CN209722901U - Multi-stage porous pipe weir shunts and warps system - Google Patents
Multi-stage porous pipe weir shunts and warps system Download PDFInfo
- Publication number
- CN209722901U CN209722901U CN201920307840.0U CN201920307840U CN209722901U CN 209722901 U CN209722901 U CN 209722901U CN 201920307840 U CN201920307840 U CN 201920307840U CN 209722901 U CN209722901 U CN 209722901U
- Authority
- CN
- China
- Prior art keywords
- permeable
- weir
- hole
- standpipe
- comb
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
It is shunted the utility model discloses a kind of multi-stage porous pipe weir and warps system, need to warp the intake channel and drainage channel of area, side, upstream and downstream including being provided with river major trough respectively, intake channel, drainage channel are connected with the dike root depression area Luo Yu respectively;Multiple rows of hole Guan Yan is set along embankment direction interval in the area Luo Yu of dike root depression, every round pipe weir is along the transversely arranged arrangement in the dike root depression area Luo Yu;Impermeable water hole Guan Yan is made of waterproof standpipe in the area Luo Yu of dike root depression, positioned at the hole pipe weir in intake channel upstream side and drainage channel downstream side, remaining hole pipe weir is made of permeable hole pipe weir permeable standpipe, and the upstream face and back side tube wall of permeable standpipe offer water hole.The utility model deposits to raise the low-lying section of dike root using river height water containing Shahe, and " water-control " reaches and form dike root " korneforos river " with beach area slope surface rainwater " along dike flood passage " when preventing great flood, jeopardize lower reaches of river dyke and flood control safety purpose.
Description
Technical field
The utility model relates to the fully-loaded streams in hydraulic and hydroelectric engineering to external drainage warping works, more particularly, to more
Grade hole pipe weir, which shunts, warps system.
Background technique
The riverbed of fully-loaded stream often has silting phenomenon, for guarantee river operational safety, it is necessary to warped with
Reinforce embankment.Now by taking China the Yellow River as an example, the Yellow River downstream channel is aboveground river world-famous, and river bed is higher by two sides ground 3m
~9m, while river width maximum reaches 25km between the dyke of downstream or so, main stem is gone around swing, " Yokogawa ", " oblique river " and " Shun Dihang
Flood " phenomenon has generation more, brings very big hidden danger to the Yellow River flood control.
To solve riverbed silting phenomenon, mainly takes warp the measure of reinforcing embankment in embankment land side at present, i.e.,
The grid embankment continuously sealed is built along dike in embankment land side, the high extraction of water containing Shahe is entered by mud carrier and is gone here and there one by one
Clear water in dike pond is bled off, is increased by stages step by step after sediment deposition by sub- embankment pond even.Above-mentioned silt arrester effect is good, again
Silt in river is utilized, becomes the major measure of downstream embankment reinforcement.But occur for fully-loaded stream part section
The phenomenon that " slot is high, beach is low, dike root is hollow ", i.e., " double suspended channel " as shown in Figure 7, during the unfavorable form of " double suspended channel " is easily led to
Chang Hongshui overbank, when flood passage, form oblique river, Yokogawa, along the river regime of the unfavorable embankment safety such as dike flood passage.To alleviate because " second level is outstanding
Threat caused by the unfavorable form in river " to Seawall safety is arranged in dyke side of bordering on the river using building guard dam and choose the conduct of bank of wandering about as a refugee
It applies, but the low-lying topography of dike root does not change.
Summary of the invention
The utility model aim is that providing a kind of multi-stage porous pipe weir shunts system of warping, and cuts down in moderate flood
Current top-lashed action, oblique impact embankment and the probability occurred along dike flood passage phenomenon that may cause.
To achieve the above object, the utility model takes following technical proposals:
Multi-stage porous pipe described in the utility model weir shunts and warps system, including is provided with river major trough needs respectively and warps
The intake channel and drainage channel of area, side, upstream and downstream, the intake channel, drainage channel are connected with the dike root depression area Luo Yu respectively
Logical, intake channel, the axis of drainage channel are at an acute angle with the angle of the river major trough water (flow) direction respectively;It is hollow in the dike root
Multiple rows of hole Guan Yan is set along embankment direction interval in the area Di Luoyu, hole pipe weir described in every row is laterally arranged along the dike root depression area Luo Yu
Column arrangement;Every round pipe weir is made of multiple standpipes;In the area Luo Yu of dike root depression, it is located at intake channel upstream side and gutter
The hole pipe weir in road downstream side is made of impermeable water hole Guan Yan waterproof standpipe, remaining hole pipe weir is made of permeable permeable standpipe
Hole Guan Yan, the upstream face and back side tube wall of the permeable standpipe offer water hole.
Depth >=0.5m of the waterproof lower riser end embedment below ground on the impermeable water hole pipe weir, upper end are higher by the water surface
Height >=0.5m.
The top overflow area of not overflow area and low comb composition that permeable hole pipe weir described in every row is made of high comb is constituted;
The high comb lateral length in every row's permeable hole pipe weir accounts for the 2/3 of row's permeable hole pipe weir lateral length, the low comb
Lateral length accounts for the 1/3 of row's permeable hole pipe weir lateral length;High comb and low comb are in >=60 ° of angles with water (flow) direction,
The concave surface of high comb and low comb junction is towards downstream side;Form the water hole percent opening of the permeable standpipe of high comb >
Form the water hole percent opening of the permeable standpipe of low comb.
Depth >=0.5m of the permeable lower riser end embedment below ground of the high comb, upper end are higher by the height of the water surface
Degree >=0.5m;Depth >=0.5m of the permeable lower riser end embedment below ground of the low comb, upper end be located at the water surface with
Under;The permeable standpipe upper end of high comb exceeds the permeable standpipe upper end 0.7m or more of low comb, to guarantee stable and carrying overcurrent.
The high comb and the low comb on the permeable hole pipe weir of adjacent row or so interlaced arrangement.
It is provided with percent opening≤permeable standpipe surface area 30% of the water hole on the permeable standpipe;Positioned at saturating
The water hole of 1/4 height of water riser upper open up density > be located at permeable 3/4 height of standpipe lower part water hole open up density.
The water hole of the permeable standpipe is distributed in 90 ° of camber line areas of upstream face and back side of tube wall.
The utility model advantage is to deposit using river height water containing Shahe to raise the low-lying section of dike root, " is controlled with water
Water " reaches and forms dike root " korneforos river " with beach area slope surface rainwater " along dike flood passage " when preventing great flood, jeopardizes lower reaches of river dyke
And flood control safety purpose.The utility model compared with existing artificial dyke strengthening by warping method, advantage major embodiment in the following areas:
1, drainage is warped from high to low, and nature water energy is utilized, and is saved machinery and is drawn water power cost;
2, the conveying of flow and carrying is maintained using the different height distribution of permeable standpipe, while reduces flow velocity again,
Dynamic water falls the lower implementation of silt dynamic, and primary range of depositing is wide, saves the time;
3, pipe weir in hole is divided into high comb area and the low comb area existing cofferdam of substitution with moveable permeable standpipe (PE pipe)
And small dike, it is reusable, it reduces investment outlay and the duration;
4, integral construction is small to surrounding environment influence;
5, pipe weir in hole uses tubular body structure, and stress condition is good, and material is universal, and tube body is light, facilitates construction, construction efficiency
Height, low cost.
Detailed description of the invention
Fig. 1 is that multi-stage porous pipe described in the utility model weir shunts the plan view warped.
Fig. 2 is the A-A profile structure diagram of Fig. 1.
Fig. 3 is the B-B cross-section structure diagram of Fig. 1.
Fig. 4 is the C-C of Fig. 1 to the schematic diagram of the section structure.
Fig. 5 is the D-D of Fig. 1 to the schematic diagram of the section structure.
Fig. 6 is the water hole distribution schematic diagram that the utility model is provided on the permeable standpipe.
Fig. 7 is the schematic diagram of " double suspended channel " described in the utility model.
Specific embodiment
It elaborates with reference to the accompanying drawing to the embodiments of the present invention, the present embodiment is with the utility model technology
Implemented under premised on scheme, the detailed implementation method and specific operation process are given, but the protection of the utility model
Range is not limited to following embodiments.
As shown in figures 1 to 6, multi-stage porous pipe described in the utility model weir shunts and warps system, and specific implementation step is as follows:
Step 1 excavates intake channel 2 to the dike root depression area Luo Yu 3, diversion in the upstream that river major trough 1 needs to warp area
1 axis of channel and the angle of 1 water (flow) direction of river major trough smoothly connect in less than 45 ° acute angles, and excavated section size is by determining
Corresponding water level, soil property composition etc. are comprehensive when water diversion flow, diversion determines, conveys hyper-concentration flow to the dike root depression area Luo Yu 3;
Step 2 needs to warp the downstream excavation drainage channel 4 in area to the dike root depression area Luo Yu 3, draining in river major trough 1
4 axis of channel and the angle of 1 water (flow) direction of river major trough smoothly connect in less than 45 ° acute angles, and excavated section size is by determining
Water diversion flow, draining gradient, soil property composition etc. are comprehensive to be determined;
Step 3, multiple rows of hole Guan Yan, the equal edge in every round pipe weir is arranged in suitable 5 direction interval of embankment in the dike root depression area Luo Yu 3
The transversely arranged arrangement in the dike root depression area Luo Yu 3;Every round pipe weir is made of multiple standpipes (PE pipe);The dike root depression area Luo Yu 3
It is interior, be made of waterproof standpipe 6 impermeable water hole positioned at the hole pipe weir in 4 downstream side of 2 upstream side of intake channel and drainage channel and manage
Weir, remaining hole pipe weir are made of permeable hole pipe weir permeable standpipe 7, and the upstream face and back side tube wall of permeable standpipe 7 open up
There is water hole 8.
Depth >=0.5m of 6 lower end of the waterproof standpipe embedment below ground on impermeable water hole pipe weir, upper end are higher by the water surface
Highly >=0.5m.
As shown in Figure 4,5, it overflows on the top of every row's permeable hole pipe weir is made of high comb not overflow area 9 and low comb composition
Area 10 is flowed to constitute;High comb lateral length in every row's permeable hole pipe weir accounts for the 2/3 of row's permeable hole pipe weir lateral length, low row
Pipe lateral length accounts for the 1/3 of row's permeable hole pipe weir lateral length;High comb and low comb are with water (flow) direction in >=60 ° of folders
Angle, the concave surface of high comb and low comb junction is towards downstream side;Form 8 percent opening of water hole of the permeable standpipe 7 of high comb >
Form 8 percent opening of water hole of the permeable standpipe 7 of low comb.The not overflow area 9 and top overflow area on the permeable hole pipe weir of adjacent row
10 or so interlaced arrangements.
7 lower end of permeable standpipe embedment depth >=0.5m of below ground of high comb, upper end be higher by the height of the water surface >=
0.5m;Depth >=0.5m of 7 lower end of the permeable standpipe embedment below ground of low comb, upper end are located at the water surface or less;High comb
Permeable 7 upper end of standpipe exceeds the 7 upper end 0.7m of permeable standpipe or more of low comb, to guarantee stable and carrying overcurrent.
8 percent opening of the water hole≤permeable standpipe surface area 30% being provided on permeable standpipe 7;On permeable standpipe 7
The water hole 8 of 1/4 height of portion open up density > be located at permeable 7 lower part of standpipe, 3/4 height water hole 8 open up density.
As shown in fig. 6, the water hole 8 of permeable standpipe 7 is distributed in 90 ° of camber line areas of upstream face and back side of tube wall.
Utility model works principle is summarized as follows:
The utility model changes water flow point using the sediment carrying capacity of water flow and the high power correlation of flow rate of water flow
Cloth condition will affect its carrying amount.Different characteristics is flowed by weir flow and hole, realize sediment transport and falls the unification of silt.
The top overflow area 10 of low comb composition, top overflow are equivalent to sharp-crested weir overflow, and inflow-rate of water turbine is big, and sediment carrying capacity is strong.
Permeable hole pipe weir bottom hole stream, the overcurrent under upstream and downstream water-head and flow velocity effect, overcurrent flow velocity is small, and sediment carrying capacity is weak, makes mud
Husky tunneling boring precipitating.
The utility model proposes and the new method that water flow subregion forms different fluidised forms by hole pipe weir is utilized, i.e., using sandy
The method that river water and river shoal topography fall silt naturally.
The utility model proposes new hole pipe weir technologies: in siltation area's overcurrent depression, being overflow by hole arranged pipe weir crest
Area 10 is flowed to ensure certain flow and flow rate, is passed through its different location and is distributed the uniformity for guaranteeing carrying, through hole stream reduces
Flow section underflow flow velocity makes silt fall silt, realizes and carrys out husky duration and fall husky uniformity.That is: it is located on permeable standpipe 7
The water hole 8 of 1/4 height of portion open up density > be located at permeable 7 lower part of standpipe, 3/4 height water hole 8 open up density.
Engineering is reversible: the standpipe on every round pipe weir can be transferred to reaching to fall after silt requires, and not change the natural soil property rock in riverbed
Sexual element;Replace the materials such as building stones, concrete, pollution-free industrial plastic product material (PE pipe) realization is fully utilized and falls silt, it is raw
State.
Claims (7)
1. a kind of multi-stage porous pipe weir shunts and warps system, it is characterised in that: need to warp area including being provided with river major trough respectively
The intake channel and drainage channel of upstream and downstream side, the intake channel, drainage channel are connected with the dike root depression area Luo Yu respectively
Logical, intake channel, the axis of drainage channel are at an acute angle with the angle of the river major trough water (flow) direction respectively;It is hollow in the dike root
Multiple rows of hole Guan Yan is set along embankment direction interval in the area Di Luoyu, hole pipe weir described in every row is laterally arranged along the dike root depression area Luo Yu
Column arrangement;Every round pipe weir is made of multiple standpipes;In the area Luo Yu of dike root depression, it is located at intake channel upstream side and gutter
The hole pipe weir in road downstream side is made of impermeable water hole Guan Yan waterproof standpipe, remaining hole pipe weir is made of permeable permeable standpipe
Hole Guan Yan, the upstream face and back side tube wall of the permeable standpipe offer water hole.
2. multi-stage porous pipe according to claim 1 weir shunts and warps system, it is characterised in that: the impermeable water hole pipe weir
Depth >=0.5m of waterproof lower riser end embedment below ground, upper end are higher by height >=0.5m of the water surface.
3. multi-stage porous pipe according to claim 1 or 2 weir shunts and warps system, it is characterised in that: permeable hole described in every row
The top overflow area of not overflow area and low comb composition that pipe weir is made of high comb is constituted;It is described in every row's permeable hole pipe weir
High comb lateral length accounts for the 2/3 of row's permeable hole pipe weir lateral length, and the low comb lateral length accounts for row's permeable hole pipe
The 1/3 of weir lateral length;High comb and low comb are in >=60 ° of angles, high comb and low comb junction with water (flow) direction
Concave surface is towards downstream side;Water hole percent opening > low the comb of composition for forming the permeable standpipe of high comb is described permeable vertical
The water hole percent opening of pipe.
4. multi-stage porous pipe according to claim 3 weir shunt warp system, it is characterised in that: the high comb it is described
Depth >=0.5m of water lower riser end embedment below ground, upper end are higher by height >=0.5m of the water surface;The low comb it is described
Depth >=0.5m of permeable lower riser end embedment below ground, upper end are located at the water surface or less;The permeable standpipe upper end of high comb is super
The permeable standpipe upper end 0.7m or more of low comb out, to guarantee stable and carrying overcurrent.
5. multi-stage porous pipe according to claim 3 weir shunts and warps system, it is characterised in that: the permeable hole of adjacent row
The high comb and the low comb on pipe weir or so interlaced arrangement.
6. multi-stage porous pipe according to claim 1 weir shunts and warps system, it is characterised in that: be provided with the permeable standpipe
On the water hole percent opening≤permeable standpipe surface area 30%;Water hole positioned at permeable 1/4 height of riser upper is opened
If density > be located at permeable 3/4 height of standpipe lower part water hole open up density.
7. multi-stage porous pipe according to claim 1 weir shunt warp system, it is characterised in that: the permeable standpipe it is described
Water hole is distributed in 90 ° of camber line areas of upstream face and back side of tube wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920307840.0U CN209722901U (en) | 2019-03-12 | 2019-03-12 | Multi-stage porous pipe weir shunts and warps system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920307840.0U CN209722901U (en) | 2019-03-12 | 2019-03-12 | Multi-stage porous pipe weir shunts and warps system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209722901U true CN209722901U (en) | 2019-12-03 |
Family
ID=68685996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920307840.0U Active CN209722901U (en) | 2019-03-12 | 2019-03-12 | Multi-stage porous pipe weir shunts and warps system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209722901U (en) |
-
2019
- 2019-03-12 CN CN201920307840.0U patent/CN209722901U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109778798A (en) | Multi-stage porous pipe weir shunts and warps method | |
Wang et al. | Dynamic characteristics of the Yellow River mouth | |
CN101205710A (en) | Watershed weir series treating soil erosion and constructing method thereof | |
CN102733351B (en) | Method for treating river entrance | |
CN106192871A (en) | Protection arrangement for debris flow gully | |
CN107620285A (en) | A kind of a copious, rapid flow of words governing system and method | |
CN106087953A (en) | A kind of drainage and construction method preventing and treating large-scale spoil ground, mountain area mud-rock flow | |
CN109457660A (en) | A kind of water conservancy construction method for retaining rainwater resource in small watershed river | |
CN203782664U (en) | Anti-scour structure of sandy foundation water gate | |
CN109145457B (en) | River type division method based on longitudinal river potential adjustment transfer and obstruction mechanism | |
Atykbekova et al. | Operation damless intake of the Amudarya river (Central Asia) | |
CN105064291A (en) | Step sand-blocking dam ecosystem for reservoir desilting and sand prevention | |
JPH10266171A (en) | Method of sand and sludge discharge system for reservoir and basin, and sand and sludge discharge system equipment for reservoir and basin | |
CN205954559U (en) | A ditch water treatment structure that is used for large -scale sediment field of blocking | |
CN206052635U (en) | For the protection arrangement of debris flow gully | |
CN209722901U (en) | Multi-stage porous pipe weir shunts and warps system | |
CN108316250A (en) | Technology and construction method are cleared using the silt that stops for dynamically stopping silt storage capacity separation mud-rock flow | |
CN110468792A (en) | A kind of not silting ecological permeable dam and its method of construction | |
CN207392146U (en) | A kind of key water control project with filtering function | |
CN214460826U (en) | Bottom grid barrier and upstream surface seepage flow perforated pipe water collecting gallery water taking system | |
CN1153002C (en) | Method for piping-type sand collection in river, shifting silt from reservoir and treating river and desert | |
CN208668366U (en) | River bank antiskid retaining structure | |
CN209277087U (en) | Diversion works head stores clear erosion and deposition regulating reservoir | |
CN106930242A (en) | Pile foundation overfall dam and galvanized wire gabion protection-apron | |
CN208395782U (en) | Using the row's guide structure for dynamically stopping silt storage capacity separation mud-rock flow |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |