CN109281328A - 钢围堰定位桩精确施工方法 - Google Patents

钢围堰定位桩精确施工方法 Download PDF

Info

Publication number
CN109281328A
CN109281328A CN201811351218.6A CN201811351218A CN109281328A CN 109281328 A CN109281328 A CN 109281328A CN 201811351218 A CN201811351218 A CN 201811351218A CN 109281328 A CN109281328 A CN 109281328A
Authority
CN
China
Prior art keywords
pile
steel
guide
construction
guide pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811351218.6A
Other languages
English (en)
Other versions
CN109281328B (zh
Inventor
骆光辉
周勇
刘昌文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201811351218.6A priority Critical patent/CN109281328B/zh
Publication of CN109281328A publication Critical patent/CN109281328A/zh
Application granted granted Critical
Publication of CN109281328B publication Critical patent/CN109281328B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames

Abstract

本发明公开了一种钢围堰定位桩精确施工方法,涉及桥梁施工技术领域,提供一种能够提高钢围堰定位桩施工位置精度的钢围堰定位桩精确施工方法。钢围堰定位桩精确施工方法包括以下步骤:A、在钢栈桥平台上搭设施工平台;B、测量得出钢护筒的位置;采用打桩机在施工平台上施工,将钢护筒打入河床;钢护筒内形成定位桩施工区域;C、在定位桩施工区域内测量得出定位桩的位置;采用打桩机在施工平台上施工,将定位桩从施工区域内打入河床;D、拔出定位钢护筒。钢护筒起隔水作用,定位桩施工区域内水是静止的,无水流流动,使得定位桩打入过程中不受水流影响,定位桩施工精确,从而使得钢围堰的下放精确。

Description

钢围堰定位桩精确施工方法
技术领域
本发明涉及桥梁施工技术领域,尤其涉及一种钢围堰定位桩精确施工方法。
背景技术
跨江大桥墩柱的施工一直制约着桥梁的建设,钢围堰的下放精度是直接影响墩柱建设的关键步骤,钢围堰的下放就位精度需要精确的定位桩来控制,传统的定位桩施工,往往受到水流作用的影响,施工偏差较大,直接影响钢围堰的下放精度。
目前现有的专利技术CN108252316A公开了一种陆地钢板桩围堰下沉的导向系统及辅助下沉方法。本发明中的弧形限位槽可有效保证钢板桩的下沉精度,防止发生偏移,具有加工制作方便、安装简单、定位精度有保障、占用空间小的优点,可以克服地质因素对钢板桩下沉带来的困难,从而保证复杂地质下陆地圆哑铃型钢板桩围堰的快速、准确下沉施工,具备经济可行、施工效率高的特点,但是该专利技术不能适用于水流环境下的定位施工,尤其是受到水流影响时,如何精确施工定位桩,控制钢围堰的下放精度。
发明内容
本发明要解决的技术问题是:提供一种能够提高钢围堰定位桩施工位置精度的钢围堰定位桩精确施工方法。
为解决上述问题采用的技术方案是:钢围堰定位桩精确施工方法包括以下步骤:
A、在钢栈桥平台上搭设施工平台;
B、测量得出钢护筒的位置;采用打桩机在施工平台上施工,将钢护筒打入河床;钢护筒内形成定位桩施工区域;
C、在定位桩施工区域内测量得出定位桩的位置;采用打桩机在施工平台上施工,将定位桩从施工区域内打入河床;
D、拔出定位钢护筒。
进一步的是:步骤B包括在施工平台上设置钢护筒导向结构;钢护筒打入河床过程中,护筒导向结构对钢护筒进行导向;钢护筒打入完成后,钢护筒导向结构临时固定钢护筒。
进一步的是:步骤C包括在钢护筒上设置定位桩导向结构;定位桩打入河床过程中,定位桩导向结构对定位桩进行导向;定位桩打入完成后,在定位桩底部浇筑混凝土固定定位桩。
进一步的是:步骤D包括拆除钢护筒导向结构和定位桩导向结构。
本发明的有益效果是:本发明先将将钢护筒打入河床,钢护筒内形成定位桩施工区域,再将定位桩从施工区域内打入河床。钢护筒起隔水作用,定位桩施工区域内水是静止的,无水流流动,使得定位桩打入过程中不受水流影响,定位桩施工精确,从而使得钢围堰的下放精确。
附图说明
图1是步骤B示意图;
图2是步骤C示意图;
图3是钢护筒导向结构示意图;
图中标记为:钢栈桥平台1、施工平台2、钢护筒3、定位桩施工区域4、河床5、定位桩6。
具体实施方式
下面结合附图和具体实施方式对本发明进一步说明。
钢围堰定位桩精确施工方法包括以下步骤:A、在钢栈桥平台1上搭设施工平台2;B、测量得出钢护筒3的位置;采用打桩机在施工平台2上施工,将钢护筒3打入河床5;钢护筒3内形成定位桩施工区域4;C、在定位桩施工区域4内测量得出定位桩6的位置;采用打桩机在施工平台2上施工,将定位桩6从施工区域4内打入河床5;D、拔出定位钢护筒3。
本发明先将将钢护筒3打入河床5,钢护筒3内形成定位桩施工区域4,再将定位桩6从定位桩施工区域4内打入河床5。钢护筒3起隔水作用,定位桩施工区域4内水是静止的,无水流流动,使得定位桩6打入过程中不受水流影响,定位桩施工精确。
钢护筒3打入河床过程中,虽然受到水流影响,但钢护筒3只是临时起作用且精度要求不高,只要不偏移过多即可。为了避免钢护筒3偏移过多,步骤B包括在施工平台2上设置钢护筒导向结构;钢护筒3打入河床5过程中,护筒导向结构对钢护筒3进行导向;钢护筒3打入完成后,钢护筒导向结构临时固定钢护筒3。钢护筒导向结构可以如图3所示,是两层由钢材焊接成的具有导向方形孔的部件。
为了进一步提高定位桩6施工精度,步骤C包括在钢护筒3上设置定位桩导向结构;定位桩6打入河床5过程中,定位桩导向结构对定位桩6进行导向;定位桩6打入完成后,在定位桩6底部浇筑混凝土固定定位桩6。定位桩导向结构与钢护筒导向结构基本相同,区别只是导向方形孔较小。

Claims (4)

1.钢围堰定位桩精确施工方法,其特征在于:包括以下步骤:
A、在钢栈桥平台(1)上搭设施工平台(2);
B、测量得出钢护筒(3)的位置;采用打桩机在施工平台(2)上施工,将钢护筒(3)打入河床(5);钢护筒(3)内形成定位桩施工区域(4);
C、在定位桩施工区域(4)内测量得出定位桩(6)的位置;采用打桩机在施工平台(2)上施工,将定位桩(6)从施工区域(4)内打入河床(5);
D、拔出定位钢护筒(3)。
2.根据权利要求1所述的钢围堰定位桩精确施工方法,其特征在于:步骤B包括在施工平台(2)上设置钢护筒导向结构;钢护筒(3)打入河床(5)过程中,护筒导向结构对钢护筒(3)进行导向;钢护筒(3)打入完成后,钢护筒导向结构临时固定钢护筒(3)。
3.根据权利要求1所述的钢围堰定位桩精确施工方法,其特征在于:步骤C包括在钢护筒(3)上设置定位桩导向结构;定位桩(6)打入河床(5)过程中,定位桩导向结构对定位桩(6)进行导向;定位桩(6)打入完成后,在定位桩(6)底部浇筑混凝土固定定位桩(6)。
4.根据权利要求1所述的钢围堰定位桩精确施工方法,其特征在于:步骤D包括拆除钢护筒导向结构和定位桩导向结构。
CN201811351218.6A 2018-11-14 2018-11-14 钢围堰定位桩精确施工方法 Active CN109281328B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811351218.6A CN109281328B (zh) 2018-11-14 2018-11-14 钢围堰定位桩精确施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811351218.6A CN109281328B (zh) 2018-11-14 2018-11-14 钢围堰定位桩精确施工方法

Publications (2)

Publication Number Publication Date
CN109281328A true CN109281328A (zh) 2019-01-29
CN109281328B CN109281328B (zh) 2021-01-22

Family

ID=65176117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811351218.6A Active CN109281328B (zh) 2018-11-14 2018-11-14 钢围堰定位桩精确施工方法

Country Status (1)

Country Link
CN (1) CN109281328B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868805A (zh) * 2019-02-28 2019-06-11 天津大学 钢护筒式强夯法水下地基加固施工方法
CN112758862A (zh) * 2020-12-24 2021-05-07 中国十九冶集团有限公司 辊道安装方法
CN114215084A (zh) * 2021-12-17 2022-03-22 中国十九冶集团有限公司 水流调节装置、钢围堰隔舱装置及钢围堰定位桩施工方法
CN114718097A (zh) * 2022-04-25 2022-07-08 中交第二航务工程局有限公司 深水钢围堰或沉井快速定位方法
CN117437564A (zh) * 2023-12-20 2024-01-23 中铁三局集团广东建设工程有限公司 一种用于桥梁施工监控的无人机数据处理方法及装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2220432A (en) * 1988-07-08 1990-01-10 Micoperi Spa Driving hollow piles to form an underwater foundation
CN102383436A (zh) * 2011-09-05 2012-03-21 中铁大桥局股份有限公司 一种双壁钢围堰的精确定位施工方法
CN203808072U (zh) * 2014-02-11 2014-09-03 华北水利水电大学 深水区插桩定位装置
CN204690772U (zh) * 2015-06-12 2015-10-07 葛洲坝集团第五工程有限公司 一种深水桩基定位、导向结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2220432A (en) * 1988-07-08 1990-01-10 Micoperi Spa Driving hollow piles to form an underwater foundation
CN102383436A (zh) * 2011-09-05 2012-03-21 中铁大桥局股份有限公司 一种双壁钢围堰的精确定位施工方法
CN203808072U (zh) * 2014-02-11 2014-09-03 华北水利水电大学 深水区插桩定位装置
CN204690772U (zh) * 2015-06-12 2015-10-07 葛洲坝集团第五工程有限公司 一种深水桩基定位、导向结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
殷婷婷等: "跨海大桥定位桩安装新工艺――GPS定位桩导向架技术研究介绍", 《中国高新技术企业》 *
王珊: "《桩基工程设计施工及检测实用手册-第3卷》", 31 December 2002, 黑龙江人民出版社 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868805A (zh) * 2019-02-28 2019-06-11 天津大学 钢护筒式强夯法水下地基加固施工方法
CN112758862A (zh) * 2020-12-24 2021-05-07 中国十九冶集团有限公司 辊道安装方法
CN114215084A (zh) * 2021-12-17 2022-03-22 中国十九冶集团有限公司 水流调节装置、钢围堰隔舱装置及钢围堰定位桩施工方法
CN114718097A (zh) * 2022-04-25 2022-07-08 中交第二航务工程局有限公司 深水钢围堰或沉井快速定位方法
CN114718097B (zh) * 2022-04-25 2023-09-22 中交第二航务工程局有限公司 深水钢围堰或沉井快速定位方法
CN117437564A (zh) * 2023-12-20 2024-01-23 中铁三局集团广东建设工程有限公司 一种用于桥梁施工监控的无人机数据处理方法及装置
CN117437564B (zh) * 2023-12-20 2024-03-12 中铁三局集团广东建设工程有限公司 一种用于桥梁施工监控的无人机数据处理方法及装置

Also Published As

Publication number Publication date
CN109281328B (zh) 2021-01-22

Similar Documents

Publication Publication Date Title
CN109281328A (zh) 钢围堰定位桩精确施工方法
CN106638640B (zh) 岩层地质条件下无封底混凝土组合式围堰的施工方法
CN103122636A (zh) 一种软弱地层地下连续墙浅层槽壁加固方法
CN103114599A (zh) 深基坑封闭降水装置及其施工方法
CN110344335B (zh) 一种桥梁施工过程中钢栈桥、初始平台和围堰施工的方法
CN107620311A (zh) 一种泥浆护壁成孔灌注桩防止孔口护筒下沉的方法
CN104895083A (zh) 一种水中承台基坑导向架及其围堰支护施工方法
CN108049393A (zh) 用于富水厚砂层条件下的地铁车站附属围护结构施工工艺
CN103397634A (zh) 一种锁扣钢管桩围堰的锚固施工方法
CN202466644U (zh) 一种型钢混凝土柱式接头
CN104912093B (zh) 一种深水桩基定位、导向结构的施工方法
CN103669359A (zh) 一种防渗墙预埋灌浆管桁架装置
CN106871882B (zh) 挖孔桩垂直度及平整度激光导向装置及其施工方法
CN107859034B (zh) 大直径桩基漏浆快速处理方法
CN202194143U (zh) 深水中围堰钢板桩插打导向结构
CN204728333U (zh) 一种水中承台基坑导向架
CN110886328A (zh) 一种先桩法海上风电导管架基础水下灌浆测量装置及其测量方法
CN202925557U (zh) 一种钢围堰拼装浮式平台
CN205875146U (zh) 一种断桩的加固结构
CN204690772U (zh) 一种深水桩基定位、导向结构
CN104594421B (zh) 一种绞吸式挖泥船绞刀梁长轴孔绞支架的安装方法
CN209907967U (zh) 一种用于控制灌注桩钢筋笼主筋间距的工具
CN206800401U (zh) 灌注桩护筒定位及操作平台一体化装置
CN109518683B (zh) 一种人工挖孔桩的桩心定位方法
CN106223334A (zh) 一种断桩的修复方法及其加固结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant