CN109353971A - Road and bridge construction lifting means - Google Patents

Road and bridge construction lifting means Download PDF

Info

Publication number
CN109353971A
CN109353971A CN201811508406.5A CN201811508406A CN109353971A CN 109353971 A CN109353971 A CN 109353971A CN 201811508406 A CN201811508406 A CN 201811508406A CN 109353971 A CN109353971 A CN 109353971A
Authority
CN
China
Prior art keywords
cage
groups
pulley
ceiling
wirerope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811508406.5A
Other languages
Chinese (zh)
Inventor
刘苏州
刘伟
刘庆
刘亚州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Mingshan Road And Bridge Machinery Manufacturing Co Ltd
Original Assignee
Xuzhou Mingshan Road And Bridge Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Mingshan Road And Bridge Machinery Manufacturing Co Ltd filed Critical Xuzhou Mingshan Road And Bridge Machinery Manufacturing Co Ltd
Priority to CN201811508406.5A priority Critical patent/CN109353971A/en
Publication of CN109353971A publication Critical patent/CN109353971A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F13/00Common constructional features or accessories

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses road and bridge construction lifting means, including the first cage, second cage, connecting rod and pillar, the pillar bottom end is fixedly connected with pedestal, the pillar top is fixedly connected with the connecting rod, the connecting rod is parallel with plane where pedestal, the connecting rod passes through first pulley, second wirerope is connected separately with the first cage, second cage, first cage, second cage is respectively arranged on the two sides of pillar, first cage, second cage passes through the first wirerope respectively, second pulley with pull a cart to connect, first wirerope, it second pulley and pulls a cart to be equipped with two groups, first cage, second cage top is fixedly connected to ceiling, the ceiling is equipped with two groups, ceiling described in two groups is each equipped with solar panels and battery.The road and bridge construction lifting means, design is rationally, easy to operate, has the function of illumination, improves the efficiency of construction, easy to spread.

Description

Road and bridge construction lifting means
Technical field
The invention belongs to road technical field of bridge construction, and in particular to road and bridge construction lifting means.
Background technique
Lifting means is the equipment for promoting mine (rock) stone and producer goods and personnel.During road construction, lead to It often needs working tool being lifted into eminence, to carry out eminence construction.
The existing mode for transporting tool to eminence, which mainly passes through, manually to be carried out, and hand haulage is time-consuming and laborious, and makes Construction efficiency is low, labor intensity is big, influences the progress rapidly and efficiently of constructing, and the promotion of existing road and bridge construction Equipment lacks certain illumination functions when improving material, in this way when light is bad, will seriously affect road The use of bridge construction lifting means,
Summary of the invention
The purpose of the present invention is to provide road and bridge construction lifting means, mentioned above in the background art to solve Problem.
To achieve the above object, the invention provides the following technical scheme: road and bridge construction lifting means, including first Cage, the second cage, connecting rod and pillar, the pillar bottom end are fixedly connected with pedestal, and the pillar top and connecting rod are solid Fixed connection, the connecting rod is parallel with plane where pedestal, and the connecting rod is separately connected by first pulley, the second wirerope There are the first cage, the second cage, first cage, the second cage are respectively arranged on the two sides of pillar, first cage, second Cage passes through the first wirerope, second pulley respectively and pulls a cart to connect, and first wirerope, second pulley and pulls a cart to be equipped with Two groups, first cage, the second cage top are fixedly connected to ceiling, and the ceiling is equipped with two groups, ceiling described in two groups Solar panels and battery are each equipped with, the solar panels, which are inlayed, to be installed on ceiling, and the battery is set to inside ceiling, The ceiling lower end surface is connected with energy-saving lamp, and the battery is electrically connected with energy-saving lamp and solar panels respectively by conducting wire, Dodge gate is hinged on first cage, the second cage.
Preferably, the ceiling top is fixedly welded with hanging ring, and the hanging ring is equipped with multiple groups, first cage, second Cage bottom end is fixedly welded with hanging ring.
Preferably, in the pedestal insertion soil, second pulley described in two groups is fixedly connected with the ground, and described in two groups Second pulley is respectively arranged on the two sides of pedestal.
Preferably, the hanging ring with first cage, the second cage bottom end respectively of one end of the first wirerope described in two groups Be fixedly connected, first wirerope far from hanging ring one end pass through second pulley with pull a cart to be fixedly connected, pull a cart described in two groups Outbound course it is opposite.
Preferably, the bottom face of the connecting rod be fixedly connected with two groups described in first pulley, second wirerope One end is fixedly connected with the first cage, and second wirerope passes through first pulley and the second cage far from one end of the first cage It is fixedly connected.
Technical effect and advantage of the invention: the road and bridge construction lifting means is slided by first pulley, second Wheel, the first wirerope, the second wirerope and the mutual cooperation pulled a cart keep the first cage and the second cage uninterruptedly alternate Material transportation is carried out, improves the efficiency of material transportation, while improving the efficiency of construction, and pass through the solar panels on ceiling With the design of battery, enough electric energy are provided for energy-saving lamp, battery can get up extra solar energy collecting, convenient The use at energy-saving lamp night, and by the design of energy-saving lamp, it constructs convenient for night, the convenient dress to the first cage and the second cage Material and discharging, the road and bridge construction lifting means, design is rationally, easy to operate, has the function of illumination, improves construction Efficiency, it is easy to spread.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the first cage side view of the invention;
Fig. 3 is circuit diagram of the invention.
In figure: 1 first cage, 2 connecting rods, 3 pillars, 4 first pulleys, 5 second cages, 6 pedestals, 7 second pulleys, 8 are drawn Vehicle, 9 dodge gates, 10 hanging rings, 11 first wirerope, 12 energy-saving lamps, 13 ceilings, 14 solar panels, 15 batteries, 16 second steel wires Rope.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of road and bridge construction lifting means as shown in Figs. 1-3, including the first cage 1, Two cages 5, connecting rod 2 and pillar 3,3 bottom end of pillar are fixedly connected with pedestal 6, and 3 top of pillar and connecting rod 2 are solid Fixed connection, the connecting rod 2 is parallel with 6 place plane of pedestal, and the connecting rod 2 is divided by first pulley 4, the second wirerope 16 It is not connected with the first cage 1, the second cage 5, first cage 1, the second cage 5 are respectively arranged on the two sides of pillar 3, and described One cage 1, the second cage 5 by the first wirerope 11, second pulley 7 and are pulled a cart 8 connections respectively, first wirerope 11, It second pulley 7 and pulls a cart 8 to be equipped with two groups, first cage 1,5 top of the second cage are fixedly connected to ceiling 13, described Ceiling 13 is equipped with two groups, and ceiling 13 described in two groups is each equipped with solar panels 14 and battery 15, and the solar panels 14 are inlayed It is installed on ceiling 13, the battery 15 is set to inside ceiling 13, and 13 lower end surface of ceiling is connected with energy-saving lamp 12, described Battery 15 is electrically connected with energy-saving lamp 12 and solar panels 14 respectively by conducting wire, on first cage 1, the second cage 5 It is hinged with dodge gate 9, and dodge gate 9 is equipped with two groups relatively on the first cage 1, the second cage 5 respectively, first cage 1, the second cage 5 is also connected with protective net.
Specifically, 13 top of ceiling is fixedly welded with hanging ring 10, the hanging ring 10 is equipped with multiple groups, first cage 1,5 bottom end of the second cage is fixedly welded with hanging ring 10, is equipped with an accommodating space in ceiling 13, battery 15 is fixedly connected on top Inside canopy 13, electric energy is transferred to battery 15 by solar panels 14, is stored up by battery 15, is then led to again by battery 15 Wire transmission is crossed to energy-saving lamp 12, is illuminated by energy-saving lamp 12.
Specifically, the pedestal 6 is embedded in soil, second pulley 7 described in two groups is fixedly connected with the ground, and two groups of institutes State the two sides that second pulley 7 is respectively arranged on pedestal 6.
Specifically, one end of the first wirerope 11 described in two groups respectively with first cage 1,5 bottom end of the second cage Hanging ring 10 is fixedly connected, first wirerope 11 far from one end of hanging ring 10 pass through second pulley 7 with pull a cart 8 to be fixedly connected, Pull a cart described in two groups 8 outbound course it is opposite.
Specifically, the bottom face of the connecting rod 2 be fixedly connected with two groups described in first pulley 4, second wirerope 16 one end is fixedly connected with the first cage 1, and second wirerope 16 passes through first pulley 4 far from one end of the first cage 1 It is fixedly connected with the second cage 5.
Specifically, the road and bridge construction lifting means when in use first leads to the first cage 1 and the second cage 5 It crosses the second wirerope 16 and first pulley 4 is lifted in connecting rod 2, be then respectively fixedly connected with two group of first wirerope 11 The bottom end of first cage 1 and the second cage 5, then 8 are pulled a cart by two group of first wirerope 11 is opposite with two outbound courses respectively It is fixedly connected, the material for needing to transport is in the first cage 1, wherein one group of 8 first wirerope of dragging 11 of pulling a cart is to far from the The direction running of two cages 5 moves downward to drag the second cage 5 by the first wirerope 11 and second pulley 7, and second hangs Cage 5 pulls the first cage 1 to move up to the road of required material or the height of bridge floor by the second wirerope 16 and first pulley 4 Degree, after the material in the first cage 1 is shed, the first cage 1 of connection pulls a cart 8 according to the method described above, then material will be housed Second cage 5 is dragged to the road of required material or the height of bridge floor, while the first cage 1 moves downwardly to ground, fills again Material is taken, and is mounted on energy-saving lamp 12 in the first cage 1 and the second cage 5, facilitates charging and discharging, the road and bridge construction With lifting means, design is rationally, easy to operate, has the function of illumination, improves the efficiency of construction, easy to spread.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (5)

1. a kind of road and bridge construction lifting means, including the first cage (1), the second cage (5), connecting rod (2) and pillar (3), it is characterised in that: pillar (3) bottom end is fixedly connected with pedestal (6), and pillar (3) top and connecting rod (2) are solid Fixed connection, the connecting rod (2) is parallel with plane where pedestal (6), and the connecting rod (2) passes through first pulley (4), the second steel Cord (16) is connected separately with the first cage (1), the second cage (5), and first cage (1), the second cage (5) are respectively arranged on The two sides of pillar (3), first cage (1), the second cage (5) respectively by the first wirerope (11), second pulley (7) with Pull a cart (8) connection, first wirerope (11), second pulley (7) and pull a cart (8) be equipped with two groups, first cage (1), the second cage (5) top is fixedly connected to ceiling (13), and the ceiling (13) is equipped with two groups, ceiling described in two groups (13) Solar panels (14) and battery (15) are each equipped with, the solar panels (14), which are inlayed, to be installed on ceiling (13), the storage Battery (15) is set to ceiling (13) inside, and ceiling (13) lower end surface is connected with energy-saving lamp (12), and the battery (15) is logical It crosses conducting wire to be electrically connected with energy-saving lamp (12) and solar panels (14) respectively, on first cage (1), the second cage (5) It is hinged with dodge gate (9).
2. road and bridge construction lifting means according to claim 1, it is characterised in that: ceiling (13) top is solid Surely it is welded with hanging ring (10), the hanging ring (10) is equipped with multiple groups, and first cage (1), the second cage (5) bottom end are fixedly welded There are hanging ring (10).
3. road and bridge construction lifting means according to claim 1, it is characterised in that: pedestal (6) the insertion soil In earth, second pulley described in two groups (7) is fixedly connected with the ground, and second pulley described in two groups (7) is respectively arranged on pedestal (6) Two sides.
4. road and bridge construction lifting means according to claim 3, it is characterised in that: the first wirerope described in two groups (11) one end is fixedly connected with the hanging ring (10) of first cage (1), the second cage (5) bottom end respectively, first steel Cord (11) far from hanging ring (10) one end pass through second pulley (7) with pull a cart (8) be fixedly connected, pull a cart described in two groups (8) Outbound course is opposite.
5. road and bridge construction lifting means according to claim 1, it is characterised in that: the bottom of the connecting rod (2) End face be fixedly connected with two groups described in first pulley (4), one end of second wirerope (16) and the first cage (1) is fixed connects It connects, second wirerope (16) passes through first pulley (4) and the second cage (5) fixed company far from the one end of the first cage (1) It connects.
CN201811508406.5A 2018-12-10 2018-12-10 Road and bridge construction lifting means Pending CN109353971A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811508406.5A CN109353971A (en) 2018-12-10 2018-12-10 Road and bridge construction lifting means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811508406.5A CN109353971A (en) 2018-12-10 2018-12-10 Road and bridge construction lifting means

Publications (1)

Publication Number Publication Date
CN109353971A true CN109353971A (en) 2019-02-19

Family

ID=65331971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811508406.5A Pending CN109353971A (en) 2018-12-10 2018-12-10 Road and bridge construction lifting means

Country Status (1)

Country Link
CN (1) CN109353971A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2784163A1 (en) * 2019-03-22 2020-09-22 Domingo De Arribas Jose Luis AUTOMATIC LIFTING SYSTEM FOR LIQUIDS AND SOLIDS IN BULK FOR INDUSTRIAL PROCESSES (Machine-translation by Google Translate, not legally binding)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB110966A (en) * 1916-11-27 1917-11-15 George William Lester Improvements in and relating to Safety Appliances for Pit-cages, Lifts and the like.
CN2268696Y (en) * 1994-09-16 1997-11-26 山东莱州市建筑机械厂 Four rope synchronous lifting unit of builder's hoist
FI20090028A0 (en) * 2009-01-30 2009-01-30 Kone Corp A method for arranging the rope lift, a method for modernizing the elevator, and an elevator implemented by the method
CN201834723U (en) * 2010-10-26 2011-05-18 熊晓倩 Lifter capable of upwards and downwards moving
CN104555638A (en) * 2014-12-14 2015-04-29 河南高端地坪工程有限公司 Lift used for constructional engineering
CN205034926U (en) * 2015-10-19 2016-02-17 海宁虎霸重工有限公司 Large -scale cage construction elevator of modified
CN106185533A (en) * 2016-10-08 2016-12-07 安徽理工大学 A kind of energy-saving safety construction elevator
CN206266055U (en) * 2016-11-10 2017-06-20 长春特种设备检测研究院 A kind of energy-conserving elevator car light
CN209193494U (en) * 2018-12-10 2019-08-02 徐州铭山路桥机械设备制造有限公司 A kind of road and bridge construction lifting means

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB110966A (en) * 1916-11-27 1917-11-15 George William Lester Improvements in and relating to Safety Appliances for Pit-cages, Lifts and the like.
CN2268696Y (en) * 1994-09-16 1997-11-26 山东莱州市建筑机械厂 Four rope synchronous lifting unit of builder's hoist
FI20090028A0 (en) * 2009-01-30 2009-01-30 Kone Corp A method for arranging the rope lift, a method for modernizing the elevator, and an elevator implemented by the method
CN201834723U (en) * 2010-10-26 2011-05-18 熊晓倩 Lifter capable of upwards and downwards moving
CN104555638A (en) * 2014-12-14 2015-04-29 河南高端地坪工程有限公司 Lift used for constructional engineering
CN205034926U (en) * 2015-10-19 2016-02-17 海宁虎霸重工有限公司 Large -scale cage construction elevator of modified
CN106185533A (en) * 2016-10-08 2016-12-07 安徽理工大学 A kind of energy-saving safety construction elevator
CN206266055U (en) * 2016-11-10 2017-06-20 长春特种设备检测研究院 A kind of energy-conserving elevator car light
CN209193494U (en) * 2018-12-10 2019-08-02 徐州铭山路桥机械设备制造有限公司 A kind of road and bridge construction lifting means

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2784163A1 (en) * 2019-03-22 2020-09-22 Domingo De Arribas Jose Luis AUTOMATIC LIFTING SYSTEM FOR LIQUIDS AND SOLIDS IN BULK FOR INDUSTRIAL PROCESSES (Machine-translation by Google Translate, not legally binding)

Similar Documents

Publication Publication Date Title
CN105442865B (en) A kind of piecewise method for dismounting of high chimney and its equipment
CN203998711U (en) Civil engineering tower crane
CN102409838B (en) Moveable operating platform and method for constructing suspended ceiling of roof by using same
CN209193494U (en) A kind of road and bridge construction lifting means
CN109113745A (en) A method of go down the hill to construct using fully-mechanized digging machine progress high inclination-angle big cross section and cuts eye
CN109353971A (en) Road and bridge construction lifting means
CN203373022U (en) Self-lifting type cableway transportation device
CN107023310A (en) The separate zone production quick lapping technique of large area
CN107476439A (en) A kind of retractable flexible encapsulated net canopy of new large span
CN102518396A (en) Automatic drilling machine
CN206784958U (en) A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure
CN103274310B (en) Self-lifting type cableway transporting device
CN105923548A (en) Device for achieving cable logging based on excavator
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN208456591U (en) A kind of the Towing Device of Tunneller
CN204476407U (en) A kind of pick anchor parallel operations construction equipment
CN202444998U (en) Aquaculture fixed platform mechanical fishing device
CN213243381U (en) Fast-assembling crossing structure
CN208686411U (en) A kind of driving face in coal mine steel belt for mining supports crane
CN202768027U (en) Quick heading temporary shoring system matched and used with heading machine
CN101967903A (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN107720652A (en) A kind of construction method for hanging of frame structure large scale equipment
CN204012462U (en) A kind of for setting up the suspender of wire
CN209259610U (en) A kind of equipotential live line work personnel lifting device
CN103825214A (en) Novel guide rope laying one-pull-seven construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190219

RJ01 Rejection of invention patent application after publication