CN109239564A - 一种基于软件逻辑功能配合的晶闸管测试系统 - Google Patents
一种基于软件逻辑功能配合的晶闸管测试系统 Download PDFInfo
- Publication number
- CN109239564A CN109239564A CN201710555210.0A CN201710555210A CN109239564A CN 109239564 A CN109239564 A CN 109239564A CN 201710555210 A CN201710555210 A CN 201710555210A CN 109239564 A CN109239564 A CN 109239564A
- Authority
- CN
- China
- Prior art keywords
- thyristor
- control unit
- valve
- tester
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/26—Testing of individual semiconductor devices
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/26—Testing of individual semiconductor devices
- G01R31/2607—Circuits therefor
- G01R31/263—Circuits therefor for testing thyristors
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/26—Testing of individual semiconductor devices
- G01R31/2601—Apparatus or methods therefor
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/26—Testing of individual semiconductor devices
- G01R31/2642—Testing semiconductor operation lifetime or reliability, e.g. by accelerated life tests
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
- G01R31/333—Testing of the switching capacity of high-voltage circuit-breakers ; Testing of breaking capacity or related variables, e.g. post arc current or transient recovery voltage
- G01R31/3333—Apparatus, systems or circuits therefor
- G01R31/3336—Synthetic testing, i.e. with separate current and voltage generators simulating distance fault conditions
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/60—Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Power Conversion In General (AREA)
- Testing Of Individual Semiconductor Devices (AREA)
- Rectifiers (AREA)
Abstract
本发明提出了一种基于软件逻辑功能配合的晶闸管测试系统,其主要内容为,测试系统包括:被测晶闸管阀、阀控单元和测试仪,阀控单元具有专门的测试模式,测试仪在进行每项测试时都分为三个步骤。被测晶闸管阀和阀控单元之间采用光纤连接,被测晶闸管阀和测试仪之间采用电缆连接,阀控单元和测试仪之间无任何连接。
Description
技术领域
本发明涉及一种用于在工程现场给晶闸管阀进行功能测试的测试系统及对应的测试方法,属于电力电子领域。
背景技术
在有晶闸管阀应用的工程现场,一般在投运前、年检或者设备发生故障更换后,需要用专门的测试仪对晶闸管阀进行测试,而晶闸管触发单元(TCU)由于负责对晶闸管的触发、保护,以及对阀控单元(VBE)的信号反馈,所以是测试中的重点。早期由于TCU和VBE交互的光信号比较单一,所以可以不专门测试,即测试仪和晶闸管阀仅有电缆连接。随着TCU功能以及和VBE之间配合的丰富,两者之间交互的光信号趋于复杂。例如为了区分补脉冲和保护性触发回报,TCU针对不同意义的回报光信号设置了不同的宽度,为了测试这些光信号的正确性,测试仪和晶闸管阀之间除电缆连接外,还需要有光纤连接。
