CN109236293A - A kind of large-mining-height working surface squeeze blasting construction method - Google Patents

A kind of large-mining-height working surface squeeze blasting construction method Download PDF

Info

Publication number
CN109236293A
CN109236293A CN201811138510.XA CN201811138510A CN109236293A CN 109236293 A CN109236293 A CN 109236293A CN 201811138510 A CN201811138510 A CN 201811138510A CN 109236293 A CN109236293 A CN 109236293A
Authority
CN
China
Prior art keywords
class
circle
height
mining
presbyopia
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811138510.XA
Other languages
Chinese (zh)
Inventor
常贵
王康胜
罗胜兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201811138510.XA priority Critical patent/CN109236293A/en
Publication of CN109236293A publication Critical patent/CN109236293A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/14Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by compressed air; by gas blast; by gasifying liquids

Abstract

The present invention provides a kind of large-mining-height working surface squeeze blasting construction method, using the parallel perforating operation of multi-section side machine, a circle class onepull or circle two separate explosion of class;Borehole arrangement specifically: arrange five presbyopia when coal wall bottom cash thickness is more than working face mining height 2/3;When thickness arranges three presbyopia in 1/3~2/3 range of working face mining height;When spoil thickness is less than working face mining height 1/3, single eye is arranged;When a circle class onepull: when hole depth is 2.3m, eye distance 0.7m, explosive payload is volume 3;When circle two separate explosion of class: when hole depth is 1.8m, eye distance 1.0m, explosive payload is volume 2.Advantage are as follows: increase the selectivity according to a circle class onepull or circle two separate explosion of class; improve bottom cash crushing effect after explosion; a possibility that reducing secondary blasting; reduce the time consumed by blast working; guarantee is provided for the normal back production of working face, similar problems is encountered for subsequent coal exploiting field and provides Technical Reference.

Description

A kind of large-mining-height working surface squeeze blasting construction method
Technical field
The present invention relates to blasting technique field under mine, a kind of specifically large-mining-height working surface squeeze blast working Method.
Background technique
Squeeze area is encountered during working face extraction under mine, bottom plate is mostly packsand, and the regional effect back production is long Degree and width, bottom cash thickness is thicker, and because bottom cash is sandstone, lithology is harder, and coal machine cutting is difficult, need to carry out perforating and loosen dynamic big gun. And in the prior art, lack the effective measures that dynamic big gun is loosened in perforating in response to this.
Summary of the invention
The technical problem to be solved by the present invention is to how improve bottom cash crushing effect after explosion, reduce secondary blasting Possibility.
The present invention solves above-mentioned technical problem by the following technical programs:
A kind of large-mining-height working surface squeeze blasting construction method, comprising the following steps:
Using the parallel perforating operation of multi-section side machine, a circle class onepull or circle two separate explosion of class;
Borehole arrangement specifically: arrange five presbyopia when coal wall bottom cash thickness is more than working face mining height 2/3;When thickness is in work Make to arrange three presbyopia in 1/3~2/3 range of face mining height;When spoil thickness is less than working face mining height 1/3, single eye is arranged;
When a circle class onepull: when hole depth is 2.3m, eye distance 0.7m, explosive payload is volume 3;When a circle class is quick-fried twice When broken: when hole depth is 1.8m, eye distance 1.0m, explosive payload is volume 2.
Preferably, bottom row's eye distance is not more than 0.5m from bottom plate, and sealed borehole length must not be lower than 0.6m, borehole angle: top eye water 90 ° of straight angle degree, 5~10 ° of vertical angle;90 ° of bottom eye level angle, 10~15 ° of vertical angle.
When preferably, using five presbyopia or three presbyopia, arranging eye distance up and down is 0.5m.
The present invention has the advantages that
The selectivity according to a circle class onepull or circle two separate explosion of class is increased, bottom cash is broken after improving explosion Effect, reduces the time consumed by blast working, provides for the normal back production of working face a possibility that reducing secondary blasting It ensures, encounters similar problems for subsequent coal exploiting field and provide Technical Reference.
Detailed description of the invention
Fig. 1 is that 1 thickness of spoil layer is less than work in a kind of large-mining-height working surface squeeze blasting construction method of the present embodiment Make the cloth ocular structure schematic diagram when mining height 1/3 of face;
Fig. 2 is that 1 thickness of spoil layer is more than work in a kind of large-mining-height working surface squeeze blasting construction method of the present embodiment Make to arrange cloth ocular structure schematic diagram when five presbyopia when the mining height 2/3 of face;.
Fig. 3 is the structural schematic diagram that hole depth and angle, explosive are placed in the present embodiment.
Specific embodiment
The effect of to make to structure feature of the invention and being reached, has a better understanding and awareness, to preferable Examples and drawings cooperation detailed description, is described as follows:
As shown in Figure 1 and Figure 2, a kind of large-mining-height working surface squeeze blasting construction method, comprising the following steps:
Using the parallel perforating operation of multi-section side machine, a circle class onepull or circle two separate explosion of class;
Borehole arrangement specifically: arrange five presbyopia when spoil layer 1 thickness in coal wall bottom is more than working face mining height 2/3;Work as cash 1 thickness of rock layers arranges three presbyopia in 1/3~2/3 range of working face mining height;When 1 thickness of spoil layer is less than working face mining height 1/3 When, arrange single eye;
As shown in figure 3, when a circle class onepull: when hole depth is 2.3m, eye distance 0.7m, 4 explosive payload of explosive is 3 Volume;When circle two separate explosion of class: when 5 depth of hole is 1.8m, eye distance 1.0m, explosive payload is volume 2.
Bottom arranges eye distance and is not more than 0.5m from bottom plate 2, and 3 length of sealing section must not be lower than 0.6m, borehole angle: top eye horizontal angle 90 °, 5~10 ° of vertical angle of degree;90 ° of bottom eye level angle, 10~15 ° of vertical angle.
When using five presbyopia or three presbyopia, arranging eye distance up and down is 0.5m.Original substantially of the invention has been shown and described above Reason, main feature and advantages of the present invention.
It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, above-described embodiment and explanation It is the principle of the present invention described in book, the present invention also has various changes without departing from the spirit and scope of the present invention Change and improve, these changes and improvements are both fallen in the range of claimed invention.The present invention claims protection scope by Appended claims and its equivalent define.

Claims (3)

1. a kind of large-mining-height working surface squeeze blasting construction method, it is characterised in that: the following steps are included:
Using the parallel perforating operation of multi-section side machine, a circle class onepull or circle two separate explosion of class;
Borehole arrangement specifically: arrange five presbyopia when coal wall bottom cash thickness is more than working face mining height 2/3;When thickness is in working face Three presbyopia are arranged in 1/3~2/3 range of mining height;When spoil thickness is less than working face mining height 1/3, single eye is arranged;
When a circle class onepull: when hole depth is 2.3m, eye distance 0.7m, explosive payload is volume 3;When circle two separate explosion of class When: when hole depth is 1.8m, eye distance 1.0m, explosive payload is volume 2.
2. a kind of large-mining-height working surface squeeze blasting construction method according to claim 1, it is characterised in that: bottom row Eye distance is not more than 0.5m from bottom plate, and sealed borehole length must not be lower than 0.6m, borehole angle: 90 ° of eye level angle of top, vertical angle 5 ~10 °;90 ° of bottom eye level angle, 10~15 ° of vertical angle.
3. a kind of large-mining-height working surface squeeze blasting construction method according to claim 1, it is characterised in that: use When five presbyopia or three presbyopia, arranging eye distance up and down is 0.5m.
CN201811138510.XA 2018-09-28 2018-09-28 A kind of large-mining-height working surface squeeze blasting construction method Pending CN109236293A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811138510.XA CN109236293A (en) 2018-09-28 2018-09-28 A kind of large-mining-height working surface squeeze blasting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811138510.XA CN109236293A (en) 2018-09-28 2018-09-28 A kind of large-mining-height working surface squeeze blasting construction method

Publications (1)

Publication Number Publication Date
CN109236293A true CN109236293A (en) 2019-01-18

Family

ID=65057611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811138510.XA Pending CN109236293A (en) 2018-09-28 2018-09-28 A kind of large-mining-height working surface squeeze blasting construction method

Country Status (1)

Country Link
CN (1) CN109236293A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682040A (en) * 2020-12-29 2021-04-20 四川川煤石洞沟煤业有限责任公司 Mining method for large-dip-angle coal seam flexible shield support falling frame arrangement zero coal pillar

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1680990A1 (en) * 1989-04-18 1991-09-30 Филиал Новочеркасского политехнического института им.С.Орджоникидзе в г.Шахты Method for working very thin gently sloping coal seams
SU1788254A1 (en) * 1988-04-04 1993-01-15 Uk Ni Pk I Podzemnoj Gidravlic Method for unattended mining of thin steep outburst-prone and running-out coal seams
CN106939795A (en) * 2017-05-02 2017-07-11 中国神华能源股份有限公司 Thin bedrock high-seam working face large section cuts the method for protecting support of eye
CN107120137A (en) * 2017-07-12 2017-09-01 安徽理工大学 A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN107387085A (en) * 2017-09-26 2017-11-24 河南理工大学 A kind of tight roof and the porous controlled blasting softening method in coal seam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1788254A1 (en) * 1988-04-04 1993-01-15 Uk Ni Pk I Podzemnoj Gidravlic Method for unattended mining of thin steep outburst-prone and running-out coal seams
SU1680990A1 (en) * 1989-04-18 1991-09-30 Филиал Новочеркасского политехнического института им.С.Орджоникидзе в г.Шахты Method for working very thin gently sloping coal seams
CN106939795A (en) * 2017-05-02 2017-07-11 中国神华能源股份有限公司 Thin bedrock high-seam working face large section cuts the method for protecting support of eye
CN107120137A (en) * 2017-07-12 2017-09-01 安徽理工大学 A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN107387085A (en) * 2017-09-26 2017-11-24 河南理工大学 A kind of tight roof and the porous controlled blasting softening method in coal seam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
裴春利: "大采高工作面过薄煤区安全回采技术", 《山东煤炭科技》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682040A (en) * 2020-12-29 2021-04-20 四川川煤石洞沟煤业有限责任公司 Mining method for large-dip-angle coal seam flexible shield support falling frame arrangement zero coal pillar

Similar Documents

Publication Publication Date Title
CN103216236B (en) Method for reducing subsidence of stope overburden bed separation by grouting
CN103278055B (en) Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting
CN105569659B (en) A kind of tunnel hydraulic slotted liner technique directional blasting cuts top pressure relief method
CN110952982B (en) Medium-length hole presplitting blasting mining method for steeply inclined thin-vein to extremely thin-vein ore body
CN105626071B (en) Mining method for gently inclined thin ore body
CN110173264A (en) Lane bump method is stayed with conventional release prevention and treatment tight roof in disconnected top
CN103016047B (en) Method of draining gas in gob through long drill hole in roof trend on fully mechanized caving face
CN109763822A (en) Face in steep thick coal seam Multi sectional is without coal column placement method between coal column staggered floor Hu Xiang and section
CN102678120A (en) Method for releasing pressure and removing danger of rock burst
CN104329113B (en) A kind of method of surface drilling standing seat earth release mash gas extraction
CN106014407B (en) Utilize the roof fracture water method that reduction master control coal rock layer controls disaster in situ
CN103670412B (en) A kind of Mined-out Area control of high-dipping ore block exploitation and Depressurized mining method
CN105134286B (en) L-type well goaf gas pumping method
CN105673063B (en) A kind of high inclination-angle thick gassy coal seam impacts diaster prevention and control method
CN102589372B (en) Chamber and deep hole blasting method of gob
CN102587960A (en) Arrangement method of high gas coal seam extraction working face roadway
CN104763466B (en) Method for detecting active diffusion radius of covered rock separation grouting filling slurry
CA2986062A1 (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN104074538A (en) Primary extraction working face high-level suction tunnel gas extraction method
CN106761750B (en) Slot type recovery method is built in the longwell plane milling of half-edge coal seam longitudinal direction
CN110173238A (en) The anti-reflection extraction of high seam three-dimensional roadway layout networking explosion thick gas method entirely
CN110067592A (en) Top plate gas cooperative control method based on tight roof ground fracturing
CN107939402B (en) A kind of mining methods of the medium above firm inclined thick ore body of back production ore-rock
CN106149677B (en) High-pressure water-enriched goaf grouting reinforcement means
CN109162713A (en) A kind of double resource pit mining modes of coal water not changing overlying strata hydrogeologic condition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190118