CN109377037B - 基于分时列车数量序列的地铁峰期设置方法及系统 - Google Patents
基于分时列车数量序列的地铁峰期设置方法及系统 Download PDFInfo
- Publication number
- CN109377037B CN109377037B CN201811189452.3A CN201811189452A CN109377037B CN 109377037 B CN109377037 B CN 109377037B CN 201811189452 A CN201811189452 A CN 201811189452A CN 109377037 B CN109377037 B CN 109377037B
- Authority
- CN
- China
- Prior art keywords
- time
- peak
- sharing
- train
- period
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 44
- 238000004590 computer program Methods 0.000 claims description 4
- 238000012163 sequencing technique Methods 0.000 claims description 2
- 239000000126 substance Substances 0.000 claims description 2
- 230000008569 process Effects 0.000 abstract description 2
- 230000008520 organization Effects 0.000 description 6
- 238000004364 calculation method Methods 0.000 description 4
- 238000009826 distribution Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- NAWXUBYGYWOOIX-SFHVURJKSA-N (2s)-2-[[4-[2-(2,4-diaminoquinazolin-6-yl)ethyl]benzoyl]amino]-4-methylidenepentanedioic acid Chemical compound C1=CC2=NC(N)=NC(N)=C2C=C1CCC1=CC=C(C(=O)N[C@@H](CC(=C)C(O)=O)C(O)=O)C=C1 NAWXUBYGYWOOIX-SFHVURJKSA-N 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000007619 statistical method Methods 0.000 description 2
- 238000004220 aggregation Methods 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Educational Administration (AREA)
- Physics & Mathematics (AREA)
- Development Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Entrepreneurship & Innovation (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811189452.3A CN109377037B (zh) | 2018-10-12 | 2018-10-12 | 基于分时列车数量序列的地铁峰期设置方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811189452.3A CN109377037B (zh) | 2018-10-12 | 2018-10-12 | 基于分时列车数量序列的地铁峰期设置方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109377037A CN109377037A (zh) | 2019-02-22 |
CN109377037B true CN109377037B (zh) | 2022-09-02 |
Family
ID=65397600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811189452.3A Active CN109377037B (zh) | 2018-10-12 | 2018-10-12 | 基于分时列车数量序列的地铁峰期设置方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109377037B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111626469B (zh) * | 2020-04-10 | 2023-11-14 | 广州地铁集团有限公司 | 一种面向运能提升的快慢车开行优化方法 |
CN113723731B (zh) * | 2020-05-26 | 2024-05-28 | 中车株洲电力机车研究所有限公司 | 基于客流特征的城市轨道交通运行图编制方法及系统 |
CN112465234A (zh) * | 2020-12-02 | 2021-03-09 | 交控科技股份有限公司 | 一种平峰行车计划的生成方法、装置及电子设备 |
CN112918523B (zh) * | 2021-02-25 | 2023-05-02 | 北京电子科技职业学院 | 拥挤地铁线路基于列车时刻表优化的客流协同精确控制方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105128894A (zh) * | 2015-09-02 | 2015-12-09 | 深圳市地铁集团有限公司 | 一种列车的运行调度方法及运行调度系统 |
CN105740556A (zh) * | 2016-02-02 | 2016-07-06 | 北京交通大学 | 基于客流需求的列车运行图自动编制方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101388050A (zh) * | 2008-09-25 | 2009-03-18 | 卡斯柯信号有限公司 | 一种实现自动编制城轨列车运行图的方法 |
CN105095994B (zh) * | 2015-07-29 | 2018-12-07 | 西南交通大学 | 一种基于线性规划的城轨线路客流峰值预测方法 |
CN105857350B (zh) * | 2016-03-17 | 2017-05-31 | 中南大学 | 一种基于区间断面客流的高铁列车开行方法 |
CN106274913A (zh) * | 2016-09-20 | 2017-01-04 | 王哲 | 一种城市轨道交通车站站台平面结构体系 |
CN106485359A (zh) * | 2016-10-13 | 2017-03-08 | 东南大学 | 一种基于列车运行时刻表的城市轨道交通断面客流推测方法 |
CN107766969B (zh) * | 2017-09-28 | 2021-02-19 | 东南大学 | 一种基于地铁服务能力瓶颈区段识别的大站快线布设方法 |
CN107914740B (zh) * | 2017-11-23 | 2020-04-17 | 交控科技股份有限公司 | 基于实时客流的列车自组织调度系统及方法 |
-
2018
- 2018-10-12 CN CN201811189452.3A patent/CN109377037B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105128894A (zh) * | 2015-09-02 | 2015-12-09 | 深圳市地铁集团有限公司 | 一种列车的运行调度方法及运行调度系统 |
CN105740556A (zh) * | 2016-02-02 | 2016-07-06 | 北京交通大学 | 基于客流需求的列车运行图自动编制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109377037A (zh) | 2019-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109377037B (zh) | 基于分时列车数量序列的地铁峰期设置方法及系统 | |
US20220172175A1 (en) | Transportation system and method for allocating frequencies of transit services therein | |
CN107194497B (zh) | 一种突发事件下城市轨道交通乘客出行路径规划方法 | |
Bates | History of demand modelling | |
CN106326992A (zh) | 一种基于电量匹配的app预约租车系统及方法 | |
CN109543934B (zh) | 城市公交线网的综合指标的评价方法 | |
US9626823B2 (en) | System and method of predicting future demand of a charging station | |
CN102005122B (zh) | 多匝道调节方法及其系统 | |
Medina et al. | Model for the optimal location of bus stops and its application to a public transport corridor in Santiago, Chile | |
JP6969438B2 (ja) | 共用車両管理装置 | |
CN108734353A (zh) | 一种公交线路行车计划生成方法及装置 | |
Polus | Modeling and measurements of bus service reliability | |
Cats et al. | Evaluating the added-value of online bus arrival prediction schemes | |
CN106296355A (zh) | 一种基于电量匹配的web门户预约租车系统及方法 | |
CN114730415A (zh) | 车辆管理装置和车辆管理程序 | |
JP2018106745A (ja) | 電動車両の運行管理装置及び運行計画立案方法、並びにコンピュータプログラム | |
Gittens et al. | Evaluation of bus reliability measures and development of a new composite indicator | |
US20150291047A1 (en) | System and method of monitoring usage of a charging station | |
CN107609734B (zh) | 一种高速铁路规格化列车运行图的周期确定方法 | |
Deng et al. | Reduce bus bunching with a real-time speed control algorithm considering heterogeneous roadway conditions and intersection delays | |
CN113919650A (zh) | 一种列车运行方案优化编制方法及系统 | |
US20190087753A1 (en) | Operating system for vehicle-sharing service | |
JP2019093906A (ja) | 運行管理支援装置、及び運行制御システム | |
Jenelius | Data-driven bus crowding prediction based on real-time passenger counts and vehicle locations | |
CN109872047B (zh) | 一种考虑出行者拥挤度感知的公交出行方案推荐方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhou Wenliang Inventor after: Deng Lianbo Inventor after: Zeng Junhao Inventor after: Shi Fengshou Inventor after: Huang Junda Inventor after: Huang Jun Inventor before: Deng Lianbo Inventor before: Zeng Junhao Inventor before: Zhou Wenliang Inventor before: Shi Fengshou Inventor before: Huang Junda Inventor before: Huang Jun |
|
GR01 | Patent grant | ||
GR01 | Patent grant |