 is placed on the end in construction elevator 1, and the axial wall of rotation axis 3 is placed in the inside of channel Box 2, thus in elevator
When 1 parked input and output material state of ontology, the protective door of elevator body 1 is opened, it is horizontal for only need to gradually overturning channel Box 2
State makes channel Box 2 ride upon the protection safety door on architecture noumenon in advance far from one end face of lift port 11 and until takes
It is located on the outer of architecture noumenon, the access platform for construction material or construction personnel's transport is formed by channel Box 2, using logical
1 integrated setting of pavement slab 2 and elevator body had both saved cost, has reduced labor without separately taking transport channel platform at the construction field (site)
Power also saves the step of mounting and dismounting again, convenient for construction, reduces security risk, while in 1 operating status of elevator body
When, channel Box 2 is gradually flipped up into vertical state (with reference to Fig. 3), it at this time can also be by channel Box as lift port 11
The sealing protective plate at place uses, and improves safety when elevator body operation.Wherein along panel on the upper surface of channel Box 2
Length direction be equipped with folding line, so that channel Box 2 is formed the upward arced configuration in protrusion, to make channel Box 2 is horizontally disposed
For shipping platform in use, one Zhi Lidian of formation on the bottom plate of elevator body 1 is arranged in one end based on channel Box 2, separately
One end, which rides upon, forms another branch force on the outer of architecture noumenon, can be dispersed using domes convenient for channel Box 2
Bearing capacity improves its bending resistance, increases the load-bearing property of channel Box 2, in order to improve the safety transported on channel Box 2
Property, anti-skid chequer is additionally provided on the upper surface of channel Box 2, and multiple small-sized square tubes are connected on the bottom surface of channel Box 2
The reinforcement of structure stupefied 8 (refers to Fig. 4), especially in the affixed reinforcement stupefied 8 in the bending place of channel Box 2, to increase channel Box 2
Bearing capacity, it is ensured that channel Box 2 is durable.Middle part is installed on the end that channel Box 2 is placed in elevator body 1
Anti- faulting of slab ends folded plate 7 creasy is formed, makes two flangings of anti-faulting of slab ends folded plate 7 that can carry out overturning adjusting along folding line, anti-faulting of slab ends is rolled over
Hinge connection is placed in a wherein flanging for anti-faulting of slab ends folded plate 7 logical on the upper surface of channel Box 2 at the middle part folding line of plate 7
On the edge of pavement slab 2, another flanging is placed in elevator body 1, when construction elevator and floor beam stop position height are different
When, the gradient that anti-faulting of slab ends folded plate 7 and 1 contacts baseplate of elevator body can be adjusted by hinge is horizontal to adjust channel Box 2
The gradient of placement makes construction elevator and structure flooring stop height so that channel Box 2 can smoothly be set up to floor beam
Play the role of buffering when inconsistent, the stop error of elevator operator can be reduced.
As described above, being additionally provided with protective fence 4 in the two sides of channel Box 2, make the channel Box between two protective fences 4
2 form access platform, and protective fence 4 is U-shaped structure of the opening towards channel Box 2, and the both ends of 4 opening of protective fence are solid
It connects on the panel of channel Box 2, specifically, integrally formed with fixed block 5 on the both ends of 4 opening of protective fence, and it is solid
The both ends for determining block 5 are connect with the panel bolts of channel Box 2 respectively, and the entirety of protective fence 4 is made to be used for construction of prevention work personnel or big
Type transports material, and forms handrail by the top half of protective fence 4, while when channel Box 2 to be gradually flipped up, channel
The protective fence 4 of 2 two sides of panel is also overturn into elevator body 1, and the ground of elevator body 1 is resisted by the handrail position of protective fence 4
On plate, so that channel Box 2 be made, makes channel Box 2 at vertical state, channel Box 2 is avoided excessively to turn in elevator plate body 1
Turn.The both ends blocked bar 6, and block bar 6 are equipped in the middle part level of protective fence 4 to be integrally formed respectively on two side levers of protective fence 4,
Make the railing 6 based on protective fence 4 for protecting middle-size and small-size transport material, avoids the gap between 4 liang of side levers of U-shaped protective fence is excessive from leading
Cause to be easy the case where falling when transport of materials, improve the safety of protective fence 4, and the width of protective fence 4, highly can basis
Specific condition of construction is configured.
A kind of access platform of construction elevator of the invention is cancelled elevator protective door on the basis of construction elevator, and is set
The channel Box 2 being hinged on car-floor is set, in 1 operating status of elevator body, channel Box 2 is gradually flipped up into
Vertical state can be used by channel Box 2 as the sealing protective plate of lift port 11 at this time, and elevator body 1 it is parked into
When discharge state, only channel Box 2 need to gradually overturn as horizontality, keep channel Box 2 one far from lift port 11 proper
To the protection safety door ridden upon on architecture noumenon in advance and until ride upon on the outer of architecture noumenon, by 2 shape of channel Box
It is not necessarily at the access platform for construction material or construction personnel's transport using 1 integrated setting of channel Box 2 and elevator body
Transport channel platform is separately taken at the construction field (site), has both been saved cost, has been reduced labour, has also saved the step of mounting and dismounting again, just
In construction, security risk is reduced.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this
On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore,
These modifications or improvements without departing from theon the basis of the spirit of the present invention are fallen within the scope of the claimed invention.
Claims (10)
1. a kind of access platform of construction elevator, it is characterised in that: the access platform includes elevator body (1) and is mounted on electricity
Channel Box (2) in terraced ontology (1), the elevator body (1) are protected with respect to being formed on one side from live ladder for architecture noumenon
The lift port (11) of door, the channel Box (2) is horizontally set on lift port (11) outside, and one end of channel Box (2) is hinged
On the bottom plate of elevator body (1), it overturn channel Box (2) can to elevator body (1), and in channel Box (2)
It is equipped with folding line along the length direction of panel on upper surface, channel Box (2) is made to form the upward arced configuration in protrusion.
2. a kind of access platform of construction elevator according to claim 1, it is characterised in that: elevator body (1) bottom
The two sides of plate are connected with link block (12), and being equipped with rotation axis (3) makes the both ends of rotation axis (3) be rotatably connected on two pieces respectively
On link block (12), the axial wall of the rotation axis (3) is fixed in channel Box (2) and is placed on the end in elevator body (1).
3. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2)
Two sides are equipped with protective fence (4), and the channel Box (2) between two protective fences (4) is made to form access platform.
4. a kind of access platform of construction elevator according to claim 3, it is characterised in that: the protective fence (4) is to open
Mouthful towards channel Box (2) U-shaped structure, and the both ends of protective fence (4) opening are fixed in the panel of channel Box (2)
On.
5. a kind of access platform of construction elevator according to claim 4, it is characterised in that: protective fence (4) opening
Integrally formed with fixed block (5) on the both ends at place, the both ends of the fixed block (5) the panel spiral shell with channel Box (2) respectively
It tethers and connects.
6. a kind of access platform of construction elevator according to claim 4, it is characterised in that: in the protective fence (4)
Portion's level is equipped with and blocks bar (6), and the both ends for blocking bar (6) are integrally formed respectively on two side levers of protective fence (4).
7. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2) is set
Anti- faulting of slab ends folded plate (7) creasy, the anti-faulting of slab ends folded plate (7) are formed in being equipped with middle part on the end in elevator body (1)
Middle part folding line at hinge connection on the upper surface of channel Box (2).
8. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2)
Multiple reinforcements stupefied (8) are connected on bottom surface.
9. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2)
Thickness range is 2-4mm.
10. a kind of access platform of construction elevator according to claim 1, it is characterised in that: the channel Box (2)
Upper surface is equipped with anti-skid chequer.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2018116137977 | 2018-12-27 | ||
CN201811613797 | 2018-12-27 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109484951A true CN109484951A (en) | 2019-03-19 |
Family
ID=65713566
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811642431.2A Pending CN109484951A (en) | 2018-12-27 | 2018-12-29 | A kind of access platform of construction elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109484951A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114873412A (en) * | 2022-05-09 | 2022-08-09 | 中国一冶集团有限公司 | Elevator floor connecting device and using method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202808143U (en) * | 2012-07-31 | 2013-03-20 | 中天建设集团有限公司天津分公司 | Passage structure among construction elevator and floors |
CN203946757U (en) * | 2014-07-02 | 2014-11-19 | 厦门康柏机械集团有限公司 | A kind of construction elevator cage plate-turning door |
KR20150010060A (en) * | 2013-07-18 | 2015-01-28 | 윤혜진 | Lift apparatus for construction |
CN204675591U (en) * | 2015-04-21 | 2015-09-30 | 广东新裕华重工科技有限公司 | A kind of little reverse turning bed structure of elevator craning cage |
CN207774569U (en) * | 2017-12-21 | 2018-08-28 | 河北建设集团股份有限公司 | Building hoist self-action safe pedal device |
-
2018
- 2018-12-29 CN CN201811642431.2A patent/CN109484951A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202808143U (en) * | 2012-07-31 | 2013-03-20 | 中天建设集团有限公司天津分公司 | Passage structure among construction elevator and floors |
KR20150010060A (en) * | 2013-07-18 | 2015-01-28 | 윤혜진 | Lift apparatus for construction |
CN203946757U (en) * | 2014-07-02 | 2014-11-19 | 厦门康柏机械集团有限公司 | A kind of construction elevator cage plate-turning door |
CN204675591U (en) * | 2015-04-21 | 2015-09-30 | 广东新裕华重工科技有限公司 | A kind of little reverse turning bed structure of elevator craning cage |
CN207774569U (en) * | 2017-12-21 | 2018-08-28 | 河北建设集团股份有限公司 | Building hoist self-action safe pedal device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114873412A (en) * | 2022-05-09 | 2022-08-09 | 中国一冶集团有限公司 | Elevator floor connecting device and using method thereof |
CN114873412B (en) * | 2022-05-09 | 2024-01-12 | 中国一冶集团有限公司 | Floor connecting device of lifter and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2016203815B2 (en) | Hoisting Apparatus and System | |
US8511039B2 (en) | Safety barrier for multi-storey buildings | |
US11345571B2 (en) | Rack-and-pinion elevator system having a protective roof | |
RU63305U1 (en) | FREIGHT WAGON BODY | |
CN109484951A (en) | A kind of access platform of construction elevator | |
EP1918479A1 (en) | Stair system | |
IT201800011085A1 (en) | MOBILE COVERING ELEMENT FOR A COVERING APPARATUS, PREFERABLY AN ADJUSTABLE TYPE SUNSCREEN | |
DE3714053C2 (en) | Elevator for passenger transportation | |
US3448554A (en) | Vertical walls constructed of uprights and detachable panels and structures comprising them | |
CN206256702U (en) | A kind of 3 D stereo operating platform installed for steel columns of steel structures | |
CN206969947U (en) | Stagnant empty formula construction elevator | |
CN106013637B (en) | Subway station L-type staircase structure | |
CN106395571B (en) | A kind of elevator | |
KR102178186B1 (en) | Expandable bucket safety handrail structure with foldable structure | |
KR102178504B1 (en) | Elevator door safety apparatus for construction site | |
CN209307845U (en) | A kind of modular Multidirectional displacement bridge expansion device | |
EP0579024A1 (en) | Elevator shaft for prefabricated multi-storey buildings | |
CN207032835U (en) | A kind of construction lifting platform | |
ITBG20100012A1 (en) | MODULAR STRUCTURE FOR SCAFFOLDING AND THE LIKE | |
KR20200134999A (en) | up-lift control and Anti-fall prevention steel box girder bridge | |
EP1619323B1 (en) | Underground transformer substation with baffle-barrier device | |
JP7133444B2 (en) | mesh sheet | |
KR102612484B1 (en) | A prefabricated high-place workable | |
CN219859993U (en) | Passageway platform between construction elevator and building | |
CN114873412B (en) | Floor connecting device of lifter and using method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190319 |