CN109322449A - Metal Roof cornice integral hoisting gliding method - Google Patents
Metal Roof cornice integral hoisting gliding method Download PDFInfo
- Publication number
- CN109322449A CN109322449A CN201710637100.9A CN201710637100A CN109322449A CN 109322449 A CN109322449 A CN 109322449A CN 201710637100 A CN201710637100 A CN 201710637100A CN 109322449 A CN109322449 A CN 109322449A
- Authority
- CN
- China
- Prior art keywords
- aluminum plate
- cornice
- honeycomb aluminum
- hanging beam
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 229910052751 metal Inorganic materials 0.000 title claims abstract description 12
- 239000002184 metal Substances 0.000 title claims abstract description 12
- 229910052782 aluminium Inorganic materials 0.000 claims abstract description 37
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims abstract description 37
- 238000009434 installation Methods 0.000 claims abstract description 17
- 239000011490 mineral wool Substances 0.000 claims abstract description 7
- 239000004568 cement Substances 0.000 claims abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 239000000203 mixture Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 14
- 230000002708 enhancing effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 4
- 238000000465 moulding Methods 0.000 description 3
- 239000004411 aluminium Substances 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000004026 adhesive bonding Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000000796 flavoring agent Substances 0.000 description 1
- 235000019634 flavors Nutrition 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000036548 skin texture Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/15—Trimming strips; Edge strips; Fascias; Expansion joints for roofs
- E04D13/158—Trimming strips; Edge strips; Fascias; Expansion joints for roofs covering the overhang at the eave side, e.g. soffits, or the verge of saddle roofs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of metal Roof cornice integral hoisting gliding methods, it includes step 1: cornice skeleton, cement pressure plate, rock wool and each component are combined into a honeycomb aluminum plate cornice unit in ground group;Two: spelling sets two rectangular frames and the two rectangular frames is set up at L-shaped bracket;Three: setting up a bracket respectively in the Core Walls Structure of honeycomb aluminum plate cornice unit two sides;Four: setting up a hanging beam between two supports;Five: two Core Walls Structures of honeycomb aluminum plate cornice unit two sides are wide outside and narrow inside, wide at the top and narrow at the bottom;Six: hanging two groups of pulley blocks;Two groups of pulley blocks are hung on hanging beam by jack;Seven: on the outside of honeycomb aluminum plate cornice unit vertical transport to installation site;Eight: honeycomb aluminum plate cornice unit being moved inward, until being moved to the installation site of honeycomb aluminum plate cornice unit.The present invention reduces amount of high-altitude operation, improves construction precision, enhancing construction efficiency.
Description
Technical field
The present invention relates to a kind of gliding methods, specifically metal Roof cornice integral hoisting gliding method.
Background technique
With Chinese society rapid economic development, the important behaviour form as culture and arts is built, is had been assigned more
Meaning.Roofing as component part mostly important in building enclosure system, should meet first becalm take shelter from rain, insulation,
The physical property requirements such as safety durable, sound insulation and noise reducing, while as moulding the indispensable a part of architectural image, moulding,
Material, color, skin texture etc. have higher requirement.Metal Roof has high-strength light, sets compared with traditional prepared roofing
The features such as flexible, rich in color, moulding is unique is counted, building can be made to generate stronger modern sense and times flavour.
In roofing eave work progress there are process intersect, face idle job, hoisting difficulty is high the features such as, for metal Roof
Cornice construction traditional process generally first carries out the welding of cornice skeleton, then carries out the installation of the fillers such as cement pressure plate, rock wool, most
The installation of roofing eave panel is carried out afterwards, and panel carries out the gluing processing in aluminium sheet gap after being installed, construction, which will cause, in this way applies
Work measure amount is big, amount of high-altitude operation is big, faces the Construction State that idle job is more, safety management difficulty is big, construction machinery is at high cost.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of metal Roof cornice integral hoisting gliding method is provided, is subtracted
Few working measure amount, the purpose for shortening the construction period, improving construction efficiency.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A kind of metal Roof cornice integral hoisting gliding method, it is characterised in that it includes the following steps:
Step 1: cornice skeleton, cement pressure plate, rock wool and each component are combined into a honeycomb aluminum plate cornice list in ground group
Member;
Step 2: setting support;Several girders are combined into two rectangular frames and the two rectangular frames are set up at L-shaped branch
Frame adds several support rods between two rectangular frames;
Step 3: a bracket is set up respectively in the Core Walls Structure of honeycomb aluminum plate cornice unit two sides;
Step 4: limitation hanging beam is equipped at the inside of a piece hanging beam of erection between two supports, hanging beam and Core Walls Structure in bracket
The limited block of upper sliding;
Step 5: two Core Walls Structures of the honeycomb aluminum plate cornice unit two sides are wide outside and narrow inside, wide at the top and narrow at the bottom, the hanging beam position
In the upper outside of honeycomb aluminum plate cornice unit;
Step 6: two groups of pulley blocks are hung;Every group of pulley blocks include movable pulley, fixed pulley and leading block, and every group of pulley blocks connect
A hoist engine is connect, two groups of pulley blocks are hung on hanging beam by jack;
Step 7: will be on the outside of honeycomb aluminum plate cornice unit vertical transport to installation site by hoist engine and pulley blocks;
Step 8: when honeycomb aluminum plate cornice unit reaches mounting height, being horizontally moved by the jack of bracket end, will
Honeycomb aluminum plate cornice unit moves inward, until being moved to the installation site of honeycomb aluminum plate cornice unit.
The metal Roof cornice integral hoisting gliding method, it is characterised in that: the hanging beam is by two H profile steel groups
At hanging beam side is equipped with an angle steel as support.
The beneficial effects of the present invention are: the actions such as honeycomb aluminum plate cornice skeleton, rock wool, panel are in ground construction, energy
It reduces amount of high-altitude operation, improve construction precision, enhancing construction efficiency;Using installation on ground, whole promotion, short distance sliding are just
Position.By cornice skeleton, panel, rock wool etc. in installation on ground at a module unit, cornice carries out vertical lifting, lifting outside batter post
Horizontal sliding is carried out after to certain altitude, is slid onto the welding of progress skeleton behind designated position, is guaranteed structural stability and size
It is accurately positioned.It is also a kind of new trial to the installation of incline structure honeycomb aluminum plate using modular installation, conventional construction can be expanded
Thinking;Honeycomb aluminum plate integral installation improves construction and installation quality, can be easy to aluminium sheet outer surface finished product protection.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the main view of bracket;
Fig. 2 is the side view of bracket;
Fig. 3 is the schematic diagram of erect bracket;
Fig. 4 is hanging beam schematic diagram;
Fig. 5 is that hanging beam sets up floor map;
Fig. 6 is pulley blocks schematic diagram;
Fig. 7 is pulley scheme of installation;
Fig. 8 is the schematic diagram of vertical lifting.
Specific embodiment
As shown in Figure 1, 2: a kind of metal Roof cornice integral hoisting gliding method, it includes the following steps:
Step 1: cornice skeleton, cement pressure plate, rock wool and each component are combined into a honeycomb aluminum plate cornice unit in ground group
4;
Step 2: as shown in figure 3, setting support 1;Several girders are combined into two rectangular frames and take the two rectangular frames
L-shaped brackets are set as, several support rods 2 are added between two rectangular frames;
Step 3: a bracket is set up respectively in the Core Walls Structure 3 of honeycomb aluminum plate cornice unit two sides;
Step 4: as shown in Figure 4,5: setting up a hanging beam 5 between two supports, the hanging beam is made of two H profile steels, is
Prevent unstability, hanging beam side is equipped with an angle steel 6 as support.Limitation hanging beam is equipped at the inside of hanging beam and Core Walls Structure
The limited block 7 slided on bracket;
Step 5: two Core Walls Structures of the honeycomb aluminum plate cornice unit two sides be it is wide outside and narrow inside, wide at the top and narrow at the bottom, in order to by honeycomb
Aluminum plate unit is smoothly hung to construction point, and hanging beam is located at the upper outside of honeycomb aluminum plate cornice unit;
Step 6: as shown in Figure 6,7: hanging two groups of pulley blocks 13;Every group of pulley blocks include that movable pulley 8, fixed pulley 9 and guiding are slided
Wheel 10, every group of pulley blocks connect a hoist engine, two groups of pulley blocks are hung on hanging beam by jack;In order to laborsaving, avoid
The load that wirerope is subject to is excessive, the form lift-on/lift-off system that two groups of movable pulleys of lifting proposed adoption of honeycomb aluminum plate lift, single pulley
Group plays object with four sections of ropes, and single wire rope 12 lifts 1/8th (1/2*1/4 that power used for object is exactly gross weight
=1/8).Wherein select 10T grades of running blocks and 5 tonnes of fixed pulley groups and 5 tonnes of fixed pulley wheel wheel groups, 2 tons of elevators
Machine and 11mm wirerope.
Step 7: as shown in figure 8, passing through hoist engine and pulley blocks for honeycomb aluminum plate cornice unit vertical transport to installation position
Set outside;
Step 8: when honeycomb aluminum plate cornice unit reaches mounting height, being horizontally moved by the jack of bracket end, will
Honeycomb aluminum plate cornice unit moves inward, until being moved to the installation site of honeycomb aluminum plate cornice unit.
Claims (2)
1. a kind of metal Roof cornice integral hoisting gliding method, it is characterised in that it includes the following steps:
Step 1: cornice skeleton, cement pressure plate, rock wool and each component are combined into a honeycomb aluminum plate cornice list in ground group
Member;
Step 2: setting support;Several girders are combined into two rectangular frames and the two rectangular frames are set up at L-shaped branch
Frame adds several support rods between two rectangular frames;
Step 3: a bracket is set up respectively in the Core Walls Structure of honeycomb aluminum plate cornice unit two sides;
Step 4: limitation hanging beam is equipped at the inside of a piece hanging beam of erection between two supports, hanging beam and Core Walls Structure in bracket
The limited block of upper sliding;
Step 5: two Core Walls Structures of the honeycomb aluminum plate cornice unit two sides are wide outside and narrow inside, wide at the top and narrow at the bottom, the hanging beam position
In the upper outside of honeycomb aluminum plate cornice unit;
Step 6: two groups of pulley blocks are hung;Every group of pulley blocks include movable pulley, fixed pulley and leading block, and every group of pulley blocks connect
A hoist engine is connect, two groups of pulley blocks are hung on hanging beam by jack;
Step 7: will be on the outside of honeycomb aluminum plate cornice unit vertical transport to installation site by hoist engine and pulley blocks;
Step 8: when honeycomb aluminum plate cornice unit reaches mounting height, being horizontally moved by the jack of bracket end, will
Honeycomb aluminum plate cornice unit moves inward, until being moved to the installation site of honeycomb aluminum plate cornice unit.
2. metal Roof cornice integral hoisting gliding method according to claim 1, it is characterised in that: the hanging beam is by two
Root H profile steel composition, hanging beam side are equipped with an angle steel as support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710637100.9A CN109322449A (en) | 2017-07-31 | 2017-07-31 | Metal Roof cornice integral hoisting gliding method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710637100.9A CN109322449A (en) | 2017-07-31 | 2017-07-31 | Metal Roof cornice integral hoisting gliding method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109322449A true CN109322449A (en) | 2019-02-12 |
Family
ID=65244747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710637100.9A Pending CN109322449A (en) | 2017-07-31 | 2017-07-31 | Metal Roof cornice integral hoisting gliding method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109322449A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113503030A (en) * | 2021-07-27 | 2021-10-15 | 森特士兴集团股份有限公司 | Arc-shaped cornice modular prefabrication and spaced hoisting construction method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225408A (en) * | 2013-04-18 | 2013-07-31 | 成军 | Construction method for long-span net rack multiple-mast independent type integral lifting |
CN203199913U (en) * | 2013-04-10 | 2013-09-18 | 中建城市建设发展有限公司 | Assembling and disassembling type hoisting truss |
CN203461780U (en) * | 2013-07-19 | 2014-03-05 | 天津二十冶建设有限公司 | Hoisting device for corrosion prevention treatment of pipes |
CN204474202U (en) * | 2014-12-19 | 2015-07-15 | 山西省第三建筑工程公司 | Large-tonnage steel member integrated hoisting fixture |
-
2017
- 2017-07-31 CN CN201710637100.9A patent/CN109322449A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203199913U (en) * | 2013-04-10 | 2013-09-18 | 中建城市建设发展有限公司 | Assembling and disassembling type hoisting truss |
CN103225408A (en) * | 2013-04-18 | 2013-07-31 | 成军 | Construction method for long-span net rack multiple-mast independent type integral lifting |
CN203461780U (en) * | 2013-07-19 | 2014-03-05 | 天津二十冶建设有限公司 | Hoisting device for corrosion prevention treatment of pipes |
CN204474202U (en) * | 2014-12-19 | 2015-07-15 | 山西省第三建筑工程公司 | Large-tonnage steel member integrated hoisting fixture |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113503030A (en) * | 2021-07-27 | 2021-10-15 | 森特士兴集团股份有限公司 | Arc-shaped cornice modular prefabrication and spaced hoisting construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101514586B (en) | Hanger rail type electric hanging boat and construction method thereof | |
CN106065661A (en) | Large span unsettled steel corridor construction engineering method | |
CN107217815B (en) | Resistance to compression, safe type assembled steel construction elevartor shaft | |
CN102322135A (en) | Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same | |
CN108033367B (en) | Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane | |
CN106013419B (en) | Long-span Cantilever abnormity transfinites structural steel corridor construction engineering method | |
CN106812328B (en) | The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer | |
CN204588379U (en) | For the Dokdo type elevator of outdoor | |
CN202108242U (en) | Elevator shaft construction scaffold device constructed and lifted together with a building main structure by layers | |
CN106013453B (en) | Long-span Cantilever transfinites structure construction engineering method | |
CN113062584A (en) | Multipoint elevator shaft construction lifting platform and construction method | |
CN109322449A (en) | Metal Roof cornice integral hoisting gliding method | |
CN209568688U (en) | A kind of elevating construction platform | |
CN217400394U (en) | High-altitude manual hoisting profiled steel sheet construction device | |
CN203257106U (en) | Multifunctional power-driven walking type walking system | |
CN212507305U (en) | High-altitude operation platform applied to large-span factory building | |
CN204492173U (en) | Elevator shaft integral lifting template operation platform | |
CN210508326U (en) | Liftable well operation platform | |
CN209760761U (en) | Construction platform and elevator core section of thick bamboo construction structures in a core section of thick bamboo | |
CN210563326U (en) | Overhead unit type overhead sliding splicing operation platform | |
CN113047594A (en) | Movable climbing frame for elevator shaft and erection method thereof | |
CN110359697B (en) | Overhead sliding splicing operation platform of high-altitude unit type | |
CN102767280A (en) | Quick-dismounting system and installation method for top plate | |
CN111636667A (en) | High-altitude operation platform construction method and operation platform applied to large-span plant | |
CN207348787U (en) | One kind maintenance cat ladder platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190212 |