CN109328787A - A kind of short trees accumulated snow in gardens shakes off equipment - Google Patents

A kind of short trees accumulated snow in gardens shakes off equipment Download PDF

Info

Publication number
CN109328787A
CN109328787A CN201811298312.XA CN201811298312A CN109328787A CN 109328787 A CN109328787 A CN 109328787A CN 201811298312 A CN201811298312 A CN 201811298312A CN 109328787 A CN109328787 A CN 109328787A
Authority
CN
China
Prior art keywords
rod
fixed
guide sleeve
accumulated snow
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811298312.XA
Other languages
Chinese (zh)
Inventor
吴开英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811298312.XA priority Critical patent/CN109328787A/en
Publication of CN109328787A publication Critical patent/CN109328787A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protecting plants

Landscapes

  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Clamps And Clips (AREA)

Abstract

Shake off the short trees accumulated snow of equipment more particularly to a kind of gardens the present invention relates to a kind of accumulated snow and shakes off equipment.Technical problem of the invention is: providing a kind of can prevent from getting wet in clothes, can be improved accumulated snow and shake off the short trees accumulated snow in gardens of efficiency and shake off equipment.The technical scheme is that a kind of short trees accumulated snow in gardens shakes off equipment, it include bottom plate, wheel, oscillating rod, clamping device, guide rod, the first guide sleeve, connecting rod etc.;The front and rear sides of bottom base plate have been provided with the wheel of migration, and the front and rear sides of bottom plate left side are hinged with oscillating rod, and the left end of oscillating rod is equipped with the left side that can be fixed on to the clamping device that branch is fixed, guide rod at the top of bottom plate.The present invention is fixed the branch on trees by clamping device, user, which moves left and right the first guide sleeve, to shake off the accumulated snow on branch, it so can prevent accumulated snow from falling downwards on the clothing of user, the clothing of user is got wet, and can be improved accumulated snow and shake off efficiency.

Description

A kind of short trees accumulated snow in gardens shakes off equipment
Technical field
Shake off the short trees accumulated snow of equipment more particularly to a kind of gardens the present invention relates to a kind of accumulated snow and shakes off equipment.
Background technique
After winter snows, a large amount of accumulated snow can have been fallen on the trees in gardens, be so easy the branch pressure on trees Disconnected, branch is broken in order to prevent, and people can shake off the accumulated snow on branch thus, and people shake off to accumulated snow at present When, usually people go the limb for shaking trees progress accumulated snow to shake off, and such accumulated snow is easy to fall on the clothes of people downwards, It is easy to get wet in the clothes of people after snow melting, since weather is more cold, can so reduce accumulated snow and shake off efficiency, in order to It prevents from getting wet in the clothes of people, people can hold longer wooden stick and fall the accumulated snow lane of trees, but people hold wooden stick pair for a long time Accumulated snow on trees carries out doing to fall arm and be easy to ache.
Summary of the invention
Shake off to overcome people that the limb for shaking trees is gone to carry out accumulated snow, is easy after snow melting on the clothes of people Clothes is got wet, since weather is more cold, can so reduce the shortcomings that accumulated snow shakes off efficiency, technical problem of the invention is: There is provided a kind of can prevent from getting wet in clothes, can be improved accumulated snow and shake off the short trees accumulated snow in gardens of efficiency and shake off equipment.
The technical scheme is that a kind of short trees accumulated snow in gardens shakes off equipment, it include bottom plate, wheel, swing Bar, clamping device, guide rod, the first guide sleeve, connecting rod, push rod and pushing hands, the front and rear sides of bottom base plate have been provided with movement The wheel of effect, the front and rear sides of bottom plate left side are hinged with oscillating rod, and the left end of oscillating rod, which is equipped with, to carry out branch Fixed clamping device, guide rod are fixed on the left side at the top of bottom plate, and slidingtype, which is cased with, on guide rod can make oscillating rod swing First guide sleeve, it is hinged there are two the connecting rod of removable clamping device on the first guide sleeve, two connecting rods respectively with former and later two The top left side of oscillating rod is hinged, and push rod is hinged among bottom plate top right side, and pushing hands is set to the top of push rod.
It further illustrates, clamping device includes big curved rod, sliding block, plectrum, small curved rod and spring, big curved rod Right side and the left end of oscillating rod are affixed, and the sliding slot that small curved rod can be made mobile, the top of big curved rod are provided in big curved rod It is provided with the arcuate socket playing the guiding role, arcuate socket is connected to sliding slot, and sliding slot inner sliding type is combined with sliding block, the top setting of sliding block In plectrum, plectrum passes through arcuate socket, and the lateral surface of former and later two sliding blocks is connected with small curved rod that can be fixed to branch, small arc Shape bar slidingtype is located in sliding slot, and spring is wound in small curved rod, and one end of spring is connect with sliding block, the other end of spring and big Curved rod is affixed.
It further illustrates, further includes having the first annulus, inserted link, link block, the second annulus, wirerope and pull ring, first inserts Slot is opened in the right side at the top of bottom plate, and the first slot is located at the left side of push rod, is equipped with inserted link in the first slot, the first annulus is fixed on The lower part of push rod left side, inserted link pass through the first annulus, and the front and rear sides lower part of inserted link is respectively and fixedly provided with link block, and the second annulus is solid Connect the top in push rod left side, the top of inserted link is fixed with wirerope, the second annulus of steel wire penetrating, is fixed on wirerope Pull ring.
It further illustrates, further includes having the second guide sleeve, pulley, bracing wire and guide post, the second guide sleeve slidingtype is covered in guide rod On, the second guide sleeve is located at the left side of the first guide sleeve, is equipped with multiple guide posts at the top of big curved rod, pulley is mounted on guide rod top The left side in portion, pulley are located at the left side of the second guide sleeve, are fixed with bracing wire on plectrum, bracing wire successively bypasses multiple guide posts and cunning The left side of wheel, the right end of bracing wire and the second guide sleeve is connected.
It further illustrates, further includes having connecting rod, slotting ring and plug, the right side of the first guide sleeve is connected with connecting rod, connecting rod Right end is fixed with slotting ring, and the right side at the top of guide rod is provided with the second slot, is equipped with the plug that can fix the first guide sleeve, plug in slotting ring Lower part be located in the second slot.
When needing to shake off the accumulated snow on trees short in gardens, the present invention is moved on the right side of trees by user Suitable position, subsequent user is fixed the branch on trees by clamping device, and then user pushes to the left or to the right First guide sleeve can so make former and later two oscillating rods outward or inwardly side oscillation, former and later two oscillating rods outward or to Inside, which swings by clamping device, so that branch is shaken, and so can do to fall by the accumulated snow on branch, so as to prevent from accumulating Snow is fallen on the clothing of user downwards, the clothing of user is got wet, and can be improved accumulated snow and shake off efficiency, when the product on branch After the completion of snow is shaken off, user is held pushing hands and is pulled to the right by fixation of the clamping device releasing to branch, subsequent user, pushing hands to Moving right can drive bottom plate move right by push rod, and the bottom plate part being able to drive thereon that moves right moves right, such as This can be moved by wheel, so as to facilitate user to shake off the accumulated snow on next trees.
When needing that branch is fixed, user moves inward former and later two plectrums, can so make front and back two A inside Slideslip of sliding block, spring are upheld therewith, and so as to slide into small curved rod in sliding slot, the left side of big curved rod is beaten It opens, subsequent user, which is moved to the left the present invention, is located at branch in big curved rod, and then user unclamps plectrum, in the work of spring force It can make small curved rod is mobile to reset under, branch can be so fixed, so as to facilitate user on trees Accumulated snow is shaken off, and after the accumulated snow on trees is shaken off, user moves inward former and later two plectrums, and spring is upheld therewith, Subsequent user moves right the present invention, branch can so removed in big curved rod, then user unclamps plectrum, in spring bullet It can make small curved rod is mobile to reset under the action of power.
When needing that the present invention is pushed to move, user by inserted link be inserted into the first slot in, so can to push rod into Row is fixed, and so as to facilitate user that the present invention is pushed to move, when needing the accumulated snow to branch to shake off, user is by inserted link It is taken out out of first slot, subsequent user hangs over pull ring on link block, then the present invention is pulled to move, is so not required to use Family moves left and right the first guide sleeve, so as to reduce the workload of user.
When needing that branch is fixed, user moves right the second guide sleeve, and the second guide sleeve, which moves right, passes through bracing wire Former and later two plectrums can be made mutually to draw close, small curved rod can so slid into sliding slot, spring is upheld therewith, can so be incited somebody to action Big curved rod is opened, and subsequent user, which is moved to the left the present invention, is located at branch in big curved rod, and then user unclamps the second guide sleeve, Small curved rod reset can under the action of the spring branch be fixed, so as to facilitate user to consolidate branch Fixed, and then can be improved trees accumulated snow and shake off efficiency, after the completion of the accumulated snow on branch is shaken off, user, which moves right, second to be led Set, can so open big curved rod, and the user present invention that moves right removes branch in big curved rod, and then user unclamps Second guide sleeve can be such that small curved rod resets under the action of the spring.
When needing to shake off trees accumulated snow, user takes out plug out of the second slot and slotting ring, then left and right Mobile first guide sleeve can shake off the accumulated snow on branch, and when needing the mobile present invention, plug is inserted into slotting ring by user In the second slot, connecting rod can be so fixed, so as to which oscillating rod is fixed, and then can be prevented at this When practical new mobile, oscillating rod swing brings obstruction to present invention movement.
Compared with prior art, the present invention has the advantage that the present invention by clamping device to the branch on trees into Row is fixed, and user, which moves left and right the first guide sleeve, to shake off the accumulated snow on branch, can so prevent accumulated snow from falling downwards It falls on the clothing of user, the clothing of user is got wet, and can be improved accumulated snow and shake off efficiency;Second guide sleeve, which moves right, to be passed through Bracing wire can be such that former and later two plectrums mutually draw close, and being so not required to user draws close former and later two plectrums mutually with hand, so as to drop The labor intensity of low user;Plug insertion slotting ring can be fixed the first guide sleeve in the second slot, can so prevent Only when this is practical new mobile, oscillating rod swing brings obstruction to present invention movement.
Detailed description of the invention
Fig. 1 is the first overlooking structure diagram of the invention.
Fig. 2 is the overlooking structure diagram of clamping device of the present invention.
Fig. 3 is the first partial top structural schematic diagram of the invention.
Fig. 4 is second of overlooking structure diagram of the invention.
Fig. 5 is second of partial top structural schematic diagram of the invention.
Fig. 6 is the overlooking structure diagram of A of the present invention.
In figure: 1 bottom plate, 2 wheels, 3 oscillating rods, 4 clamping devices, 41 big curved rods, 42 sliding slots, 43 arcuate sockets, 44 sliding blocks, 45 plectrums, 46 small curved rods, 47 springs, 5 guide rods, 6 first guide sleeves, 7 connecting rods, 8 push rods, 9 pushing hands, 10 first slots, 11 One annulus, 12 inserted links, 13 link blocks, 14 second annulus, 15 wirerope, 16 pull rings, 17 second guide sleeves, 18 pulleys, 19 bracing wires, 20 Guide post, 21 connecting rods, 22 slotting rings, 23 second slots, 24 plugs.
Specific embodiment
The invention will be further described combined with specific embodiments below, in the illustrative examples and explanation of the invention For explaining the present invention, but it is not as a limitation of the invention.
Embodiment 1
A kind of short trees accumulated snow in gardens shakes off equipment, as shown in figures 1 to 6, includes bottom plate 1, wheel 2, oscillating rod 3, clamps dress 4, guide rod 5, the first guide sleeve 6, connecting rod 7, push rod 8 and pushing hands 9 are set, the front and rear sides of 1 bottom of bottom plate have been provided with mobile work Wheel 2, the front and rear sides of 1 left side of bottom plate are hinged with oscillating rod 3, the left end of oscillating rod 3 be equipped with can to branch into The fixed clamping device 4 of row, guide rod 5 are fixed on the left side at 1 top of bottom plate, and slidingtype, which is cased with, on guide rod 5 can make 3 front and back of oscillating rod The first guide sleeve 6 swung, hinged there are two the connecting rod 7 of removable clamping device 4 on the first guide sleeve 6, two connecting rods 7 are distinguished Hinged with the top left side of former and later two oscillating rods 3, push rod 8 is hinged among 1 top right side of bottom plate, and pushing hands 9 is set to push rod 8 Top.
Embodiment 2
A kind of short trees accumulated snow in gardens shakes off equipment, as shown in figures 1 to 6, includes bottom plate 1, wheel 2, oscillating rod 3, clamps dress 4, guide rod 5, the first guide sleeve 6, connecting rod 7, push rod 8 and pushing hands 9 are set, the front and rear sides of 1 bottom of bottom plate have been provided with mobile work Wheel 2, the front and rear sides of 1 left side of bottom plate are hinged with oscillating rod 3, the left end of oscillating rod 3 be equipped with can to branch into The fixed clamping device 4 of row, guide rod 5 are fixed on the left side at 1 top of bottom plate, and slidingtype, which is cased with, on guide rod 5 can make 3 front and back of oscillating rod The first guide sleeve 6 swung, hinged there are two the connecting rod 7 of removable clamping device 4 on the first guide sleeve 6, two connecting rods 7 are distinguished Hinged with the top left side of former and later two oscillating rods 3, push rod 8 is hinged among 1 top right side of bottom plate, and pushing hands 9 is set to push rod 8 Top.
Clamping device 4 includes big curved rod 41, sliding block 44, plectrum 45, small curved rod 46 and spring 47, big curved rod 41 Right side and oscillating rod 3 left end it is affixed, the sliding slot 42 that small curved rod 46 can be made mobile, big arc are provided in big curved rod 41 The top of bar 41 is provided with the arcuate socket 43 playing the guiding role, and arcuate socket 43 is connected to sliding slot 42, and 42 inner sliding type of sliding slot is combined with Sliding block 44, the top of sliding block 44 are set to plectrum 45, and plectrum 45 passes through arcuate socket 43, and the lateral surface of former and later two sliding blocks 44 is solid It is connected to small curved rod 46 that can be fixed to branch, small 46 slidingtype of curved rod is located in sliding slot 42, is wound with bullet in small curved rod 46 One end of spring 47, spring 47 is connect with sliding block 44, and the other end of spring 47 and big curved rod 41 are affixed.
Embodiment 3
A kind of short trees accumulated snow in gardens shakes off equipment, as shown in figures 1 to 6, includes bottom plate 1, wheel 2, oscillating rod 3, clamps dress 4, guide rod 5, the first guide sleeve 6, connecting rod 7, push rod 8 and pushing hands 9 are set, the front and rear sides of 1 bottom of bottom plate have been provided with mobile work Wheel 2, the front and rear sides of 1 left side of bottom plate are hinged with oscillating rod 3, the left end of oscillating rod 3 be equipped with can to branch into The fixed clamping device 4 of row, guide rod 5 are fixed on the left side at 1 top of bottom plate, and slidingtype, which is cased with, on guide rod 5 can make 3 front and back of oscillating rod The first guide sleeve 6 swung, hinged there are two the connecting rod 7 of removable clamping device 4 on the first guide sleeve 6, two connecting rods 7 are distinguished Hinged with the top left side of former and later two oscillating rods 3, push rod 8 is hinged among 1 top right side of bottom plate, and pushing hands 9 is set to push rod 8 Top.
Clamping device 4 includes big curved rod 41, sliding block 44, plectrum 45, small curved rod 46 and spring 47, big curved rod 41 Right side and oscillating rod 3 left end it is affixed, the sliding slot 42 that small curved rod 46 can be made mobile, big arc are provided in big curved rod 41 The top of bar 41 is provided with the arcuate socket 43 playing the guiding role, and arcuate socket 43 is connected to sliding slot 42, and 42 inner sliding type of sliding slot is combined with Sliding block 44, the top of sliding block 44 are set to plectrum 45, and plectrum 45 passes through arcuate socket 43, and the lateral surface of former and later two sliding blocks 44 is solid It is connected to small curved rod 46 that can be fixed to branch, small 46 slidingtype of curved rod is located in sliding slot 42, is wound with bullet in small curved rod 46 One end of spring 47, spring 47 is connect with sliding block 44, and the other end of spring 47 and big curved rod 41 are affixed.
It further include having the first annulus 11, inserted link 12, link block 13, the second annulus 14, wirerope 15 and pull ring 16, first inserts Slot 10 is opened in the right side at the top of bottom plate 1, and the first slot 10 is located at the left side of push rod 8, equipped with inserted link 12 in the first slot 10, first Annulus 11 is fixed on the lower part of 8 left side of push rod, and inserted link 12 passes through the first annulus 11, and the front and rear sides lower part of inserted link 12 is fixed There is link block 13, the second annulus 14 is fixed in the top of 8 left side of push rod, and the top of inserted link 12 is fixed with wirerope 15, steel wire Rope 15 passes through the second annulus 14, is fixed with pull ring 16 on wirerope 15.
Embodiment 4
A kind of short trees accumulated snow in gardens shakes off equipment, as shown in figures 1 to 6, includes bottom plate 1, wheel 2, oscillating rod 3, clamps dress 4, guide rod 5, the first guide sleeve 6, connecting rod 7, push rod 8 and pushing hands 9 are set, the front and rear sides of 1 bottom of bottom plate have been provided with mobile work Wheel 2, the front and rear sides of 1 left side of bottom plate are hinged with oscillating rod 3, the left end of oscillating rod 3 be equipped with can to branch into The fixed clamping device 4 of row, guide rod 5 are fixed on the left side at 1 top of bottom plate, and slidingtype, which is cased with, on guide rod 5 can make 3 front and back of oscillating rod The first guide sleeve 6 swung, hinged there are two the connecting rod 7 of removable clamping device 4 on the first guide sleeve 6, two connecting rods 7 are distinguished Hinged with the top left side of former and later two oscillating rods 3, push rod 8 is hinged among 1 top right side of bottom plate, and pushing hands 9 is set to push rod 8 Top.
Clamping device 4 includes big curved rod 41, sliding block 44, plectrum 45, small curved rod 46 and spring 47, big curved rod 41 Right side and oscillating rod 3 left end it is affixed, the sliding slot 42 that small curved rod 46 can be made mobile, big arc are provided in big curved rod 41 The top of bar 41 is provided with the arcuate socket 43 playing the guiding role, and arcuate socket 43 is connected to sliding slot 42, and 42 inner sliding type of sliding slot is combined with Sliding block 44, the top of sliding block 44 are set to plectrum 45, and plectrum 45 passes through arcuate socket 43, and the lateral surface of former and later two sliding blocks 44 is solid It is connected to small curved rod 46 that can be fixed to branch, small 46 slidingtype of curved rod is located in sliding slot 42, is wound with bullet in small curved rod 46 One end of spring 47, spring 47 is connect with sliding block 44, and the other end of spring 47 and big curved rod 41 are affixed.
It further include having the first annulus 11, inserted link 12, link block 13, the second annulus 14, wirerope 15 and pull ring 16, first inserts Slot 10 is opened in the right side at the top of bottom plate 1, and the first slot 10 is located at the left side of push rod 8, equipped with inserted link 12 in the first slot 10, first Annulus 11 is fixed on the lower part of 8 left side of push rod, and inserted link 12 passes through the first annulus 11, and the front and rear sides lower part of inserted link 12 is fixed There is link block 13, the second annulus 14 is fixed in the top of 8 left side of push rod, and the top of inserted link 12 is fixed with wirerope 15, steel wire Rope 15 passes through the second annulus 14, is fixed with pull ring 16 on wirerope 15.
It further include having the second guide sleeve 17, pulley 18, bracing wire 19 and guide post 20,17 slidingtype of the second guide sleeve is covered in guide rod 5 On, the second guide sleeve 17 is located at the left side of the first guide sleeve 6, and the top of big curved rod 41 is equipped with multiple guide posts 20, and pulley 18 is pacified Mounted in the left side at the top of guide rod 5, pulley 18 is located at the left side of the second guide sleeve 17, is fixed with bracing wire 19 on plectrum 45, bracing wire 19 according to Secondary to bypass multiple guide posts 20 and pulley 18, the left side of the right end of bracing wire 19 and the second guide sleeve 17 is connected.
Embodiment 5
A kind of short trees accumulated snow in gardens shakes off equipment, as shown in figures 1 to 6, includes bottom plate 1, wheel 2, oscillating rod 3, clamps dress 4, guide rod 5, the first guide sleeve 6, connecting rod 7, push rod 8 and pushing hands 9 are set, the front and rear sides of 1 bottom of bottom plate have been provided with mobile work Wheel 2, the front and rear sides of 1 left side of bottom plate are hinged with oscillating rod 3, the left end of oscillating rod 3 be equipped with can to branch into The fixed clamping device 4 of row, guide rod 5 are fixed on the left side at 1 top of bottom plate, and slidingtype, which is cased with, on guide rod 5 can make 3 front and back of oscillating rod The first guide sleeve 6 swung, hinged there are two the connecting rod 7 of removable clamping device 4 on the first guide sleeve 6, two connecting rods 7 are distinguished Hinged with the top left side of former and later two oscillating rods 3, push rod 8 is hinged among 1 top right side of bottom plate, and pushing hands 9 is set to push rod 8 Top.
Clamping device 4 includes big curved rod 41, sliding block 44, plectrum 45, small curved rod 46 and spring 47, big curved rod 41 Right side and oscillating rod 3 left end it is affixed, the sliding slot 42 that small curved rod 46 can be made mobile, big arc are provided in big curved rod 41 The top of bar 41 is provided with the arcuate socket 43 playing the guiding role, and arcuate socket 43 is connected to sliding slot 42, and 42 inner sliding type of sliding slot is combined with Sliding block 44, the top of sliding block 44 are set to plectrum 45, and plectrum 45 passes through arcuate socket 43, and the lateral surface of former and later two sliding blocks 44 is solid It is connected to small curved rod 46 that can be fixed to branch, small 46 slidingtype of curved rod is located in sliding slot 42, is wound with bullet in small curved rod 46 One end of spring 47, spring 47 is connect with sliding block 44, and the other end of spring 47 and big curved rod 41 are affixed.
It further include having the first annulus 11, inserted link 12, link block 13, the second annulus 14, wirerope 15 and pull ring 16, first inserts Slot 10 is opened in the right side at the top of bottom plate 1, and the first slot 10 is located at the left side of push rod 8, equipped with inserted link 12 in the first slot 10, first Annulus 11 is fixed on the lower part of 8 left side of push rod, and inserted link 12 passes through the first annulus 11, and the front and rear sides lower part of inserted link 12 is fixed There is link block 13, the second annulus 14 is fixed in the top of 8 left side of push rod, and the top of inserted link 12 is fixed with wirerope 15, steel wire Rope 15 passes through the second annulus 14, is fixed with pull ring 16 on wirerope 15.
It further include having the second guide sleeve 17, pulley 18, bracing wire 19 and guide post 20,17 slidingtype of the second guide sleeve is covered in guide rod 5 On, the second guide sleeve 17 is located at the left side of the first guide sleeve 6, and the top of big curved rod 41 is equipped with multiple guide posts 20, and pulley 18 is pacified Mounted in the left side at the top of guide rod 5, pulley 18 is located at the left side of the second guide sleeve 17, is fixed with bracing wire 19 on plectrum 45, bracing wire 19 according to Secondary to bypass multiple guide posts 20 and pulley 18, the left side of the right end of bracing wire 19 and the second guide sleeve 17 is connected.
It further include having connecting rod 21, slotting ring 22 and plug 24, the right side of the first guide sleeve 6 is connected with connecting rod 21, connecting rod 21 Right end is fixed with slotting ring 22, and the right side at 5 top of guide rod is provided with the second slot 23, and the first guide sleeve 6 can be fixed by being equipped in slotting ring 22 The lower part of plug 24, plug 24 is located in the second slot 23.
When needing to shake off the accumulated snow on trees short in gardens, the present invention is moved on the right side of trees by user Suitable position, subsequent user is fixed the branch on trees by clamping device 4, and then user pushes to the left or to the right First guide sleeve 6 can so make former and later two oscillating rods 3 outward or inwardly side oscillation, former and later two oscillating rods 3 outward or Swinging by clamping device 4 inwardly can be such that branch shakes, and so can do to fall by the accumulated snow on branch, so as to prevent Accumulated snow is fallen downwards on the clothing of user, and the clothing of user is got wet, and be can be improved accumulated snow and shaken off efficiency, when on branch After the completion of accumulated snow is shaken off, user releases the fixation to branch by clamping device 4, and subsequent user holds pushing hands 9 and pulls to the right, pushes away Hand 9, which moves right, to drive bottom plate 1 move right by push rod 8, and bottom plate 1, which moves right, is able to drive part thereon to the right It is mobile, it can so be moved by wheel 2, so as to facilitate user to shake off the accumulated snow on next trees.
When needing that branch is fixed, user moves inward former and later two plectrums 45, can so make front and back Two inside Slideslips of sliding block 44, spring 47 are upheld therewith, so as to slide into small curved rod 46 in sliding slot 42, by big arc The left side of bar 41 is opened, and subsequent user, which is moved to the left the present invention, is located at branch in big curved rod 41, and then user unclamps plectrum 45, it can make small curved rod 46 is mobile to reset under the action of 47 elastic force of spring, branch can be so fixed, so as to Enough facilitate user to shake off the accumulated snow on trees, after the accumulated snow on trees is shaken off, user make former and later two plectrums 45 to Medial movement, spring 47 are upheld therewith, and subsequent user moves right the present invention, and branch can so be made to remove big curved rod 41 Interior, then user unclamps plectrum 45, can make small curved rod 46 is mobile to reset under the action of 47 elastic force of spring.
When needing that the present invention is pushed to move, inserted link 12 is inserted into the first slot 10 by user, so can be to pushing away Bar 8 is fixed, so as to facilitate user that the present invention is pushed to move, when needing the accumulated snow to branch to shake off, and user Inserted link 12 is taken out out of first slot 10, subsequent user hangs over pull ring 16 on link block 13, then the present invention is pulled to carry out It is mobile, it is so not required to user and moves left and right the first guide sleeve 6, so as to reduce the workload of user.
When needing that branch is fixed, user moves right the second guide sleeve 17, and the second guide sleeve 17, which moves right, to be passed through Bracing wire 19 can be such that former and later two 45 phases of plectrum draw close, and small curved rod 46 can so slide into sliding slot 42, spring 47 is therewith It upholds, big curved rod 41 can so be opened, subsequent user, which is moved to the left the present invention, is located at branch in big curved rod 41, so User unclamps the second guide sleeve 17 afterwards, and under the action of spring 47 the small reset of curved rod 46 can be fixed branch, thus It can facilitate user that branch is fixed, and then can be improved trees accumulated snow and shake off efficiency, when the accumulated snow on branch has been shaken off Cheng Hou, user move right the second guide sleeve 17, can so open big curved rod 41, and the user present invention that moves right makes branch It removes in big curved rod 41, then user unclamps the second guide sleeve 17, and under the action of spring 47 small curved rod 46 can reset.
When needing to shake off trees accumulated snow, user takes out plug 24 out of the second slot 23 and slotting ring 22, with The accumulated snow on branch can be shaken off by moving left and right the first guide sleeve 6 afterwards, and when needing the mobile present invention, user is by plug 24 It is inserted into slotting ring 22 and the second slot 23, connecting rod 21 can be so fixed, so as to which oscillating rod 3 is fixed, And then can prevent when this is practical new mobile, 3 swing of oscillating rod brings obstruction to present invention movement.
It should be understood by those skilled in the art that the above embodiments do not limit the invention in any form, it is all using equivalent The mode technical solution obtained of replacement or equivalent transformation, falls within the scope of protection of the present invention.

Claims (5)

  1. It include bottom plate (1), wheel (2), oscillating rod (3) and clamping device 1. a kind of short trees accumulated snow in gardens shakes off equipment (4), the front and rear sides of bottom plate (1) bottom have been provided with the wheel (2) of migration, the front and rear sides of bottom plate (1) left side It is hinged with oscillating rod (3), the left end of oscillating rod (3) is equipped with can be to the clamping device (4) that branch is fixed, and feature exists In further including having guide rod (5), the first guide sleeve (6), connecting rod (7), push rod (8) and pushing hands (9), guide rod (5) is fixed on bottom plate (1) left side at the top of, slidingtype is cased with the first guide sleeve (6) that can make oscillating rod (3) swing, the first guide sleeve on guide rod (5) (6) hinged there are two the connecting rod (7) of removable clamping device (4) on, two connecting rods (7) respectively with former and later two oscillating rods (3) top left side is hinged, and push rod (8) is hinged among bottom plate (1) top right side, and pushing hands (9) is set to the top of push rod (8) End.
  2. 2. the short trees accumulated snow in a kind of gardens according to claim 1 shakes off equipment, which is characterized in that clamping device (4) It include big curved rod (41), sliding block (44), plectrum (45), small curved rod (46) and spring (47), the right side of big curved rod (41) The left end of side and oscillating rod (3) is affixed, the sliding slot (42) that small curved rod (46) can be made mobile is provided on big curved rod (41), greatly The arcuate socket (43) playing the guiding role is provided at the top of curved rod (41), arcuate socket (43) is connected to sliding slot (42), sliding slot (42) Inner sliding type is combined with sliding block (44), is set at the top of sliding block (44) plectrum (45), and plectrum (45) passes through arcuate socket (43), preceding The lateral surface of latter two sliding block (44) is connected with small curved rod (46) that can be fixed to branch, small curved rod (46) slidingtype position In sliding slot (42), it is wound with spring (47) on small curved rod (46), one end of spring (47) is connect with sliding block (44), spring (47) The other end and big curved rod (41) it is affixed.
  3. 3. the short trees accumulated snow in a kind of gardens according to claim 2 shakes off equipment, which is characterized in that further include having first Annulus (11), inserted link (12), link block (13), the second annulus (14), wirerope (15) and pull ring (16), the first slot (10) are opened Right side at the top of bottom plate (1), the first slot (10) are located at the left side of push rod (8), are equipped with inserted link (12) in the first slot (10), First annulus (11) is fixed on the lower part of push rod (8) left side, and inserted link (12) passes through the first annulus (11), the front and back of inserted link (12) Two side lower parts are respectively and fixedly provided with link block (13), and the second annulus (14) is fixed in the top of push rod (8) left side, the top of inserted link (12) End is fixed with wirerope (15), and wirerope (15) passes through the second annulus (14), is fixed with pull ring (16) on wirerope (15).
  4. 4. the short trees accumulated snow in a kind of gardens according to claim 3 shakes off equipment, which is characterized in that further include having second Guide sleeve (17), pulley (18), bracing wire (19) and guide post (20), the second guide sleeve (17) slidingtype cover on guide rod (5), and second leads Set (17) is located at the left side of the first guide sleeve (6), is equipped with multiple guide posts (20) at the top of big curved rod (41), pulley (18) peace Left side at the top of guide rod (5), pulley (18) are located at the left side of the second guide sleeve (17), and plectrum is fixed with bracing wire on (45) (19), bracing wire (19) successively bypasses multiple guide posts (20) and pulley (18), the right end of bracing wire (19) and the second guide sleeve (17) Left side is connected.
  5. 5. the short trees accumulated snow in a kind of gardens according to claim 4 shakes off equipment, which is characterized in that further include having connecting rod (21), slotting ring (22) and plug (24), the right side of the first guide sleeve (6) are connected with connecting rod (21), and the right end of connecting rod (21) is fixed Have slotting ring (22), the right side at the top of guide rod (5) is provided with the second slot (23), and the first guide sleeve (6) can be fixed by being equipped in slotting ring (22) Plug (24), the lower part of plug (24) is located in the second slot (23).
CN201811298312.XA 2018-11-02 2018-11-02 A kind of short trees accumulated snow in gardens shakes off equipment Withdrawn CN109328787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811298312.XA CN109328787A (en) 2018-11-02 2018-11-02 A kind of short trees accumulated snow in gardens shakes off equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811298312.XA CN109328787A (en) 2018-11-02 2018-11-02 A kind of short trees accumulated snow in gardens shakes off equipment

Publications (1)

Publication Number Publication Date
CN109328787A true CN109328787A (en) 2019-02-15

Family

ID=65313461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811298312.XA Withdrawn CN109328787A (en) 2018-11-02 2018-11-02 A kind of short trees accumulated snow in gardens shakes off equipment

Country Status (1)

Country Link
CN (1) CN109328787A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109964680A (en) * 2019-05-15 2019-07-05 淄博华擎信息科技服务有限公司 Efficient branch pruning device
CN110178603A (en) * 2019-05-31 2019-08-30 杨素华 A kind of evergreen tree branch accumulated snow shakes off machine
CN111742766A (en) * 2020-06-30 2020-10-09 菏泽处堂机械租赁有限公司 Garden landscape tree snow shakes off equipment
CN112385432A (en) * 2020-11-17 2021-02-23 赖艳红 Pat formula gardens branch snow remove device
CN112449954A (en) * 2020-11-12 2021-03-09 刘烈涛 Gardens vegetation snow elimination's device convenient to remove
CN115486307A (en) * 2022-10-13 2022-12-20 张璐璐 Garden landscape tree snow shakes off equipment

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102349395A (en) * 2011-10-27 2012-02-15 马俊贵 Oscillatory dry fruit and nut harvester
CN202285603U (en) * 2011-08-29 2012-07-04 集辰(福建)农林发展有限公司 Portable fruit vibrating picker
CN103563565A (en) * 2013-09-06 2014-02-12 西北农林科技大学 Vibrating-type fruit picking device
CN203435376U (en) * 2013-05-29 2014-02-19 西北农林科技大学 Novel portable walnut picking machine
CN103650778A (en) * 2012-09-13 2014-03-26 梁劲根 Dragging device
CN103814692A (en) * 2014-02-27 2014-05-28 张立凡 Waxberry picker
CN104375213A (en) * 2014-11-14 2015-02-25 无锡信大气象传感网科技有限公司 Snow gauge with light energy heating function
CN206461993U (en) * 2017-01-10 2017-09-05 塔里木大学 A kind of jujube recovering device
CN206564854U (en) * 2017-01-18 2017-10-20 陈吉敖 Shake fruit is clamped
CN108307894A (en) * 2018-04-11 2018-07-24 沈华伦 A kind of snow cleaning plant for branch

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202285603U (en) * 2011-08-29 2012-07-04 集辰(福建)农林发展有限公司 Portable fruit vibrating picker
CN102349395A (en) * 2011-10-27 2012-02-15 马俊贵 Oscillatory dry fruit and nut harvester
CN103650778A (en) * 2012-09-13 2014-03-26 梁劲根 Dragging device
CN203435376U (en) * 2013-05-29 2014-02-19 西北农林科技大学 Novel portable walnut picking machine
CN103563565A (en) * 2013-09-06 2014-02-12 西北农林科技大学 Vibrating-type fruit picking device
CN103814692A (en) * 2014-02-27 2014-05-28 张立凡 Waxberry picker
CN104375213A (en) * 2014-11-14 2015-02-25 无锡信大气象传感网科技有限公司 Snow gauge with light energy heating function
CN206461993U (en) * 2017-01-10 2017-09-05 塔里木大学 A kind of jujube recovering device
CN206564854U (en) * 2017-01-18 2017-10-20 陈吉敖 Shake fruit is clamped
CN108307894A (en) * 2018-04-11 2018-07-24 沈华伦 A kind of snow cleaning plant for branch

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109964680A (en) * 2019-05-15 2019-07-05 淄博华擎信息科技服务有限公司 Efficient branch pruning device
CN109964680B (en) * 2019-05-15 2022-02-01 淄博华擎信息科技服务有限公司 Efficient branch pruning device
CN110178603A (en) * 2019-05-31 2019-08-30 杨素华 A kind of evergreen tree branch accumulated snow shakes off machine
CN110178603B (en) * 2019-05-31 2021-04-23 杨素华 Evergreen tree branch snow shaking-off machine
CN111742766A (en) * 2020-06-30 2020-10-09 菏泽处堂机械租赁有限公司 Garden landscape tree snow shakes off equipment
CN111742766B (en) * 2020-06-30 2021-11-19 湖南蓝旗格气体有限公司 Garden landscape tree snow shakes off equipment
CN112449954A (en) * 2020-11-12 2021-03-09 刘烈涛 Gardens vegetation snow elimination's device convenient to remove
CN112385432A (en) * 2020-11-17 2021-02-23 赖艳红 Pat formula gardens branch snow remove device
CN115486307A (en) * 2022-10-13 2022-12-20 张璐璐 Garden landscape tree snow shakes off equipment
CN115486307B (en) * 2022-10-13 2024-02-02 张璐璐 Landscape tree snow trembles equipment

Similar Documents

Publication Publication Date Title
CN109328787A (en) A kind of short trees accumulated snow in gardens shakes off equipment
CN103240727B (en) Tool for integrally removing nests
CN109473931A (en) A kind of power transmission device in adjustable support direction and angle
CN111011002A (en) Forest fruit harvester
CN104429343A (en) Sweet-scented osmanthus picking device
CN212232211U (en) Intelligent picking robot
CN208462408U (en) A kind of adjustable height device for picking fruit
CN104871729B (en) All-electric machine for collecting medlar
CN209662558U (en) Ball collecting device is used in a kind of practice of table tennis
CN106717550B (en) One kind hanging dry jujube harvesting apparatus
CN208446085U (en) A kind of tool of fruit-picking
CN208924694U (en) A kind of cherry falls collection device
CN208258452U (en) A kind of scalable fruit picking rod
CN217905214U (en) Fruit growing is with supplementary device of picking
CN207476936U (en) A kind of large capacity flue-cured tobacco comb cigarette clamp device
CN108925230B (en) A collection device for waxberry tree
CN110123093A (en) A kind of suspention potted landscape frame
CN205667136U (en) The special recovering device of Fructus Pruni
CN219326274U (en) Ramie fiber collection device
CN217665243U (en) Pine wood nematode morphological identification device
CN109077034A (en) A kind of anti-soft-shelled turtle capture clip to bite
CN104871728B (en) The method of manufacture and use thereof of all-electric machine for collecting medlar
CN108651001A (en) A kind of stay-supported picker and its pluck fruit method
CN212087044U (en) A retrieve recoverer that picks for mikania micrantha seed
CN107347374A (en) A kind of petal collection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190215

WW01 Invention patent application withdrawn after publication