一种临近基坑边危房保护结构及其施工方法 Download PDFInfo
- Publication number
- CN109403336B CN109403336B CN201811137335.2A CN201811137335A CN109403336B CN 109403336 B CN109403336 B CN 109403336B CN 201811137335 A CN201811137335 A CN 201811137335A CN 109403336 B CN109403336 B CN 109403336B
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- construction
- critical
- foundation
- cement mixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/08—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil
Abstract
本发明公开了一种临近基坑边危房保护结构及其施工方法,该临近基坑边危房保护结构包括若干个设置于基坑和邻近危房之间的水泥搅拌桩,并在其中部分或全部的水泥搅拌桩内竖向插入工型钢;其施工方法包括如下步骤:步骤1)通过灌注桩将靠近危房区域的土方独立出来,完成其他部分土方的基坑开挖,并对已开挖部分的基坑进行地下结构施工,同时在基坑和邻近危房之间进行围护桩结构施工;步骤2)对未开挖部分的基坑进行土方开挖、型钢支撑和结构施工;步骤3)对全部基坑进行土方回填、型钢支撑拆除;本发明的优点在于,能保证基坑施工时临近危房的结构安全,也能同时保证基坑正常施工时的进度与安全性。
Description
技术领域
本发明属于基坑边建筑保护技术领域,尤其是涉及一种临近基坑边危房保护结构及其施工方法。
背景技术
近年来,随着城市发展的脚步越来越快,城市建设呈现出飞速发展的趋势,城市的复杂系统特性决定了城市规划是随城市发展与运行状况长期调整、不断修订,持续改进和完善的复杂的连续过程。在现代城市建设中往往碰到新老建筑的交替施工,对新建工程对周边复杂环境的保护显得尤为重要,尤其是对临近基坑边危房的保护更是重中之重。在考虑对危房保护时,重点是考虑在基坑施工阶段对危房的保护方法,首先是考虑围护施工阶段如何对危房进行保护,其中除了不影响基坑正常的围护体系外,如何对危房临近基坑边一侧进行加固措施,同时还要考虑在土方开挖、地下结构施工等阶段如何对危房进行更好的保护并且将对基坑施工的影响降到最低。
发明内容
本发明目的是:提供一种临近基坑边危房保护结构及其施工方法,能保证基坑施工时临近危房的结构安全,也能同时保证基坑正常施工时的进度与安全性。
本发明的技术方案是:一种临近基坑边危房保护结构,包括若干个设置于基坑和邻近危房之间的水泥搅拌桩,并在其中部分或全部的水泥搅拌桩内竖向插入工型钢。
作为优选的技术方案,在全部水泥搅拌桩内均竖向插入工型钢。
作为优选的技术方案,在部分水泥搅拌桩内采用插二隔一的方式竖向插入工型钢。
作为优选的技术方案,相邻的水泥搅拌桩之间相互搭接。
如上所述的临近基坑边危房保护结构的施工方法,包括如下步骤:
步骤1)通过灌注桩将靠近危房区域的土方独立出来,完成其他部分土方的基坑开挖,并对已开挖部分的基坑进行地下结构施工,同时在基坑和邻近危房之间进行围护桩结构施工;
步骤2)对未开挖部分的基坑进行土方开挖、型钢支撑和结构施工;
步骤3)对全部基坑进行土方回填、型钢支撑拆除。
作为优选的技术方案,所述围护桩结构包括若干个设置于基坑和邻近危房之间的水泥搅拌桩,并在其中部分或全部的水泥搅拌桩内竖向插入工型钢。
本发明的优点是:
1.本发明能保证基坑施工时临近危房的结构安全,也能同时保证基坑正常施工时的进度与安全性;
2.本发明不需在工程红线以外区域进行对危房的保护措施,也无需对危房自身结构进行加固翻修等措施,可大大减少施工所产生的额外费用;
3.本发明采用的材料均为常规水泥和钢材,采用设备也仅需现场原本就需要用到的桩架施工;
4.本发明可根据现场实际情况以及监测情况调整临近危房后开挖区域的施工时间,具有极高的灵活性。
附图说明
下面结合附图及实施例对本发明作进一步描述:
图1为本发明临近基坑边危房保护结构的结构示意图;
图2为在其中全部的水泥搅拌桩内竖向插入工型钢的结构示意图;
图3为在其中部分的水泥搅拌桩内竖向插入工型钢的结构示意图;
其中:1水泥搅拌桩,2工型钢,3灌注桩,4H型钢。
具体实施方式
下面详细描述本发明的实施方式,所述实施方式的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,旨在用于解释本发明,而不能理解为对本发明的限制。
实施例1:参照图1所示,一种临近基坑边危房保护结构,包括若干个设置于基坑和邻近危房之间的水泥搅拌桩1,同时相邻的水泥搅拌桩1之间相互搭接,参照图2所示,在全部水泥搅拌桩1内均竖向插入工型钢2;能保证基坑施工时临近危房的结构安全,也能同时保证基坑正常施工时的进度与安全性,同时不需在工程红线以外区域进行对危房的保护措施,也无需对危房自身结构进行加固翻修等措施,可大大减少施工所产生的额外费用。
如上所述的临近基坑边危房保护结构的施工方法,包括如下步骤:
步骤1)通过灌注桩3将靠近危房区域的土方独立出来,完成其他部分土方的基坑开挖,并对已开挖部分的基坑进行地下结构施工,同时在基坑和邻近危房之间进行围护桩结构施工,该围护桩结构包括若干个设置于基坑和邻近危房之间的水泥搅拌桩1,并在其中全部的水泥搅拌桩1内竖向插入工型钢2;
步骤2)对未开挖部分的基坑进行土方开挖、H型钢4支撑和结构施工;
步骤3)对全部基坑进行土方回填、H型钢4支撑拆除。
实施例2:参照图1所示,一种临近基坑边危房保护结构,包括若干个设置于基坑和邻近危房之间的水泥搅拌桩1,同时相邻的水泥搅拌桩1之间相互搭接,参照图3所示,在部分水泥搅拌桩1内采用插二隔一的方式竖向插入工型钢2,能保证基坑施工时临近危房的结构安全,也能同时保证基坑正常施工时的进度与安全性,同时不需在工程红线以外区域进行对危房的保护措施,也无需对危房自身结构进行加固翻修等措施,可大大减少施工所产生的额外费用。
如上所述的临近基坑边危房保护结构的施工方法,包括如下步骤:
步骤1)通过灌注桩3将靠近危房区域的土方独立出来,完成其他部分土方的基坑开挖,并对已开挖部分的基坑进行地下结构施工,同时在基坑和邻近危房之间进行围护桩结构施工,该围护桩结构包括若干个设置于基坑和邻近危房之间的水泥搅拌桩1,并在部分水泥搅拌桩1内采用插二隔一的方式竖向插入工型钢2;
步骤2)对未开挖部分的基坑进行土方开挖、H型钢4支撑和结构施工;
步骤3)对全部基坑进行土方回填、H型钢4支撑拆除。
上述实施例仅例示性说明本发明的原理及其功效,而非用于限制本发明。任何熟悉此技术的人士皆可在不违背本发明的精神及范畴下,对上述实施例进行修饰或改变。因此,举凡所属技术领域中具有通常知识者在未脱离本发明所揭示的精神与技术思想下所完成的一切等效修饰或改变,仍应由本发明的权利要求所涵盖。
Claims (2)
1.一种临近基坑边危房保护结构的施工方法,其特征在于,包括如下步骤:
步骤1)通过灌注桩将靠近危房区域的土方独立出来,完成其他部分土方的基坑开挖,并对已开挖部分的基坑进行地下结构施工,同时在基坑和邻近危房之间进行围护桩结构施工;所述围护桩结构包括若干个设置于基坑和邻近危房之间的水泥搅拌桩,相邻的水泥搅拌桩之间相互搭接;并在其中部分或全部的水泥搅拌桩内竖向插入工型钢;
步骤2)对灌注桩与围护桩结构之间未开挖部分的基坑进行土方开挖、型钢支撑和结构施工;
步骤3)对全部基坑进行土方回填、型钢支撑拆除。
2.根据权利要求1所述的临近基坑边危房保护结构的施工方法,其特征在于,在部分水泥搅拌桩内采用插二隔一的方式竖向插入工型钢。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811137335.2A CN109403336B (zh) | 2018-09-28 | 2018-09-28 | 一种临近基坑边危房保护结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811137335.2A CN109403336B (zh) | 2018-09-28 | 2018-09-28 | 一种临近基坑边危房保护结构及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109403336A CN109403336A (zh) | 2019-03-01 |
CN109403336B true CN109403336B (zh) | 2020-12-11 |
Family
ID=65465483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811137335.2A Active CN109403336B (zh) | 2018-09-28 | 2018-09-28 | 一种临近基坑边危房保护结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109403336B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202298633U (zh) * | 2011-10-20 | 2012-07-04 | 中交第三航务工程勘察设计院有限公司 | 拱形树根桩隔离桩墙 |
CN203639925U (zh) * | 2013-12-13 | 2014-06-11 | 山西省第三建筑工程公司 | 基坑四周带止水帷幕的支护桩体 |
CN105756091A (zh) * | 2016-03-16 | 2016-07-13 | 山东理工大学 | 一种控制邻近建筑物变形的地铁车站基坑施工方法 |
CN105926668A (zh) * | 2016-06-23 | 2016-09-07 | 程华清 | 一种超深基坑和邻近危房之间的隔断墙施工方法 |
CN107700508A (zh) * | 2017-09-23 | 2018-02-16 | 北京建材地质工程有限公司 | 一种型钢搅喷水泥土帷幕支护桩的施工方法 |
-
2018
- 2018-09-28 CN CN201811137335.2A patent/CN109403336B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202298633U (zh) * | 2011-10-20 | 2012-07-04 | 中交第三航务工程勘察设计院有限公司 | 拱形树根桩隔离桩墙 |
CN203639925U (zh) * | 2013-12-13 | 2014-06-11 | 山西省第三建筑工程公司 | 基坑四周带止水帷幕的支护桩体 |
CN105756091A (zh) * | 2016-03-16 | 2016-07-13 | 山东理工大学 | 一种控制邻近建筑物变形的地铁车站基坑施工方法 |
CN105926668A (zh) * | 2016-06-23 | 2016-09-07 | 程华清 | 一种超深基坑和邻近危房之间的隔断墙施工方法 |
CN107700508A (zh) * | 2017-09-23 | 2018-02-16 | 北京建材地质工程有限公司 | 一种型钢搅喷水泥土帷幕支护桩的施工方法 |
Non-Patent Citations (1)
Title |
---|
深基坑隔断墙保护临近建筑物的效果与工程应用分析;应宏伟等;《岩土工程学报》;20110731;第33卷(第7期);第1126-1127页 * |
Also Published As
Publication number | Publication date |
---|---|
CN109403336A (zh) | 2019-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103321230B (zh) | 在运行浅埋地铁长距离穿越场地中的深大基坑开挖方法 | |
CN109723085B (zh) | 一种深基坑分坑施工肋墙换撑结构及其施工方法 | |
CN109137998A (zh) | 横穿隧道基坑的现有电力管廊保护结构及其施工方法 | |
CN102410031B (zh) | 桩墙法建造地下空间结构 | |
CN108867692A (zh) | 城市大断面明挖隧道临近建筑物保护及隧道基坑挖掘方法 | |
CN106812131B (zh) | 一种永久板桩地下结构及其施工方法 | |
CN210597402U (zh) | 一种新型地下保护结构 | |
CN105604064A (zh) | 综合管线保护体系支撑体系施工方法 | |
CN113235613B (zh) | 利用邻近既有围护桩的新建基坑开挖支护方法 | |
Zumrawi et al. | Importance of deep excavation support and its influence on adjacent buildings | |
CN110965581A (zh) | 地铁施工中地下管线的保护施工方法 | |
CN209941754U (zh) | 一种高压电力管涵原地保护结构 | |
CN109403336B (zh) | 一种临近基坑边危房保护结构及其施工方法 | |
CN111778983A (zh) | 在既有设施上方施工基坑的方法及支护结构 | |
CN110512594A (zh) | 旋挖钻机遇空洞成孔成桩的简易方法 | |
CN113202106B (zh) | 深基坑开挖方法 | |
CN209243731U (zh) | 小平面基坑逆作快速施工装置 | |
Boon et al. | Protection of buildings and structures within the influence of tunnelling works | |
Quigg | Battersea cable tunnel: powering regeneration in central London, UK. | |
CN219710339U (zh) | 一种深基坑交叉管道接驳口支护保护结构 | |
Chu et al. | Integrate approach for deep excavation along soft ground (MTRC) tunnels | |
Herranz et al. | SEM crossover cavern in Downtown LA | |
Humpheson et al. | THE BASEMENTS AND SUBSTRUCTURE FOR THE NEW HEADQUARTERS OF THE HONGKONG AND SHANGHAI BANKING CORPORATION, HONG KONG. | |
Kastner et al. | Avoiding damage caused by soil-structure interaction: Lessons learnt from case histories | |
CN210002338U (zh) | 一种横跨基坑水渠在基坑施工中的改迁结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |