CN109406365A - A kind of three axis gas injection experimental rig of geotechnique and method of fast assembling-disassembling - Google Patents

A kind of three axis gas injection experimental rig of geotechnique and method of fast assembling-disassembling Download PDF

Info

Publication number
CN109406365A
CN109406365A CN201811446176.4A CN201811446176A CN109406365A CN 109406365 A CN109406365 A CN 109406365A CN 201811446176 A CN201811446176 A CN 201811446176A CN 109406365 A CN109406365 A CN 109406365A
Authority
CN
China
Prior art keywords
pressure
pipe
gas injection
boss
top cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811446176.4A
Other languages
Chinese (zh)
Inventor
王勇
何维
孔令伟
任文其
杨志勇
王艳丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201811446176.4A priority Critical patent/CN109406365A/en
Publication of CN109406365A publication Critical patent/CN109406365A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume, or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N13/00Investigating surface or boundary effects, e.g. wetting power; Investigating diffusion effects; Analysing materials by determining surface, boundary, or diffusion effects
    • G01N13/04Investigating osmotic effects
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume, or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/0806Details, e.g. sample holders, mounting samples for testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume, or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/082Investigating permeability by forcing a fluid through a sample
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume, or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N2015/0813Measuring intrusion, e.g. of mercury

Landscapes

  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Dispersion Chemistry (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses the three axis gas injection experimental rigs of geotechnique and method of a kind of fast assembling-disassembling, including pedestal, top cap and latex film, base top central protuberance is equipped with first boss, lower part permeable stone is fitted with outside the first boss of pedestal, first boss center is equipped with gas injection needle, pedestal side section is not connected with external air injection pipe and external water injection pipe, top cap bottom centre protrusion is equipped with second boss, top permeable stone is fitted with outside second boss, top cap side is connected with back-pressure pipe, back-pressure communicating pipe is equipped with inside top cap, the input end of back-pressure communicating pipe is placed at the top of the permeable stone of top, the outlet end of back-pressure communicating pipe is connected with back-pressure pipe;Latex film is connected between top cap and pedestal, latex film top is closed to be set in top cap bottom outside, and latex film bottom is closed to be set on the outside of base top.The present invention has many advantages, such as that structure is simple, installation and removal are quick, can be realized the free switching between ordinary triaxial test and gas injection test.