在工程现场进行测试时,一般所有的TCU和VBE之间的光纤铺设和连接已经完成,所以测试时需要将TCU上和VBE连接的光纤拔出,然后再用另外的光纤将TCU和测试仪连接,如图1所示,这样TCU和测试仪之间可以直接进行光信号的传输,以满足试验的需要。但这种做法存在一个较大的隐患,即每对一个晶闸管级进行试验时,都至少需要在TCU上进行两次光纤插拔,若该晶闸管级试验并不顺利,则在检查过程中可能多次插拔光纤,而每次插拔光纤都可能对光纤以及TCU的光接口处造成污秽和磨损,影响光信号的传输。在以往的工程现场曾经出现过在完成测试仪对晶闸管阀的功能测试,将原来光纤恢复后,在后续的试验中发现光路故障的情况。由于所有光路在前期完成光纤敷设后会统一进行测试,说明该光路故障是由于后续用测试仪对晶闸管阀的测试过程中的反复插拔导致,而由于光路测试的工作量巨大,不可能进行复测,所以受损光纤便遗漏到后续试验过程中,造成影响。
发明内容
本发明所要解决的问题是,针对上述测试系统和测试方法的缺点,提出一种不用插拔现场已连接光纤,通过测试仪和VBE之间相互配合,便能满足晶闸管阀所有测试功能和测试要求的方案。
本发明提供一种晶闸管阀的测试系统,所述测试系统包括:被测晶闸管阀、测试仪和阀控单元。
其中,所述被测晶闸管阀包括至少一个晶闸管级,每个晶闸管级至少包括一个晶闸管、一个触发单元和所需辅助回路。
其中,所述阀控单元具有专用的测试模式:
1.阀控单元每连续收到N个回报脉冲1时,向触发单元发送一个触发脉冲;
2.阀控单元收到回报脉冲2后,在下一次连续收到N个回报脉冲1时,不向触发单元发送触发脉冲;
3.阀控单元若在一定时间T内没有收到任何回报脉冲时,则所有脉冲个数从零计算。
其中,所述测试仪的每个测试项目均分为3个步骤:
1.施加激励为正弦电压,测试仪在该阶段中检测晶闸管是否导通,判断整个晶闸管级电路及光路是否正常;
2.施加激励为对应本测试项目内容的正弦电压或冲击电压或正向电压和冲击电压的叠加,测试仪在该阶段中检测晶闸管电压及电流,判断本测试项目中晶闸管阀在电气方面是否满足要求;
3.施加激励为正弦电压,测试仪在该阶段中检测晶闸管是否导通,判断在步骤b中晶闸管阀向阀控单元回报的光信号是否正确。
其中,所述的被测晶闸管阀和所述阀控单元之间采用光纤连接,所述被测晶闸管阀和所述测试仪之间采用电缆连接,所述阀控单元和所述测试仪之间无任何连接。
与现有测试系统和测试方法相比,本发明所提出的技术在现场测试时摒弃了原先需要挨个插拔光纤的测试方法,仅需将VCU设置为测试模式,利用已有的VCU和换流阀之间的触发回报光纤,将测试仪逐个和被测晶闸管阀连接,进行测试。测试过程中由于每个项目都分为3个步骤,可以对光路、电路和触发单元的回报信号进行检测,达到了即不增加现场测试设备和测试工作量,又能全面可靠高效地完成测试的目的,尤其对于晶闸管数目庞大的工程,具有很高的实用性。
附图说明
图1为原有的一种用于晶闸管阀的测试系统示意图。
图2为本发明提出的一种晶闸管测试系统示意图。
图3为本发明提出的一种晶闸管测试系统空间布置图。
图4为本发明提出的一种阀控单元的测试模式逻辑流程图。
图5为本发明提出的一种的测试仪的测试步骤示意图。
具体实施方式
下面结合一种实施例,对本发明进行进一步的介绍和描述,但本发明的保护范围不局限于此。
本实例提供的测试系统如图2所示,由测试仪4、被测晶闸管阀5和阀控单元3组成。其中,被测晶闸管阀5和阀控单元3有且仅有两根光纤连接,一收一发,用于传输触发回报信号;被测晶闸管阀5和测试仪4有且仅有两根电缆连接,用于测试仪4向被测晶闸管阀5施加测试电压电流;测试仪4和阀控单元3之间没有任何连接。
本实例提供的测试系统的空间布置如图3所示,被测晶闸管阀5通过光纤1和位于控制室6的阀控单元3连接,测试仪4位于阀厅7,并靠近被测晶闸管阀5,通过电缆2和被测晶闸管阀5连接。
本实例中的阀控单元3和测试仪4通过功能逻辑上的配合,实现无需光纤连接也可以测试TCU回报光信号的正确性,具体方法如下:
阀控单元3除正常触发功能外,具有专用的测试模式。测试人员可以通过设置控制字或其他方法将阀控单元3切换到测试模式。在测试模式下,阀控单元3的功能逻辑如图4所示:
阀控单元3每收到1个宽度小于15us的回报脉冲时,则回报计数器加1,当计数值=10时,若辅助计数器的值=0,则阀控单元3向被测晶闸管阀5发送一个触发脉冲并清零计数器,若辅助计数器的值=1,则阀控单元3不发送触发脉冲,直接清零所有计数器;
阀控单元3在收到宽度大于15us的回报脉冲时,辅助计数器加1且清零回报计数器;
阀控单元3在2s内没有收到回报脉冲时,则所有计数器清零。
测试仪4在每个测试项目中施加激励均分为3个步骤,如图5所示:
第一阶段施加激励为15个周波的正弦电压,在该阶段中,阀控单元3会向被测晶闸管阀5发送一个触发脉冲,若所有电路及光路均正常,则被测晶闸管阀5将会导通,测试仪4在该阶段中检测晶闸管电流,用于判断整个晶闸管级电路及光路是否正常;
