CN109267536A - A kind of Waterway Regulation of library tail falling zone - Google Patents
A kind of Waterway Regulation of library tail falling zone Download PDFInfo
- Publication number
- CN109267536A CN109267536A CN201811364234.9A CN201811364234A CN109267536A CN 109267536 A CN109267536 A CN 109267536A CN 201811364234 A CN201811364234 A CN 201811364234A CN 109267536 A CN109267536 A CN 109267536A
- Authority
- CN
- China
- Prior art keywords
- water level
- navigation
- library
- deep water
- sandstone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/02—Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The present invention is a kind of Waterway Regulation of library tail falling zone, and the technical problem to be solved by the present invention is to thoroughly solve the world-class problem of library tail river regulation.The technical scheme is that building concrete deep water hole in the position of library tail navigation upper end, sandstone conveyer belt is installed in the bottom in deep water hole;Water level, which is built, between falling zone lower end to library tail navigation lower end keeps dam.
Description
Technical field:
The present invention relates to hydraulic engineering technical field, in particular to a kind of river regulation method.
Background technique:
The SEA LEVEL VARIATION of Reservoir Tail falling zone will affect navigation, and the silt 70~90% into reservoir is to be disappeared to fall by library tail
Area enters reservoir, solves both of these problems and plays an important role and meaning, the prior art using plant-nursing riverbank area and
River training method extend the depth of water, due to library tail riverbed be water flow slow down, it is shifting, be easy siltation feature, the side of dredging
Method cannot thoroughly eliminate influence of the SEA LEVEL VARIATION to navigation, can not prevent library tail silt completely and enter reservoir area, therefore library tail river
Road, which is administered, becomes world-class problem.
Summary of the invention:
The present invention is a kind of Waterway Regulation of library tail falling zone, and the technical problem to be solved by the present invention is to thoroughly solve library
The world-class problem of tail river regulation.The technical scheme is that
When reservoir normal high water level (N.H.W.L.), the position that the maximum ship P Passable of reservoir area navigation reaches library tail is known as the navigation of library tail
Upper end;When reservoir normal low water level (N.L.W.L.), the position that the maximum ship P Passable of reservoir area navigation reaches library tail is known as under the navigation of library tail
End;The return water point of reservoir normal low water level (N.L.W.L.) is called falling zone lower end;In library, deep water hole, deep water are built in the position of tail navigation upper end
Hole is that effect is precipitating sandstone, and sandstone conveyer belt is installed in the bottom in deep water hole, and sandstone conveyer belt whole year ceaselessly works, according to not
The speed of service of how much adjusting sandstone conveyer belts of same time sandstone amount;The collective effect of deep water hole and sandstone conveyer belt is complete
Prevent library tailings stone and enters reservoir area;
Water level is built between falling zone lower end to library tail navigation lower end and keeps dam, and it is falling zone that water level, which keeps the effect on dam,
Navigation channel whole year keeps normal high water level (N.H.W.L.);The backwater gate that water level keeps dam all in reservoir normal high water level (N.H.W.L.) is fully open
, just closing part backwater gate when the water level of reservoir is lower than normal high water level (N.H.W.L.) makes falling zone navigation channel keep normal high water level (N.H.W.L.);
If falling zone navigation channel bank has large size city or falling zone to belong to important navigation channel, it is therefore necessary to which falling zone navigation channel whole year is protected
Water holding library normal high water level (N.H.W.L.) has particularly important function and significance to navigation economic development;
Deep water, which is cheated to water level, keeps the river between dam to be known as falling zone navigation channel;There is 3~4 months time to disappear among 1 year
Settle in an area navigation channel influenced because of water level decreasing Navigation capacity decline, the method to settle the matter once and for all be falling zone navigation channel whole year protect
Water holding library normal high water level (N.H.W.L.);Water level keeps the river between dam to library tail navigation lower end expand deeply, and the river is made to have navigation
The deep water fairway of large ship.
In the above technical solution, deep water pit sand stone conveyer belt technology and falling zone navigation channel whole year keep the normal Gao Shui of reservoir
Position, the combination of two kinds of technologies could have special technical effect, if such as the river of sandstone conveyer belt position be not able to maintain one
The water level of depthkeeping degree, serious obstruction navigation accident can occur for the deep water hole of sandstone conveyer belt during low water;Sandstone conveyer belt
The advantages of cheating two kinds of technologies cooperations with deep water is, since deep water hole will be lower than 3~5 meters of riverbed bottom, so to the sandstone of flowing
There is precipitating, is deposited in sandstone on sandstone conveyer belt;
The water level in falling zone navigation channel is fixed, therefore the storage capacity in falling zone navigation channel is changed into non-storage capacity, due to existing
Reservoir it is more and more, most of reservoir, which becomes combining, controls flood, to flood control require declined, therefore storage capacity reduce
A part is filled perhaps;Water level keeps dam to be built in the updrift side position of library tail navigation lower end, rather than is built in library tail and leads to
The position of boat lower end, it is therefore an objective to occupy storage capacity less as far as possible;
Water level is built in the centre of reservoir and keeps dam, can be hindered fish migration, cutting river biological chain, be hindered ship current
Influence be very little;Water level keeps dam to be different from conventional reservoir dam, and 8~9 months water levels keep the gear on dam in 1 year
Sluice gate is fully open, and water level keeps dam not play any effect, and keeping dam to block 3~4 middle of the month of water in water level is also not continuous
Block water, be that discontinuity blocks water, therefore counter productive is smaller;And beneficial effect is then extremely huge, such as Sanmenxia Reservoir, moderate seas
Silt entrance is greatly decreased after implementing the technical program in bottom water library, Three Gorges Reservoir and other reservoirs for having library tail silt to enter
Reservoir, to substantially extend the service life of reservoir.
Detailed description of the invention:
Fig. 1 is: reservoir schematic diagram;
Fig. 2 is: the transversal cross-section enlarged drawing of Fig. 1 the midsagittal plane line A;
Fig. 3 is: the longitudinal cross-section enlarged drawing of Fig. 1 the midsagittal plane line A;
() inner number or letter represent number or letter in figure, and number or letter represent the title before ();Reservoir is big
Dam (1), normal high water level (N.H.W.L.) (2), normal low water level (N.L.W.L.) (3), library tail open the navigation or air flight upper end (4), falling zone lower end (5), library tail navigation lower end
(6), deep water hole (7), sandstone conveyer belt (8), reservoir bottom line (9), river (10), riverbank (11), Ji Shaqu (12), sandstone is defeated
Band rotation direction (13), water (flow) direction (14) are sent, deep water cheats concrete structure (15), and water level keeps dam (16), section line A (A),
The water level depth (B) of library tail navigation upper end, the depth (C) apart from river bed, the length (D) in deep water hole, the width (E) in deep water hole.
Specific embodiment:
The technical program is illustrated with reference to the accompanying drawings:
Shown in Fig. 1, when reservoir normal high water level (N.H.W.L.) 2, the position that the maximum ship P Passable of reservoir area navigation reaches library tail claims
For library tail navigation upper end 4;When reservoir normal low water level (N.L.W.L.), the position that the maximum ship P Passable of reservoir area navigation reaches library tail is known as
Library tail navigation lower end 6;The return water point of reservoir normal low water level (N.L.W.L.) 3 is called falling zone lower end 5;The position of tail navigation upper end 4 in library
Deep water hole 7 is built, deep water hole 7 is that effect is precipitating sandstone, and sandstone conveyer belt 8 is installed in the bottom in deep water hole 7;Shown in Fig. 2, sandstone
The effect of conveyer belt 8 is the sandstone in river ceaselessly to be transported to the riverbank area Shang Jisha 12, the annual ceaselessly work of sandstone conveyer belt 8
Make, according to the speed of service of how much adjusting sandstone conveyer belts 8 of different times sandstone amount;Deep water hole 7 and sandstone conveyer belt 8 are total to
Same-action is to prevent library tailings stone completely to enter reservoir area;
Shown in Fig. 2 Fig. 3, the structure in deep water hole 7 is armored concrete, and the length D in deep water hole cheats position with deep water is built
Bottom of river channel is of same size, and the width E in deep water hole is 5~10 meters, and it is 3 that deep water, which cheats 7 updrift side sides lower than the height C of river bed,
~6 meters;It is library tail navigation upper end 4 that deep water, which cheats 7 downstream direction sides, and the water level depth B of library tail navigation upper end is 5~7 meters;
Deep water hole 7 to water level keeps the river between dam 16 to be known as falling zone navigation channel;Have among 1 year 3~4 months when
Between falling zone navigation channel influenced because of water level decreasing Navigation capacity decline, the method to settle the matter once and for all is that falling zone navigation channel is complete
Year holding reservoir normal high water level (N.H.W.L.);
Shown in Fig. 1, water level is built between falling zone lower end 5 to library tail navigation lower end 6 and keeps dam 16, water level keeps dam 16
It is made of water blocking dam body and ship lock two parts, it is falling zone navigation channel whole year to keep the normal Gao Shui of reservoir that water level, which keeps the effect on dam 16,
Position 2;Water level keep all backwater gates in reservoir normal high water level (N.H.W.L.) 2 of dam 16 be it is fully open, when the water level of reservoir is lower than
Part backwater gate is just closed when normal high water level (N.H.W.L.) 2 makes falling zone navigation channel remain normal high water level (N.H.W.L.) 2, while starting ship by ship
Lock passes through;
Shown in Fig. 1, water level keeps the river 10 between dam 16 to library tail navigation lower end 6 expand deeply, has the river
The deep water fairway of navigation large ship.
The technical program can be implemented in all reservoirs for having library tail silt to enter, and be carried out as an example with Three Gorges Reservoir
Illustrate:
Three Gorges Reservoir normal low water level (N.L.W.L.) 3 is that 145 meters of return water point is downstream side of the falling zone lower end 5 in Chongqing city
To Chongqing city has 3~4 months time to influence Navigation capacity decline because of water level decreasing among 1 year, affect Chongqing
The economic development in city;
Three Gorges Reservoir tail is opened the navigation or air flight, and there are three positions for upper end 4, and three positions are proximate to the length of Jia Lingjiang River river mouth updrift side
Rivers road, the Jia Lingjiang River river close to Jia Lingjiang River river mouth updrift side, the Wujiang River river close to Wujiang River river mouth updrift side, three
A position builds deep water respectively and cheats 7 sandstone conveyer belts 8, and silt is greatly decreased and enters Three Gorges Reservoir, to substantially extend Three Gorges water
The service life in library;
Water level is built between Special Zone of Three-gorge Reservoir lower end 5 to library tail navigation lower end 6 keeps dam 16, library tail navigation upper end 4
Water level depth B be designed as 6.5 meters, water level keep dam downstream side river 10 expand it is deep;Mating Three Gorges Ship Lock new tunnel, Pueraria lobota
The sill headwater depth of continent dam ship lock new tunnel is designed as 6.0 meters, and Yangtze middle reaches use a kind of technology of the administering method of plain river,
Such 5000 tonnes of ships annual can open the navigation or air flight from Shanghai to Chongqing city, and Chongqing City will develop into one line city of the world.
Claims (1)
1. a kind of Waterway Regulation of library tail falling zone, it is characterized in that:
In library, deep water hole (7) is built in the position of tail navigation upper end (4), and deep water hole (7) is that effect is precipitating sandstone, and deep water cheats (7)
Bottom sandstone conveyer belt (8) are installed, the effect of sandstone conveyer belt (8) is that the sandstone in river is ceaselessly transported to collecting on riverbank
Husky area (12), sandstone conveyer belt (8) whole year ceaselessly works, according to how much adjusting sandstone conveyer belts of different times sandstone amount
(8) the speed of service, it is to prevent library tailings stone completely to enter reservoir area that deep water, which cheats (7) and the collective effect of sandstone conveyer belt (8),;?
To water level holding dam (16) is built between library tail navigation lower end (6), it is to disappear that water level, which keeps the effect of dam (16), for falling zone lower end (5)
Settle in an area navigation channel whole year keep reservoir normal high water level (N.H.W.L.) (2), water level keep dam (16) all water blocking at reservoir normal high water level (N.H.W.L.) (2)
Gate be it is fully open, when the water level of reservoir be lower than normal high water level (N.H.W.L.) (2) when just closing part backwater gate so that falling zone is navigated
Road remains normal high water level (N.H.W.L.) (2), while starting ship and being passed through by ship lock;Water level keeps dam (16) to library tail to open the navigation or air flight lower end (6)
Between river (10) expand deep, so that the river is had the deep water fairway of navigation large ship;
The length (D) in deep water hole is of same size with the bottom of river channel for building deep water hole position, and the width (E) in deep water hole is 5~10
Rice, it is 3~6 meters that deep water, which cheats (7) updrift side side lower than the height (C) of river bed,;It is library tail that deep water, which cheats (7) downstream direction side,
It opens the navigation or air flight upper end (4), the water level depth (B) of library tail navigation upper end is 5~7 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811364234.9A CN109267536A (en) | 2018-11-16 | 2018-11-16 | A kind of Waterway Regulation of library tail falling zone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811364234.9A CN109267536A (en) | 2018-11-16 | 2018-11-16 | A kind of Waterway Regulation of library tail falling zone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109267536A true CN109267536A (en) | 2019-01-25 |
Family
ID=65190340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811364234.9A Pending CN109267536A (en) | 2018-11-16 | 2018-11-16 | A kind of Waterway Regulation of library tail falling zone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109267536A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08291514A (en) * | 1995-04-21 | 1996-11-05 | Fujita Corp | Unloading method and unloading equipment for sediment carrying vessel |
CN1648347A (en) * | 2005-02-18 | 2005-08-03 | 林步东 | Method for cleaning channel silt using variable tide control gate |
JP2005330731A (en) * | 2004-05-20 | 2005-12-02 | Penta Ocean Constr Co Ltd | Artificial tideland material using dredged cohesive soil, manufacturing device for the same, and artificial tideland construction method |
CN101245589A (en) * | 2007-02-12 | 2008-08-20 | 湖南人文科技学院 | Method for harnessing river and reservoir with sand stirring boat and liftable low water head dam |
CN106012949A (en) * | 2016-07-05 | 2016-10-12 | 彭国洪 | Seasonal hydro-junction with high environmental requirement |
CN106245593A (en) * | 2016-08-20 | 2016-12-21 | 新疆北方建设集团有限公司 | Multi-functional channel sand material and the steady material spreader of water |
CN106320277A (en) * | 2016-08-20 | 2017-01-11 | 新疆北方建设集团有限公司 | Paving machine for channel sand-gravel aggregates and water stabilized mixture |
CN106677118A (en) * | 2017-03-14 | 2017-05-17 | 交通运输部天津水运工程科学研究所 | Treating method for descending of water level of channel on downstream near-dam section of ship lock in inland river |
CN206624331U (en) * | 2017-02-21 | 2017-11-10 | 中交疏浚技术装备国家工程研究中心有限公司 | A kind of dividing plate conveyer dress throws bagging apparatus |
CN207392122U (en) * | 2016-12-17 | 2018-05-22 | 河西学院 | It is a kind of that there is the key water control project of desilting |
-
2018
- 2018-11-16 CN CN201811364234.9A patent/CN109267536A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08291514A (en) * | 1995-04-21 | 1996-11-05 | Fujita Corp | Unloading method and unloading equipment for sediment carrying vessel |
JP2005330731A (en) * | 2004-05-20 | 2005-12-02 | Penta Ocean Constr Co Ltd | Artificial tideland material using dredged cohesive soil, manufacturing device for the same, and artificial tideland construction method |
CN1648347A (en) * | 2005-02-18 | 2005-08-03 | 林步东 | Method for cleaning channel silt using variable tide control gate |
CN101245589A (en) * | 2007-02-12 | 2008-08-20 | 湖南人文科技学院 | Method for harnessing river and reservoir with sand stirring boat and liftable low water head dam |
CN106012949A (en) * | 2016-07-05 | 2016-10-12 | 彭国洪 | Seasonal hydro-junction with high environmental requirement |
CN106245593A (en) * | 2016-08-20 | 2016-12-21 | 新疆北方建设集团有限公司 | Multi-functional channel sand material and the steady material spreader of water |
CN106320277A (en) * | 2016-08-20 | 2017-01-11 | 新疆北方建设集团有限公司 | Paving machine for channel sand-gravel aggregates and water stabilized mixture |
CN207392122U (en) * | 2016-12-17 | 2018-05-22 | 河西学院 | It is a kind of that there is the key water control project of desilting |
CN206624331U (en) * | 2017-02-21 | 2017-11-10 | 中交疏浚技术装备国家工程研究中心有限公司 | A kind of dividing plate conveyer dress throws bagging apparatus |
CN106677118A (en) * | 2017-03-14 | 2017-05-17 | 交通运输部天津水运工程科学研究所 | Treating method for descending of water level of channel on downstream near-dam section of ship lock in inland river |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bruun et al. | Natural by-passing of sand at coastal inlets | |
Fan et al. | Reservoir sedimentation. I: Delta and density current deposits | |
Price et al. | FIELD AND MODEL INVESTIGATION INTO THE REASONS FOR SILTATION IN THE MERSEY ESTUARY. | |
CN109356080A (en) | A method of it creating ecological wetland and promotes surrounding basin or the exchange of bay water body | |
CN109083091A (en) | It is a kind of to guarantee that the construction method that do not stop navigation during shutting off is led in cofferdam | |
CN100347377C (en) | Mould bag line curtain and method for preventing falldown of river bank | |
CN1687530A (en) | Installation for trapping sediment from riverbed and seabed promoting siltation and erosion protection | |
Atykbekova et al. | Operation damless intake of the Amudarya river (Central Asia) | |
CN109778798A (en) | Multi-stage porous pipe weir shunts and warps method | |
CN109267536A (en) | A kind of Waterway Regulation of library tail falling zone | |
CN109145457B (en) | River type division method based on longitudinal river potential adjustment transfer and obstruction mechanism | |
Borland et al. | Sediment problems of the lower Colorado River | |
CN108729407A (en) | Clear husky device is arrheaed in river double flute hardening riverbed exchange | |
CN109267535A (en) | A kind of administering method of plain river | |
CN116084338B (en) | Method for treating main flow of large-fall large-included-angle canal tributary | |
US235967A (en) | Method of relieving river-channels of sediment and forming levees | |
CN219218847U (en) | Energy dissipation sand sedimentation diversion hydraulic construction system for branch river channel | |
Bruun et al. | Natural by-passing of sand at coastal inlets | |
CN1229159A (en) | Method for solving river-bed rising | |
CN209722901U (en) | Multi-stage porous pipe weir shunts and warps system | |
Boillat et al. | Sediment management examples in Swiss Alpine reservoirs | |
De Cesare et al. | Innovative approaches to sediment management | |
BAYLISS | IMPACTS OF GLACIALLY-MODIFIED VALLEY LAND SYSTEMS ON THE GEOTECHNICAL DESIGN, CONSTRUCTION AND PERFORMANCE OF DAM FOUNDATIONS IN CANADA | |
Karaki | Desilting structure at the Gualanday Canal Headworks, Coello Project, Colombia, SA | |
Li | Channel regulation engineering plan for Reach in Xijiang River |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190125 |