Description

A kind of three axis gas injection experimental rig of geotechnique and method of fast assembling-disassembling
Technical field
The present invention relates to geotechnical engineering geotechnique's laboratory test technical field more particularly to a kind of three axis of geotechnique of fast assembling-disassembling Gas injection experimental rig and method.
Background technique
Currently, usually needing transport issues of the learning gas in rock soil medium in geotechnical engineering field.Such as: in large area Weak soil Dredger Filling Engineering in, frequently with pressed gas injection hydraulic reclamation soil layer in cause the soil body to cleave under gas pressure, to reach To the effect of quick-discharging consolidation;In the engineering measure for administering sand liquefaction, has to inject bubble in sand and prevent and treat sand Liquefied method;In city refuse landfill engineering, the gas that rubbish generates for a long time to cover capping layer failure;Seabed The free gas of preservation can penetrate overlying water and close object cap rock and loss etc. into ocean under gas hydrates layer, such It is both needed in engineering it is to be understood that migration and intrusive behavior of the pressed gas in rock soil medium.However, geotechnological three axis in current interior There is no gas injection experimental rig in testing equipment.Although existing unsaturation triaxial apparatus can be filled with gas into three axis samples, It is that injecting hole is located on the contact surface of pedestal and sample, pressed gas often just passes through sample and latex before not entering into sample It is escaped in the gap of membrane boundary, so as to cause being difficult to the accurate migration with quantitatively research pressed gas in rock soil medium and invading Enter behavior.If directly reequiping the specimen mount of existing triaxial test instrument, original understructure can be not only destroyed, is influenced Geotechnical centrifuge model operation, and installation and removal are also very complicated, are unfavorable for the development of three axis gas injection experimental studies.
Summary of the invention
Place in view of the shortcomings of the prior art, the purpose of the present invention is to provide a kind of three axis of geotechnique of fast assembling-disassembling Gas injection experimental rig and method can not change the specimen mount structure of existing ordinary triaxial test equipment, directly be sleeved on original Have on the pedestal of normal triaxial, the quantification Study on Triaxial Tests that gas is migrated and invaded in rock soil medium can be completed.This Invention has many advantages, such as the advantages of structure is simple, installation and removal are quick, does not influence original ordinary triaxial test device structure, energy Enough realize the free switching between ordinary triaxial test and gas injection test.
The purpose of the invention is achieved by the following technical solution:
A kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling, including pedestal, top cap and latex film, the base top Central protuberance is equipped with first boss, and the lower part permeable stone of circular ring shape is fitted with outside the first boss of the pedestal, described First boss center is equipped with gas injection needle, and the pedestal side section is not connected with external air injection pipe and external water injection pipe, the bottom Seat is internal to be equipped with connection water pipe and connectivity trachea, and the water inlet end of the connection water pipe is connected with external water injection pipe, the connection The water outlet of water pipe is placed in lower part permeable stone bottom, and the inlet end of the connectivity trachea is connected with external air injection pipe, the company The outlet side of snorkel is connected with gas injection needle;Top cap bottom centre protrusion is equipped with second boss, outside the second boss Portion is fitted with the top permeable stone of circular ring shape, and the top cap side is connected with back-pressure pipe, is equipped with back-pressure inside the top cap Communicating pipe, the input end of the back-pressure communicating pipe are placed at the top of the permeable stone of top, the outlet end of the back-pressure communicating pipe and back-pressure Pipe is connected;Latex film is connected between the top cap and pedestal, the latex film internal sleeve is equipped with soil sample, the latex film top Portion is packaged in top cap bottom outside by zero type sealing ring, which plays close between top cap bottom at the top of latex film The effect of envelope;The latex film bottom is packaged on the outside of base top by zero type sealing ring, which plays latex The effect sealed between film bottom and base top.Currently preferred zero type sealing ring is fabricated by rubber material.This hair Zero bright type sealing ring is technology contents known to the art public, be a kind of section is circular rubber ring, because of it Section is zero type, therefore is called zero type sealing ring, is mainly used between mechanical part preventing the leakage of liquids and gases medium, The dynamic sealing element of axially reciprocating and low-speed rotation can also be used as simultaneously;Zero type sealing ring is properly termed as circle again Sealing ring plays sealing function between two components.
In order to which the present invention is better achieved, it is recessed that base top recess on the outside of first boss is equipped with a circle pedestal The notch end of slot, the base groove is corresponding with lower part permeable stone bottom, the connection water pipe with base groove is closed is connected to; Top cap bottom recess on the outside of second boss is equipped with a circle top cap groove, and the notch end and top of the top cap groove are saturating Corresponding at the top of water stone, the back-pressure communicating pipe is connected to top cap groove sealing.
Preferably, the gas injection needle includes the gas injection needle tubing for connecting tube socket A and being plugged in connection tube socket A, the note Air tube tube top portion is placed in inside latex film, and the first boss center is provided with threaded hole, and the connection lower part tube socket A is external screw thread The external thread column A of column A, the connection tube socket A are threadedly connected in the threaded hole of first boss, the gas injection needle tubing be connected to gas Manage closed connection.
Preferably, the pedestal side is provided with gas injection threaded hole the invention also includes connection tube socket B and connection tube socket C With water filling threaded hole, there is the connection tube socket B external thread column B, the external thread column B of the connection tube socket B to be threadedly connected to bottom In the gas injection threaded hole of seat, there is the connection tube socket C external thread column C, the external thread column C of the connection tube socket C to be threadedly coupled In the water filling threaded hole of pedestal;There is the pipeline A of connection corresponding with connectivity trachea inside the connection tube socket B, it is described external In the closed pipeline A for being plugged in connection tube socket B of gas injection tube end;There is connect corresponding with connection water pipe inside the connection tube socket C In logical pipeline B, the external closed pipeline B for being plugged in connection tube socket C of water filling tube end.
Preferably, the top cap side is provided with back-pressure threaded hole, the connecting tube the invention also includes connection tube socket D There is seat D external thread column D, the external thread column D of the connection tube socket D to be threadedly connected in the back-pressure threaded hole of top cap, the company There is the pipeline C of connection corresponding with back-pressure communicating pipe, the back-pressure tube end is closed to be plugged in connection tube socket D inside stub (tube) D Pipeline C in.
Preferably, the pedestal, first boss are in cylindrical shape, the internal diameter of the lower part permeable stone and first convex The diameter of platform is equal, and the height of the lower part permeable stone is equal with the height of first boss, the outer diameter of the lower part permeable stone with The diameter of pedestal is equal.
Preferably, the top cap, second boss are in cylindrical shape, the internal diameter of the top permeable stone and second convex The diameter of platform is equal, and the height of the top permeable stone is equal with the height of second boss, the outer diameter of the top permeable stone with The diameter of top cap is equal.
Preferably, the back-pressure communicating pipe is made of back-pressure general pipeline and two back-pressure branch pipes, all back-pressure branch pipes are divided equally It is not connected with back-pressure general pipeline, it is different that the input end of all back-pressure branch pipes is respectively placed in the top cap inside grooves on the permeable stone of top The back-pressure general pipeline of position, the back-pressure communicating pipe is connected with back-pressure pipe.
Preferably, the base bottom is equipped with cutting ferrule, the routine the invention also includes normal triaxial instrument specimen mount Tight clamping fit is in cutting ferrule at the top of triaxial apparatus specimen mount.
A kind of three axis gas injection test method of geotechnique of fast assembling-disassembling, including geotechnological three axis gas injection experimental rigs, method step It is rapid as follows:
A, select the Ottawa AFS50/70 normal sand as soil sample, the relative compaction control of soil sample is 50%, by latex Film bottom is tightened with base top with zero type sealing ring, and is supported latex film with split cavity and fixed, currently preferred zero type Sealing ring is fabricated by rubber material;
B, drying and processing is carried out to the soil sample that step A is obtained, soil sample is weighed according to relative compaction, by weighed soil sample Divide five layers to fall into latex film through funnel, soil sample surface is struck off, whether measurement present level reaches requirement, when highly higher When, split cavity side wall need to be tapped using rubber hammer, settle sand, until height reaches requirement;Then top cap is installed, by latex Tightened with top cap bottom with zero type sealing ring at the top of film, be cased in this way latex film soil sample be just installed on top cap and pedestal it Between;By earthwork triaxial apparatus pressure chamber to the confining pressure of 30kPa is applied on the outside of soil sample to hold soil sample, currently preferred zero type is close Seal is fabricated by rubber material;
C, using the intrapore gas of carbon dioxide gas displacement soil sample, external air injection pipe is closed, external water injection pipe is passed through It is passed through carbon dioxide gas, gas flows out after passing through soil sample from back-pressure pipe, and venting process is not less than 2 hours, and venting pressure is little In the confining pressure for the soil sample being applied on latex film;
D, after the completion of ventilation, water flowing operation is carried out by external water injection pipe, water flows out after passing through soil sample from back-pressure pipe, external The water that water injection pipe is passed through is no steam distillation water, and water flowing pressure is not more than the confining pressure for the soil sample being applied on latex film;To back-pressure pipe After the water for flowing out twice of soil sample volume, stop water flowing operation;
E, back-pressure is saturated, and control effective confining pressure 150kPa is constant, applies back-pressure and confining pressure step by step, every to have increased level-one back-pressure After confining pressure, after pore pressure is stablized, the changing value of back-pressure is recorded, and calculate B value, B=back-pressure changing value/confining pressure changing value, to B After value is greater than 0.98, i.e., it is believed that soil sample is fully saturated;
F, control effective confining pressure 150kPa keep 2 hours it is constant sample is consolidated, consolidation style is using each to equipressure Consolidation;
G, external water injection pipe is closed, external air injection pipe is opened and carries out gas injection operation, gas is injected from external air injection pipe, just Beginning injection pressure is equal to the pore water pressure in soil sample, and gas injection pressure is incremented by step by step, and every grade of gas injecting time of control is identical, and sets It sets back-pressure to remain unchanged, and the back-pressure, pore pressure and the air pressure that finally obtain gas injection test change over time figure.
The present invention compared with the prior art, have the following advantages that and the utility model has the advantages that
(1) the present invention provides a kind of three axis gas injection experimental rig of the geotechnique of fast assembling-disassembling, original routine three is not being dismantled It is quickly reequiped in the case where axis instrument specimen mount, thus meet the needs of gas injection test, it, can using modular component Different components is matched according to testing program requirement.
(2) present invention has many advantages, such as that structure is simple, installation and removal are quick, can be realized ordinary triaxial test and gas injection Free switching between test.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of pedestal of the present invention and water filling, gas injection;
Fig. 3 is the structural schematic diagram of lower part permeable stone of the present invention;
Fig. 4 is the A-A cross-sectional view of Fig. 3;
Fig. 5 is the structural schematic diagram of gas injection needle of the present invention;
Fig. 6 is that back-pressure, pore pressure and air pressure change over time figure in the embodiment of the present invention.
Wherein, title corresponding to the appended drawing reference in attached drawing are as follows:
1- pedestal, the lower part 2- permeable stone, 3- gas injection needle, 31- connection tube socket A, 32- gas injection needle tubing, the external note of 4- Tracheae, the external water injection pipe of 41- connection tube socket B, 5-, 51- connection tube socket C, 6- top cap, 61- second boss, 7- conventional three Axis instrument specimen mount, 8- soil sample, 9- latex film, 10- back-pressure pipe, 101- connection tube socket D, 11- first boss, 12- connect Water service pipe, 13- connectivity trachea, 14- back-pressure communicating pipe, 15- cutting ferrule, the top 16- permeable stone, 17- base groove, 18- Top cap groove.
Specific embodiment
The present invention is described in further detail below with reference to embodiment:
Embodiment
As shown in fig. 1~fig. 5, the three axis gas injection experimental rig of geotechnique of a kind of fast assembling-disassembling, including pedestal 1, top cap 6 and cream Glue film 9,1 top center protrusion of pedestal are equipped with first boss 11, are fitted with circular ring shape outside the first boss 11 of pedestal 1 It is equal to place internal diameter, an outer diameter before installing lower part permeable stone 2 between lower part permeable stone 2 and pedestal 1 for lower part permeable stone 2 Equal to the annular filter paper of lower part permeable stone 2.The center of first boss 11 is equipped with gas injection needle 3, and 1 side of pedestal is connected separately with outer Air injection pipe 4 and external water injection pipe 5 are connect, connection water pipe 12 and connectivity trachea 13 is equipped with inside pedestal 1, is connected to the water inlet end of water pipe 12 It is connected with external air injection pipe 4, the water outlet of connection water pipe 12 is placed in 2 bottom of lower part permeable stone, the inlet end of connectivity trachea 13 It is connected with external water injection pipe 5, the outlet side of connectivity trachea 13 is connected with gas injection needle 3;6 bottom centre's protrusion of top cap is equipped with the Two boss 61 are fitted with the top permeable stone 16 of circular ring shape outside second boss 61, and 6 side of top cap is connected with back-pressure pipe 10, back-pressure communicating pipe 14 is equipped with inside top cap 6, the input end of back-pressure communicating pipe 14 is placed in 16 top of top permeable stone, and back-pressure connects The outlet end of siphunculus 14 is connected with back-pressure pipe 10;It is connected with latex film 9 between top cap 6 and pedestal 1, is set with inside latex film 9 There is a soil sample 8,6 bottom outside of top cap is packaged in by zero type sealing ring at the top of the latex film 9,9 bottom of latex film passes through Zero type sealing ring is packaged in 1 top outer of pedestal, and currently preferred zero type sealing ring is fabricated by rubber material.
Recess is equipped with a circle base groove 17 on the outside of first boss 11 at the top of pedestal 1 of the present invention, base groove 17 Notch end is corresponding with 2 bottom of lower part permeable stone, and connection water pipe 12 and base groove 17 is closed to be connected to (the present embodiment connection water pipe The water outlet at 12 tops with base groove 17 is closed is connected to);When external water injection pipe 5 carries out water flowing operation, external water injection pipe 5 is passed through It crosses connection water pipe 12 to be input in base groove 17, water is uniformly distributed in 2 bottom of lower part permeable stone by base groove 17, is made in this way It obtains water to enter in soil sample 8 uniformly through lower part permeable stone 2, base groove 17 can allow water uniformly through lower part permeable stone 2.Top 6 bottom of cap recess on the outside of second boss 61 is equipped with a circle top cap groove 18, and the notch end and top of top cap groove 18 are permeable The top of stone 16 is corresponding, back-pressure communicating pipe 14 and top cap groove 18 be closed to be connected to (the present embodiment back-pressure communicating pipe 14 bottom into Mouthful end with top cap groove 18 is closed is connected to);When in soil sample 8 gas or water top cap groove 18 is input to by top permeable stone 16 In, gas or water are uniformly distributed and are input in back-pressure communicating pipe 14 by top cap groove 18.
As shown in figure 5, gas injection needle 3 includes connection tube socket A31 and is plugged in the gas injection needle tubing 32 connected in tube socket A31, this The gas injection needle tubing 32 of invention has different standard caliber and length, and the gas injection needle 3 of different size can be matched according to experimental program It is connected with pedestal 1, is placed at the top of gas injection needle tubing 32 inside latex film 9,11 center of first boss is provided with threaded hole, connects tube socket The lower part A31 is external thread column A, and the external thread column A of connection tube socket A31 is threadedly connected in the threaded hole of first boss 11, gas injection Needle tubing 32 with connectivity trachea 13 is closed is connected to.
As shown in Fig. 2, 1 side of pedestal is provided with gas injection screw thread the invention also includes connection tube socket B41 and connection tube socket C51 There is external thread column B, the external thread column B of connection tube socket B41 to be threadedly connected to pedestal 1 by hole and water filling threaded hole, connection tube socket B41 Gas injection threaded hole in, connection tube socket C51 have external thread column C, connection tube socket C51 external thread column C be threadedly connected to pedestal 1 Water filling threaded hole in;Connect the pipeline A inside tube socket B41 with connection corresponding with connectivity trachea 13, external 4 end of air injection pipe In the closed pipeline A for being plugged in connection tube socket B41;Connect the pipeline inside tube socket C51 with connection corresponding with connection water pipe 12 In B, the closed pipeline B for being plugged in connection tube socket C51 in external 5 end of water injection pipe.
As shown in Figure 1,6 side of top cap is provided with back-pressure threaded hole the invention also includes connection tube socket D101, tube socket is connected There is D101 external thread column D, the external thread column D of connection tube socket D101 to be threadedly connected in the back-pressure threaded hole of top cap 6, connecting tube There is the pipeline C of connection corresponding with back-pressure communicating pipe 14,10 end of back-pressure pipe is closed to be plugged in connection tube socket inside seat D101 In the pipeline C of D101.
Currently preferred pedestal 1, first boss 11 are in cylindrical shape, the internal diameter of lower part permeable stone 2 and first convex The diameter of platform 11 is equal, and the height of lower part permeable stone 2 is equal with the height of first boss 11, the outer diameter of lower part permeable stone 2 and bottom The diameter of seat 1 is equal.
Currently preferred top cap 6, second boss 61 are in cylindrical shape, the internal diameter of top permeable stone 16 and second convex The diameter of platform 61 is equal, and the height of top permeable stone 16 is equal with the height of second boss 61, the outer diameter of top permeable stone 16 with The diameter of top cap 6 is equal.
As shown in Figure 1, back-pressure communicating pipe 14 is made of back-pressure general pipeline and two back-pressure branch pipes, all back-pressure branch pipes are distinguished It is connected with back-pressure general pipeline, the input end of all back-pressure branch pipes is respectively placed in inside the top cap groove 18 on top permeable stone 16 not The back-pressure general pipeline of same position, back-pressure communicating pipe 14 is connected with back-pressure pipe 10.
As shown in Figure 1,1 bottom of pedestal is equipped with cutting ferrule 15, routine three the invention also includes normal triaxial instrument specimen mount 7 7 top tight clamping fit of axis instrument specimen mount is in cutting ferrule 15.
As shown in Fig. 1~Fig. 6, the three axis gas injection test method of geotechnique of a kind of fast assembling-disassembling, it is characterised in that: including geotechnique Three axis gas injection experimental rigs, method and step are as follows:
A, select the Ottawa AFS50/70 normal sand as soil sample 8, the relative compaction control of soil sample 8 is 50%, will be newborn 9 bottom of glue film is tightened at the top of pedestal 1 with zero type sealing ring, and is supported latex film 9 with split cavity and fixed, currently preferred Zero type sealing ring is fabricated by rubber material;
B, drying and processing is carried out to the soil sample 8 that step A is obtained, soil sample 8 is weighed according to relative compaction, by weighed soil Sample 8 divides five layers to fall into latex film 9 through funnel, and 8 surface of soil sample is struck off, and whether measurement present level reaches requirement, when height When higher, split cavity side wall need to be tapped using rubber hammer, settle sand, until height reaches requirement;Then top cap 6 is installed, 9 top of latex film is tightened with 6 bottom of top cap with zero type sealing ring, the soil sample 8 equipped with latex film 9 is just installed on top cap 6 in this way Between pedestal 1;By earthwork triaxial apparatus pressure chamber on the outside of soil sample 8 apply 30kPa confining pressure to hold soil sample 8, the present invention Preferred zero type sealing ring is fabricated by rubber material;
C, using the intrapore gas of carbon dioxide gas displacement soil sample 8, external air injection pipe 4 is closed, external water filling is passed through Pipe 5 is passed through carbon dioxide gas, and gas flows out after passing through soil sample 8 from back-pressure pipe 10, and venting process is not less than 2 hours, ventilation pressure Power is not more than the confining pressure for the soil sample 8 being applied on latex film 9, and the venting pressure of the present embodiment uses 20kPa;
D, after the completion of ventilation, water flowing operation is carried out by external water injection pipe 5, water flows out after passing through soil sample 8 from back-pressure pipe 10, The water that external water injection pipe 5 is passed through is no steam distillation water, and water flowing pressure is not more than the confining pressure for the soil sample 8 being applied on latex film 9, this The water flowing pressure of embodiment uses 20kPa;After back-pressure pipe 10 flows out the water of twice of 8 volume of soil sample, stop water flowing operation;
E, back-pressure is saturated, and control effective confining pressure 150kPa is constant, applies back-pressure and confining pressure step by step, every to have increased level-one back-pressure After confining pressure, after pore pressure is stablized, the changing value of back-pressure is recorded, and calculate B value, B=back-pressure changing value/confining pressure changing value, to B After value is greater than 0.98, i.e., it is believed that soil sample 8 is fully saturated;
F, control effective confining pressure 150kPa keep 2 hours it is constant sample is consolidated, consolidation style is using each to equipressure Consolidation;
G, external water injection pipe 5 is closed, external air injection pipe 4 is opened and carries out gas injection operation, gas is from external 4 note of air injection pipe Enter, initial injection pressure is equal to the pore water pressure in soil sample 8, and gas injection pressure is incremented by step by step, controls every grade of gas injecting time phase Together, it and back-pressure is set remains unchanged, and the back-pressure, pore pressure and the air pressure that finally obtain gas injection test change over time figure (such as Fig. 6 institute Show).
Term used in the present invention be should be noted that merely to describing specific embodiment, and not intended to limit According to the illustrative embodiments of the application.It is unless the context clearly indicates otherwise, otherwise singular if used herein Form be also intended to include plural form, additionally, it should be understood that, when in the present specification use term "comprising" and/or When " comprising ", existing characteristics, step, operation, device, component and/or their combination are indicated.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling, it is characterised in that: including pedestal (1), top cap (6) and latex Film (9), pedestal (1) the top center protrusion are equipped with first boss (11), match outside the first boss (11) of the pedestal (1) The lower part permeable stone (2) for being equipped with circular ring shape is closed, first boss (11) center is equipped with gas injection needle (3), the pedestal (1) Side is connected separately with external air injection pipe (4) and external water injection pipe (5), be equipped with inside the pedestal (1) connection water pipe (12) and The water inlet end of connectivity trachea (13), connection water pipe (12) is connected with external water injection pipe (5), connection water pipe (12) Water outlet is placed in lower part permeable stone (2) bottom, and the inlet end of the connectivity trachea (13) is connected with external air injection pipe (4), institute The outlet side for stating connectivity trachea (13) is connected with gas injection needle (3);Top cap (6) bottom centre's protrusion is equipped with second boss (61), the top permeable stone (16) of circular ring shape, top cap (6) the side connection are fitted with outside the second boss (61) Have back-pressure pipe (10), be equipped with back-pressure communicating pipe (14) inside the top cap (6), the input end of the back-pressure communicating pipe (14) is placed in At the top of top permeable stone (16), the outlet end of the back-pressure communicating pipe (14) is connected with back-pressure pipe (10);The top cap (6) with It is connected between pedestal (1) latex film (9), is packaged in outside top cap (6) bottom at the top of the latex film (9) by zero type sealing ring Side, latex film (9) bottom are packaged in pedestal (1) top outer by zero type sealing ring.
2. a kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling described in accordance with the claim 1, it is characterised in that: described Recess is equipped with circle base groove (17), the slot of the base groove (17) on the outside of first boss (11) at the top of pedestal (1) Mouthful end is corresponding with lower part permeable stone (2) bottom, the connection water pipe (12) with base groove (17) is closed is connected to;The top cap (6) bottom recess on the outside of second boss (61) is equipped with circle top cap groove (18), the notch end of the top cap groove (18) It is corresponding at the top of top permeable stone (16), the back-pressure communicating pipe (14) with top cap groove (18) is closed is connected to.
3. a kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling described in accordance with the claim 1, it is characterised in that: the note Air tube (3) include connection tube socket A(31) and be plugged in connect tube socket A(31) in gas injection needle tubing (32), the first boss (11) center is provided with threaded hole, the connection tube socket A(31) lower part be external thread column A, the connection tube socket A(31) external screw thread Column A is threadedly connected in the threaded hole of first boss (11), the gas injection needle tubing (32) with connectivity trachea (13) is closed is connected to.
4. a kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling described in accordance with the claim 1, it is characterised in that: further include Connect tube socket B(41) and connection tube socket C(51), pedestal (1) side is provided with gas injection threaded hole and water filling threaded hole, the company Stub (tube) B(41) with external thread column B, the connection tube socket B(41) external thread column B be threadedly connected to the gas injection of pedestal (1) In threaded hole, the connection tube socket C(51) the external thread column C threaded connection with external thread column C, the connection tube socket C(51) In the water filling threaded hole of pedestal (1);The connection tube socket B(41) pipeline of the inside with connection corresponding with connectivity trachea (13) A, external air injection pipe (4) end is closed to be plugged in connection tube socket B(41) pipeline A in;The connection tube socket C(51) it is internal Pipeline B with connection corresponding with connection water pipe (12), external water injection pipe (5) end is closed to be plugged in connection tube socket C (51) in pipeline B.
5. a kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling described in accordance with the claim 1, it is characterised in that: further include Connect tube socket D(101), top cap (6) side is provided with back-pressure threaded hole, the connection tube socket D(101) there is external thread column D, The connection tube socket D(101) external thread column D be threadedly connected in the back-pressure threaded hole of top cap (6), the connection tube socket D (101) the internal pipeline C with connection corresponding with back-pressure communicating pipe (14), back-pressure pipe (10) end is closed to be plugged in connection Tube socket D(101) pipeline C in.
6. a kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling described in accordance with the claim 1, it is characterised in that: the bottom Seat (1), first boss (11) are in cylindrical shape, the internal diameter of the lower part permeable stone (2) and the diameter of first boss (11) Equal, the height of the lower part permeable stone (2) is equal with the height of first boss (11), the outer diameter of the lower part permeable stone (2) It is equal with the diameter of pedestal (1).
7. a kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling described in accordance with the claim 1, it is characterised in that: the top Cap (6), second boss (61) are in cylindrical shape, the internal diameter of the top permeable stone (16) and the diameter of second boss (61) Equal, the height of the top permeable stone (16) is equal with the height of second boss (61), outside the top permeable stone (16) Diameter is equal with the diameter of top cap (6).
8. the three axis gas injection experimental rig of geotechnique of a kind of fast assembling-disassembling according to claim 2, it is characterised in that: described anti- Pressure communicating pipe (14) is made of back-pressure general pipeline and two back-pressure branch pipes, and all back-pressure branch pipes are connected with back-pressure general pipeline respectively, The input end of all back-pressure branch pipes is respectively placed in the internal different location of the top cap groove (18) on top permeable stone (16), described anti- The back-pressure general pipeline of pressure communicating pipe (14) is connected with back-pressure pipe (10).
9. a kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling described in accordance with the claim 1, it is characterised in that: further include Normal triaxial instrument specimen mount (7), pedestal (1) bottom are equipped with cutting ferrule (15), normal triaxial instrument specimen mount (7) top Portion's tight clamping fit is in cutting ferrule (15).
10. a kind of three axis gas injection test method of geotechnique of fast assembling-disassembling, it is characterised in that: including geotechnological three axis gas injections test dress It sets, method and step is as follows:
A, select the Ottawa AFS50/70 normal sand as soil sample (8), the relative compaction control of soil sample (8) is 50%, by latex Film (9) bottom is tightened at the top of pedestal (1) with zero type sealing ring, and is supported latex film (9) with split cavity and fixed;
B, drying and processing is carried out to the soil sample (8) that step A is obtained, soil sample (8) is weighed according to relative compaction, by weighed soil Five layers of sample (8) point fall into latex film (9) through funnel, and soil sample (8) surface is struck off, and whether measurement present level reaches requirement, When highly higher, split cavity side wall need to be tapped using rubber hammer, settle sand, until height reaches requirement;Then it installs Top cap (6) will be tightened with zero type sealing ring with top cap (6) bottom at the top of latex film (9), the soil sample of latex film (9) be housed in this way (8) it is just installed between top cap (6) and pedestal (1);By earthwork triaxial apparatus pressure chamber to application 30kPa on the outside of soil sample (8) Confining pressure is to hold soil sample (8);
C, using carbon dioxide gas displacement soil sample (8) intrapore gas, external air injection pipe (4) is closed, external water filling is passed through Pipe (5) is passed through carbon dioxide gas, and gas flows out after passing through soil sample (8) from back-pressure pipe (10), and venting process is not less than 2 hours, Venting pressure is not more than the confining pressure for the soil sample (8) being applied on latex film (9);
D, after the completion of ventilation, water flowing operation is carried out by external water injection pipe (5), water flows after passing through soil sample (8) from back-pressure pipe (10) Out, the water that external water injection pipe (5) is passed through is no steam distillation water, and water flowing pressure is not more than the soil sample (8) being applied on latex film (9) Confining pressure;After back-pressure pipe (10) flow out the water of twice of soil sample (8) volume, stop water flowing operation;
E, back-pressure is saturated, and control effective confining pressure 150kPa is constant, applies back-pressure and confining pressure step by step, every to have increased level-one back-pressure and enclosed After pressure, after pore pressure is stablized, the changing value of back-pressure is recorded, and calculate B value, B=back-pressure changing value/confining pressure changing value is big to B value After 0.98, i.e., it is believed that soil sample (8) is fully saturated;
F, control effective confining pressure 150kPa keep 2 hours it is constant sample is consolidated, consolidation style is using each to isotonic consolidation;
G, external water injection pipe (5) is closed, external air injection pipe (4) is opened and carries out gas injection operation, gas is infused from external air injection pipe (4) Enter, initial injection pressure is equal to the pore water pressure in soil sample (8), and gas injection pressure is incremented by step by step, controls every grade of gas injecting time It is identical, and back-pressure is set and is remained unchanged, and the back-pressure, pore pressure and the air pressure that finally obtain gas injection test change over time figure.
CN201811446176.4A 2018-11-29 2018-11-29 A kind of three axis gas injection experimental rig of geotechnique and method of fast assembling-disassembling Pending CN109406365A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811446176.4A CN109406365A (en) 2018-11-29 2018-11-29 A kind of three axis gas injection experimental rig of geotechnique and method of fast assembling-disassembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811446176.4A CN109406365A (en) 2018-11-29 2018-11-29 A kind of three axis gas injection experimental rig of geotechnique and method of fast assembling-disassembling

Publications (1)

Publication Number Publication Date
CN109406365A true CN109406365A (en) 2019-03-01

Family

ID=65456396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811446176.4A Pending CN109406365A (en) 2018-11-29 2018-11-29 A kind of three axis gas injection experimental rig of geotechnique and method of fast assembling-disassembling

Country Status (1)

Country Link
CN (1) CN109406365A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113125274A (en) * 2021-05-17 2021-07-16 西南交通大学 Rock internal capillary action fluctuation test device and method under suction control
CN113686650A (en) * 2021-08-11 2021-11-23 北京交通大学 Lateral confining pressure loading equipment for undisturbed soil of sludge

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2826404Y (en) * 2005-06-29 2006-10-11 长春工程学院 Pressurized flexible-wall permeameter
CN102539244A (en) * 2012-02-21 2012-07-04 上海大学 Unsaturated soil anisotropic consolidation test device
CN103792118A (en) * 2014-01-21 2014-05-14 中国科学院武汉岩土力学研究所 High-pressure gas dissolved saturation test device and application thereof in gas contained soil sample artificial preparation
CN105241750A (en) * 2015-11-24 2016-01-13 四川大学 Pressing head system for indoor triaxial hydrofracture experiment
CN105842420A (en) * 2016-03-28 2016-08-10 中南大学 Unsaturated soil tri-axial test matrix suction quick balance apparatus and use method thereof
CN107607374A (en) * 2017-09-06 2018-01-19 辽宁工程技术大学 A kind of hollow cylinder pilot system suitable for unsaturated soil
CN208109591U (en) * 2018-04-23 2018-11-16 盐城工业职业技术学院 The test device and soil test equipment of soil solidifying
CN209264522U (en) * 2018-11-29 2019-08-16 中国科学院武汉岩土力学研究所 A kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2826404Y (en) * 2005-06-29 2006-10-11 长春工程学院 Pressurized flexible-wall permeameter
CN102539244A (en) * 2012-02-21 2012-07-04 上海大学 Unsaturated soil anisotropic consolidation test device
CN103792118A (en) * 2014-01-21 2014-05-14 中国科学院武汉岩土力学研究所 High-pressure gas dissolved saturation test device and application thereof in gas contained soil sample artificial preparation
CN105241750A (en) * 2015-11-24 2016-01-13 四川大学 Pressing head system for indoor triaxial hydrofracture experiment
CN105842420A (en) * 2016-03-28 2016-08-10 中南大学 Unsaturated soil tri-axial test matrix suction quick balance apparatus and use method thereof
CN107607374A (en) * 2017-09-06 2018-01-19 辽宁工程技术大学 A kind of hollow cylinder pilot system suitable for unsaturated soil
CN208109591U (en) * 2018-04-23 2018-11-16 盐城工业职业技术学院 The test device and soil test equipment of soil solidifying
CN209264522U (en) * 2018-11-29 2019-08-16 中国科学院武汉岩土力学研究所 A kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨晶: "《压实黄土的工程性质研究》", 武汉大学出版社, pages: 97 - 101 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113125274A (en) * 2021-05-17 2021-07-16 西南交通大学 Rock internal capillary action fluctuation test device and method under suction control
CN113686650A (en) * 2021-08-11 2021-11-23 北京交通大学 Lateral confining pressure loading equipment for undisturbed soil of sludge
CN113686650B (en) * 2021-08-11 2023-12-19 北京交通大学 Lateral confining pressure loading equipment for undisturbed soil of sludge

Similar Documents

Publication Publication Date Title
CN103776979B (en) A kind of coal seam water infusion suppresses analog detection method and the device of desorption of mash gas effect
WO2018129920A1 (en) Sample component for radial permeability test of rock having extra-low permeability and test method therefor
CN109211753A (en) More of rock, multiphase porous flow experimental provision under a kind of perturbation action
LU101541B1 (en) Gas-liquid two-phase saturated coal rock sample experimental device and saturation test method
CN105334142B (en) A kind of experimental provision formed for simulating shield mud film
CN107271340B (en) For simulating the experimental provision of the vertical Micro blazed-grating of oil-gas reservoir lighter hydrocarbons
CN109406365A (en) A kind of three axis gas injection experimental rig of geotechnique and method of fast assembling-disassembling
CN105043960A (en) Improved soil mass combined consolidation permeameter
CN109342150A (en) A kind of experimental rig and method for gassiness soil sample consolidation test and permeability test
CN109374343A (en) A kind of water sampling probe and acquisition method in situ for shallow-layer gas-bearing formation
CN110044792A (en) A kind of multi-functional low permeability media gas permeability test device and test method
CN209264522U (en) A kind of three axis gas injection experimental rig of geotechnique of fast assembling-disassembling
CN205920114U (en) Ration simulation rock core holder
CN106018244A (en) Multifunctional permeameter and method thereof
CN106908287B (en) Pressure-balancing gas collection device and method
CN113029910B (en) Rock core holder matched with rock seepage real-time imaging system and method thereof
CN209327074U (en) A kind of experimental rig for gassiness soil sample consolidation test and permeability test
CN110658328B (en) Portable in-situ gas content measuring device and method for shallow gas-containing stratum
CN109236269A (en) A kind of water breakthrough influences the test device and method of cementing quality
CN110487988A (en) A kind of air pressure-loading type one-dimensional consolidation infiltration joint test device
CN112268844B (en) Seepage erosion control system and test method under GDS triaxial apparatus drainage condition
CN105092383B (en) Packing element sets visual test device
CN105092321B (en) A kind of passive type gas collecting apparatus
CN205262912U (en) Experimental device for it constructs sludge -biofilm formation to be used for simulating shield
CN205333483U (en) Gas permeability test system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination