CN1229159A - Method for solving river-bed rising - Google Patents

Method for solving river-bed rising Download PDF

Info

Publication number
CN1229159A
CN1229159A CN 98100742 CN98100742A CN1229159A CN 1229159 A CN1229159 A CN 1229159A CN 98100742 CN98100742 CN 98100742 CN 98100742 A CN98100742 A CN 98100742A CN 1229159 A CN1229159 A CN 1229159A
Authority
CN
China
Prior art keywords
dam
gate
sand surfing
build
riverbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 98100742
Other languages
Chinese (zh)
Inventor
王武生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 98100742 priority Critical patent/CN1229159A/en
Publication of CN1229159A publication Critical patent/CN1229159A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

A method for prevent river bed from raising up features a sand-flushing sluice gate and dam are built up in the river to be treated. Said sluice gate and dam feature that the dam foundation is lower than the ground level outside the river dike and the depth of primary sluice gate is lower than that of secondary sluice gate and ground. An artificial channel is built at the downstream of primary sluice gate, which can be gradually extended until it is communicated to sea by the water flush. Its advantages are high effect and practicality.

Description

Solve the method that the riverbed increases
The present invention relates to the regulation field in hydraulic engineering rivers and creeks for solving the method that the riverbed increases.
The downstream in river because the flow velocity of the mild water of physical features slows down, causes the alluvial of silt in the riverbed to its estuary place, and " hanging river " that accumulation all the year round causes brings great threat and loss to people.Build reservoir in the upstream, draw famine and warp, dispatch new water source, rebuild methods such as cutoff, then or because time and cost, or because technical difficulty is difficult for realization.
The purpose of this invention is to provide a kind of method that the riverbed increases that solves, this method can solve increasing of riverbed effectively, and feasibility is strong.
The technical scheme that realizes the object of the invention is:
A kind ofly solve the method that the riverbed increases, be included in the river course that needs the regulation section and build the sand surfing gate dam, its step is as follows: the dam site of (a) choosing each sand surfing gate dam in this section to the location of estuary; (b) build the dam foundation, the datum S of the dam foundation in the dry season of each dam site 4Be lower than the S on the outer ground 10 of river levee 5(c) respectively build check dam 2 in two inboards of river levee 1 respectively; (d) build the scouring sluice of porous between check dam, the centre is a main shutter 6, and its both sides are secondary gate 3, make gate base plate 8 depth S of main shutter 2Be lower than gate base plate 7 depth S of secondary gate 4And the S on ground 10 5(e) respectively in the riverbed under each sand surfing gate dam, build the artificial canal 9 of one section steel concrete, the depth S of the bottom of gool section bottom main shutter 1With S 2With width d 1With d 2Adapt; (f) after each sand surfing gate dam puts into operation, in the dry season, the groove that utilizes washing away of artificial canal exit and form is with artificial canal inlet under next sand surfing gate dam or the estuary extension construction respectively of the artificial canal of each bar, until forming a steel concrete passage continuous, that feed the Haikou.
Each sand surfing gate dam also can trace back in regular turn from estuary and build by stages and in groups.
Also can brush the coating that reduces frictional resistance at each face of artificial canal gool.
The operating principle of this method is: open main shutter under the secondary closing gate situation of sand surfing gate dam, then a large amount of retainings of sand surfing gate dam interception, because the river course is at the drop on gate dam both sides, the cross section narrow down and the guiding of artificial gool under go out, powerful at a high speed directed current, are constantly washed away the river bed deposit silt before the artificial gool with not having difficulty and take away, thereby form the husky passage of a row automatically.Close main shutter (or opening secondary gate again), then the river bed deposit silt of artificial canal (or river course) both sides moves to the place, river course at the low artificial canal place of physical features thereupon, this will be drained through artificial canal again when opening the next time of secondary closing gate, main shutter, thereby repeatable operation makes that the height in riverbed is progressively reduced.
The present invention compared with prior art has following advantage:
1, the retaining of storage capacity is by means of being deep into underground, reinforced concrete structure so the artificial canal of the prolonged use of energy is got rid of the silt of deposition, the eliminating of silt strengthens the water retention capacity of riverbed reduction, storage capacity, and the increasing of water retention capacity, the increase of water flow velocity, further accelerate the eliminating of silt sediment again and quicken extension being completed into of artificial canal until artificial channel, so utilize the optimum improvement circulation in river self, make this method can solve increasing of riverbed effectively, by effecting a permanent cure but not take stopgap measures, actively but not negatively eliminate " hanging river ".
2, owing to utilize the dry season, thereby can carry out engineering construction, again owing to utilize before original river course and the artificial canal groove of formation naturally, thereby significantly reduce the regulation expense in engineering time and difficulty and river course, thereby increase the feasibility of scheme greatly on land.
3, the increase of the foundation on dam and storage capacity both can increase that the anti-flood capacity in river itself and the annual water yield are rich owes irregular regulating power, and precious water resource is fully utilized.
4, the foundation of sand surfing gate dam also provides condition for the comprehensive development of generating, bridge construction.
The construction by stages and in groups of sand surfing gate dam can solve the difficulty of fund and construction dispatching, further increases the feasibility of scheme.Each face paint of gool further improves the efficient that artificial canal is got rid of silt sediment.
The drawing of accompanying drawing is described as follows:
Fig. 1 is the schematic cross-sectional view of sand surfing gate dam and artificial canal.
Further describe the present invention below in conjunction with accompanying drawing and by embodiment:
Contain certain high river of quantity of sand and mud, " hanging river " that forms in the downstream owing to the alluvial of silt increases with annual 0.1 meter speed, and has to increase one time in per 10 years dyke.
According to the demand of city to the water yield, dam site is chosen to the height and the geological conditions on ground in existing riverbed, is being traced back by estuary to the section of need regulation then, builds a sand surfing gate dam every 10~100 kilometers, and in low water or cutout construction in season.
With wherein certain sand surfing gate dam is example, on-site river, this dam width be 3000 (unit: rice, down with) the absolute altitude S of river levee 1 7=62 (all absolute altitudes, its size all refers to height above sea level, down together), the absolute altitude in riverbed is 56, the absolute altitude S on the outer ground 10 of river levee 5=50.
When using this method to build this sand surfing gate dam, press following size:
The dam foundation of building, the absolute altitude S of its datum 4=48.The width W of hurdle dam 2 2=500.The width W of sand surfing gate dam 1=2000, the absolute altitude S of its end face 6=60.Be built in 1 # Main shutter 6 on the gate pier 5, its width d 2=12, the absolute altitude S of its base plate 8 2=40.Be built in 2 # Secondary gate 3 on the gate pier 4, the absolute altitude S of its base plate 7 4=48.The artificial canal of building under the dam 9, its length of initially building is 100, is extended by means of the groove that washes away nature formation before the canal later on, until connecting with the artificial canal on a following dam.Gool d=25 suitable for reading, its absolute altitude S 3=47.End opening d 1=15, its absolute altitude S 1=39.
After the sand surfing gate dam built up, the intercept water absolute altitude of position of its hurdle was 58, and the drop before and after the dam is 58-39=19, and the distance on this dam and next dam is 20 kilometers, so the ratio depreciation of gate dam is 19/20 * 10 3~1/1000, be much higher than the ratio depreciation (1/8000 ≈ 1/10000) in former river course and carry sand content, the therefore alluvial that can solve silt effectively up to 500 kilograms/every cubic metre ratio depreciation (1/5000) that current are required.
For farthest sand surfing gate dam, for preventing the entrance of sedimentation, can utilize the giant on the clear large junk to impact this place earlier, and then open main shutter at artificial canal from the marine outfall.
For wash away in the riverbed less than the minority position, also available bulldozer near artificial canal, is opened main shutter with this silt heap then.

Claims (3)

1, a kind ofly solve the method that the riverbed increases, be included in the river course that needs the regulation section and build the sand surfing gate dam, it is characterized in that containing the following step:
(a) choose the dam site of each sand surfing gate dam to the location of estuary in this section;
(b) build the dam foundation in the dry season of each dam site, the datum of the dam foundation is lower than the outer ground of river levee;
(c) respectively build check dam in two inboards of river levee respectively;
(d) build the scouring sluice of porous between check dam, the centre is a main shutter, and its both sides are secondary gate, makes the gate base plate degree of depth of main shutter be lower than the gate base plate degree of depth and the ground of secondary gate;
(e) respectively in the riverbed under each sand surfing gate dam, build the artificial canal of one section steel concrete, the degree of depth and the width of the bottom of gool section bottom main shutter adapts;
(f) after each sand surfing gate dam puts into operation, in the dry season, the groove that utilizes washing away of artificial canal exit and form is with artificial canal inlet under next sand surfing gate dam or the estuary extension construction respectively of the artificial canal of each bar, until forming a steel concrete passage continuous, that feed the Haikou.
2, the method that increases of solution according to claim 1 riverbed, it is characterized in that: described each sand surfing gate dam traces back in regular turn from estuary and builds by stages and in groups.
3, the method that increases of solution according to claim 1 and 2 riverbed, it is characterized in that: each face of described artificial canal gool brushes the coating that reduces frictional resistance.
CN 98100742 1998-03-16 1998-03-16 Method for solving river-bed rising Pending CN1229159A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98100742 CN1229159A (en) 1998-03-16 1998-03-16 Method for solving river-bed rising

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98100742 CN1229159A (en) 1998-03-16 1998-03-16 Method for solving river-bed rising

Publications (1)

Publication Number Publication Date
CN1229159A true CN1229159A (en) 1999-09-22

Family

ID=5216216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98100742 Pending CN1229159A (en) 1998-03-16 1998-03-16 Method for solving river-bed rising

Country Status (1)

Country Link
CN (1) CN1229159A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100465381C (en) * 2005-10-21 2009-03-04 四川希望深蓝电力有限公司 Sand-drainage construction system for diversion channel
CN101914905A (en) * 2010-09-03 2010-12-15 高文标 Non-curing transecting type flood protection water conservancy project building
CN103964650A (en) * 2014-05-26 2014-08-06 中国水利水电科学研究院 Silt removal system and method for treating silt carrying flow
PL422428A1 (en) * 2017-08-01 2019-02-11 Pietrucha Jerzy Business Assets Device for water level control

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100465381C (en) * 2005-10-21 2009-03-04 四川希望深蓝电力有限公司 Sand-drainage construction system for diversion channel
CN101914905A (en) * 2010-09-03 2010-12-15 高文标 Non-curing transecting type flood protection water conservancy project building
CN101914905B (en) * 2010-09-03 2012-10-03 高文标 Non-curing transecting type flood protection water conservancy project building
CN103964650A (en) * 2014-05-26 2014-08-06 中国水利水电科学研究院 Silt removal system and method for treating silt carrying flow
CN103964650B (en) * 2014-05-26 2015-11-11 中国水利水电科学研究院 A kind of silt removal system and method that silt carrying flow is processed
PL422428A1 (en) * 2017-08-01 2019-02-11 Pietrucha Jerzy Business Assets Device for water level control

Similar Documents

Publication Publication Date Title
Bruun et al. Natural by-passing of sand at coastal inlets
CN103510493B (en) Low overflow dam cave depot type hydropower station
CN102733351B (en) Method for treating river entrance
CN100347377C (en) Mould bag line curtain and method for preventing falldown of river bank
Boes et al. Design, operation and morphological effects of bypass tunnels as a sediment routing technique
Khidirov et al. Hydraulic mode of operation of the Takhiatash hydroelectric complex
CN114351640A (en) Method for improving waterlogging of existing coastal plain area
CN101245589B (en) Method for harnessing river and reservoir with sand stirring boat and liftable low water head dam
CN1229159A (en) Method for solving river-bed rising
CN104674772A (en) Method and structure for improving sand pulling effect of gate dam inlet
Auel et al. Sediment management in the Solis reservoir using a bypass tunnel
Tilai et al. Analysis of sediment deposition downstream tidal sluice of estuary
CN213538900U (en) Desilting and sand-discharging device for steel dam
CN1041008C (en) Method for controlling rivers' silt based on rotary planing principle
CN112647466B (en) Sediment management method suitable for sandy river hydropower station
CN206128121U (en) Passageway over strait with ocean current generating function
CN214530485U (en) Sediment management structure suitable for sandy river hydropower station
CN204401576U (en) Gate dam inlet structure
CN108547268A (en) Tail water channel structure for covering layer foundation
CN1560375A (en) Environment protection type multipurpose flood-discharging and water-discharging riverbed
Develay et al. Desilting basin system of the Dul Hasti hydroelectric project
Zhou et al. Techniques of reservoir sediment release and the application
CN114837120B (en) Double-gate regulation and control system with functions of water diversion, tide collection and silt flushing and regulation and control method thereof
CN208455586U (en) Tail water channel structure for covering layer foundation
De Cesare et al. Innovative approaches to sediment management

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication