CN207392122U - It is a kind of that there is the key water control project of desilting - Google Patents

It is a kind of that there is the key water control project of desilting Download PDF

Info

Publication number
CN207392122U
CN207392122U CN201621392232.7U CN201621392232U CN207392122U CN 207392122 U CN207392122 U CN 207392122U CN 201621392232 U CN201621392232 U CN 201621392232U CN 207392122 U CN207392122 U CN 207392122U
Authority
CN
China
Prior art keywords
channel
water
diversion
sand discharge
grit chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621392232.7U
Other languages
Chinese (zh)
Inventor
赵增锋
杨新科
张鹏宇
赵广兴
陈平平
肖让
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hexi University
Original Assignee
Hexi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hexi University filed Critical Hexi University
Priority to CN201621392232.7U priority Critical patent/CN207392122U/en
Application granted granted Critical
Publication of CN207392122U publication Critical patent/CN207392122U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

本实用新型涉及一种水利枢纽,具体涉及一种具有沉沙功能的水利枢纽。该水利枢纽,由上游河道(1),下游河道(2)和引水渠(3)组成。其中,引水渠(3)设置在本实用新型上游河道(1)的侧面,沉砂池(7)设置在引水渠(3)的内部。

The utility model relates to a water conservancy project, in particular to a water conservancy project with the function of sinking sand. The water conservancy complex is composed of an upstream channel (1), a downstream channel (2) and an aqueduct (3). Wherein, the water diversion canal (3) is arranged on the side of the upstream channel (1) of the utility model, and the grit chamber (7) is arranged inside the water diversion canal (3).

Description

一种具有沉沙功能的水利枢纽A water conservancy project with the function of sinking sand

技术领域technical field

本发明涉及一种水利枢纽,具体涉及一种具有沉沙功能的水利枢纽。The invention relates to a water conservancy project, in particular to a water conservancy project with the function of sinking sand.

背景技术Background technique

现有的水利枢纽,在引水的同时,不能很好的控制泥沙,经常将大量的泥沙带入下游,不仅破坏环境,而且影响植被的生长。Existing water conservancy projects cannot control sediment well while diverting water, and often bring a large amount of sediment downstream, which not only damages the environment, but also affects the growth of vegetation.

我们在对现有水利枢纽进行大量考察和深入分析后,设计出一种能够有效降速沉沙的水利枢纽。After a lot of investigation and in-depth analysis of existing water conservancy projects, we have designed a water conservancy project that can effectively slow down and settle sand.

发明内容Contents of the invention

本发明的目的在于提供一种能够有效降速沉沙的水利枢纽。The purpose of the present invention is to provide a water conservancy project capable of effectively reducing the speed and settling sand.

本发明所述的水利枢纽,由上游河道(1),下游河道(2)和引水渠(3)组成。The water conservancy project of the present invention is composed of an upstream channel (1), a downstream channel (2) and an aqueduct (3).

其中,引水渠(3)设置在本发明上游河道(1)的侧面,沉砂池(7)设置在引水渠(3)的内部。Wherein, the water diversion canal (3) is arranged on the side of the upstream channel (1) of the present invention, and the grit chamber (7) is arranged inside the water diversion canal (3).

其中,沉砂池(7)为上宽下窄的漏斗形状。在沉砂池(7)的底部设置排砂闸门(13)。在排砂闸门(13)的下方设置一个三通形状的排沙泵(14)。Wherein, the grit chamber (7) is in the shape of a funnel with a wide top and a narrow bottom. A sand discharge gate (13) is arranged at the bottom of the grit chamber (7). A sand discharge pump (14) of a three-way shape is set below the sand discharge gate (13).

其中,在排沙泵(14)的接口处装有排沙管道(15),在排沙管道(15)的另一端连接下游河道(2)。泥沙通过排沙管道流入下游河道内。Wherein, a sand discharge pipe (15) is installed at the interface of the sand discharge pump (14), and the other end of the sand discharge pipe (15) is connected to the downstream river course (2). Sediment flows into the downstream channel through the sand discharge pipeline.

其中,在引水渠(3)的顶端设置引水闸(16)和消力池(17)。Wherein, a diversion gate (16) and a stilling basin (17) are arranged at the top of the diversion canal (3).

其中,在引水渠(3)的底端设置出水闸(18)。Wherein, the outlet gate (18) is set at the bottom of the diversion channel (3).

其中,沉砂池(12)的数量可以根据水流的大小和沙石的含量进行设置。可以为1‐5个,优选为3个。Wherein, the quantity of the grit chamber (12) can be set according to the size of the water flow and the content of the sand. Can be 1-5, preferably 3.

其中,上游河道(1)和引水渠(3)的连接处,设置有拦污栅(19)。Wherein, a trash rack (19) is arranged at the junction of the upstream river course (1) and the diversion channel (3).

本发明中,上述各个部件的功能如下:In the present invention, the function of above-mentioned each part is as follows:

沉砂池,其利用其宽度减慢水的流速,从而使流水携带泥沙的能力大幅降低,泥沙将沉积在沉砂池底部。沉砂池底部设置为漏斗形,方便形成涡流,以便于排砂。Grit chamber, which uses its width to slow down the flow of water, so that the ability of the flowing water to carry sediment is greatly reduced, and the sediment will be deposited at the bottom of the chamber. The bottom of the grit chamber is set in a funnel shape to facilitate the formation of a vortex for sand discharge.

当沉砂量达到某一设定值时,开启排砂闸门和抽砂泵,沉砂池中出现涡流,沉砂被排出。When the amount of sand settling reaches a certain set value, the sand discharge gate and the sand pump are opened, a vortex appears in the sand settling tank, and the settling sand is discharged.

引水闸的作用:按照引水流量要求将天然水引入本水利设施。The function of the diversion sluice: to introduce natural water into the water conservancy facility according to the diversion flow requirements.

消力池的作用:消除天然水的动能,降低其流速,方便后续排沙过程。The function of the stilling pool: eliminate the kinetic energy of natural water, reduce its flow rate, and facilitate the subsequent sand discharge process.

拦污栅的作用:防止天然水流表面漂浮物(树枝、枯木、生产生活垃圾等)进入本水利设施。The role of the trash rack: to prevent floating objects (twigs, dead wood, production and domestic waste, etc.) on the surface of natural water flow from entering the water conservancy facilities.

排沙泵,在本发明中,每个排沙泵都接有两根排砂管道,平时只使用其中一根,另一根作为备用。这样可大大节约控制成本。排砂用的排沙泵和排砂闸门均安置在地下廊道内,方便工作人员的检修。Sand discharge pumps, in the present invention, each sand discharge pump is connected with two sand discharge pipelines, and only one of them is used at ordinary times, and the other is used as a spare. This can greatly save control costs. The sand discharge pumps and sand discharge gates for sand discharge are placed in the underground corridor to facilitate the maintenance of the staff.

管道最终将泥沙排往下游河道,管道出露河道壁,这是为了防止泥沙在河道侧岸大量堆积,妨碍河道正常运行。The pipeline finally discharges the sediment to the downstream channel, and the pipeline is exposed on the channel wall. This is to prevent a large amount of sediment from accumulating on the side banks of the channel and hindering the normal operation of the channel.

本发明针对现有水利枢纽不能统筹兼顾,即引水的同时不能保证下游生态需求;不能有效控制枯、讯水期达到引水要求和保证建筑安全性。提供了一个较好的解决方式。The present invention can't make overall plans for the existing water control projects, that is, it can't ensure the downstream ecological demand while water diversion; it can't effectively control the dry and fresh water seasons to meet the water diversion requirements and ensure the safety of buildings. Provides a better solution.

本发明相对于现有的水利枢纽,具有以下特点:Compared with the existing water conservancy projects, the present invention has the following characteristics:

以往的沉砂池一般为一级消力,一级沉砂。在遇到相对泥沙含量较大河流体系。其进行山区灌溉对其农田损伤较大。然而,本发明的水利枢纽采用二级沉砂排沙系统,所谓二级沉砂,将河水通过引水闸引入沉砂池内。此时河水经过消力池消力后水流速度降低,随后经过一级沉砂池。缓慢水流中泥沙开始下沉,上部清流漫过沉砂池所设置的溢流坎跌入二级沉砂池。同理,水流中在一级沉砂池残存的更加细小的泥沙开始下沉堆积,之后水流漫过二级沉砂池,开始经过反滤墙。此时水流中泥沙颗粒大小被降低为0.1mm以下并完成整个沉沙系统,此时的河水则满足农田灌溉要求。In the past, the grit chamber was generally a first-level stilling force and a first-level grit chamber. When encountering a river system with relatively large sediment content. Its irrigation in mountainous areas will greatly damage its farmland. However, the water conservancy project of the present invention adopts a secondary sand settling and sand discharge system, so-called secondary sand settling, which introduces river water into the grit settling tank through the diversion sluice. At this time, the river water flows through the stilling tank and the water velocity decreases, and then passes through the first-level grit chamber. The sediment in the slow water flow begins to sink, and the upper clear flow overflows the overflow sill set by the grit chamber and falls into the secondary grit chamber. In the same way, the finer sediment remaining in the primary grit chamber in the water flow begins to sink and accumulate, and then the water flows through the secondary grit chamber and begins to pass through the filter wall. At this time, the size of sediment particles in the water flow is reduced to less than 0.1mm and the entire sedimentation system is completed, and the river water at this time meets the requirements for farmland irrigation.

本发明大大提高河道的沉砂和排沙能力,对农田的用水量补给起到了一定得到安全性保障和储量保障。The invention greatly improves the sand settling and sand discharge capacity of the river course, and guarantees the safety and reserve of the water supply of the farmland.

本发明的水利枢纽,使得上游高含沙量的流水能够降速沉沙,降低泥沙含量。上层清水进入引水渠道,为防止推移质泥沙进入引水渠道,采取引水渠的基准线高于河道地基一定程度,同时设置拦污栅防止杂物进入引水渠。The water conservancy project of the present invention enables the flowing water with high sand content in the upstream to slow down and settle sand, reducing the sand content. The upper clear water enters the water diversion channel. In order to prevent the moving sediment from entering the water diversion channel, the baseline of the water diversion channel is higher than the river foundation to a certain extent, and a trash rack is set to prevent debris from entering the water diversion channel.

下游段安置溢流坝,能在枯水期保证引水流量的同时,在汛水期防洪减灾。水平河道积累的落差,提高引水量,当闸门打开时能借助水流携沙力冲走上游淤积泥沙。An overflow dam is installed in the downstream section, which can ensure the diversion flow in the dry season and at the same time prevent floods and reduce disasters in the flood season. The drop accumulated in the horizontal river channel increases the amount of water diversion, and when the gate is opened, it can use the sand-carrying force of the water to wash away the upstream silt.

同时,本发明能够有效降低进入引水渠的泥沙含量,并且不再用人工清淤的方法处理上游的沉沙。At the same time, the invention can effectively reduce the sediment content entering the water diversion canal, and does not use manual dredging to treat the upstream sediment.

本发明的水利枢纽主要是针对山区设计的,水利枢纽弯道设计:根据上游来水流速设计渠道弯曲程度。引水渠位置:选取最佳位置在上游河道处开口设置引水渠。积累落差:根据地形纵坡,设计渠道长度,保证积累的水头能够冲走上游淤积的泥沙,并且对于人工渠道内的沉沙能够通过排沙管道排至河道下游。渠道围堰:采用垂直的模式,解决山区地形开挖难度大的问题,降低施工量。为保证稳定性,在其中加入铆筋。选材:尽可能的就地取材,降低成本,但是必须要根据相关规范和水利工程的实际需求计算用料。The water conservancy project of the present invention is mainly designed for mountainous areas, and the curve design of the water conservancy project: the degree of curvature of the channel is designed according to the flow rate of upstream water. Diversion canal location: choose the best position to open and set the diversion canal at the upstream river channel. Accumulated drop: According to the longitudinal slope of the terrain, the length of the channel is designed to ensure that the accumulated water head can wash away the sediment accumulated in the upstream, and the sediment in the artificial channel can be discharged to the downstream of the river through the sediment discharge pipe. Channel cofferdam: the vertical mode is adopted to solve the problem of difficult excavation in mountainous terrain and reduce the amount of construction. To ensure stability, rivets are added to it. Material selection: Use local materials as much as possible to reduce costs, but the materials must be calculated according to relevant specifications and actual needs of water conservancy projects.

本发明的水利枢纽,不仅可以实现100m3/s的引水流量,而且能够满足阻挡0.1mm以上泥沙进入引水渠的作用。我们使用了一系列组合建筑物,并在考虑山区建筑的基础上使用了拦污栅、电化学防腐蚀方法等。我们深知工程建筑的安全运行的重要性,因此,为了该山区灌溉引水渠渠首枢纽工程可以长久的发挥水利作用,保证它的顺利运行,我们为其设置了较为牢靠的结构,方便后续的使用,并为可能的维修创造了尽可能大的便利。The water conservancy project of the present invention can not only realize a water diversion flow rate of 100m 3 /s, but also meet the function of preventing sediment above 0.1mm from entering the diversion channel. We used a series of combined buildings, and used trash racks, electrochemical anti-corrosion methods, etc. in consideration of mountainous buildings. We are well aware of the importance of safe operation of engineering buildings. Therefore, in order to ensure the long-term water conservancy function of the irrigation diversion canal hub project in mountainous areas and ensure its smooth operation, we have set up a relatively reliable structure for it to facilitate subsequent use, and create the greatest possible convenience for possible repairs.

附图说明Description of drawings

图1、水利枢纽的结果结构图Figure 1. The structure diagram of the result of the water conservancy project

图2、沉砂池Figure 2. Grit chamber

图中标记:Marked in the figure:

上游河道(1),下游河道(2),引水渠(3),溢流坝(4),凹岸(5)和凸岸(6),沉砂池(7),反滤墙(8),排沙闸(9),消力池(10),锚杆(11),河道壁(12),排砂闸门(13),排沙泵(14),排沙管道(15),引水闸(16),消力池(17),出水闸(18),拦污栅(19),Upstream channel (1), downstream channel (2), diversion channel (3), overflow dam (4), concave bank (5) and convex bank (6), grit chamber (7), filter wall (8) , sand discharge gate (9), stilling basin (10), anchor rod (11), river channel wall (12), sand discharge gate (13), sand discharge pump (14), sand discharge pipe (15), diversion gate (16), stilling basin (17), outlet gate (18), trash rack (19),

具体实施方式Detailed ways

通过以下具体实施例对本发明作进一步的说明,但不作为本发明的限制。The present invention will be further illustrated by the following specific examples, but not as a limitation of the present invention.

实施例1、水利枢纽Embodiment 1, water conservancy project

本发明所述的水利枢纽,由上游河道(1),下游河道(2)和引水渠(3)组成。The water conservancy project of the present invention is composed of an upstream channel (1), a downstream channel (2) and an aqueduct (3).

其中,引水渠(3)设置在本发明上游河道(1)的侧面,沉砂池(7)设置在引水渠(3)的内部。Wherein, the water diversion canal (3) is arranged on the side of the upstream channel (1) of the present invention, and the grit chamber (7) is arranged inside the water diversion canal (3).

其中,引水渠(3)设置在上游河道(1)的侧面,沉砂池(7)设置在引水渠(3)的内部。Wherein, the diversion canal (3) is arranged on the side of the upstream channel (1), and the grit chamber (7) is arranged inside the diversion canal (3).

实施例2、水利枢纽Embodiment 2, water conservancy project

本发明所述的水利枢纽,由上游河道(1),下游河道(2)和引水渠(3)组成。The water conservancy project of the present invention is composed of an upstream channel (1), a downstream channel (2) and an aqueduct (3).

其中,引水渠(3)设置在本发明上游河道(1)的侧面,沉砂池(7)设置在引水渠(3)的内部。Wherein, the water diversion canal (3) is arranged on the side of the upstream channel (1) of the present invention, and the grit chamber (7) is arranged inside the water diversion canal (3).

其中,引水渠(3)设置在上游河道(1)的侧面,沉砂池(7)设置在引水渠(3)的内部。Wherein, the diversion canal (3) is arranged on the side of the upstream channel (1), and the grit chamber (7) is arranged inside the diversion canal (3).

其中,沉砂池(7)为上宽下窄的漏斗形状。在沉砂池(7)的底部设置排砂闸门(13)。在排砂闸门(13)的下方设置一个三通形状的排沙泵(14)。Wherein, the grit chamber (7) is in the shape of a funnel with a wide top and a narrow bottom. A sand discharge gate (13) is arranged at the bottom of the grit chamber (7). A sand discharge pump (14) of a three-way shape is set below the sand discharge gate (13).

其中,在排沙泵(14)的接口处装有排沙管道(15),在排沙管道(15)的另一端连接下游河道(2)。泥沙通过排沙管道流入下游河道内。Wherein, a sand discharge pipe (15) is installed at the interface of the sand discharge pump (14), and the other end of the sand discharge pipe (15) is connected to the downstream river course (2). Sediment flows into the downstream channel through the sand discharge pipeline.

实施例3、水利枢纽Embodiment 3, water conservancy project

本发明所述的水利枢纽,由上游河道(1),下游河道(2)和引水渠(3)组成。The water conservancy project of the present invention is composed of an upstream channel (1), a downstream channel (2) and an aqueduct (3).

其中,引水渠(3)设置在本发明上游河道(1)的侧面,沉砂池(7)设置在引水渠(3)的内部。Wherein, the water diversion canal (3) is arranged on the side of the upstream channel (1) of the present invention, and the grit chamber (7) is arranged inside the water diversion canal (3).

其中,引水渠(3)设置在上游河道(1)的侧面,沉砂池(7)设置在引水渠(3)的内部。Wherein, the diversion canal (3) is arranged on the side of the upstream channel (1), and the grit chamber (7) is arranged inside the diversion canal (3).

其中,沉砂池(7)为上宽下窄的漏斗形状。在沉砂池(7)的底部设置排砂闸门(13)。在排砂闸门(13)的下方设置一个三通形状的排沙泵(14)。Wherein, the grit chamber (7) is in the shape of a funnel with a wide top and a narrow bottom. A sand discharge gate (13) is arranged at the bottom of the grit chamber (7). A sand discharge pump (14) of a three-way shape is set below the sand discharge gate (13).

其中,在排沙泵(14)的接口处装有排沙管道(15),在排沙管道(15)的另一端连接下游河道(2)。泥沙通过排沙管道流入下游河道内。Wherein, a sand discharge pipe (15) is installed at the interface of the sand discharge pump (14), and the other end of the sand discharge pipe (15) is connected to the downstream river course (2). Sediment flows into the downstream channel through the sand discharge pipeline.

其中,在引水渠(3)的顶端设置引水闸(16)和消力池(17)。Wherein, a diversion gate (16) and a stilling basin (17) are arranged at the top of the diversion canal (3).

其中,在引水渠(3)的底端设置出水闸(18)。Wherein, the outlet gate (18) is set at the bottom of the diversion channel (3).

其中,沉砂池(12)的数量可以根据水流的大小和沙石的含量进行设置。可以为1‐5个,优选为3个。Wherein, the quantity of the grit chamber (12) can be set according to the size of the water flow and the content of the sand. Can be 1-5, preferably 3.

其中,上游河道(1)和引水渠(3)的连接处,设置有拦污栅(19)。Wherein, a trash rack (19) is arranged at the junction of the upstream river course (1) and the diversion channel (3).

Claims (1)

1.一种具有沉沙功能的水利枢纽,其特征是,由上游河道(1),下游河道(2)和引水渠(3)组成,其中,引水渠(3)设置在上游河道(1)的侧面,沉砂池(7)设置在引水渠(3)的内部,1. A water conservancy project with a sedimentation function, characterized in that it consists of an upstream channel (1), a downstream channel (2) and a diversion channel (3), wherein the diversion channel (3) is arranged on the upstream channel (1) side, the grit chamber (7) is set inside the diversion channel (3), 其中,在引水渠(3)的顶端设置引水闸(16)和消力池(17),Wherein, diversion gate (16) and stilling basin (17) are set at the top of diversion canal (3), 其中,在引水渠(3)的尾端设置反滤墙(8),沉砂池(7)为上宽下窄的漏斗形状,在沉砂池(7)的底部设置排砂闸门(13),在排砂闸门(13)的下方设置一个三通形状的排沙泵(14),在排沙泵(14)的接口处装有排沙管道(15),在排沙管道(15)的另一端连接下游河道(2)。Among them, an anti-filter wall (8) is set at the end of the diversion canal (3), the grit chamber (7) is in the shape of a funnel with a wide top and a narrow bottom, and a sand discharge gate (13) is set at the bottom of the grit chamber (7). , a tee-shaped sand discharge pump (14) is set below the sand discharge gate (13), a sand discharge pipe (15) is installed at the interface of the sand discharge pump (14), and a sand discharge pipe (15) The other end is connected to the downstream channel (2).
CN201621392232.7U 2016-12-17 2016-12-17 It is a kind of that there is the key water control project of desilting Expired - Fee Related CN207392122U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621392232.7U CN207392122U (en) 2016-12-17 2016-12-17 It is a kind of that there is the key water control project of desilting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621392232.7U CN207392122U (en) 2016-12-17 2016-12-17 It is a kind of that there is the key water control project of desilting

Publications (1)

Publication Number Publication Date
CN207392122U true CN207392122U (en) 2018-05-22

Family

ID=62401578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621392232.7U Expired - Fee Related CN207392122U (en) 2016-12-17 2016-12-17 It is a kind of that there is the key water control project of desilting

Country Status (1)

Country Link
CN (1) CN207392122U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267536A (en) * 2018-11-16 2019-01-25 彭国洪 A kind of Waterway Regulation of library tail falling zone
CN109267535A (en) * 2018-11-16 2019-01-25 彭国洪 A kind of administering method of plain river
CN110453642A (en) * 2019-06-20 2019-11-15 庞双芹 A device for sedimentation of the Yellow River sediment and output of clean water
CN110528475A (en) * 2019-08-10 2019-12-03 中国水利水电第七工程局有限公司 A water intake system for water conservancy projects
CN119434201A (en) * 2023-11-14 2025-02-14 兰州理工大学 A silt removal device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267536A (en) * 2018-11-16 2019-01-25 彭国洪 A kind of Waterway Regulation of library tail falling zone
CN109267535A (en) * 2018-11-16 2019-01-25 彭国洪 A kind of administering method of plain river
CN110453642A (en) * 2019-06-20 2019-11-15 庞双芹 A device for sedimentation of the Yellow River sediment and output of clean water
CN110528475A (en) * 2019-08-10 2019-12-03 中国水利水电第七工程局有限公司 A water intake system for water conservancy projects
CN119434201A (en) * 2023-11-14 2025-02-14 兰州理工大学 A silt removal device

Similar Documents

Publication Publication Date Title
CN207392122U (en) It is a kind of that there is the key water control project of desilting
CN205314071U (en) Multistage fan -shaped abrupt slope dissipation structure
CN101260661B (en) Automatic irrigation and drainage method and system for agricultural land
CN207376562U (en) A kind of key water control project that can filter silt
CN206928252U (en) A kind of small water conservancy gate of energy-conserving and environment-protective
CN106869245B (en) Submersible pumping station for high water level change and silt rivers in hilly area
CN201596384U (en) Farmland low-pressure pipeline forebay self-draining grit chamber device
CN207760989U (en) A kind of pump discharges into water system
CN102535384A (en) In-trench water-stone separation siphoning-drainage debris flow control method
CN207392146U (en) A kind of key water control project with filtering function
CN104652383B (en) Tailings warehouse dam body free-draining device
CN104060570B (en) Current carrying analogy method under a kind of lock
CN102277894A (en) Method and facility for getting water through hierarchical guiding and discharging of channel deposits
CN108661100A (en) A kind of reservoir desilting system of novel hydropower driving
CN106702968A (en) Arc type overflow dam capable of automatically washing away sand and reducing siltation and running method of arc type overflow dam
CN207582618U (en) A kind of pump discharges into water system
CN107975010B (en) Beach volleyball sand structures are divided in head works annular special section automatically
CN206529749U (en) A kind of power station generating water diverting structure arrangement for taking into account environmental protection and sand discharge demand
CN103614986B (en) It a kind of is applicable to the pressure free current inlet method that Tailings Dam drains off floodwaters
CN206245390U (en) A culvert pipe diversion pump station
CN104727267B (en) It is a kind of to form the compound shingle trap of longitudinal spiral stream sediment trapping sand discharge
CN207419368U (en) A kind of key water control project with sensor device
CN201850576U (en) Water intaking facility capable of guiding and draining river sediment in a grading way
CN206986826U (en) It is a kind of can effective reduction of speed desilting key water control project
CN210031716U (en) A reservoir overflow device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180522

Termination date: 20191217

CF01 Termination of patent right due to non-payment of annual fee