CN105926668A - 一种超深基坑和邻近危房之间的隔断墙施工方法 - Google Patents

一种超深基坑和邻近危房之间的隔断墙施工方法 Download PDF

Info

Publication number
CN105926668A
CN105926668A CN201610472551.7A CN201610472551A CN105926668A CN 105926668 A CN105926668 A CN 105926668A CN 201610472551 A CN201610472551 A CN 201610472551A CN 105926668 A CN105926668 A CN 105926668A
Authority
CN
China
Prior art keywords
pile
foundation pit
piles
partition wall
axes agitating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610472551.7A
Other languages
English (en)
Inventor
程华清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610472551.7A priority Critical patent/CN105926668A/zh
Publication of CN105926668A publication Critical patent/CN105926668A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明提出了一种超深基坑和邻近危房之间的隔断墙施工方法,在超深基坑和邻近危房之间的连续墙内、外两侧分别设置第一三轴水泥搅拌桩、第二三轴搅拌桩,所述第二三轴搅拌桩外侧依次设置高压旋喷桩、第三三轴搅拌桩和钻孔灌注桩,相邻的每排第二三轴搅拌桩、高压旋喷桩和第三三轴搅拌桩之间相互搭接,所述钻孔灌注桩设置在第三三轴搅拌桩外侧不搭接且钻孔灌注桩的桩之间间隔设置,钻孔灌注桩的相邻桩之间间隔通过设置桩间高喷桩搭接。本发明在危房与基坑之间增设如“隔断墙”的超深基坑支护,减小地下连续墙成槽卸荷,以及基坑开挖、降止水对基坑周边多栋天然基础房屋的不利影响。

Description

一种超深基坑和邻近危房之间的隔断墙施工方法
技术领域
本发明涉及建筑施工领域,更具体地说是涉及一种超深基坑和邻近危房之间的隔断墙施工方法。
背景技术
新世界发展(武汉)有限公司拟建的武汉新世界中心三期写字楼项目,是由一栋37层塔楼和层高6—8米的五层裙楼组成的综合写字楼。建筑面积15.8万㎡,地面以下设四层地下室,基坑开挖面积13240㎡,基坑开挖深度21m—27m(“坑中坑”27m)。
基坑周边环境十分严峻、复杂:北侧位于解放大道闹市区,紧邻航空路立交桥(且基坑边分布有各种管网设施和箱涵);紧邻基坑南侧和西侧有多栋5—8层天然基础、年代久远的危房;深基坑地层上部分布有厚度较大、强度低的流塑状淤泥层及淤泥质粘土软土层,中部为砂层和卵石层,下伏岩层深度达55米以上。而且该基坑的地下水量丰富,与长江相通,本基坑基底进入了砂层,必须采取止水及深井排水、降水处理措施。
本项目中在开挖超深基坑前,必须在上述严峻环境下保证超深基坑支护安全和周边危房安全,然而现有施工技术很难解决上述问题。
发明内容
本发明提出了一种超深基坑和邻近危房之间的隔断墙施工方法,在危房与基坑之间增设如“隔断墙”的超深基坑支护,为减小地下连续墙成槽卸荷,以及基坑开挖、降止水对基坑周边多栋天然基础房屋的不利影响,在基坑南侧临近多栋天然基础房屋的坡段地下连续墙外侧布置由钻孔灌注桩+三轴搅拌桩+高压旋喷桩组成的"隔断墙",对房屋起到主动超前保护作用,保证了施工和周边危房的安全性。
本发明的技术方案是这样实现的:
一种超深基坑和邻近危房之间的隔断墙施工方法,在超深基坑和邻近危房之间的连续墙内、外两侧分别设置第一三轴水泥搅拌桩、第二三轴搅拌桩,所述第二三轴搅拌桩外侧依次设置高压旋喷桩、第三三轴搅拌桩和钻孔灌注桩,相邻的每排第二三轴搅拌桩、高压旋喷桩和第三三轴搅拌桩之间相互搭接,所述钻孔灌注桩设置在第三三轴搅拌桩外侧不搭接且钻孔灌注桩的桩之间间隔设置,钻孔灌注桩的相邻桩之间间隔通过设置桩间高喷桩搭接。
优选地,所述地下连续墙外侧接缝处设有双管旋喷桩,双管旋喷桩与第二三轴搅拌桩接驳1m至连续墙墙底。
优选地,所述高压旋喷桩为1~3排。
本发明产生的有益效果为:该方法的隔断墙施工,是在特殊环境下施工确保严峻环境下超深基坑支护安全和周边危房安全,其成效显著,引起了岩土工程界高度关注。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明的平面布置示意图;
图2为本发明的剖面意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1所示,一种超深基坑和邻近危房之间的隔断墙施工方法,在超深基坑和邻近危房之间的连续墙1内、外两侧分别设置第一三轴水泥搅拌桩2、第二三轴搅拌桩3,所述第二三轴搅拌桩3外侧依次设置高压旋喷桩5、第三三轴搅拌桩4和钻孔灌注桩6,相邻的每排第二三轴搅拌桩3、高压旋喷桩5和第三三轴搅拌桩4之间相互搭接,所述钻孔灌注桩6设置在第三三轴搅拌桩4外侧不搭接且钻孔灌注桩的桩之间间隔设置,钻孔灌注桩6的相邻桩之间间隔通过设置桩间高喷桩7搭接。
如图2的实施例施工过程中地下连续墙1外侧接缝处设有双管旋喷桩8,双管旋喷桩8与第二三轴搅拌桩3接驳1m至连续墙墙底。
优选地高压旋喷桩5和第二三轴搅拌桩3可以为1~3排,具体根据实际需求选定。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (3)

1.一种超深基坑和邻近危房之间的隔断墙施工方法,在超深基坑和邻近危房之间的连续墙内、外两侧分别设置第一三轴水泥搅拌桩、第二三轴搅拌桩,其特征在于,所述第二三轴搅拌桩外侧依次设置高压旋喷桩、第三三轴搅拌桩和钻孔灌注桩,相邻的每排第二三轴搅拌桩、高压旋喷桩和第三三轴搅拌桩之间相互搭接,所述钻孔灌注桩设置在第三三轴搅拌桩外侧不搭接且钻孔灌注桩的桩之间间隔设置,钻孔灌注桩的相邻桩之间间隔通过设置桩间高喷桩搭接。
2.如权利要求1所述的一种超深基坑和邻近危房之间的隔断墙施工方法,其特征在于,所述地下连续墙外侧接缝处设有双管旋喷桩,双管旋喷桩与第二三轴搅拌桩接驳1m至连续墙墙底。
3.如权利要求1所述的一种超深基坑和邻近危房之间的隔断墙施工方法,其特征在于,所述高压旋喷桩为1~3排。
CN201610472551.7A 2016-06-23 2016-06-23 一种超深基坑和邻近危房之间的隔断墙施工方法 Pending CN105926668A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610472551.7A CN105926668A (zh) 2016-06-23 2016-06-23 一种超深基坑和邻近危房之间的隔断墙施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610472551.7A CN105926668A (zh) 2016-06-23 2016-06-23 一种超深基坑和邻近危房之间的隔断墙施工方法

Publications (1)

Publication Number Publication Date
CN105926668A true CN105926668A (zh) 2016-09-07

Family

ID=56829240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610472551.7A Pending CN105926668A (zh) 2016-06-23 2016-06-23 一种超深基坑和邻近危房之间的隔断墙施工方法

Country Status (1)

Country Link
CN (1) CN105926668A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403336A (zh) * 2018-09-28 2019-03-01 上海建工七建集团有限公司 一种临近基坑边危房保护结构及其施工方法
CN109487783A (zh) * 2018-12-07 2019-03-19 中铁二十五局集团第五工程有限公司 一种明挖地下结构连续墙槽壁加固结构及其加固方法
CN114319379A (zh) * 2021-12-31 2022-04-12 上海市机械施工集团有限公司 一种基坑支护结构及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009052204A (ja) * 2007-08-23 2009-03-12 Nippon Concrete Ind Co Ltd コンクリート構造物
CN202627008U (zh) * 2012-04-28 2012-12-26 上海市水利工程设计研究院 一种穿越复杂强透水层的组合式截渗墙结构
CN203668969U (zh) * 2013-12-12 2014-06-25 安徽省建筑科学研究设计院 地下连续墙加固防水结构
CN105155578A (zh) * 2015-06-23 2015-12-16 中建六局土木工程有限公司 复杂地质及环境接入地铁既有支护体系施工方法
CN105696550A (zh) * 2014-11-27 2016-06-22 五冶集团上海有限公司 一种辅助加固地下连续墙成槽的三轴搅拌桩施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009052204A (ja) * 2007-08-23 2009-03-12 Nippon Concrete Ind Co Ltd コンクリート構造物
CN202627008U (zh) * 2012-04-28 2012-12-26 上海市水利工程设计研究院 一种穿越复杂强透水层的组合式截渗墙结构
CN203668969U (zh) * 2013-12-12 2014-06-25 安徽省建筑科学研究设计院 地下连续墙加固防水结构
CN105696550A (zh) * 2014-11-27 2016-06-22 五冶集团上海有限公司 一种辅助加固地下连续墙成槽的三轴搅拌桩施工方法
CN105155578A (zh) * 2015-06-23 2015-12-16 中建六局土木工程有限公司 复杂地质及环境接入地铁既有支护体系施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郑卫红: "《高压旋喷桩在某基坑止水处理中的应用》", 《中国新技术新产品》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403336A (zh) * 2018-09-28 2019-03-01 上海建工七建集团有限公司 一种临近基坑边危房保护结构及其施工方法
CN109403336B (zh) * 2018-09-28 2020-12-11 上海建工七建集团有限公司 一种临近基坑边危房保护结构及其施工方法
CN109487783A (zh) * 2018-12-07 2019-03-19 中铁二十五局集团第五工程有限公司 一种明挖地下结构连续墙槽壁加固结构及其加固方法
CN114319379A (zh) * 2021-12-31 2022-04-12 上海市机械施工集团有限公司 一种基坑支护结构及施工方法

Similar Documents

Publication Publication Date Title
CN103422501B (zh) 砂层地质中的抗浮锚杆结构及其施工方法
CN104110038A (zh) 深厚淤泥质软土地区大面积基坑围护结构的施工方法
CN102635120A (zh) 圆形深基坑无支撑施工结构和施工方法
CN110004919B (zh) 一种用于管线影响范围内的基坑围护施工方法
CN106013086A (zh) 利用凸台型工字钢接头箱处理地下连续墙接头施工的方法
CN202626978U (zh) 一种水泥土咬合桩组及其构成的防渗墙、建筑基坑支护体系
CN104099943A (zh) 地下连续墙与废弃地下人防工程交会处理方法
CN105735354A (zh) 一种城市地下工程盖挖全逆作施工方法
CN112323819A (zh) 一种软土基坑坑底就地固化方法及软土基坑坑底固化结构
CN106120805B (zh) 危房环境下的超深基坑支护的施工方法
CN105926668A (zh) 一种超深基坑和邻近危房之间的隔断墙施工方法
CN213897154U (zh) 一种软土基坑坑底固化结构
CN207176700U (zh) 一种复杂环境下的密排灌注桩内支撑基坑永久支护结构
CN106120828A (zh) 一种连续墙的夹心饼干式帷幕止水施工方法
CN107165640A (zh) 隧道及地下工程自稳修建法
Waliszewski et al. Preliminary report on the 2008 and 2009 excavation seasons at Jiyeh (Porphyreon) With appendices: 1. Sunken vessels in late Roman and Byzantine Houses in area D 2. Preliminary remarks on thresholds from private houses in Jiyeh (Porphyreon)
CN110344395A (zh) 一种支腿式地下连续墙施工工法
CN215857732U (zh) 一种潜水砂卵石地层基坑封底结构
CN113026778A (zh) 一种潜水砂卵石地层基坑封底结构及施工方法
CN207228123U (zh) 基坑连续三轴搅拌桩止水帷幕内植排桩的支护结构
Olyansky et al. Features of construction of buildings and constructions on loessial the bases in Moldova
JP2009275358A (ja) 建物支持地盤の改良構造と施工方法
Żurek Christian settlement at Failaka, Qusur site (Kuwait): excavations in 2011 and 2013
CN109680695A (zh) 无水厚砂卵砾石地层长螺旋钻孔灌注成桩施工工艺
Ho et al. Jet grouting for the mitigation of excavation wall movements in glacial silts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160907