第二阶段施加激励为对应本测试项目内容的正弦电压或冲击电压或正向电压和冲击电压的叠加,该阶段为测试的主要阶段,测试仪4在该阶段中检测晶闸管电压及电流,判断晶闸管阀在电气方面是否满足本测试项目的测试要求;
第三阶段施加激励为15个周波的正弦电压,在该阶段中,阀控单元3会根据第二阶段中接收到的回报信号是否正确,来决定是否向被测晶闸管阀5发送触发脉冲,测试仪在该阶段中检测晶闸管是否导通,用于判断在第2阶段中被测晶闸管阀5向阀控单元3回报的光信号是否正确。
本发明的特点是,不用插拔现场已连接光纤,而是通过阀控单元和测试仪之间功能逻辑方面的配合,便能满足所有测试项目和测试要求。
本领域的技术人员可以在本发明的权利要求范围内作出变形和修改,只要没有超过所述权利要求的范围,都在本发明的保护范围之内。
Claims (2)
1.一种基于软件逻辑功能配合的晶闸管测试系统,其特征在于,所述测试系统包括:被测晶闸管阀、测试仪和阀控单元,所述被测晶闸管阀和所述阀控单元之间采用光纤连接,用于传输触发回报信号;被测晶闸管阀和所述测试仪之间采用电缆连接,用于测试仪向被测晶闸管阀施加测试激励;被测晶闸管阀包括至少一个晶闸管级,所述晶闸管级包括至少一个晶闸管、一个触发单元和辅助回路;所述触发单元在正常取能时向阀控单元回报脉冲1,在保护性触发时向所述阀控单元回报脉冲2;
阀控单元设置有相应的测试模式,在测试模式下:
a.阀控单元每连续收到N个回报脉冲1时,向触发单元发送一个触发脉冲;
b.阀控单元收到回报脉冲2后,在下一次连续收到N个回报脉冲1时,不向触发单元发送触发脉冲;
c.阀控单元若在一定时间T内没有收到任何回报脉冲时,则所有脉冲个数从零计算;
测试仪按测试需求分不同阶段施加激励。
2.如权利要求1所述的一种基于软件逻辑功能配合的晶闸管测试系统,其特征在于,所述测试仪按测试需求分不同阶段施加激励,具体是指每个测试项目均包含3个步骤:
a.施加激励为正弦电压,测试仪在该阶段中检测晶闸管是否导通,判断整个晶闸管级电路及光路是否正常;
b.施加激励为对应本测试项目内容的正弦电压或冲击电压或正向电压和冲击电压的叠加,测试仪在该阶段中检测晶闸管电压及电流,判断本测试项目中晶闸管阀在电气方面是否满足要求;
c.施加激励为正弦电压,测试仪在该阶段中检测晶闸管是否导通,判断在步骤b中晶闸管阀向阀控单元发送的光信号是否正确。
Priority Applications (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710555210.0A CN109239564B (zh) | 2017-07-10 | 2017-07-10 | 一种基于软件逻辑功能配合的晶闸管测试系统 |
EP18832716.7A EP3588112A4 (en) | 2017-07-10 | 2018-06-20 | THYRISTOR VALVE TEST SYSTEM BASED ON THE COOPERATION OF LOGICAL SOFTWARE FUNCTIONS |
JP2019543908A JP6921213B2 (ja) | 2017-07-10 | 2018-06-20 | ソフトウェア論理機能の連携に基づくサイリスタバルブ試験システム |
BR112019020370-2A BR112019020370B1 (pt) | 2017-07-10 | 2018-06-20 | Sistema de teste de válvula de tiristor baseado na cooperação das funções lógicas de software |
CA3057554A CA3057554C (en) | 2017-07-10 | 2018-06-20 | Thyristor valve test system based on cooperation of logical functions of software |
KR1020197023654A KR102078519B1 (ko) | 2017-07-10 | 2018-06-20 | 소프트웨어의 논리적 기능 협력에 기반한 사이리스터 밸브 테스트 시스템 |
RU2019132054A RU2730388C1 (ru) | 2017-07-10 | 2018-06-20 | Система тестирования тиристорного вентиля на основе взаимодействия логических функций программного обеспечения |
PCT/CN2018/091974 WO2019011113A1 (zh) | 2017-07-10 | 2018-06-20 | 一种基于软件逻辑功能配合的晶闸管阀测试系统 |
US16/496,384 US11009542B2 (en) | 2017-07-10 | 2018-06-20 | Thyristor valve test system based on cooperation of logical functions of software |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710555210.0A CN109239564B (zh) | 2017-07-10 | 2017-07-10 | 一种基于软件逻辑功能配合的晶闸管测试系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109239564A true CN109239564A (zh) | 2019-01-18 |
CN109239564B CN109239564B (zh) | 2021-02-26 |
Family
ID=65001048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710555210.0A Active CN109239564B (zh) | 2017-07-10 | 2017-07-10 | 一种基于软件逻辑功能配合的晶闸管测试系统 |
Country Status (8)
Country | Link |
---|---|
US (1) | US11009542B2 (zh) |
EP (1) | EP3588112A4 (zh) |
JP (1) | JP6921213B2 (zh) |
KR (1) | KR102078519B1 (zh) |
CN (1) | CN109239564B (zh) |
CA (1) | CA3057554C (zh) |
RU (1) | RU2730388C1 (zh) |
WO (1) | WO2019011113A1 (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109669119A (zh) * | 2019-02-13 | 2019-04-23 | 云南电网有限责任公司电力科学研究院 | 一种阀基电子设备的检测系统及方法 |
CN110568294A (zh) * | 2019-09-29 | 2019-12-13 | 南京南瑞继保电气有限公司 | 一种电力电子设备测试系统及测试方法 |
CN112763878A (zh) * | 2020-11-25 | 2021-05-07 | 国网宁夏电力有限公司检修公司 | 基于无线信号传输的换流阀晶闸管导通测试方法及系统 |
CN113252951A (zh) * | 2021-06-24 | 2021-08-13 | 陕西开尔文测控技术有限公司 | 减小半导体测试夹具脉冲源延时的装置及方法 |
WO2023036132A1 (zh) * | 2021-09-07 | 2023-03-16 | 南京南瑞继保电气有限公司 | 晶闸管设备测试仪 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114993464B (zh) * | 2022-08-03 | 2023-09-15 | 中国南方电网有限责任公司超高压输电公司广州局 | 换流阀晶闸管控制单元的光功率检测系统 |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101588061A (zh) * | 2008-12-31 | 2009-11-25 | 中国电力科学研究院 | 一种故障电流限制器的晶闸管阀触发与监测系统 |
CN101964544A (zh) * | 2010-09-20 | 2011-02-02 | 中国电力科学研究院 | 一种hvdc换流阀晶闸管级运行状况监视方法 |
CN101982789A (zh) * | 2010-09-20 | 2011-03-02 | 中国电力科学研究院 | 一种新型直流换流阀晶闸管低电压触发试验方法 |
CN102035189A (zh) * | 2010-10-12 | 2011-04-27 | 中国电力科学研究院 | 一种新型换流阀模块试验晶闸管监测与保护系统 |
CN102156223A (zh) * | 2011-03-02 | 2011-08-17 | 中国电力科学研究院 | 一种新型直流换流阀晶闸管级阻抗测试装置 |
CN103926524A (zh) * | 2014-04-21 | 2014-07-16 | 许继电气股份有限公司 | 一种换流阀控制设备低电压控制模式的测试方法 |
CN104808070A (zh) * | 2015-04-23 | 2015-07-29 | 许继集团有限公司 | 一种换流阀晶闸管级阻尼回路参数测试装置和方法 |
CN204903667U (zh) * | 2015-06-11 | 2015-12-23 | 中国南方电网有限责任公司超高压输电公司贵阳局 | 一种极接地状态下换流阀及其附属设备状态检测装置 |
CN105471232A (zh) * | 2015-11-20 | 2016-04-06 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 换流阀电触发晶闸管与阀基电子设备信息交换的控制方法 |
CN105826913A (zh) * | 2016-04-29 | 2016-08-03 | 南方电网科学研究院有限责任公司 | 一种直流输电系统换流阀的控制方法及阀基电子设备 |
CN106324464A (zh) * | 2015-07-08 | 2017-01-11 | 南京南瑞继保电气有限公司 | 晶闸管阀合成试验电路及方法 |
KR20170013774A (ko) * | 2015-07-28 | 2017-02-07 | 엘에스산전 주식회사 | 사이리스터 밸브를 위한 합성 시험 회로 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0767228B2 (ja) * | 1988-04-27 | 1995-07-19 | 川崎製鉄株式会社 | サイリスタ素子の異常診断装置 |
JP2801631B2 (ja) | 1989-04-17 | 1998-09-21 | 株式会社東芝 | Vвоフリーサイリスタ変換装置 |
SE507139C2 (sv) * | 1992-08-31 | 1998-04-06 | Asea Brown Boveri | Sätt och anordning för funktionskontroll av ljustända halvledarventilenheter i HVDC-ventilanläggningar |
US6211792B1 (en) * | 1999-08-13 | 2001-04-03 | JADRIć IVAN | Method and apparatus detecting a failed thyristor |
RU2185632C2 (ru) * | 2000-03-06 | 2002-07-20 | Ростовский военный институт ракетных войск | Устройство бесконтактного определения технического состояния тиристоров источника питания |
US6791852B2 (en) * | 2001-12-28 | 2004-09-14 | General Electric Company | Method for detecting and identifying shorted thyristors |
JP3706070B2 (ja) | 2002-01-15 | 2005-10-12 | 株式会社シマノ | 靴 |
RU2310877C1 (ru) * | 2006-05-30 | 2007-11-20 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Способ диагностики трехфазного тиристорного выпрямителя |
CN201130234Y (zh) | 2007-12-21 | 2008-10-08 | 西安电力机械制造公司 | 直流输电晶闸管换流阀的电压监测板电路结构 |
CN101958638B (zh) * | 2010-09-20 | 2014-07-02 | 中国电力科学研究院 | 一种直流换流阀晶闸管电流断续保护实现方法 |
CN103219798B (zh) * | 2013-03-25 | 2015-03-25 | 国网智能电网研究院 | 一种直流输电换流阀控制保护系统及其控制保护方法 |
KR101748724B1 (ko) | 2013-08-06 | 2017-06-27 | 엘에스산전 주식회사 | 밸브 베이스 일렉트로닉스 장치의 시험 장치 |
CN103713250B (zh) | 2013-12-27 | 2016-04-20 | 国家电网公司 | 一种晶闸管阀运行试验的工作模式自适应设置方法 |
DE102014105719B4 (de) * | 2014-04-23 | 2015-11-26 | Ge Energy Power Conversion Gmbh | Schaltungsvorrichtung mit einer Thyristorschaltung sowie ein Verfahren zum Prüfen der Thyristorschaltung |
CN104038034B (zh) | 2014-06-20 | 2017-01-04 | 中国西电电气股份有限公司 | 一种特高压直流输电用晶闸管换流阀控制监测方法 |
CN105070697B (zh) * | 2015-07-28 | 2017-02-22 | 南京南瑞继保电气有限公司 | 用于直流换流阀的晶闸管组件散热器 |
CN105703481B (zh) * | 2016-03-03 | 2018-03-30 | 南京南瑞继保电气有限公司 | 一种换流阀均压状态一致性统计方法 |
-
2017
- 2017-07-10 CN CN201710555210.0A patent/CN109239564B/zh active Active
-
2018
- 2018-06-20 CA CA3057554A patent/CA3057554C/en active Active
- 2018-06-20 KR KR1020197023654A patent/KR102078519B1/ko active IP Right Grant
- 2018-06-20 WO PCT/CN2018/091974 patent/WO2019011113A1/zh unknown
- 2018-06-20 RU RU2019132054A patent/RU2730388C1/ru active
- 2018-06-20 JP JP2019543908A patent/JP6921213B2/ja active Active
- 2018-06-20 EP EP18832716.7A patent/EP3588112A4/en active Pending
- 2018-06-20 US US16/496,384 patent/US11009542B2/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101588061A (zh) * | 2008-12-31 | 2009-11-25 | 中国电力科学研究院 | 一种故障电流限制器的晶闸管阀触发与监测系统 |
CN101964544A (zh) * | 2010-09-20 | 2011-02-02 | 中国电力科学研究院 | 一种hvdc换流阀晶闸管级运行状况监视方法 |
CN101982789A (zh) * | 2010-09-20 | 2011-03-02 | 中国电力科学研究院 | 一种新型直流换流阀晶闸管低电压触发试验方法 |
CN102035189A (zh) * | 2010-10-12 | 2011-04-27 | 中国电力科学研究院 | 一种新型换流阀模块试验晶闸管监测与保护系统 |
CN102156223A (zh) * | 2011-03-02 | 2011-08-17 | 中国电力科学研究院 | 一种新型直流换流阀晶闸管级阻抗测试装置 |
CN103926524A (zh) * | 2014-04-21 | 2014-07-16 | 许继电气股份有限公司 | 一种换流阀控制设备低电压控制模式的测试方法 |
CN104808070A (zh) * | 2015-04-23 | 2015-07-29 | 许继集团有限公司 | 一种换流阀晶闸管级阻尼回路参数测试装置和方法 |
CN204903667U (zh) * | 2015-06-11 | 2015-12-23 | 中国南方电网有限责任公司超高压输电公司贵阳局 | 一种极接地状态下换流阀及其附属设备状态检测装置 |
CN106324464A (zh) * | 2015-07-08 | 2017-01-11 | 南京南瑞继保电气有限公司 | 晶闸管阀合成试验电路及方法 |
KR20170013774A (ko) * | 2015-07-28 | 2017-02-07 | 엘에스산전 주식회사 | 사이리스터 밸브를 위한 합성 시험 회로 |
CN105471232A (zh) * | 2015-11-20 | 2016-04-06 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 换流阀电触发晶闸管与阀基电子设备信息交换的控制方法 |
CN105826913A (zh) * | 2016-04-29 | 2016-08-03 | 南方电网科学研究院有限责任公司 | 一种直流输电系统换流阀的控制方法及阀基电子设备 |
Non-Patent Citations (2)
Title |
---|
张建峰等: "HVDC 直接光控换流阀中激光发射电路监测中几个问题的探讨", 《高压电器》 * |
董云龙: "HVDC换流阀合成试验控制及保护系统设计与开发", 《电力系统自动化》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109669119A (zh) * | 2019-02-13 | 2019-04-23 | 云南电网有限责任公司电力科学研究院 | 一种阀基电子设备的检测系统及方法 |
CN110568294A (zh) * | 2019-09-29 | 2019-12-13 | 南京南瑞继保电气有限公司 | 一种电力电子设备测试系统及测试方法 |
CN112763878A (zh) * | 2020-11-25 | 2021-05-07 | 国网宁夏电力有限公司检修公司 | 基于无线信号传输的换流阀晶闸管导通测试方法及系统 |
CN113252951A (zh) * | 2021-06-24 | 2021-08-13 | 陕西开尔文测控技术有限公司 | 减小半导体测试夹具脉冲源延时的装置及方法 |
CN113252951B (zh) * | 2021-06-24 | 2021-10-22 | 陕西开尔文测控技术有限公司 | 减小半导体测试夹具脉冲源延时的装置及方法 |
WO2023036132A1 (zh) * | 2021-09-07 | 2023-03-16 | 南京南瑞继保电气有限公司 | 晶闸管设备测试仪 |
Also Published As
Publication number | Publication date |
---|---|
CA3057554A1 (en) | 2019-01-17 |
KR20190099086A (ko) | 2019-08-23 |
BR112019020370A2 (pt) | 2020-04-28 |
EP3588112A4 (en) | 2020-04-29 |
JP6921213B2 (ja) | 2021-08-18 |
CA3057554C (en) | 2020-07-07 |
JP2020516860A (ja) | 2020-06-11 |
WO2019011113A1 (zh) | 2019-01-17 |
US20200011923A1 (en) | 2020-01-09 |
EP3588112A1 (en) | 2020-01-01 |
US11009542B2 (en) | 2021-05-18 |
KR102078519B1 (ko) | 2020-02-17 |
CN109239564B (zh) | 2021-02-26 |
RU2730388C1 (ru) | 2020-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109239564A (zh) | 一种基于软件逻辑功能配合的晶闸管测试系统 | |
CN105009395B (zh) | 用于测试供能网络的多个空间分布式保护设备的方法以及相应的测试系统 | |
CN105807174B (zh) | 输配电系统保护中的电流互感器断线检测方法 | |
RU2505824C2 (ru) | Направленное детектирование замыкания на землю | |
US20080183406A1 (en) | Online IED Fault Diagnosis Device and Method for Substation Automation System Based on IEC61850 | |
CN103149484B (zh) | 一种换流器触发控制装置功能的检测方法 | |
CN104483567B (zh) | 500kV线路继电保护装置检测方法和系统 | |
CN104124675B (zh) | 过电压保护装置和用于多级过电压保护装置的诊断方法 | |
CN105445585B (zh) | 电网一次回路的故障诊断方法和系统 | |
CN103346497B (zh) | 智能变电站电气虚回路隔离方法与系统 | |
CN109782108A (zh) | 一种小电流接地系统单相接地故障定位方法和装置 | |
CN105823947A (zh) | 一种高压直流保护系统现场校验方法及装置 | |
CN105162097A (zh) | 一种配电网故障处理过程的培训仿真方法及仿真系统 | |
CN109239587A (zh) | 一种基于透明转发的晶闸管阀测试系统 | |
CN101697400B (zh) | 利用五防闭锁系统防止交叉作业发生事故的方法 | |
CN203745537U (zh) | 高精度变压器铁芯接地电流测试设备 | |
CN103344854A (zh) | 一种逻辑功能装置的自动测试系统及方法 | |
CN102944762A (zh) | 发电机组投运前同期点两侧回路相序调试方法 | |
CN105182156B (zh) | 基于波形可视化同期回路极性检测装置及检测方法 | |
CN104111434A (zh) | 一种物理仿真模型的故障指示器检测方法 | |
CN104916336A (zh) | 一种反应堆保护命令逻辑处理模件测试装置 | |
CN107765118A (zh) | 一种光控换流阀反向恢复期保护单元的测试装置与方法 | |
CN104594730B (zh) | 一种电子签封的锁舌驱动方法及装置 | |
KR101396501B1 (ko) | 원자력발전소의 연계논리계통 루프신호 자동 시험장치 | |
CN203084141U (zh) | 变压器套管ct、中性点ct极性试验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |