CN109322449A CN201710637100.9A CN201710637100A CN109322449A CN 109322449 A CN109322449 A CN 109322449A CN 201710637100 A CN201710637100 A CN 201710637100A CN 109322449 A CN109322449 A CN 109322449A
Authority
CN
China
Prior art keywords
aluminum plate
cornice
honeycomb aluminum
hanging beam
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710637100.9A
Other languages
Chinese (zh)
Inventor
闫勇先
王梦圆
姚尧
杨杰
陈财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201710637100.9A priority Critical patent/CN109322449A/en
Publication of CN109322449A publication Critical patent/CN109322449A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/15Trimming strips; Edge strips; Fascias; Expansion joints for roofs
    • E04D13/158Trimming strips; Edge strips; Fascias; Expansion joints for roofs covering the overhang at the eave side, e.g. soffits, or the verge of saddle roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of metal Roof cornice integral hoisting gliding methods, it includes step 1: cornice skeleton, cement pressure plate, rock wool and each component are combined into a honeycomb aluminum plate cornice unit in ground group;Two: spelling sets two rectangular frames and the two rectangular frames is set up at L-shaped bracket;Three: setting up a bracket respectively in the Core Walls Structure of honeycomb aluminum plate cornice unit two sides;Four: setting up a hanging beam between two supports;Five: two Core Walls Structures of honeycomb aluminum plate cornice unit two sides are wide outside and narrow inside, wide at the top and narrow at the bottom;Six: hanging two groups of pulley blocks;Two groups of pulley blocks are hung on hanging beam by jack;Seven: on the outside of honeycomb aluminum plate cornice unit vertical transport to installation site;Eight: honeycomb aluminum plate cornice unit being moved inward, until being moved to the installation site of honeycomb aluminum plate cornice unit.The present invention reduces amount of high-altitude operation, improves construction precision, enhancing construction efficiency.

Description

Metal Roof cornice integral hoisting gliding method
Technical field
The present invention relates to a kind of gliding methods, specifically metal Roof cornice integral hoisting gliding method.
Background technique
With Chinese society rapid economic development, the important behaviour form as culture and arts is built, is had been assigned more Meaning.Roofing as component part mostly important in building enclosure system, should meet first becalm take shelter from rain, insulation, The physical property requirements such as safety durable, sound insulation and noise reducing, while as moulding the indispensable a part of architectural image, moulding, Material, color, skin texture etc. have higher requirement.Metal Roof has high-strength light, sets compared with traditional prepared roofing The features such as flexible, rich in color, moulding is unique is counted, building can be made to generate stronger modern sense and times flavour.
In roofing eave work progress there are process intersect, face idle job, hoisting difficulty is high the features such as, for metal Roof Cornice construction traditional process generally first carries out the welding of cornice skeleton, then carries out the installation of the fillers such as cement pressure plate, rock wool, most The installation of roofing eave panel is carried out afterwards, and panel carries out the gluing processing in aluminium sheet gap after being installed, construction, which will cause, in this way applies Work measure amount is big, amount of high-altitude operation is big, faces the Construction State that idle job is more, safety management difficulty is big, construction machinery is at high cost.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of metal Roof cornice integral hoisting gliding method is provided, is subtracted Few working measure amount, the purpose for shortening the construction period, improving construction efficiency.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A kind of metal Roof cornice integral hoisting gliding method, it is characterised in that it includes the following steps:
Step 1: cornice skeleton, cement pressure plate, rock wool and each component are combined into a honeycomb aluminum plate cornice list in ground group Member;
Step 2: setting support;Several girders are combined into two rectangular frames and the two rectangular frames are set up at L-shaped branch Frame adds several support rods between two rectangular frames;
Step 3: a bracket is set up respectively in the Core Walls Structure of honeycomb aluminum plate cornice unit two sides;
Step 4: limitation hanging beam is equipped at the inside of a piece hanging beam of erection between two supports, hanging beam and Core Walls Structure in bracket The limited block of upper sliding;
Step 5: two Core Walls Structures of the honeycomb aluminum plate cornice unit two sides are wide outside and narrow inside, wide at the top and narrow at the bottom, the hanging beam position In the upper outside of honeycomb aluminum plate cornice unit;
Step 6: two groups of pulley blocks are hung;Every group of pulley blocks include movable pulley, fixed pulley and leading block, and every group of pulley blocks connect A hoist engine is connect, two groups of pulley blocks are hung on hanging beam by jack;
Step 7: will be on the outside of honeycomb aluminum plate cornice unit vertical transport to installation site by hoist engine and pulley blocks;
Step 8: when honeycomb aluminum plate cornice unit reaches mounting height, being horizontally moved by the jack of bracket end, will Honeycomb aluminum plate cornice unit moves inward, until being moved to the installation site of honeycomb aluminum plate cornice unit.
The metal Roof cornice integral hoisting gliding method, it is characterised in that: the hanging beam is by two H profile steel groups At hanging beam side is equipped with an angle steel as support.
The beneficial effects of the present invention are: the actions such as honeycomb aluminum plate cornice skeleton, rock wool, panel are in ground construction, energy It reduces amount of high-altitude operation, improve construction precision, enhancing construction efficiency;Using installation on ground, whole promotion, short distance sliding are just Position.By cornice skeleton, panel, rock wool etc. in installation on ground at a module unit, cornice carries out vertical lifting, lifting outside batter post Horizontal sliding is carried out after to certain altitude, is slid onto the welding of progress skeleton behind designated position, is guaranteed structural stability and size It is accurately positioned.It is also a kind of new trial to the installation of incline structure honeycomb aluminum plate using modular installation, conventional construction can be expanded Thinking;Honeycomb aluminum plate integral installation improves construction and installation quality, can be easy to aluminium sheet outer surface finished product protection.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the main view of bracket;
Fig. 2 is the side view of bracket;
Fig. 3 is the schematic diagram of erect bracket;
Fig. 4 is hanging beam schematic diagram;
Fig. 5 is that hanging beam sets up floor map;
Fig. 6 is pulley blocks schematic diagram;
Fig. 7 is pulley scheme of installation;
Fig. 8 is the schematic diagram of vertical lifting.
Specific embodiment
As shown in Figure 1, 2: a kind of metal Roof cornice integral hoisting gliding method, it includes the following steps:
Step 1: cornice skeleton, cement pressure plate, rock wool and each component are combined into a honeycomb aluminum plate cornice unit in ground group 4;
Step 2: as shown in figure 3, setting support 1;Several girders are combined into two rectangular frames and take the two rectangular frames L-shaped brackets are set as, several support rods 2 are added between two rectangular frames;
Step 3: a bracket is set up respectively in the Core Walls Structure 3 of honeycomb aluminum plate cornice unit two sides;
Step 4: as shown in Figure 4,5: setting up a hanging beam 5 between two supports, the hanging beam is made of two H profile steels, is Prevent unstability, hanging beam side is equipped with an angle steel 6 as support.Limitation hanging beam is equipped at the inside of hanging beam and Core Walls Structure The limited block 7 slided on bracket;
Step 5: two Core Walls Structures of the honeycomb aluminum plate cornice unit two sides be it is wide outside and narrow inside, wide at the top and narrow at the bottom, in order to by honeycomb Aluminum plate unit is smoothly hung to construction point, and hanging beam is located at the upper outside of honeycomb aluminum plate cornice unit;
Step 6: as shown in Figure 6,7: hanging two groups of pulley blocks 13;Every group of pulley blocks include that movable pulley 8, fixed pulley 9 and guiding are slided Wheel 10, every group of pulley blocks connect a hoist engine, two groups of pulley blocks are hung on hanging beam by jack;In order to laborsaving, avoid The load that wirerope is subject to is excessive, the form lift-on/lift-off system that two groups of movable pulleys of lifting proposed adoption of honeycomb aluminum plate lift, single pulley Group plays object with four sections of ropes, and single wire rope 12 lifts 1/8th (1/2*1/4 that power used for object is exactly gross weight =1/8).Wherein select 10T grades of running blocks and 5 tonnes of fixed pulley groups and 5 tonnes of fixed pulley wheel wheel groups, 2 tons of elevators Machine and 11mm wirerope.
Step 7: as shown in figure 8, passing through hoist engine and pulley blocks for honeycomb aluminum plate cornice unit vertical transport to installation position Set outside;
Step 8: when honeycomb aluminum plate cornice unit reaches mounting height, being horizontally moved by the jack of bracket end, will Honeycomb aluminum plate cornice unit moves inward, until being moved to the installation site of honeycomb aluminum plate cornice unit.

Claims (2)

1. a kind of metal Roof cornice integral hoisting gliding method, it is characterised in that it includes the following steps:
Step 1: cornice skeleton, cement pressure plate, rock wool and each component are combined into a honeycomb aluminum plate cornice list in ground group Member;
Step 2: setting support;Several girders are combined into two rectangular frames and the two rectangular frames are set up at L-shaped branch Frame adds several support rods between two rectangular frames;
Step 3: a bracket is set up respectively in the Core Walls Structure of honeycomb aluminum plate cornice unit two sides;
Step 4: limitation hanging beam is equipped at the inside of a piece hanging beam of erection between two supports, hanging beam and Core Walls Structure in bracket The limited block of upper sliding;
Step 5: two Core Walls Structures of the honeycomb aluminum plate cornice unit two sides are wide outside and narrow inside, wide at the top and narrow at the bottom, the hanging beam position In the upper outside of honeycomb aluminum plate cornice unit;
Step 6: two groups of pulley blocks are hung;Every group of pulley blocks include movable pulley, fixed pulley and leading block, and every group of pulley blocks connect A hoist engine is connect, two groups of pulley blocks are hung on hanging beam by jack;
Step 7: will be on the outside of honeycomb aluminum plate cornice unit vertical transport to installation site by hoist engine and pulley blocks;
Step 8: when honeycomb aluminum plate cornice unit reaches mounting height, being horizontally moved by the jack of bracket end, will Honeycomb aluminum plate cornice unit moves inward, until being moved to the installation site of honeycomb aluminum plate cornice unit.
2. metal Roof cornice integral hoisting gliding method according to claim 1, it is characterised in that: the hanging beam is by two Root H profile steel composition, hanging beam side are equipped with an angle steel as support.
CN201710637100.9A 2017-07-31 2017-07-31 Metal Roof cornice integral hoisting gliding method Pending CN109322449A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710637100.9A CN109322449A (en) 2017-07-31 2017-07-31 Metal Roof cornice integral hoisting gliding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710637100.9A CN109322449A (en) 2017-07-31 2017-07-31 Metal Roof cornice integral hoisting gliding method

Publications (1)

Publication Number Publication Date
CN109322449A true CN109322449A (en) 2019-02-12

Family

ID=65244747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710637100.9A Pending CN109322449A (en) 2017-07-31 2017-07-31 Metal Roof cornice integral hoisting gliding method

Country Status (1)

Country Link
CN (1) CN109322449A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113503030A (en) * 2021-07-27 2021-10-15 森特士兴集团股份有限公司 Arc-shaped cornice modular prefabrication and spaced hoisting construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225408A (en) * 2013-04-18 2013-07-31 成军 Construction method for long-span net rack multiple-mast independent type integral lifting
CN203199913U (en) * 2013-04-10 2013-09-18 中建城市建设发展有限公司 Assembling and disassembling type hoisting truss
CN203461780U (en) * 2013-07-19 2014-03-05 天津二十冶建设有限公司 Hoisting device for corrosion prevention treatment of pipes
CN204474202U (en) * 2014-12-19 2015-07-15 山西省第三建筑工程公司 Large-tonnage steel member integrated hoisting fixture

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203199913U (en) * 2013-04-10 2013-09-18 中建城市建设发展有限公司 Assembling and disassembling type hoisting truss
CN103225408A (en) * 2013-04-18 2013-07-31 成军 Construction method for long-span net rack multiple-mast independent type integral lifting
CN203461780U (en) * 2013-07-19 2014-03-05 天津二十冶建设有限公司 Hoisting device for corrosion prevention treatment of pipes
CN204474202U (en) * 2014-12-19 2015-07-15 山西省第三建筑工程公司 Large-tonnage steel member integrated hoisting fixture

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113503030A (en) * 2021-07-27 2021-10-15 森特士兴集团股份有限公司 Arc-shaped cornice modular prefabrication and spaced hoisting construction method thereof

Similar Documents

Publication Publication Date Title
CN101514586B (en) Hanger rail type electric hanging boat and construction method thereof
CN106065661A (en) Large span unsettled steel corridor construction engineering method
CN107217815B (en) Resistance to compression, safe type assembled steel construction elevartor shaft
CN102322135A (en) Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN106013419B (en) Long-span Cantilever abnormity transfinites structural steel corridor construction engineering method
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN204588379U (en) For the Dokdo type elevator of outdoor
CN202108242U (en) Elevator shaft construction scaffold device constructed and lifted together with a building main structure by layers
CN106013453B (en) Long-span Cantilever transfinites structure construction engineering method
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN109322449A (en) Metal Roof cornice integral hoisting gliding method
CN209568688U (en) A kind of elevating construction platform
CN217400394U (en) High-altitude manual hoisting profiled steel sheet construction device
CN203257106U (en) Multifunctional power-driven walking type walking system
CN212507305U (en) High-altitude operation platform applied to large-span factory building
CN204492173U (en) Elevator shaft integral lifting template operation platform
CN210508326U (en) Liftable well operation platform
CN209760761U (en) Construction platform and elevator core section of thick bamboo construction structures in a core section of thick bamboo
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
CN113047594A (en) Movable climbing frame for elevator shaft and erection method thereof
CN110359697B (en) Overhead sliding splicing operation platform of high-altitude unit type
CN102767280A (en) Quick-dismounting system and installation method for top plate
CN111636667A (en) High-altitude operation platform construction method and operation platform applied to large-span plant
CN207348787U (en) One kind maintenance cat ladder platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212